Loading...
HomeMy WebLinkAboutNCG030650_MONITORING INFO_20190621N 71-D STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v DOC TYPE ❑HISTORICAL FILE VFl MONITORING REPORTS DOC DATE ❑ � � � � � � a YYYYMMDD COMMSCOPE° June 20, 2019 James Moore NCDEQ 6-10 East Center Avenue, Suite 301 Mooresville, NC 281'15 704-663-1699 g 'o C� Subject: CommScope, tnc.- Claremont Facility Certificate of Coverage No, NCG030650 May 2019 Storm water DMR Dear Mr. Moore: 3642 US Hwy 70 East Claremont, NC 28610 Please find enclosed two (2) copies of the June 20-19 Stormwater DMR for the CommScope, Inc - Claremont facility. Please feel free to contact me at 828-24"1-6037 with any questions. Sincerely, X2I CWA Laura R. Moody Senior Environmental Engineer Office phone: 828-241-6037 Cell phone: 828468-7238 laura.moody@com mscope.com cc: NCDEQ Central Files COMMSCOPE 6 Attachment A June 2019 Stormwater DMR Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 6/20/19 CERTIFICATE OF COVERAGE NO. NCG030650 SAMPLE COLLECTION YEAR 2019 FACILITY NAME .___CommScope, Inc.- Claremont SAMPLE PERIOD ❑ Jan -June [:1 July -Dec COUNTY Catawba or ® Monthly' June (month) PERSON COLLECTING SAMPLES _ N/A DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY_ Statesville Analytical Lab Cert. # 440 ❑Zero -flow ®Water Supply ❑SA Comments on sample collection or analysis: r_ []Other N/A PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results ' G ❑ No discharge this period72 Outfall No. Date Sample p Collected' (mo/dd/yr) 24-hour rainfall mount, Total Sus p ed end Solids p H , Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic 5 Organics Benchmarks _ - 100 mg/L4 6.0 -- 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 003 6/7/19 3.00 3.13 7.80 0.030 <0.0025 0.014 14.7 N/A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/l/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the Tf0 monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Brad Edwards Name (Print name) Site Director Title (Print title) Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mg&', where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected) (mo/dd/yc) 24-hour,rainfall amount, Inches3 New_Motor.Oil or.. Hydraulic H 8a Y d.rauic Oil Usage Non -polar O&G/TPH by EPA 1664�SGT-HEM � Total Suspended. Solids .Benchmarks - - - 15 mg/L 100 mg/L'or.50 mg/L* Parameter Code - 46529 NCOIL :NCOIL 00552 N/A Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case o "No Discharge"' reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penglties for submitting false information, including the possibility of fines and imprisonment for knowing violations." nature o"errhittee Date Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 6 20 19 CERTIFICATE OF COVERAGE NO. NCG030650 FACILITY NAME CommScope, Inc.- Claremont COUNTY Catawba PERSON COLLECTING SAMPLES NIA _ LABORATORY Statesville Analytical Lab Cert. # 440 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results c� t y SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' June (month) DISCHARGING TO CLASS ❑ORW ❑HCt:W ❑Trout ❑PNA ❑Zero -flow ®Water Supply ❑SA ❑Other PLEASE ASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 b ❑ No discharge this period?2 Outfall No. Date Sample Collected' [mo/dd/yr] 24-hour rainfall amount, Inches3 Total Suspended Solids o z Z}' pHj•. Standard units w i-� r Total Copper= - Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics' Benchmarks _ - 100 mg/0 6.0 — 9.0 0.010 mg%L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 003 6/7/19 3.00 3.13 7.80 0.030 <0.0025 0.014 14.7 N/A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Brad Edwards Name (Print name) Site Director Title (Print title) p Signature) (Date) Note: Results must be reported in numerical. format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 5S gal of new oil per month. ❑ No discharge this period?z ..Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic O.il.Usage Non -polar O&G/TPH by EPA'' 1664 (SGT.-HEM) Total Suspended Solids Benchmarks . _" - - 15,mg/L '100 mg/L'or 56. mg/L* Parameter Code - 46529 NCOIL NCOIL 00552 N/A Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case o "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant p��lties for submitting false information, including the possibility of fines and imprisonment for knowing violations. XTZ�t�/�( fl /j nature Q"evbittee Permit Date: 11/1/2018-5/31/2021 Date SWU-24S, last revised 11/1/2018 Page 3 of 3 April 30, 2019 COMMSCOPE 0 3642 Highway 70 East Claremont, NC 28610 Tel: 828-459-5000 www.commscope.com James Moore NCDEQ+�4 610 Fast Center Avenue, Suite 301 qy Mooresville, NC 28115 `® �r c b � J e 704-663-1699 q 9 NI` 3 ' Subject: ComnrScope, Inc.