Loading...
HomeMy WebLinkAboutNCG020716_COMPLETE FILE - HISTORICAL_20151123�f D STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DQ DOC TYPE 01"HISTORICALFILE ❑ MONITORING REPORTS DOC DATE ❑ ��� � �'a � YYYYMMDD North Carolina Department of Environmental Quality Pat McCrory Governor Gregory Taveras The Quartz Corp USA P.O. Box 309 Spruce Pine, NC 28777 Dear Mr. Taveras: Donald R. van der Vaart Secretary November 19, 2015 RECEIVED NOV 2 3 2015 CENTRAL PILES DWR SECTION Subject: General Permit No. NCG020000 The Quartz Corp USA - Pete Lawson Mine COC NCGO20716 Mitchell County In accordance with your request for renewal of a discharge permit received on June 30, 2014, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Energy, Mineral, and Land Resources. The Division may require modification or revocation and reissuance of the certificate of coverage (CDC). Please be advised that EPA Region 4 staff who performed a Compliance Sampling Inspection (CSI) at the end of March 2015 and follow-up sampling in June 2015 at other industrial mineral mines in North Carolina raised concerns about metals levels in the discharges. The Stormwater Permitting Program identified mines like this one that have similar activities. During the term of this General Permit, this site may be evaluated further for an alternative permitting action, such as applying to the Division of Water Resources (DWR) for an individual NPDES discharge permit (or modification of its existing wastewater individual permit) prior to the expiration of this General Permit in 2020. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mineral, and Land Resources, or permits required by the Division of water Resources (DWR), Coastal Area Management Act, or any other federal or local governmental permit that may be required. If the conditions as stipulated in the CDC are unacceptable to you, you may apply sooner for an individual NPDES discharge permit. Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http:Nportal.ncdenr.org/web/Ir/ Mailing Address: 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 i 919-707-92001 FAX: 919-715-8801 An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper M NCG020716 Renewal CDC November 19, 2015 Page 2 If you have any questions concerning this permit, please contact Bradley Bennett at telephone number (919) 807-6378, or Bethany Georgoulias at telephone number (919) 807-6372. Sincerely, for Tracy E. Davis, P.E., CPM cc: Toby Vinson, DEMLR Land Quality Section Tom Belnick, DWR Water Quality Permitting Section Stan Aiken, DEMLR Asheville Regional Office RE Linda Wiggs, DWR Asheville Regional office Kip Tyler, EPA Region IV NPDES Permitting and Enforcement Branch Stormwater Permitting Program Files DWR Central Files Certificate of Coverage Page I of I STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020716 STORMWATER AND WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, The Quartz Corp USA is hereby authorized to discharge stormwater and/or wastewater, as provided in the original Certificate of Coverage (COC), or subsequent COC modification, from a facility located at: Pete Lawson Mine Gouges Creek Rd Spruce Pine Mitchell County to receiving waters designated as Gouges Creek, class WS-IV;Tr water(s) in the French Broad River Basin(s) in accordance with the stormwater pollution management requirements, monitoring and reporting requirements, and other conditions set forth in Parts I, 11, 11I, IV, V, and VI of General Permit No. NCG020000 as attached. This Certificate of Coverage shall become effective October 1, 2015, This Certificate of Coverage shall remain effective for the duration of the General Permit. Signed this day October 1, 2015. for Tracy E. Davis, P.E., CPM Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission http://portal.ncdenr.org/web/Ir/2015-erenewal 1 1 /19/2015 North Carolina Department of Environmental Quality Technical Bulletin for N.C. General NPDES Permit NCG020000 (Mining Emkonmenral Activities) Division of Energy, Mineral, and Land Resources Qualiry Technical Bulletin for NCG020000 (Mining) Last Revised 10/812015 What activities are covered by this general permit? NCG020000 coveraae authorizes: • Stormwater discharges associated with mining and quarrying of non-metallic minerals (except fuels), mine excavation, processing, and vehicle maintenance activities (VMA) at mine sites. • Wastewater discharges (dewatering, process wastewater, wastewater recycle system overflows). • Operation of wastewater treatment systems (Authorization to Construct no longer required). NCG020000 coverage Is NOT APPLICABLE to: • Borrow Pits covered by the NC DOT statewide stormwater permit. • Peat mining, coal mining, metal mining, or oil & gas extraction operations. • Wastewater not specifically identified by the general permit. What