Loading...
HomeMy WebLinkAboutNCG020795_COMPLETE FILE - HISTORICAL_20151123STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. /v ba O -1 � J DOC TYPE el HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ � I YYYYMMDD f ° North Carolina Department of Environmental Quality Pat McCrory Donald R. van der Vaart Governor Secretary November 19, 2015 Rick Solazzo Senior V.P., Environmental Affairs Unimin Corporation 258 Elm Street New Canaan, CT 06840 RECEIVE] NOV 2 3 1015 CENTRAL FILES DWR SECTION Subject: General Permit No. NCG020000 Unimin Corporation - Schoolhouse Quartz COC NCG020795 Avery County Dear Mr. Solazzo: In accordance with your request for renewal of a discharge permit received on May 30, 2014, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Energy, Mineral, and land Resources. The Division may require modification or revocation and reissuance of the certificate of coverage (COC). Please be advised that EPA Region 4 staff who performed a Compliance Sampling Inspection (CSI) at the end of March 2015 and follow-up sampling in June 2015 at other industrial mineral mines in North Carolina raised concerns about metals levels in the discharges. The Stormwater Permitting Program identified mines like this one that have similar activities. During the term of this General Permit, this site may be evaluated further for an alternative permitting action, such as applying to the Division of Water Resources (DWR) for an individual NPDES discharge permit (or modification of its existing wastewater individual permit) prior to the expiration of this General Permit in 2020. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mineral, and Land Resources, or permits required by the Division of Water Resources (DWR), Coastal Area Management Act, or any other federal or local governmental permit that may be required. If the conditions as stipulated in the COC are unacceptable to you, you may apply sooner for an individual NPDES discharge permit. Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 512 North Salisbury Street, Raleigh, North Carolina 27604 - Internet: http://portal.ncdenr.org/web/lr/ Mailing Address: 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-9200 I FAX: 919-715-8801 An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper /i NCGO20795 Renewal COC November 19, 2015 Page 2 If you have any questions concerning this permit, please contact Bradley Bennett at telephone number (919) 807-6378, or Bethany Georgoulias at telephone number (919) 807-6372. Sincerely, for Tracy E. Davis, P.E., CPM cc: Toby Vinson, DEMLR Land Quality Section Tom Belnick, DWR Water Quality Permitting Section Stan Aiken, DEMLR Asheville Regional Office RE Linda Wiggs, DWR Asheville Regional Office Kip Tyler, EPA Region IV NPDES Permitting and Enforcement Branch Stormwater Permitting Program Files DWR Central Files t Certificate of Coverage Page I of I STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020795 STORMWATER AND WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Unimin Corporation is hereby authorized to discharge stormwater and/or wastewater, as provided in the original Certificate of Coverage (COC), or subsequent COC modification, from a facility located at: Unimin Corporation Schoolhouse Quartz 107 Harris Mining Co Rd Hwy 19e Spruce Pine Avery County to receiving waters designated as North Toe River, class C;Tr water(s) in the French Broad River Basin (s) in accordance with the stormwater pollution management requirements, monitoring and reporting requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG020000 as attached. This Certificate of Coverage shall become effective October 1, 2015. This Certificate of Coverage shall remain effective for the duration of the General Permit. Signed this