- Claremont Facility rP.4rp�Poe, Certificate of Coverage No. IqCG030650� �ydlD March 2019 Stormwater DMR fe0 April 2019 Stormwater DMR To Whom it May Concern: Please find enclosed two (2) copies of the March 2019 and April 2019 Stormwater DMR for the ConurrScope, Inc- Claremont facility. The storm water permit states that a storm event is one that results in an actual discharge from the permitted site outfall and the previous measurable storm event must have been at least 72 hours prior. Stormwater sampling was not completed during the month of March due to the high volume of rain during the month. As such, the facility did not experience a period of 72 hours of dry weather during daylight hours. We were able to perform stormwater sampling on April 5, 2019 and have included the sampling results on the April 2019 DMR. Please feel free to contact me at 828-241-6037 with any questions. Sincerely, &r xc Laura R. Moody Senior Environmental Engineer Office phone: 828-241-6037 Cell phone: 828-468-7238 laura.moody a comniscope.c:on) cc: NCDEQ, Central Files Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 4/29/19 CERTIFICATE OF COVERAGE NO. NCG030650 SAMPLE COLLECTION YEAR 2019 FACILITY NAME _ CommScope. Inc.- Claremont o SAMPLE PERIOD ❑Jan -June ❑July -Dec COUNTY Catawba c _.7:0 or ® Monthly' March _(month) PERSON COLLECTING SAMPLES NIA : = DISCHARGING TO CLASS ❑ORW ❑HQW [:]Trout❑PNA LABORATORY N/A Lab Cert. # _N/A_ ` z ❑Zero -flow ®Water Supply ❑SA Comments on sample collection or analysis:, 4: ❑Other Did not have period of "no measurable storm events" 72 hours prior � n I— o o w PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results CQ ® No discharge this period?2 Outfall No. _ Date Sample ' - I . Collected (mo/dd/yr) 24-hour rainfall amount, inches' Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons - Total Toxic Organics Benchmarks - - 100'mg/L4 6.0 — 9:0 0.010 mg/I: 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code _ 46529 C0530 00400 01119 01051 01094 00552 78141 003 March 2019 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 5WU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the 5tormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Brad Edwards Name (Print name) Site Director Title (Print " le) ZG � (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Nan -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?2 Outfall No., Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount Inches3 New Motor.Oil or Hydraulic Oil Usage Non -polar O&G/TPH by, EPA- 1664 SGT-HEM ) Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L* Parameter Code _ 46529 NCOIL NCOIL 00552 N/A Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART li SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ature of PeKnittee Date Permit Date:11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring; Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 4/29/19 CERTIFICATE OF COVERAGE NO. NCG030650 SAMPLE COLLECTION YEAR 2019 FACILITY NAME Commscope, Inc.- Claremont SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Catawba 9.1 or ® Monthly'_ March _ (month) PERSON COLLECTING SAMPLES N A o r DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY N/A Lab Cert. # N/A `D �. o ❑Zero -flow ®Water Supply ❑SA Comments on sample collection or analysis: �;` a n ❑Other Did not have period of "no measurable storm events" 72 hours priorro a ' o� u� � ry PLEASE REMEMBER TO SIGN ON PAGES 2 AND OR 3 4 d. ® / Part A: Stormwater Benchmarks and Monitoring Results d3 t7 � ® No discharge this period?2 Outfall No,- _ Date`Sam le P Collected'. (mo/dd/yr) 24-hour rainfall amount, Inches 3 m Total Sus ended p Solids PH' , Standard units Total Copper Total Lead Total Zinc. Non -Polar OW Total Petroleum Hydrocarbons Total Toxs Organics . Benchmarks - = 100'mg/L4 6.0 — 9.0 0.010 mg/L 0.075 mg/L- 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 N 78141 003 March 2019 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Brad Edwards Name (Print name) Site Director Title (Print le) zc � (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/C where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part 6: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?z Outfall No. Date Sample Collected 1 (mo/dd/yr) 24-hour rainfall amount, Inches 3 New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks . % - - - 15 mg/L 100 mg/L or 50 mg/L' Parameter Code, _ -46529 NCOIL NCOIL ; 00552 N/A Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit date: 11/1/2018-5/31/2021 5WU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results or at end of monitoring period in the cased "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." gnature of Pe y/6 //'-� Date Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 4/29/19 CERTIFICATE OF COVERAGE NO. NCG030650 SAMPLE COLLECTION YEAR 2019 FACILITY NAME Comm5co e Inc.