HomeMy WebLinkAboutNCG030500_COMPLETE FILE - HISTORICAL_20200128AR D
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
/v L& 05D
DOC TYPE
<- HISTORICAL FILE
� MONITORING REPORTS
DOC DATE
❑ �-� b o I a b
YYYYMMDD
S[E CwTeM
a Daintree company
January 15, 2020
Central Files
Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
General Permit NO. NCG030000
Certificate of Coverage NO. NCG030500
David R. Martin
Plant Manager
30105partanburg Hwy
East Flat Rock, NC 28726
USA
T 828 693 2625
david.martin @gecurrent.com
RFrP! Fn_
JAN 2 S 2020
GiwlN%1;- AL I=ILF;,
DVVR SECTION
Attached is our non -storm water discharge letter documenting that an inspection was conducted on
12/5/19 to ensure the Current Lighting Solutions, LLC facility (formerly GE Lighting) is in compliance for
the second half of 2019.
Per the acknowledgment of the letter, there was no non -storm water discharge noted or visibly noted in
our report. All the outfalls and outfall contributory industrial parking lots did not have any issues during
the inspection.
The five representative outfalls that were sampled are 001, 002, 003, 004, and 011.
Please contact site Plant Manager David Martin @ 828-693-2625, if you have any questions.
Sincerely,
David R. Martin
Plant Manager
Current Lighting Solutions, LLC
Attachment:
E�010 p5 artartftur,� Hwy. asri Flat Roe C 87fZ� w _._.eurlrenffV e.com
Non -Storm Water Discharges
The discharge covered by the storm water permit has been tested or evaluated for the
presence of non -storm water discharges and, if applicable, all non -storm water
discharges from these outfalls are identified in the plan.
The following is;a description for the method used, the dates of any testing, and the on -
site drainage points that were directly observed during the test:
Site EHS Engineer conducted a property wide visual inspection of all storm water basins,
culverts, outfalls, impervious surfaces, yards & grounds.
Findings of Non -Storm Water Discharge Evaluation conducted on 12/05/19:
1. No non -storm water discharge has occurred during the period between July 1, 2019
and December 05, 2019.
2. All outfalls inspected for signs of non -storm water discharge on 12/5/19. Inspection
consisted of visual observation of all storm water drains, basins, and culverts for each
outfall. Work was conducted by grounds crew to clean out the leaves and grass growing
up in the edge of the basins prior to sampling. Work was completed on 10/19/19.
Findings of Non -Storm Water Discharge Sampling conducted on 12/17/19:
1. Several outfalls, DA-001, DA-002, DA-004, and DA-011 had Zinc (Zn) metal detections,
but not above our benchmark limit. There was one detection of lead (Pb) on outfall DA-
004 (below our benchmark limit) and no detections of any copper (Cu) at any outfalls.
There is no non -storm water discharge above our facilities permitted limit as sampled
and reported to the DWQ on 12/17/19.
"I certify under penalty of law that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gathered and evaluated the information submitted. Based
on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and
imprisonment for knowing violations."
Plant Manager