Loading...
HomeMy WebLinkAboutNCG030125_MONITORING INFO_20190204 (2),vv , <-Iz, U STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. I DOC TYPE ❑HISTORICAL FILE 5( MONITORING REPORTS DOC DATE ❑ YYYYMMDD STORINIWATER DISCHARGE OUTFALL (SDO) MONITORING RF,PORT GENERAL PERMIT NO: NCC030125 SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 CERTIFICATE OF COVERAGE NO.: NCG03000 ('This monitoring report is ducat the Division no later than 30 days from the date the facility receives the sampling results from the laboratorv,) FACILITY NAME: FRIT CAR COUNTY Craven PERSON COLLECTING SAMPLES: Danny Hornbeck PRONE NO. (252)638-2675 CERTIFIED LABORATORY Pace Analvtical Lab # 37729 Lab # Part A: Specific Monitoring Requirements PLEASE SIGN ON THE REVERSE 4 Outfall No. 001E Date Sample Collected, mo/dd/vr 00530 00400 01051 00556 78141 Total Suspended Solids, m /L pH, Standard units Lead, mg/L Oil and Grease, i in /L Total Toxic Organics', m /L Benchmark - 100 Within 6.0 - 9.0 0.033 30 1 Downstream 12/17/19 4.0 5.92 <0.005 <5.00 Upstream 12/17/19 <2.5 5.78 <0.005 <5.00 Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 response,. See General 11ennit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes X_no (if yes, complete Part B) Part B: Vehicle i<laintenance Activity iklonitoring Requirements Outfall No. Date Sample Collected, moldd/vr 00556 00530 00400 Oil and Grease, m /L 'Total Suspended Solids, m /L, pH, Standard units New Motor Oil Usage, Annual averse al/mo Benchmark - 30 100 6.0 - 9.0 - Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pl-1, you must implement Tier 1 or Tier 2 responses. See General Permit text. STORK EVENT CHARACTERISTICS: Date 12/17/2019 (First event sampled) Total Event Precipitation (inches): 0.2 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Mail Original and one coFy to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 LU d, o -ED G a 9 >Lij F-- J 4 U� CD Cr Uj LL_ w 0 C( SWU-245-031308 Page 1 of 2 l Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.1 1; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stonnwater Pollution Prevention Plan may so certify, and the requirement for YfO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: 'Based upon my inquiry of the person or persons directly responsible for managing compliance with the pemiit monitoring requirement for total toxic organics (I"fO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the storniwater or areas which are exposed to rainfall or stomiNvater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Gary Barnes Name (Print name) Plant Mamie r Title nt title) %ZR-zd (Si¢natur (Date) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility, of fines and im r' onment for knowing violations." 32C.) (Signature of Permittee) (Date) SWU-245-031308 Page 2 of 2