day October 1, 2015. for Tracy E. Davis, P.E., CPM Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission http://porta1.ncdenr.org/web/Ir/2015-erenewa1 11 / 19/2015 North Carolina Department of Environmental Quality Technical Bulletin for N.C. General NPDES Permit NCG020000 (Mining Environmental Activities) Division of Energy, Mineral, and Land Resources Quality Technical Bulletin for NCG020000 (Mining) Last Revised 10/812015 What activities are covered by this general permit? NCG020000 coverage authorizes: • Stormwater discharges associated with mining and quarrying of non-metallic minerals (except fuels), mine excavation, processing, and vehicle maintenance activities (VMA) at mine sites. • Wastewater discharges (dewate(ng, process wastewater, wastewater recycle system overflows). • Operation of wastewater treatment systems (Authorization to Construct no longer required). NCG020000 coverage is NOT APPLICABLE to: • Borrow Pits covered by the NC DOT statewide stormwater permit. • Peat mining, coal mining, metal mining, or oil & gas extraction operations. • Wastewater not specifically identified by the general permit. What are key stormwater requirements? NCG020000 requires periodic discharge monitoring and a Stormwater Pollution Prevention Plan (SPPP); • Develop and implement an SPPP, and update it at least annually. • Inspect Stormwater Best Management Practices (BMPs) once every seven (7) calendar days. • Semi-annual analytical monitoring and qualitative (visual) monitoring. • Report Stormwater monitoring data once a year by March 1 st to DEG Central Office. • Report benchmark exceedances or Tier 2 monitoring to the DEMLR Regional Office within 30 days. • Respond to benchmark exceedances according to Tier response requirements. What are key wastewater requirements? NCG020000 stipulates wastewater treatment facility operational requirements and periodic discharge monitoring: • Notify DEG if facility faiis to perform satisfactorily or creates nuisance conditions. • Only DEQ-evaluated flocculants may be used, if administered according to maximum application doses. • Quarterly analytical monitoring for first year, or until four consecutive samples comply with all limits (then semi-annual monitoring allowed). Quarterly monitoring schedule resumes upon any limit violation. • Settleable solids (SS) monitoring applies to discharges to HQW, ORW, SA, SB, PNA, or Tr designated waters. • Total Suspended Solids (TSS) limits specific to industrial sand mines, and to any mine discharging to HQW. • Report wastewater effluent monitoring data once a year (by March 1st) to DEQ Central Office. • Report effluent limitation violations to the DEMLR Regional Office within 30 days. • Effluent turbidity levels above the water quality standard prompt upstream and downstream monitoring. What has changed from the previous permit? Some changes specific to Stormwater: • Reduced BMP inspections (weekly) for active mines; additional allowances for inactive mines that qualify for "dormant status." • Changes to SPPP Annual Update. • "Measureable storm event" (any size fhot results in a discharge) replaces "Representative" event. • New benchmarks and Tiers specific to turbidity. • Total Flow and event duration no longer required. • pH removed from VMA monitoring. Some changes specific to Wastewater: • May drop to semi-annual WW monitoring after four quarterly samples that comply with all limitations. • Turbidity instream monitoring is required if effluent levels above the water quality standard. • SS monitoring for sensitive waters only (HQW, etc.) • TSS limits apply to industrial sand mines and HQWs. Changes from the fast permit are detailed in the "Response to Comments and Summary of Changes" Document for the 20i5 NCG02 GP on our