Loading...
HomeMy WebLinkAboutNCG030503_COMPLETE FILE - HISTORICAL_20150121STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. IV D3 D DOC TYPE r HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ D O 15 YYYYMMDD i V-Aemnwwew HCOENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Engineered Sintered Components Attention: Aubrey Meadows 250 Old Murdock Road Troutman, NC 28166 Dear Mr. Meadows: Donald R. van der Vaart Secretary January 21, 2015 Subject: Relief from Monthly Monitoring Stormwater Permit # NCG030503 Engineered Sintered Components Iredell County Troutman, NC 28166 We are in receipt of your December 22, 2014 letter requesting relief from monthly monitoring at the Troutman facility. Based on the information provided the facility is in compliance with the tiered response actions and other conditions of the NCG030000 General Permit. Therefore, the Division is granting regulatory relief from the Tier responses. Upon receipt of this letter, the subject facility may resume the permit specified semi-annual analytical monitoring for the remainder of the current permit term which expires on October 31, 2017. This decision applies only to the copper and zinc benchmarks. A benchmark exceedance of any other parameter listed in your permit will trigger the tiered response actions as described in the general permit. You must notify this office, in writing, within five business days if you become aware of any significant source of copper or zinc at your facility that has the potential to be exposed to stormwater. The relief granted in this letter is contingent upon the current industrial practices at Engineered Sintered Components. If industrial practices change and copper or zinc does become a significant stormwater exposure risk or significant zinc or copper values have been recorded during regular sampling events, then this office reserves the right to withdraw this decision and reinstate the permit specified tiered response or other actions that may be warranted by the new set of circumstances. Division of Energy, Mineral, and Land Resources Land Quality Section - Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Telephone: 704-663-16991 FAX: 704-663-6040 • Internet: http:llportal.ncdenr.org/web/Irtland-quality An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled / 10% Post Consumer Paper Please retain and append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit. If you have any questions or comments concerning this letter, please contact me at 704-663-1699. Sincerely, James Moore Acting Regional Engineer Land Quality Section Enclosure: Inspection Report cc: Bathany Georgoulias-Stormwater Permitting Program (via e-mail) MRO-Land Quality Section, Stormwater Files-NCG030503 Permit: NCG030503 SOC: County: iredell Region: Mooresville Contact Person: Jan S Comer Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 11101112 Expiration: 10/31117 Owner : Engineered Sintered Components Company Effective: Expiration: Facility: Engineered Sintered Components Company 250 Old Murdock Rd Title: Inspection Date: 05112/2014 Entry Time: 11:OOAM Primary Inspector: Samar E Bou Ghazale Secondary Inspector(s): Troutman NC 28166 Certification: Exit Time: 12:40PM Phone: 704-528-7500 Phone: Phone: 704-663-1699 Ext.2199 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 permit: NCG030503 Owner - Facility: Engineered Sintered Components Company Inspection Date: 05112/2014 Inspection Type : Compliance Evaivation Reason for Visit: Routine Inspection Summary: There are 4 stormwater discharge outfalls at this facility. Zinc and copper were all above the bench mark values in 2013 except for copper at 5DO-4. The facility did not start the monthly monitoring for the stormweater discharge in compliance with the permit requirements because of personel turn over at the facility. According to Jan Comer, Vice President -Human Resource, they will start the monthly requirement starting this month. During the site investigation it was noted that there was not a secondary containment for the (heat treat oil coolers). Also, It was suggested to sweep clean the parking lots prior to the sampling events. Page 2 of 3 Permit: NCGO30503 Owner - Facility: Engineered Sintered Components Company Inspection Date: 05/12/2014 Inspection Type : Compliance Evaluation Reason for Visit: Routine stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? N ❑ ❑ ❑ # floes the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a fist of significant spills occurring during the past 3 years ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ®❑ ❑ # Does the Plan include a BMP summary? E ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ! ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ® ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Please provide a secomdary containment for heat treat oil coolers. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ El Comment: The facility did not start the tiers response after capper and zinc level were noted above the permit bench mark. According. to Jan Comer, Vice president -Human Resourse monitoring for copper and zinc were dropped when the previous employee that is responsible for the permit requirement left the company at the end of 2013, Permit and Outfalls Yes No NA NE # is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? M ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ® ❑ ❑ ❑ Comment: Page 3 of 3