Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030565_MONITORING INFO_20181108
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V DOC TYPE ❑HISTORICAL FILE �. MONITORING REPORTS DOC DATE o )ol � /1 D � YYYYMMDD Semi-annual Stormwater_Discharge Monitoring Report for North Carolina Division of-Wateri.Quaiity'General Permit No. NCG030000 Date submitted"t�� N.aY 9 $ 201$ CERTIFICATE OF COVERAGE NO. NCG03� SAMPLE COLLECTION YEAR �V 1 FACILITY NAME y� CAN lfl_-ZAL FILES SAMPLE PERIOD ❑ Jan -June July -Dec COUNTY :. ^/R SECTICN or ❑ Monthly" (month) PERSON COLLECTIN SAMPLES DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Lab Cert. # ❑Zero-flowWater Supply []SAComments on sample collection or analysis: [✓Other _ l 1.t1 Part A: Stormwater Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 OV10 discharge this period?z Outfall No. Date Sample Collected" (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar 0&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L r 1 �S ,., < . b �-, 10.01 M C a .o � w, o.01 S r, LE rti, "Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. `See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Da, './1/2012-10/31/2017 SWU-245, last revised " �5/2012 Page 1 of 3 Facilities t incorporate a solvent management plan into the Stormwater Pc :)n Prevention Plan may so certify, and the requirement for TTO : itoring may be wai ed. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General - Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement,. "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results, only for facilities averaging > 55 gal of new oil per month. No discharge this period?Z Out -fall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HENS) Total Suspended Solids pH Benchmarks == > _ 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/l/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. + 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. + TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCE5 FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ON07 IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy ot this DMR, including all "No Discharge" reports,_ within 30 days_ of receipt of the lab results (or at end of monitoring period in the case o "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I Certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and beiief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit flat ./1/2012-10/31/2017 i !� (Date) SWU-245, last revised' - "'5/2012 Page 3 of 3 NCDENR EF Stormwater Discharge Outfall (SDO) JUL 0 9 2018 Qualitative Monitoring Report E-%' i��L FILES TIONI For guidance on filling out this form, please visit: http:f /portal.ncdenr,orglwcblwq/wsisu/npdQssw#tab-4 Permit No.: Facility Name: 190 County: - Inspector: -� Date of Inspection: Time of Inspection: O/ j2/ U/ or Certificate of Coverage No.: Phone No. GA � C-) - `1C) S - 7. Total Event Precipitation (inches): �__ Was this a "Representative Storm Event" or "Measureable Stor� E ent" as defined by, he permit? (See information below.) ❑ Yes "E@ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certikl4qt this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, LUS[ modified 10/25/2012 f 1. Outfall Description: Outfall No. 7 �tru Receiving Stream: o Describe the i �fttrial activities (') i._ �l1 k \ �,x l'% f %J1 Q re (pipe, ditch, etc.), e ti ` ' O V-*� o ,ram within the outfall drainage area: r� 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: (-'r ) '- 'a rl - 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): ri o tt ---(- 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: i ' ' 0 2 3 4 S S. Floating Solids: Choose the ndmber which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choosethenumber which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and S is extremely muddy: 0 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 ;A `NCDENR Stormwater Discharge Outfall (SDQ) Qualitative Monitoring Report Forguidance on filling out this form, please visit: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: or Certificate of Coverage No.: N/C/G/D/3 /n/, Facility Name: A R [✓ .o r 1 o y� County: w 0 n Phone No. Inspector: 4 A S Date of Inspection: Time of Inspection: fy\ Total Event Precipitation (inches): �� Was this a "Representative Storm Event" or "Measureable Storm Event" as efi d byhe tperm t? (See information below.) �)) �hK c SF3 ry- � a L17 h T -e Q � r0 "'-, P o n <-� 1 n 6-4, ❑ Yes '�j No p 0 Q -r, r 00 V3 Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last mudified 10/25/2012 r a 1. Outfall Description: Outfall No. % Structure (pipe, ditch, etc.) R,4 -t A, a Receiving Stream: o In r- -e. 4-> Describe the ip 4s real activities that o within the outfall drainage area: 6 C— l� ► I f3 U1 S A � u � -t r S 2. Color: Describe the color of the dis (light, medium, dark) as descriptors: C ge using basic colors (red, brown, blue, etc.) and tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 0 Yl 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: ' 0 2 3 4 5 5.' ' Floating Solids: Choose the number which best describes the amount of Floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the storrnwater discharge, where 1 is no solids and 5 is extremely muddy: 0 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes oNo B. is there an oil sheen in the stormwater discharge? Yes (No 9. Is there evidence of erosion or deposition at the outfall? Yes 00 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. a Page 2 of 2 SWU-242, Last modified 10/25/2012 i Year 1 Period 1 January 1st. —June 301" 2018 Stormwater Discharge Outfall (SDO) Monitoring; Report mailed on 7/2/2018 Original and copy of this report is only requirement per NCDWQ. Qualitative report and lab reports should be maintained and available if an inspector requests them. Copies in the project green book. Sent in SDO Monitoring report indicating no flow for year I period 1 and letter of explanation. SDO and letter sent to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 July 2, 2018 Dear Division of Water Quality Storm water Division, We have 1 retention pond that catches all storm water run-off from our property and settles out the water before overflowing, eventually, into the ditch/creek/river system. As usual I'm struggling to catch this retention pond overflowing. We had plenty of days of rain during this stretch but no event was significant enough to catch the pond overflowing. I do constantly monitor this and have a lab kit on stand-by. Therefore, please accept the attached DMR documenting a No Flow situation. Please contact me if you have any questions. Thank you very much, Dennis Davis EHS Specialist Ph: 919-705-2618 Dennis.davis@aarcorp.com 500 Gateway Drive - Goldsboro, NC 27534 o Phone (919) 705-2450 I1,1ES&HlSturnwatei DWQ Letter 1-20-15 doc Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qua Ity General Permit No. NCG030000 Date submitted 1% I ao %) 7 CERTIFICATE OF COVERAGE NO: NCG03 Q S FACILITY NAME Y-- 2 COUNTY PERSON COLLECTING S MPLES c V LABORATORY �� ,- < <wb Cert. # _ Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR C 7 SAMPLE PERIOD ❑ Jan -June July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA M,ero-flow ❑Water Supply —❑SA Other C ,i 5 w PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 o discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics-' Benchmarks =__> _ - 100 mg/L or 50 mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (far metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/l/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 5U Footnotes from Part A also apply to this Part B * SeP General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR'PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to; Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the'person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qua ity General Permit No. NCG030000 Date submitted ) :10 l i 7 CERTIFICATE OF COVERAGE NO. NCG03 0 .S FACILITY NAME Y4--)3. Lip r P n r iPr ; G i� COUNTY PERSON COLLECTING LABORATORY I F, o , Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR - � - ',-- -) 1 SAMPLE PERIOD ❑ Jan -June [.]July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑7 ro-flow ❑Water Supply ❑SA Other C- #s 5 w PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 [L]�o discharge this period?' Outfall No. Date Sample-' Collected' (mo/dd/yr) •24-hour rainfall amount, Inches' Total Suspended Solids -! Pal, Standard units -, o Copper Lead Zinc Nan -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics' Benchmarks =__> _ - 100 mg/L or so mg/O 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. `See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implemi solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) quirement for total toxic organics areas which are exposed to rainfall or Ling the all the provisions of the Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, dr other similar non -numerical format. When results are below the applicable limits, the must be reported in the format "<XX m L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. lee General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. pate Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solidi pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L ' 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B_ • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMRncluding all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Disc_horpe" reports) tor. Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) . ) / ) �u �7 (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 November 15, 2017 Dear Division of Water Quality Storm water Division, We have 1 retention pond that catches all storm water run-off from our property and settles out the water before overflowing, eventually, into the ditch/creek/river system. As usual I'm struggling to catch this retention pond overflowing. We had plenty of days of rain during this stretch but no event was significant enough to catch the pond overflowing. I do constantly monitor this and have a lab kit on stand-by. Therefore, please accept the attached DMR documenting a No Flow situation. Please contact me if you have any questions. Thank you very much, Dennis Davis EHS Specialist Ph: 919-705-2618 Dennis.davis@aarcorp.com 500 Gateway Drive - Goldsboro, NC 27534 - Phone (919) 705-2450 HIES&HLStomiwaleffiWQ Letter 1-20-15 doc Semi-annual Stormwater 131acharge Monitoring Report for North Carolina Division of Water lity General Permit No. NCG030000 Date submitted _ F-' CERTIFICATE OF COVERAGE NO. N0003 O S FACILITY NAME 1--) fl R C D C P o r ►J G . COUNTY W PERSON COLLECTIN SAMPLES S LABORATORYLab Cert. # Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION EAR D D ) 7 SAMPLE PERIOD Jan -June ❑ July -Dec or ❑ Monthly'_ _ _(month) Rt jDISrCHARGING TO CLASS ❑ORW ❑HQW [:]Trout❑PNA �e V � ) ❑Zero -flow [—]Water Supply ❑SA MAY i ['Other CFC-N L FILM PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 0 VVR , F._Pf' r- ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, lnches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics s Benchmarks =__> - - 100 mg/L or 50 mg/L° 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 5A2j ... 5 4.•1 V- _U1 40. o l "1 L o, o i "A o. o )Y) < 5 rn!& NIA } Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. a See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). RECEIVED MAY 19 Z017 Permit Date: 11/1/2012-10/31/2017 CENTFRAL FILES SWU-245, last revised 10/25/2012 DWR SECTION Page 1 of 3 Facilities that incorporate a solvent management plan into the 5tormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. !Vote: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. 0 No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 4.0 5U s Footinotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Dat*1/2o12-10/31/2017 SWU-245, last revised 1 5/2012 Page 2 of 3 Note: If yo ort a sample value in excess of the benchmark, you must impI ent Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR* PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 day_s of receipt of the lab results for at end of monitoring in the case o "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 5 --It/i (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharl;e Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted l 6/ I yb 4 CERTIFICATE OF COVERAGE NO. NCG03 0 :5 5 FACILITY NAME COU NTY PERSON COLLECTING SAMPLES S U LABORATORY - ►-, v � C. k Lab Cert. # Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR / L SAMPLE PERIOD ❑ Jan -June July -Dec or ❑ Monthly'_ (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑ ro-flow [:]Watersupply [:]SA RECEIVED her G n _� LA-) DEC 16 2016 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES ©WR SECTION ❑ No discharge this period: Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks =__> _ - 100 mg/L or 50 mg/L 6.0 - 9.0 0.007 mg/L 0.033 mg/L 00-067 mg/L 15 mg/L 1 mg/L v 1 I b 1 ►��, t 4,. 3 .19 ._ L �� <o. o 1 r <o.o 'emirs < S C A ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same paramae—PrA 'e same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark her -'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rai gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (far metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Dat _/1/2012-10/31/2017 SWU-245, last revised "'-,5/2012 0 Page 1 of 3 �a) FaciIitiesoincorporate a solvent management plan into the Stormwater Pie on Prevention Plan may so certify, and the requirement for TTO �itoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PqL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier I, Tier Z or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area. -Monitoring Results: only for facilities averaging > 55 gal of new oil Per month. ❑ No discharge