website. PAGE TECHNICAL BULLETIN FOR N.C. GENERAL NPDES PERMIT NCGO20000 (MINING ACTIVITIES) Frequently Asked Questions What if my mine is inactive? The permit makes allowances for inactive mines that have sus- pended all industrial activities and that certify to DEMLR that the site has been stabilized. If approved for "dormant status," these operations qualify for re- duced BMP inspections and may be exempted from outfall moni- toring by the Regional Engineer. Do 1 have to monitor all outfalls? Yes. However, you may request Representative Outfall Status (ROS). If approved, ROS allows monitoring at fewer outfalls. To request ROS, submit an ROS Re- quest Form to the DEMLR Region- al Office. The form is available on our website (below). Also, the Regional Office may exempt mines with "dormant sta- tus" from analytical and/or quali- tative monitoring. What if I sell my business, or the name changes? You are required to notify DEMLR of those changes in writing, and continuation of permit coverage is subject to the Director's ap= proval. Please submit the Name/ Ownership Change form located on our Program website. What do I do when my permit expires? Permitees are not required to sub- mit an application for renewal un- less directed by the Division. The permittee should continue to abide by this general permit if it expires and renewed coverage has not yet been issued. What is wastewater, and what is stormwater at a mine site? Any water contacting an actively mined area, wafer used to pro- cess mined materials, and mine dewatering water are all consid- ered "wastewater." For some mines, "mine dewatering" also means wet pit overflows, and not just pumped -out water. Any stormwater that commingles with these waters is "wastewater." "stormwater" includes runoff from areas related to mining, pro- cessing, or raw material storage areas, such as haul roads or pro- cessing plant areas at the mine. Sometimes the answer is not clear because of how broad the defini- tions are. For example, N.C. con- siders runoff from areas that con- tain overburden only (no mined or processed material), and that does not gommincile with wastewater (including runoff from the mine), to be stormwater. If you are unsure about discharges, please contact the DEMLR Re- gional Office for assistance. Does a certified lab need to analyze my samples? Monitoring under NPDES permits must be conducted in accord- ance with test procedures ap- proved in federal regulations in 40 CFR § 136. All labs certified by LAST REV. 10IM 5 North Carolina perform analysis in accordance with those proce- dures. While N.C. certification re- quirements do not apply to testing stormwater-only discharges, data gathered under an NPDES permit must still conform to federal re- quirements. Using a North Caroli- na certified lab is one way to en- sure compliance. A list of certified labs is available from: http:// portal.ncdenr.org/web/wq/lab/ cert/ What if I pull samples for my analytical monitoring, and I'm unable to get a sample or valid results for a parameter? If this happens, please sample for the missing parameter during the next measureable storm event or wastewater discharge. If I sample my discharge, do have to do visual monitoring at the same time? You may, but it is not necessary under NCG02. Some other gen- eral permits require it, however. What if there is no flow for a period between two samples that exceed a benchmark? Are those consecutive exceedances? Yes. This scenario still puts you in Tier 2. The new permit is more cleat about how the Tier 2 trigger omits periods of no discharge. Who can help me with questions? Your questions about stormwater permit requirements yua �- can be addressed to the DEMLR Offices: Asheville Office........... (828) 296-4500 Washington Office ....... (252) 946-6481 Fayetteville Office....... (910) 433-3300. Wilmington. Office........ (910) 796-7215 Mooresville Office....... (704) 663-1699 Winston-Salem Office... (336) 776-9800 Raleigh Office............ (919) 791-4200 Central Office ............. (919) 707-9220 Hel ful Link: DEMLR Stormwater Permitting Program: http://portal.ncdenr.org/web/ir/stormwater r ,ANNUAL SUMMARY DISCHARGE MONITORING REPORT.(DM R — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG020000 Calendar Year "Report ALL STORMWATER monitoring data on this form (include "No Flow"Mo Discharge" and Benchmark Exceedances) from the previous calendar year to the bEQ by MARCH 1 of each year. . Certificate of Coverage No. NCG02 Facility Name: County: Phone Number: ( ) Certified Laboratory Lab # Lab # Total no. of SDOs monitored Stormwater Discharge Ouffall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year; was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ .f y . •Yt 'Outfall No: �.w J - r Total Rainfall, inches - �. TSS' rimgll - .xF W `rr'k* 6..w t , --SS, nil/I �., Turbidity, NTU, 'Circle fi � ,r . Upstream .- - Turliidit ; (U} • y ' N7U r, T'.' ,,: • c ; ; : • � -Downstream (D}.=Turbidity; ;- NTU .,� - • � '-Non-polar ,0&G, mgf! • , Motor Qil.- Usage" �. allmo: Stormwafer - indicate NO `e circle Benchmark 100 0.1 Benchmark 50/25/10.. NIA .snaapplea .tardal NIA nadap Standard 15 '55 gafto. average requires T;�� Mon -War oG„e . DatPMSample Collected,. „ ,molddl' r E Mimi= Mimi ,�_ Permit Date 1011 /2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other _ ❑ Outfall No Total - Rainfall; inches TSS, ~ SS, R- mgll m111 ' - .- Turbidity; NTU Upstream` (U) Turbidity, NTU Downstream (D) Turbidity, NTU . f New.*.. Non- olar Motor Oil P . q&G, mgll` Usage tV_ MA) (60111710.1. Stormwater ln,,,.,,o Benchmarks F`0W a kabie c`"�' Benchmark - 100150 0.1 Circle Benchmark � 50/25/10 NIA' Water lity Standard aappries NIA rappi;es Standard ?55gaumn. a'arapa requires 1 `5� TO&GSS and Non-polarg Date Sample. Collected., .. molddl r .. Permit Date 101112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. N0002 ❑❑❑❑ .Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No.. ; ..Upstream ..� Downstream Total TSS, Turbidi SS,, h► (U) -Turbidity, (D) Turbidity, Rainfall, mg11 mlll L, NTU' ,NTU NTU inches' . C r: '' t Non -polar. p O&G,- mg/1', (VMA), a ` .New • Motor Qil s'' Usage atlma Stormwater Benchmarks Circle Circle Benchmark Benchmark � NIA NIA Indicate NO Benchmark r. Benchmark Quality aFLawb� 100150 0.1 50/25/10 ' - Standardppl s StandardapW a 15 >ss gaUm°. average requires irron{tq�jniat To3Gand ;Date Sample "�`'Collscted, mAdl r`, Permit Date 101112015 — 9/3012020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122,22] Signature Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct = Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 10/1/2015 — 9130/2020 Last Revised 10-2-2015 ANNUAL SUMMARY DISCHARGE MONITORING REPORT UMR -WASTEWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCO020000 Calendar Year +Report ALL WASTEWATER monitoring data on this form (include "No Flow"/"No Discharge" and Limit Violations) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. N0002 Facility Name: County: Phone Number: ( ) Certified Laboratory Lab # Lab # Total no. of outfalis monitored Wastewater (WW) Discharge Outfall No. Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No ❑ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑ If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑ Were there any limit violations in the calendar year? Yes ❑ No ❑ `r Outfall No Daily Flow Rate, cfs pH, -SU � TSS; `mg11 a - _11 SS;. ,m1/1, : Irapprlca0le Discharge Turbidity,- NTU: - V.0 UpstreamFry - f(U) Turbidity, - NTU Downstream (D)-Tu�61dity,. n NTU Fecal : Coliifoim,� ;co11100 iri1: ,.