- Claremont SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Catawba or ® Monthly' April (month) PERSON COLLECTING SAMPLES N/A DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Statesville Analytical Lab Cert. t# 440 ❑Zero -flow ®Water Supply [:]SA Comments on sample collection or analysis:. []Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results n o ❑ No discharge this period?z Outfalli No. - Date Sample Collected' ' (mo/dd/yr) 24-hour rainfall amount, inches3 Total Suspended Solids cu pH, Standard units Total Copper _ Total Lead '. Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics 5 .Benchmarks ;. ; _ - - 1.00 mg/O 6.0 - 9.0 0.010 mg/L,. 0.075 mg/L " 0.126 mg/L 15 mg/L 1`mg/L Parameter Cade - 46529. C0530 00400 01119 01051 01094 00552 78141. 003 04/05/19 0.68 11.12 7.52 0.049 <0.0025 0.059 38.3 N/A ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Brad Edwards Name (Print name) Site Director Title (Print ' le) t /ZL / Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the -format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected" -(mo/dd/yr) 24-hour rainfall amount, ..Inches' New Motor Oil or Hydraulic Oil Usage ' Non-polar.O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks' - - - - 15 mg/L 100 mg/L or 50-mg/L* Parameter Code - 46529 NCOIL •NCOIL 00552 N/A Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION 8. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEIVILR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ture of Pe 1?b Date Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 4/29/19 CERTIFICATE OF COVERAGE NO. NCG030650 SAMPLE COLLECTION YEAR 2019 FACILITY NAME CommScope, Inc.- Claremont SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Catawba or ® Monthly' April (month) PERSON COLLECTING SAMPLES N/A _ ; DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Statesville Analytical _ Lab Cert. # 440 a r" ❑Zero -flow ®Water Supply ❑SA Comments on sample collection or analysis: rn ❑Other N/A ti n =a ° PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results _o co N °f- q ❑ No discharge this period?' ter, Outfall,.No: Date Sample Collected' `(mo/00/yr) 24-hours. rainfall amount, Inches Total SuspendedO Solids i pH, Standard units Total Copper Total lead Total Zinc' Non -Polar O&G/. Total Petroleum Hydrocarbons Total Toxic Organics$ `Benchmarks _ - 100 mg/0 6.0 — 9.0. 0.010 mg/L 0.075'mg/L. OA26 mg/L 15 mg/L .1 mg/L Parameter Code - 46529. C0530 00400 01119 01051 01094 00552 78141 003 04/05/19 0.68 11.12 7.52 0.049 <0.0025 0.059 38.3 N/A 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 5WU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Brad Edwards Name (Print name) Site Director Title (Print ' le) Tt Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B. Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period ?2 Outfall.No. Date Sample Collected i (mo/dd/yr) 24-hour rainfall amount, mount Inches3 New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 (5GT-HEM) Total Suspended Solids Benchmarks _ - - 15 mg/L 100 mg/L or 50 mg/L* " Parameter Code _ 46529 NCOIL NCOIL 00552 - N/A Footnotes from Part A also apply to this Part B Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3. HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy ofthis DMR, including all "No Discharge" reports, within 30 days ofreceipt of the la_6 results (or at end of monitoring period in the case of "No Discharge" reports_) to: Division of Water Quality T Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations_" re of C��L_ - 11�7 - Date Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 April 30, 2019 James Moore NCDEQ 610 East Center Avenue, Suite 301 Mooresville, NC 28115 704-663-1699 o0. .r.