are key stormwater requirements? NCG020000 requires periodic discharge monitoring and a Stormwater Pollution Prevention Plan (SPPP): • Develop and implement an SPPP, and update it at least annually. • Inspect Stormwater Best Management Practices (BMPs) once every seven (7) calendar days. • Semi-annual analytical monitoring and qualitative (visual) monitoring. • Report stormwater monitoring data once a year by March 1 st to DEQ Central Office. • Report benchmark exceedances or Tier 2 monitoring to the DEMLR Regional Office within 30 days. • Respond to benchmark exceedances according to Tier response requirements. What are key wastewater requirements? NCG020000 stipulates wastewater treatment facility operational requirements and periodic discharge monitoring: • Notify DEQ if facility fails to perform satisfactorily or creates nuisance conditions. • Only DEQ-evaluated flocculants may be used, if administered according to maximum application doses. • Quarterly analytical monitoring for first year, or until four consecutive samples comply with all limits (then semi-annual monitoring allowed). Quarterly monitoring schedule resumes upon any limit violation. • Settleable solids (SS) monitoring applies to discharges to HQW, ORW, SA, SB, PNA, or Tr designated waters. • Total Suspended Solids (TSS) limits specific to industrial sand mines, and to any mine discharging to HQW. • Report wastewater effluent monitoring data once a year (by March ist) to DEQ Central Office. • Report effluent limitation violations to the DEMLR Regional Office within 30 days. • Effluent turbidity levels above the water quality standard prompt upstream and downstream monitoring. What has changed from the previous permit? Some changes specific to Stormwater: • Reduced BMP inspections (weekly) for active mines: additional allowances for inactive mines that qualify for "dormant status." • Changes to SPPP Annual Update. • "Measureable storm event" (any size that results in a discharge) replaces "Representative" event. • New benchmarks and Tiers specific to turbidity. • Total Flow and event duration no longer required. • pH removed from VMA monitoring. Some changes specific to Wastewater: • May drop to semi-annual WW monitoring after four quarterly samples that comply with all limitations. . Turbidity instream monitoring is required if effluent levels above the water quality standard. • SS monitoring for sensitive waters only (HQW, etc.) • TSS limits apply to industrial sand mines and HQWs. Charges from the last permit are detailed in the "Response to Comments and Summary of Changes" Document for the 2015 NCG02 GP on our website. PAGE TECHNICAL BULLETIN FOR N.C. GENERAL NPDES PERMIT NCGO20000 (MINING ACTIVITIES) Frequently Asked Questions What if my mine is inactive? The permit makes allowances for inactive mines that have sus- pended all industrial activities and that certify to DEMLR that the site has been stabilized. If approved for "dormant status," these operations qualify for re- duced BMP inspections and may be exempted from outfall moni- toring by the Regional Engineer. Do I have to monitor all outfalls? Yes. However, you may request Representative Outfall Status (ROS). If approved, ROS allows monitoring at fewer outfalls. To request ROS, submit an ROS Re- quest Form to the DEMLR Region- al Office. The form is available on our website (below). Also, the Regional Office may exempt mines with "dormont sta- tus" from analytical and/or quali- tative monitoring. What if I sell my business, or the name changes? You are required to notify DEMLR of those. changes in writing, and continuation of permit coverage is subject to the Director's ap- proval. Please submit the Name/ Ownership Change form located on our Program website. What do I do when my permit expires? Permitees are not required to sub- mit an application for renewal un- less directed by the Division. The permittee should continue to abide by this general permit if it expires and renewed coverage has not yet been issued. What is wastewater, and what is stormwater at a mine site? Any water contacting an actively mined area, water used to pro- cess mined materials, and mine dewatering wafer are all consid- ered "wastewater." For some mines, "mine dewatering" also means wet pit overflows, and not just pumped -out water. Any stormwater that commingles with these waters is "wastewater." "Stormwater" includes runoff from areas related to mining, pro- cessing, or raw material storage areas, such as haul roads or pro- cessing plant areas at the mine. Sometimes the answer is not clear because of how broad the defini- tions are. For example, N.C. con- siders runoff from areas that con- tain overburden only (no mined or processed material), and that does not commingle with wastewater (including runoff from the mine), to