• SA - Effluent Limitations Mo. Ave I Daily Max. HOW or ORW _ 50% of 7010 Indicate NO FLOW If applicable. freshwater 6.0-0.0 ' °a""�' Industdal Sand " 25145 HQWor0Rw 20130 How a oRw prig 7r or PNA 10115 HQW, ORW, . &%8B,PMA, °' any Trout 0.110.2 No -Limit ualad S nerd that applies 50/25110 NIA Water Quality, Standard applies NIA Water Quality Standard applies N/A ':Date Sample 'Collected; ' Permit Date 10/1/2015 — 9/3012020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Wastewater (WW) Discharge Outfall No. ' Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No ❑ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑ If so, what is the 7010 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑ Were there any limit violations in the calendar year reported? Yes ❑ No ❑ : Outfall No'. •baily Flow pH,�, Rate, cfs' SU., t •, -Fecal TSS, ,, SS, ': .Discharge -Upstream Downstream Coliform,. mgll.-1 mill Turbidity,' (U) Turbidity, (D) Turbidity, ; col/100 ml _ Napp,7cab,. NTU' NTU NTU ISM, Effluent Limitations Mo. Ave, Daily Max. HOW or freshwater 50% of 6.0-9.0 7Q10 Caaltwater ' 6.8-8.5 !ndlcate NO FLOW !/applkab,e industrial Sand '2J/45 HOW,ORW, HQW or ORW sA SO, PNA No Limit NIA NIA 20/30 or any Trout Q a{ ti ta Gard Standardapplies Standard Water Standarquality appli s N/A HOW or ORW 0.1 /O.2 that applies: - . gpdIr or PNA 50/25/10 10/15 - ,Date Sample - ,Collected" Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ -Additional Outfall Attachment (make copies as needed for additional outfalls) Wastewater (WW) Discharge Outfall No. Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No ❑ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑ If so, what is the 7010 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑ Were there any limit violations in the calendar year reported? Yes ❑ No ❑ Outfall No r . _ Dailyf Flow' 'pH, TSS;-SS-'Discharge Rate, cfs SU mglh"• -v mill Mappuyabla _ Upstream Turbidity, (U) Turbidity, NTU NTU Q' Fecal` Downstream, Coliform,~ (D) Turbidity,' co11100.ml NTU SA Effluent Limitations Mo. Ave IDaily Max. Industrial Sand HOW orOF2W treahwater _2ia14CJ 50%of 6.0-9.0 'HOW orORW' 7Q10 saltwater 20130 6.8-8.5 HQW °r Onw IndkataNOFLOW mdTrarPNA llapplkable ,.. 10115 HOW,ORW, SA. SB,PHA. °""r Trout 0.110.2that _ No Limit NIA , Quality Standard stand ra d aplity plles. appllas: 50/25/10 NIA Water Quality Standard applies NIA Date_Sample ,,Collected, ` molddl r . , t ' F Permit Date 10/1/2015 -- 9130/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ r,, CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment -for knowing violations." [Required by 40 CFR §122.22] Signature Date Mail Annual Summary Wastewater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (riot DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 BENCHMARK EXCEEDANCE or TIER 2 DISCHARGE MONITORING REPORT DMR - STORNiWATER SUBMIT TO REGIONAL .OF•F.ICE* General Permit No. NCG020000 *Use this form if any stormwater samples have EXCEEDED A BENCHMARK.or if the facility is in TIER 2 MONITORING for any parameter (including TIER 2 for Turbidity). Send sample results to the..DEMLR Regional'Office within 30 days otreceipt from the laboratory. Certificate of Coverage No. NCG02 ❑❑❑❑ Facility Name: Sample Collection Period: Period 1 ❑ Period 2 ❑ Calendar Year County: For Monthly Monitoring: Month Phone Number: U Person Collecting Samples: Certified Laboratory: Lab # Lab # Has this -facility had 4 or more benchmark exceedances for any single parameter, at any one SW discharge outfall (SDO)? Yes ❑ No ❑ Have you contacted the Regional Office? Yes ❑ No ❑ Whom at the Region did you speak with? Part A: Stormwater Monitorina Reauirements (no VMA. see next"naae for outfalls with VMA) +se•'+!