this period ?z OutfalE No. Date Sample Collected' (mo/dd/yr) ._ -Z4"-h6ur rainfall amount, a _..Inches_ .., , Non -polar O&G/TPH by ERA 1664 (SGT-HEM) Total. Suspended -solids Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 -- 9.0 SU: Footnotes from Part A also apply to this Part B * See General PeFmit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you roust implement Tier 2, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BEN01NARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART It SECTION B. • 2 rX( EEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3. HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Dat /1/2012-10/31/2D17 r� /e i,4 I J'� (Date) SWU-245, last revised' -"-?5/2012 Page 3 of 3 July 8, 2016 Dear Division of Water Quality Stormwater Division, RECEIVED JUL 12 Nib CENTRAL FILES DWR SECTION We have 1 retention pond that catches all stormwater run-off from our property and settles out the water before overflowing, eventually, into the ditch/creek/river system. As usual I'm struggling to catch this retention pond overflowing. We had plenty of days of rain during this stretch but no event was significant enough to catch the pond overflowing. I do constantly monitor this and have a lab kit on stand-by. Therefore, please accept the attached DMR documenting a No Flow situation. Please contact me if you have any questions. Thank you very much, Dennis Davis EHS Specialist Ph: 919-705-2618 Dennis.davis@aarcorp.com 500 Gateway Drive - Goidsboro, NC 27534 - Phone (919) 705-2450 WES&F.13tormwateODWQ Letter 1-70-15.COC Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Qualimo eneral Permit No. NCG030000 Date submitted 8 CERTIFICATE OF COVERAGE NO. NCG03 O 5 b 5 FACILITY NAME A 'f-1 � (_6 r p p r• M i, o COUNTY U.1 _ PERSON COLLECTING SA PLES fl r\ I S '�') to U 1 S LABORATORY _+y t„ a s_r„3_��� C1,¢4ab Cert. # Ci Ll Comments on sample collection or analysis: Part A: 5tormwater Benchmarks and Monitoring Results SAMPLE COLLECTION EAR SAMPLE PERIOD Jan -June ❑ July -Dec or ❑ Monthly" (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water supply [:]SA ©Other C ))5 w PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 [] No discharge this period?Z Outfall No. Date Sample Collected" (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organicss genchmorks =__> _ - 100 mg/L or SO mg/L 6.0 — 9.0 0A07 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge, Unattended sites may be eligible for a waiver of the rain gauge requirement. a see General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Pwrmit Da; './1/2012-10/31/2017 SWU-245, last revised " '15/2012 Page 1 of 3 Facilities t incorporate a solvent management plan into the stormwater Pc on Prevention Plan may so certify, and the requirement for TTO , itoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format, When results are below the applicable limits, they must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No dischorge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inche53 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B ' See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies, Permit Date: 11/l/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. + TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one co,ny of this DMR, including all "No Discharge" regorts, within 30 days of receipt of the lab results for at end of monitoring period in the case o "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Dal, ,/1/2012-10/31/2017 7 &2 /. (Date) SWU-245, last revised' - `�5/2012 Page 3 of 3 ',I Semi-annual Stormwater Discharge Monitoring Report Allxc� for North Carolina Division of Water Q� all y General Permit No. Date submitted 11 3 �b J S CERTIFICATE OF COVERAGE NO. NCG03Q S b E FACILITY NAME �_t9� �o c I, or to r_t COUNTY W A LA -P ' PERSON COLLECTING LABORATORY F r� i NCG030000 610 W ft"O. SAMPLE COLLECTION YEAR _10 } SAMPLE PERIOD ❑ Jan -June July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA b Cert: # ❑Zero -flow ❑Water 5upply ❑SA Comments on sample collection or analysis: U L—' MJuther C n S U V`) k 41<-au \-)A u J Part A: Stormwater Benchmarks and Monitoring Results OEC 0 4 2015 DWRAL FILES SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?Z Outfall No. Date Sample p Collected' (mo/dd/yr) 24-hour rainfall amount, Inches} Total Suspended Solids p H, Standard units Copper - f Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks =_-> _ - 100 mg/L or 50 mg/L 6.0 - 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L < ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ' See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469,12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Dat _/1/2012-10/31/2017 SWU-245, last revised ,_µ ;5/2012 ® Page 1 of 3 �� s Facilities incorporate a solvent management plan into the Stormwater PID an Prevention Plan may so certify, and the requirement for TTO , \itoring may be waned. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they _must be reported in the format. "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. f Note: if you report a sample.value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. 0 No discharge this period?2 Outfall No.Collected; Date Sample (mo/dd/yr) i"6ur rainfall amount, -inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =_> - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9"0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Dats--: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 i Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART AAND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Dal ./1/2012-10/31/2017 i '3 1 a 6 L-, (Date) SWU-245, last revised®�5/2012 Page 3 of 3 • ®i ®j N®ENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: http: f /portal.ncdenr.oi,g/web/wq/ws/su.Inp(iessw#tab-4 Permit No.: N/C/ G/ 0 1/�/�/ Facility Name: fl Q County: Inspector: Date of Inspection: a Time of Inspection: J n.) RD Certificate of Coverage No.: Plione No.3 Total Event Precipitation (inches): Was this a "Representative Storm Event" or "Measureable Storm ,d d by the permit? (See information below.) O/Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "mea.sureuble storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfail. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this wort is accurate and complete to the best of my knowledge: \1 �� (Signature of Permittee or Designe SWU-242, Last modified 10/25/2012 Page 1 of 2 1. Outfall Description: Outfall No. 1 St ucture (pipe, ditch, etc.) Receiving Stream: � -A -, Al-n Describe t e industrial activitiP�}5 hat oc r within the outfall rainage area: •-;I)r�R rrn <� - I e D YYN r1^() r. der UrI✓i N 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors:. C If? r 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 1 1) Y} 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: t 1� 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: , 0 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes ) S. Is there an oil sheen in the stormwater discharge? Yes QNo 9. is there evidence of erosion or deposition at the outfall? Yes No 10. Other Ohvious Indicators ofStormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. s 4 Page 2 of 2 SWU-242, [.ast modified 10/25/2012 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality G neral Permit No. NCG030000 Date submitted % CERTIFICATE OF COVERAGE NO. NCG03 o S -L FACILITY NAME r-1 If--) 4 COUNTY i,J , PERSON COLLECTINd SAMPLES Y`n LABORATORY [,, -, 3 . ; _ a ,,A n \, ,,,ntab Cert. Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION EAR SAMPLE PERIOD Jan -June ❑ July -Dec or ❑ Monthly' _ (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply [:]SA �CEIVE� ®Other n S JUN 0 2 2015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 C;D CENTRAL FILES DWR SECTION ❑ No discharge this period 22 Outfail No. Date'Sample Collected 1 ' 24=hour.rainfall' 1 .,I - amount, _. Inches3 Total Suspended Solids pH, Standard units Copper, r Lead. Zinc Non -Polar O&G/ ;Total Petroleum r Hydro carbon Total Toxic Organics s Benchmarks =__> _ 400 mg/L or 50 mg/L° 6.0 — 9.0 0.007 mg/L 0.03' mg/L 0.06Tmg/L. :15 mg/L- -1 mg/L Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Storm water Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No., Date Sample � ollctd':Ce ma dd r 24-hour rainfall amount Inches m . EPA 1654: S_G7=HEM _Tatal;Suspended Solids. pH _ Benchmdrks =-=> _ - 15•r9g/L - 100 mg/L or 50 mg/L* - .,.6.0 - 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART it SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality �^ Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature —of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted I - .QO - i CERTIFICATE OF COVERAGE NO. NCG030 � FACILITY NAME AAA Coyro oraf i on _ COUNTY PERSON COLLECTINd5AMPLES _ `7�Irli1 �h�5 LABORATORY C{r>Nr ,4 Lab Cert. # q - Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR o i SAMPLE PERIOD ❑ Jan -June July -Dec ,,ppJ or ❑ Monthly' (month) RECEIVEU�jJ�WRTOCLASS ❑Oe o-flow Wa�rs�ut I ❑PNA ❑ ❑ pp Y ❑SA [Other JAN 22 2015 Water Quality Regional EASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Operations Section [✓] No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, . Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks =__> _ - 100 mg/L or 50 mg/L 6.0 - 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Da /1/2012-10/31/2017 SWU-245, last revised ` ;5/2012 a . 0 Page 1 of 3 0 /� Facilities incorporate a solvent management plan into the Stormwater s an Prevention Plan may so certify, and the requirement for TfOO .toting may be waned. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. 1 further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. . Nate:. if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) •24=hour rainfall amount, s _Inches _ Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended,Solids _ .pH_, ._ Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 910 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. i • Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: + A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. + 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3. HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoriesperiod in the case of "No Discharge" reports) to. Division of Water Quality Attn: DWQCentral Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 1-ao-c5 (Date) Permit Dat _/1/2012-10/31/2017 SWU-245, last revised''-05/2012 - 0 Page 3 of 3 ®I January 20, 2015 Dear Division of Water Quality Stormwater Division, We have 1 retention pond that catches all stormwater run-off from our property and settles out the water before overflowing, eventually, into the ditch/creek/river system. As usual I'm struggling to catch this retention pond overflowing. We had plenty of days of rain during this stretch but none significant enough to catch the pond overflowing. do constantly monitor this and have a lab kit on stand-by. Therefore, please accept the attached DMR documenting a No Flow situation. Please contact me if you have any questions. Thank you very much, Sam Phillips EHS Engineer Ph: 919-705-2450 samuel.phillips@aarcorp.com 500 Gateway Drive - Goldsboro, NC 27534 o Phone (919) 705-2450 M: HME58H15tormwater DWQ Letter 1-20-15 doc Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted -7 — 9 — [ L{- CERTIFICATE OF COVERAGE NO. NCG030 5 % 15 FACILITY NAME AA (9, Lo C QO +r Ck A-, o+l COUNTY W/1 1/06_ PERSON COLLECTIN SAMPLES 'jflm 01'1, (I c Q `5_ LABORATORY �n�; m4mrn ei tat (,0E r1 is� Lab Cert. # 9 Comments on sample collection or analysis: SAMPLE COLLECTION YEAR Q<01 4 SAMPLE PERIOD Jan -June ❑ July -Dec or ❑ Monthly'_ (month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑Zero -flow [:]Watersupply [:]SA [✓Other C tiJ -:5 W CEI V ED JUL 1 1 2014 Part A: Stormwater Benchmarks and Monitoring Results CENTRAL FILES ngAir%fmr%eP PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 E?rNo discharge this period:2 Outfali No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks =__> _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Dat. _/1/2012-10/31/2017 SWU-245, last revised '`0,5/2012 Page 1 of 3 ,; Facilities t, incorporate a solvent management plan into the 5tormwater Pc on Prevention Plan may so certify, and the requirement for TTO i -_,)itoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the 5tormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format: Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX ma/L', where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yrj 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ==_? - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier I, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART li SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER ATANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) rtn eC -7- 9-1 (Date) Permit Dal ./1/2012-10/31/2017 SWU-245, last revised 1"=15/2012 Page 3 of 3 01 July 9, 2014 Dear Division of Water Quality Stormwater Division, We have 1 retention pond that catches all stormwater run-off from our property and settles out the water before overflowing, eventually, into the ditch/creek/river system. As usual I'm struggling to catch this retention pond overflowing. We had rain during Year 2 period 1 but only 1 significant rain which occurred on Friday 5/16/14 of 2.22 inches. However, up until the time I left that Friday the retention pond was not overflowing. So again I'm going to have to report a no flow for this period. Therefore, please accept the attached DMR documenting a No Flow situation. Please contact me if you have any questions. Thank you very much, Sam Phillips EHS Engineer Ph: 919-705-2450 samuel.phiIlips@aarcorp.com 500 Gateway Drive o Goldsboro, NC 27534 , Phone (919) 705-2450 11GLDNCFS94DalalSlrarelCARG01DepartmentslHR1E5&HlStornrrraterlDWQ Letter 7-9-14.doc