Loading...
HomeMy WebLinkAboutNCG030650_MONITORING INFO_20190617Mao STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. DOC TYPE 0 HISTORICAL FILE CX MONITORING REPORTS DOC DATE ❑ � O J "! � � � YYYYMMDD COMMSCOPE @ 3642 US Hwy 70 East Claremont, NC 2861.0 June 13, 2019 James Moore NCDEQj- 610 East Center Avenue, Suite 301 '. ,Mooresville, NC 28115 704-663-1699 Subject: CommScope, Inc.- Claremont Facility c Certificate of Coverage No. NCG030650 'r May 2019 Stormwater DMR C° Dear Mr. Moore: Please find enclosed two (2) copies of the May 2019 Stormwater DMR for the CommScope, Inc - Claremont facility. The stormwater permit states that a storm event is one that results in an actual discharge from the permitted site outfall and the previous measurable storm event must have been at least 72 hours prior. Stormwater sampling was not completed during the month of May due to the lack of rain. Please feel free to contact me at 828-241-6037 with any questions. Sincerely, �-� a� d2 . Yho) d'0� Laura R. Moody Senior Environmental Engineer Office phone: 828-241-6037 Cell phone: 828-468-7238 laura.moody@comrnscope.com cc: NCDEQ, Central Files COMMSCOPE G Attachment A May 2019 Stormwater DMR Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 6/13/19 CERTIFICATE OF COVERAGE NO. NCG030650 FACILITY NAME CommSCODe. Inc.- Claremont COUNTY Catawba PERSON COLLECTING SAMPLES N/A LABORATORY N/A Lab Cert. # N A a r Comments on sample collection or analysis: Did not have period of "no measurable storm events" 72 hours prior �eo �L: r� Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' May (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ®Water Supply ❑SA ❑Other -� PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No discharge this period?2 Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfamount Inches31 c, eo Total Suspended Solids PH,and Standard units Total Copper Total Lead Total Zinc Non -Polar O&G Total Petroleum Hydrocarbons Total nicss Organics Benchmarks _ - 100 mg/L' 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code _ 46529 C0530 00400 01119 01051 01094 00552 78141 003 May 2019 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. ' Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the othere lements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), i certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Brad Edwards Name (Print name) Site Director Title (Print tid ) nIS gnature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX m L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part 8: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?z Outfall No.. DateSample Collected 1 (mo/dd/yr) 24,hour,rainfalF ;: amount, _ _Inches3.° _ `New. Motor Oil or Hydraulic Oil Usage - : Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmorks' - - - "Is mg/L 100 mg/L or 50 mg/L* Parameter Code _ ; 46529 NCOIL z - i NCOIL- 005S2 N/A Footnotes from Part A also apply to this Part B Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION 8. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail on original and one copy of this DMR, includinp all "No Discharge" reports, within 30 days of receipt of the lab results {or at end o monitorin_g period_ in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1517 Mail Service Center Raleigh, North Carolina 27599-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pe ties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permit Date: 11/1/2018-5/31/2021 Date SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 6/13/19 CERTIFICATE OF COVERAGE NO. NCG030650 SAMPLE COLLECTION YEAR 2019 FACILITY NAME CommScope, Inc.- Claremont SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Catawba or ® Monthly'_ May (month] DISCHARGING TO CLASS [❑ORW ❑HQW ❑Trout ❑PNA PERSON COLLECTING SAMPLES N/A • ❑Zero -flow ®Water Supply [:]SA LABORATORY N/A Lab Cert. # N/A_ �. . _ _ Comments on analysis: sample collection or P Y c ❑Other -, Did not have period of "no measurable storm events" 72 hours prior F � f aR - r' PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results Sb f g :� a ���� ® No discharge this period?' 24 -hour— Date;Sample fail rainfall Total: Suspended 6 pH, . ;: Non -Polar O&G/ dotal Toxic ;Outfall.No Collected r -amount, Solids Standard units Total Copper Total Lead.Total Zinc, <, ;Total Petroleum Organics s mo' dd r [ / /Y) vl nches3 T 4 Hydrocarbons Benchmarks: ` 100sm °0 g/L s 6:0 9 0 010 mg, s ! /L 0.07Sim g]L 4 0126 mg/L 15 mg/L I: 1 mg/L :. w Paro►neted C0530 "011rCae OI 005500400 78141 003 Mav 2019 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring maybe waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Brad Edwards Name (Print name) Site Director Title (Print titl } gnature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?z Outfall No.. Date -Sample - . = Collected', (mo/dd/yr) , 24hour-rainfall . a.amount; 3 :"Inches New Motor Oil or Hydraulic Oil Usage Non-poiar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L on 50 mg/L* Parameter Code - 46529 NCOIL-;,. - NCOIL' .. 00552 N/A Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICF? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, includinsgall "No Discharge" reports, within 30 days of receipt of the lab results ror at end of monitarina period in the case o "No Discharge-0 reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted_ Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant pe ties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Date Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3