•�•+. --•` 'Outfalh� ;Nod.Collected T.'.-.�e'.w'S;':_ --.,Date Sampie ` -r:-a .:: .;r `—w�i -To , = r Aainfail s ;�^,.z i -- Is this;SDO n. Tier 2? ..+r .?.:t^_Total -Suspended Solids' TSS ��' }.� Settleable-- ` -Solids` riilll • "_....0 ' s'"'p'. - w Turbidity,,NTU:��_ Upstream;(U} :Turbidity, s� _ .NTU Downstream (D). - Turbidity,- • . _ NTU Ism, 1rinOld.d:�Ly,r or "NO Ft�OWre -a f.. inches -YIN. - - - 100= - .ri0•{oftW,HOW,Tr,PkA)- 0A so - 25 (takes, reservoirs; saftwaters) 10 (freehrratarTrdesignated streams, lakes. and reserwits NIA WaterCuaHty Standard applies NIA Walar0uality - Standard applies Permit Date 10/1/2015 — 9130/2020 .Last Revised 10-2-2015 Page 1 of 3 Certificate of Coverage No. NCG02 ❑❑❑❑ Part A: Stormwater Monitoring Requirements (no VMA), cant. -_ '`- 0utfall —� `No:�:�rCollected� �; Date Sample •- f, r .° Total Rainfall Is this SDO in•T,ler2?, Total`- ~4Suspertded' 'Solids (TSS),_ rmgll :; Settleable A.:Solids, :� -mill. ;T =- ` ". ' -Turbidity, NTU �. '' w x Upstream (U). =Turbidity,_ :- NTU �� ..Downstream (D)' = Turbidity, NTU k molddlyr�� + ior�'�NO i'LO•■'i+ + a, '. ",Inches 3 s .y -� 2 r YIN - 100 5O {QRW, HOW, Tr, PNAj- 0.1 5o 2S peke:, ro.e,�Ira, can M,ataR1 10 (freshwater Trdeslgnated stmam36 lakes and reservoirs) NIA Water Quality Standard applies N/A Water Quallty. Standard applies Part B: Stormwater Monitoring Requirements for SDOs with Vehicle Maintenance Activities (VMA) where facilities use > 55 gallons of new motor oil a month if averaged over the calendar year. -NOTE: Other parameters only for outfalls that include both mining activities and VMA. 47- ,Ou No n i r ,'Date.Sampfe .: ollected +KPSs� F t c -Total Rainfall Y }� VMA = TSS; ' ' ,,Mgll' �� f ,. t VMA only Non-polar','f 08rG,.mg11 - R:, s 'VMA onlyv . ,NewNotor, -'Oil Use. ^ (gaVmo.j; ` !f applicable SS ; _.. roll! f " l'. E' :'!f applicable ' Turbidity; NTU" r "If applicable_' Upstream (U) Turbidity, `.NTU ` If applicable Downstream (D) Turbidity, - NTU • . or "NOFLOW" ln 100150- 15 :55 0.1 50/25/10 NIA NIA Permit -Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 Page 2 of 3 Certificate of Coverage No. NCG02 ❑❑OE CERTIFICATION " I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.221 Signature Date Mail Benchmark Exceedanceffier 2 DMR to Your DEMLR Regional Office Land Quality Section: EVILL_E REGIONAL OF: 2090 US Highway 70 Swannanoa, NC 28778 (828) 296-4500 3800 Barrett Drive Raleigh, NC 27609 (919)791-4200 WINSTON SALEM REGIONAL` OFFICE -- 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27103 (336)776-9800 Permit Date 10/1/2015 — 9130/2020 FAYETFEVILLE REGIONAL.O_F_F__I_C_E_ 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 943 Washington Square Mall Washington, NC 27889 (252) 946-6481 CENTRAL OFFICE Questions for The Central Office Stormwater Permitting Program? (919) 707-9220 MQORESVILLE REGIONAL OFFICE 610 East Center Avenue/Suite 301 Mooresville, NC 28115 (704) 663-1699 WILMINGTON REGIONAL OFFICE 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910) 796-7215 Last Revised 10-2-2015 Page 3 of 3 LIMIT VIOLATION DISCHARGE MONITORING REPORT (DMR) — WASTEWATER SUBMIT TO REGIONAL OFFICE' General Permit No. NCG020000 'Use this form if any wastewater samples'have EXCEEDED A WASTEWATER LIMIT for any parameter. Send sample results to the DEMLR Regional Office within 30 days of receipt from the laboratory. Certificate of Coverage No. NCG02 ❑❑❑❑ Facility Name: Sample Collection Period: Qtr 1 ❑ Qtr 2 ❑ Qtr 3 ❑ Qtr 4 ❑ Calendar Year County: If Monthly Monitoring: Month Phone Number: (_� Person Collecting Samples: Certified Laboratory: Lab # Lab # Is this an industrial sand mine? Yes ❑ No ❑ Discharge to HQW or ORW waters? Yes ❑ No ❑ Discharge to SA waters? Yes ❑ No ❑ Discharge to Tr (Trout) waters? Yes ❑ No ❑ Discharge to SB or PNA waters? Yes ❑ No ❑ If HQW, what is the 7Q10 flow rate? or Tidal, 7010 not available ❑ Wastewater Monitoring Reauirements ..r Outfall No ��_,; 4..Fw a.F ,• - tijdtiL 1� 'Date_Sample Collected' -r•-•-g. - „'��.. _ � - - - Daily Flow-. Rate, cfs'`` .