�4�'�'� f p9 Subject: CommScope, Inc. -Catawba Facility Certificate of Coverage No. NCGO3007, • o; O March 2019 Stormwater DMR a April 2019 Stormwater DMR CIO To Whom It May Concern: COMMSCOPE a 6519 CommScope Road Catawba, NC 28609 Tel: 828-241-6000 www.commscope.com Please find enclosed two (2) copies of the March 2019 and April 2019 Stormwater DMR for the CommScope, Inc- Catawba facility. The stormwater permit states that a storm event is one that results in an actual discharge from the permitted site outfall and the previous measurable storm event must have been at least 72 hours prior. Stormwater sampling was not completed during the month of March due to the high volume of rain during the month. As such, the facility did not experience a period of 72 hours of dry weather during daylight hours. We were able to perform stormwater sampling on April 5, 2019 and have included the sampling results on the April 2019 DMR. Please feel free to contact me at 828-241-6037 with any questions. Sincerrelly,,^, Laura R. Moody rnC4'n ��Y Senior Environmental Engineer Office phone: 828-241-6037 Cell phone: 828-468-7238 1aura.moody@comrnscope.com cc: NCDEQ, Central Piles Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 4/29/19 CERTIFICATE OF COVERAGE NO. NCG030078 SAMPLE COLLECTION YEAR 2019 FACILITY NAME CommSco e Inc.- Catawba SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Catawba a or ® Monthly' March month PERSON COLLECTING SAMPLES N/A DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA LABORATORYN/A Lab Cert. i# _ N/A ` :c_ -z ❑Zero -flow ®Water Supply [:]SA Comments on sample collection or analysis: ;, n ❑Other Did not have period of "no measurable storm events" 72 hours prior C. f' v< C1 :LJ > PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results 41 00 � ® No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, lnches3 Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks _ - 100 mg/L° 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code _ 46529 C0530 00400 01119 01051 01094 00552 78141 003 March 2019 004 March 2019 005 March 2019 006 March 2019 008 March 2019 009 March 2019 012 March 2019 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date-.11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Dayne Willis Name (Print name) - Site Director Title (VtJ4, T (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX miz/L",, where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L* Parameter Code _ 46529 NCOIL NCOIL 00552 006 March 2019 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DFMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: T Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons d4 ectly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware t at he=es for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Permit Date:11/1/2018-5/31/2021 Date SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 4/29/19 CERTIFICATE OF COVERAGE NO. NCG030078 FACILITY NAME CommScooe. Inc.- Catawba COUNTY Catawba PERSON COLLECTING SAMPLES N/A LABORATORY N/A Lab Cert. # N/A Comments on sample collection or analysis: Did not have period of "no measurable storm events" 72 hours prior Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' March (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ®Water Supply ❑SA ❑Other 3r PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 2y, ®Na discharge this period?z Outfall No. Date Sample Collected) (mo/dd/yr) 24-hour rainfall amount, inches' Total Suspended Solids CD J M %�r M ►-� o, v� L; pH, _o'er Startdard ur4is =:t = Y Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks - 100 mg/L° 6.0 — 9.o 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code _ 46529 C0530 00400 01119 01051 01094 00552 78141 003 March 2019 004 March 2019 005 March 2019 006 March 2019 008 March 2019 009 March 2019 012 March 2019 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469,22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Davne Willis Name (Print name) Site Director Title( ri t titl (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?z Outfall No. DaSample Date ate tedl Col(mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks _ - - 15 mg/1_ 100 mg/L or 50 mg/L* Parameter Code - 46529 NCOIL NCOIL 00552 006 March 2019 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an on final and one copy of this DMR including all "No Discharge" reports, within 30 days Of receipt of the lab results or at end of monitoring eriod in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons ' ectly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware t at here ar significan penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Permit Date: 11/1/2018-5/31/2021 Date SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and band Resources General Permit No. NCG030000 Date submitted 4/29/19 CERTIFICATE OF COVERAGE NO. NCG030078 FACILITY NAME CommScope, Inc.