Loading...
HomeMy WebLinkAboutNCG030078_MONITORING INFO_20190617STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. Iv U& (D 3 b� DOC TYPE ❑HISTORICAL FILE @' MONITORING REPORTS DOG DATE ❑ 30 � � b �i I 7 YYYYMMDD COMMSCOPE e June 13, 2019 James Moore NCDEQ 6-10 East Center Avenue, Suite 301 Mooresville, NC 28115 704-663-1699 Subject: CommScope, Inc.- Catawba Facility Certificate of Coverage No. NCG030078 May 2019 Stormwater DMR Dear Mr. Moore: 6519 CommScope Road Catawba, NC 28609 JUN 17 2ot9 "Sect; on Please find enclosed two (2) copies of the May 2019 Stormwater DMR for the CommScope, Inc- Catawba facility. The stormwater permit states that a storm event is one that results in an actual discharge from the permitted site outfall and the previous measurable storm event must have been at least 72 hours prior. Stormwater sampling was not completed during the month of May due to the lack of rain. Please feel free to contact me at 828-241-6037 with any questions. Sincerely, X,,, �-' n��Z�,r Laura R. Moody Senior Environmental Engineer Office phone: 828-241-6037 Cell phone: 828-468-7238 laur_a.tnoody@commscope.com cc: NCDEQ Central Files COMMSC**OPE6 Attachment A May 2019 Stormwater DMR Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 6/13/19 CERTIFICATE OF COVERAGE NO. NCG030078 FACILITY NAME CommScooe. Inc.- Catawba COUNTY Catawba PERSON COLLECTING SAMPLES N/A ; LABORATORY N/A Lab Cert. #^ N/A .;. ;- Comments on sample collection or analysis: "- Did not have period of "no measurable storm events" 72 hours prior Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec _ or ® Monthly' May (month} 0DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA Y - u - ❑Zero -flaw ®Water Supply ❑SA � r []Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 r'0 ® No discharge this period?z Outfall No. Date Sample Collected i (mo/dd/yr) 24hour rainfall amount, Inches; `,� Total Suspended solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks - - 100 mg/O 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L i mg/L Parameter Code - 46529 COS30 00400 01119 01051 01094 00552 78141 003 May 2019 004 May 2019 005 May 2019 006 May 2019 008 May 2019 IRA 009 May 2019 012 May 2019 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date. 11/l/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dayne Willis Name (Print name) Site Director Title (Prin title) OLJ-JZ (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?2 Outfall No. Date Sample Collected) (mo/dd/yr) 24-hour rainfall amount, lnches3 New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 {SGT-HEM} Total Suspended Solids Benchmarks _ - - 15 mg/L 100 mg/L or SO mg/L* Parameter Code - 46529 NCOIL NCOIL 00552 006 May 2019 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWLI-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART li SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® No ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: James Moore Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of recent of the lab results (or at end of monitoring period in the case o "No Dischar e" re arts to: T Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thAhere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �JL7 Signature of )Vermittee Permit Date: 11/1/2018-5/31/2021 6-/3 Date SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 6 13 19 CERTIFICATE OF COVERAGE NO. NCG030078 FACILITY NAME CommSco a Inc. -Catawba COUNTY Catawba PERSON COLLECTING SAMPLES N/A LABORATORY N/A Lab Cert. # N/A Comments on sample collection or analysis: Did not have period of "no measurable storm events" 72 hours prior Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly'_ May (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ®Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?Z 0utfail No. Date Sample p Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended �? p Solids =i c>> pH ! ' ^' Standard nits = w �' `Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total taxis Organics' Benchmarks _ - 100 mg/L° 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 79141 003 May 2019 004 May 2019 005 May 2019 006 May 2019 008 May 2019 009 May 2019 012 May 2019 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfail. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible forma naging compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dayne Willis Name (Print name) Site Director Title (Prin title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period ?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches -'Hydraulic New Motor Oil or Oil Usage Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks _ - - 15 mg/L 100 mg/L or SO mg/L* Parameter Code - 46529 NCOIL NCOIL 00552 006 May 2019 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ® NO REGIONAL OFFICE CONTACT NAME: James Moore Mail an original and one copy of this DMR including all "No Discharge" reports _within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thjf�here are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permit Date:11/1/2018-5/31/2021 6-/3 - /g Date SWU-245, last revised 11/1/2018 Page 3 of 3 M'z 0 STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V C& DOC TYPE ❑HISTORICAL FILE C)�MONITORING REPORTS DOC DATE p a u YYYYMMDD COMMSCOPE (3 June 13, 2019 Central Files NCDEQ- Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 877-623-6748 Subject: CommScope, Inc.