•'�`_.:'"'�r�.rw.l pH, SU r.-.�w,�;..t Suspended ;,Solids (T3S), -• .y..«xa s. � Settleable - Solids, ,;NePPllceblY �„ `° Discharge r ^' I'.Tuibidity;'NTU e:' �. -`t,.� Upstream' (U) Turbidity, :NTU. _� «. ;Downstream (D)Turbidity, NTU »., . _ Fecal. Coliform, =6011100.m1't.` (SA)' - sr .• * molitCalf .: of "NO FLOW" - - r- HQW or ORW 50% Of indicafa NO FLOW if freshwater "6.0-9.0 snaer 6.8-8.5 - dfdustrlal Sand . 25145 _ _ r Howorortw 20130 How or ORW ante Tr or PHA 1011$ - HQW, OAW. SA, SEL PHA uraarrrout 0:110.2 - -No Limit Clfr Witterlty Standard �p": 50/25/10 NIA adat Stitridrp NIA Water Standard applies NIA - Permit Date 10/112016 — 9/30/2020 Last Revised 11-18-2015 Page 1 of 3 Certificate of Coverage No. NCG02 ❑00E] Wastewater Monitoring Requirements, cont. ' O,utfafl Y fVo: rl Date Sample Collected . - DailyVlow , Rate, cfs '' Y _, pH; SU ° .�� L -.- :Total . ..'?Suspended' ` 'Solids �s c . - r ,;i Settleable Solids; .--11 opPlleabla "' Discharge "Turbidity, NTU: 7T 4' ' t .. °Upstream (U) Turbidity, •aNTU. ;� �. - ti- - ' .Downstream (D) Turbidity,- NTU - Fecal -Coiiform, col/100:m1: "(SA) molddlyr "NL HQW orORW '50% Of Indkoft NO FLOWN BA011cabio freshwater 6.0-9.0 • 6.8-8.6 - + Industrial Send 26I45 . HQWorORW -20130 HQworOltWMTrorPNA 10I16 HQW, ORW, SA, SR. PNA, or any Trout -0.110.2 NO Limit Circle Wateray Standard applies: 60/25/10 NIA- ^ ua.�ap NIA p'ar sandard applies NIA Permit Date 10/112015 — 9/30/2020 Last Revised 11-18-2015 Page 2 6f 3 Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the informations submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.22] Signature Date RA Mail Limit Violation DMR to Your DEMLR Regional Office Land Quality Section: 2090 US Highway 70 Swannanoa, NC 28778 (828) 296-4500 3800 Barrett Drive Raleigh, NC 27609 (919) 791-4200 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27103 (336) 776-9800 Permit Date 1011 /2016 — 9/30/2020 FAY ETTEVIL'LE REGIONAL,OFFICE 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910)433-3300 WASHINGTON_REGIONAL_OFFICE 943 Washington Square Mall Washington, NC 27889 (252) 946-6481 Questions for The Central Office Stormwater Permitting Program? (919) 707-9220 610 East Center Avenue/Suite-301 Mooresville, NC 28115 (704) 663-1699 WILMINGTON_REGIONAL OFFICT+J 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910) 796-7215 Last Revised 11-18-2015 Page 3 of 3 �� =VFA NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: http;.//paaal.ncdenr.org/web/LL/nl2des-stormwaterl Permit No.: Li/�/�/_/_/ _/_/_/_/ or Certificate of Coverage No.: LV/C/L/`/_/`/_/_/_/ Facility Name: County: Phone No. Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ❑ Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event' is a storm event that measures greater than 01 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with Floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 5WU-242, Last modified 7/31/2013 LFWAA Amw�-A RCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit. httu;././pprtal.ncdenr,org/web/Irla dj) es-stormwaterl Permit No.: jY/�/_/_ /,/_/_/_/^/ or Certificate of Coverage No.: Facility Name: County: _ Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): Phone No. Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ❑ Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Pagel of 2 SWU-242, East modified 7/31/2013 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the.stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013