- Catawba COUNTY Catawba PERSON COLLECTING SAMPLES N/A LABORATORY Statesville Analytical Lab Cert. # 440 a '� Comments on sample collection or analysis:, None " r oa Part A: Stormwater Benchmarks and Monitoring Results v I SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' April (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout .❑PNA ❑Zero -flow ®Water Supply ❑SA ❑Other n PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 �.. N o ❑ No discharge this period?' Outfall No. e Date Sample Collected [mo/dd/yr] 24-hour rainfall amount � lnches3 u Total Suspended Solids r Standardand units 9 Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons. Total Toxic Organics s Benchmarks _ - 100 mg/O 6.0 - 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 003 04/05/19 0.68 9.18 6.67 0.019 <0.0025 0.14 17.6 N/A 004 04/05/19 0.68 26 6.88 0.011 <0.0025 0.13 <5.0 N/A 005 04/05/19 0.68 79.75 7.22 0.015 <0.0025 0.23 10.2 N/A 006 04/05/19 0.68 32 7.64 0.020 <0.0025 0.29 <5.08 N/A 008 04/05/19 0.68 24.86 6.75 0.004 <0.0025 0.022 <5.13 N/A 009 04/05/19 0.68 20.49 6.52 0.014 <0.0025 0.061 <5.18 N/A 012 04/05/19 0.68 101 7.04 0.009 <0.0025 1 0.15 <5.49 N/A ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/l/2018-5/31/2021 5WU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dayne Willis Name (Print name) Site Director Titl rint titl _ 2-9 (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. (Vote: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period ?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks - - 1S mg/L 100 mg/L or 50 mg/L* Parameter Code - 46529 NCOI L NCOI L 00552 006 04/05/19 0.68 55 gal <5.08 32 Footnotes from Part A also apply to this Part B (Vote: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last.revised 11/1/2018 Page 2 of 3 FOR PART A AND PART 8 MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEE DANCES FORTH E SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ®NO ❑ REGIONAL OFFICE CONTACT NAME: lames Moore Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: ^ Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am awlare there are signific t penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Permit Date:11/1/2018-5/31/2021 Date SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 4/29/19 CERTIFICATE OF COVERAGE NO. NCG030078 FACILITY NAME CommScooe, Inc.- Catawba COUNTY Catawba PERSON COLLECTING SAMPLES NIA 0 LABORATORY Statesville Analytical Lab Cert. # 440 Comments on sample collection or analysis: `' d None Z Part A: Stormwater Benchmarks and Monitoring Results o n w � � SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' Aril month DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑Zero -flow ®Water Supply ❑SA ❑Other A < PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3 o ' 9 ❑ No discharge this period?z Outfall No. Date Sample Collected (mo/dd/yr) 24-hour amount Inches3 n Total Suspended"' "' Solids r' pH, � Standard units Total Copper Total Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons . Total To Toxic Organics Benchmarks _ - 100 mg/L4 6.0 -9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 003 04/05/19 0.68 9.18 6.67 0.019 <0.0025 0.14 17.6 N/A 004 04/05/19 0.68 26 6.88 0.011 <0.0025 0.13 <5.0 N/A 005 04/05/19 0.68 79.75 7.22 0.015 <0.0025 0.23 10.2 N/A 006 04/05/19 0.68 32 7.64 0.020 <0.0025 0.29 <5.08 N/A 008 04/05/19 0.68 24.86 6.75 0.004 <0.0025 0.022 <5.13 N/A 009 04/05/19 0.68 1 20.49 6.52 0.014 <0.0025 0.061 <5.18 N/A 012 04/05/19 1 0.68 1 101 7.04 0.009 <0.0025 1 0.15 <5.49 N/A ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. ' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dayne Willis Name (Print name) Site Director Titl rint tit' { ignature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mgLL", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L* Parameter Code - 46529 NCOIL NCOIL 00552 006 04/05/19 0.68 55 gal <5.08 32 Footnotes from Part A also apply to this Part S Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last.revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: James Moore Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware t there aEresgniTtenalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." i Signature of Permittee Permit Date: 11/1/2018-5/31/2021 Date SWU-245, last revised 11/1/2018 Page 3 of 3