- Catawba Facility Certificate of Coverage No. NCG030078 May 2019 Stormwater DMR To Whom It May Concern: 6519 CommScope Road Catawba, NC 28609 RECPI ED JUN 1 7 2019 CEN-1 ri L FILES DVVR SECTION ['lease find enclosed two (2) copies of the May 201.9 Stormwater DMIZ for the CommScope, Inc- Catawba facility. The Stormwater permit states that a storm event is one that results in an actual discharge from the permitted site outfall and the previous measurable storm event must have been at least 72 hours prior. Stormwater sampling was not completed during the month of May due to the lack of rain. Please feel free to contact me at 828-241-6037 with any questions. Sincerely, Laura R. Moody Senior Environmental Engineer Office phone: 828-241-6037 Cell phone: 828-468-7238 laura.mood ®commsco e.com cc: Jaynes ,Moore, NCDEQ- Mooresville Regional Office COMMSCOPE 6 Attachment A May 2019 Stormwater DMR Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 6/13/19 CERTIFICATE OF COVERAGE NO. NCG030078 FACILITY NAME CommScope. Inc.- Catawba COUNTY Catawba PERSON COLLECTING SAMPLES N/A LABORATORY N/A Lab Cert. 0 NIA Comments on sample collection or analysis: Did not have period of "no measurable storm events" 72 hours prior Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly) May (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ®Water Supply [_]SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?2 Outfall No. Date Sample Collected) (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics5 Benchmarks - - 100 mg/L° 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 003 May 2019 004 May 2019 005 May 2019 006 May 2019 008 May 2019 009 May 2019 012 May 2019 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a,waiver of the rain gauge requirement. a See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the stormwater Pollution Prevention Plan." Da ne Willis Name (Print name) Site Director Title (Prin title) 'I (_�, (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mt;/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?2 Outfall No. Date Sample Collected" (mo/dd/yr) 24-hour rainfall amount, Inches' New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids Benchmarks _ - - 15 mg/L 100 mg/L or 50 mg/L* Parameter Code - 46529 NCOIL NCOIL 00552 006 May 2019 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/l/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: James Moore Mail an original and one copy of this DMR including all "No Discharge" re orts within 30 da s of receipt of the lob results or at end of monitoring period in the case o "No Discharge"' reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thAhere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of jyerinittee Permit Date:11/1/2018-5/31/2021 6'/ 3 J l2 Date SWU-245, last revised 11/1/2018 Page 3 of 3 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit'No. NCG030000 Date submitted 6/13/19 CERTIFICATE OF COVERAGE NO. NCG030078 FACILITY NAME CommScope, Inc.- Catawba COUNTY Catawba PERSON COLLECTING SAMPLES N/A _ LABORATORY_ N/A Lab Cert. # N/A Comments on sample collection or analysis: Did not have period of "no measurable storm events" 72 hours prior Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2019 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' May (monthl DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ®Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, lnches3 Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics' Benchmarks - - 100 mg/V 6.0-9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 02119 01051 01094 1 00552 78141 003 May 2019 004 May 2019 005 May 2019 006 May 2019 008 May 2019 009 May 2019 012 May 2019 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469,31). Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for 770 monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Dayne Willis Name (Print name) T Site Director Title (Prin title) JL (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ® No discharge this period?' Outfall No. DaSample Date ate tedl Coll(mo/dd/yr) 24-hour rainfall amount, Inchesj New Motor Oil or Hydraulic Oil Usage Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total suspended solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/L* Parameter Code - 46529 NCOIL NCOIL 00552 006 May 2019 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART If SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS, SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: James Moore Mail a» ariainol and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware thhere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of JO(erkttee Permit Date:11/1/2018-5/31/2021 Date SWU-245, last revised 11/1/2018 Page 3 of 3