be stormwater. if you are unsure about discharges, please contact the DEMLR Re- gional Office for assistance. Does a certified lab need to analyze my samples? Monitoring under NPDES permits must be conducted in accord- ance with test procedures ap- proved in federal regulations in 40 CFR § 136. All labs certified by LAST REV. 1018/ 15 North Carolina perform analysis in accordance with those proce- dures. While N.C. certification re- quirements do not apply to testing stormwater-only discharges, data gathered under an NPDES permit must still conform to federal re- quirements. Using a North Caroli- na certified lab is one way to en- sure compliance. A list of certified labs is available from: http:// portal.ncdenr.org/web/wq/lab/ cert/ What if I pull samples for my analytical monitoring, and I'm unable to get a sample or valid results for a parameter? If this happens, please sample for the missing parameter during the next measureable storm event or wastewater discharge. If I sample my discharge, do have to do visual monitoring at the same time? You may, but it is not necessary under NCG02. Some other gen- eral permits require it, however. What if there is no flow for a period between two samples that exceed a benchmark? Are those consecutive exceedances? Yes. This scenario still puts you in Tier 2. The new permit is more clear about how the Tier 2 trigger omits periods of no discharge. Who can help me with" questions?, Your questions about stormwater permit requirements can be addressed to the DEMLR Offices: Asheville Office........... (828) 296-4500 Washington Office....... (252) 946-6481 Fayetteville Office....... (910) 433-3300 Wilmington Office........ (910) 796-721 S Mooresville Office....... (704) 663-1699 Winston-Salem Office... (336) 776-9800 Raleigh Office ............ (919) 791-4200 Central Office ............. (919) 707-9220 Helpful Link: DEMLR Stormwater Permitting Program: http://portal.ncdenr.org/web/ir/stormwater M ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG020000 Calendar Year 'Report ALL STORMWATER monitoring data on this form (include "No Flow"I"No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. N0002 ❑❑❑❑ Facility Name: County: Phone Number: ( ) Total no. of SDOs monitored Certified Laboratory Lab #. Lab # Stormwater Discharge Outfall. (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes.. received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ r. � Outfall"Nol a: _ T '� ti Total'- 'Rainfall,s inches;.,_.°(VMA),., y p { � �TSS; {`"mgll:` h .' SS, r '` mkll:. .T' '•-jyL Turbidit .. Yr �'NTU y 4 (' (• - Upstream (U)>Turb�dity, a ,r NTU h 4„h 4.^ Dowristream ` ` 'l (D) Turtiid�ty, ,; `; NTU `� y� ; `. '` b k'f -polar None olar'' OG; img11. - . - » c',„_,New Motor.Oil ,Usage} Stormwater Benchmarks NedkafB NO"' FOca Circle ' Benchmark 100150 �.1 circle Banehmadr 50/25/10 _NIA __ Standard tan�`daple � NIA. urda srwapptn 15 >55 garlmo. avarapa raqulrea T�it�'�ab; oacmo :Dat0am0le,. , Colledtedi 'M moldd! r=' 0 Mimi= =I= M Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No. Total Rainfall inches J, Upstream n Downstream TSS Ss,..- Turbidity, (U) Turbidity, (D) Turbidity, NTU 'mgll mlN, ': r-NTU NTU :,.. `' .. Non=polar, O�G m' 11Usage—, , . g (VMA) ""1.New . Motor Oil,' allmo. , Stormwater, Benchmarks lndlcate NO eFt°�e a Circle - Circle NIA NIA benchmark Benchmark 100150 0.1 50I25110 standard aaAPilities Standard appllea 15 >55gaumo: average requires 70d.Gnrnonitnriar -Date Sample .Collected, Permit Date 101112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ ° Total =' Turbidity, }h�� _ ,OutfaH`No. y T$S,.. SS, tYr C Rainfallmgll : m111 :. ,, NTU i inches T Upstream Downstream (U) Turbidity, (D) Turbidity, `F NTU _ .' NTU. Non- olar`. p O&G,' mg11' (VMA)' New f 1 Motor Oil` Usage: allmo. Stormwater BenchmarkBencCirclehmark hrdfcate NO Benchmark Benchmark Benchmarks aFtfkVad;e , 109150 , 0.1. 50/25/10 NIA NIA sae^aa�a apples standard apples 1 `� 'SSgaUm° average regWros tar TSS and ORG monitoring _:Date Sample ': Collected; , -mdlddljr Permit Date 10I112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. N0002 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Required by 40 CFR §122.221 Signature Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct Central Files -is housed in DWR (not DEMLR) N.C. Department of Environmental'Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 10i112015 -- 9/30/2020 Last Revised 10-2-2015 ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) —WASTEWATER SUBMIT- TO CENTRAL OFFICE* General Permit No. NCG020000 Calendar Year *Report ALL WASTEWATER monitoring data on this form (include "No Flow"I"No Discharge" and Limit Violations) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG02 Facility Name: County: Phone Number: (_ Certified Laboratory Lab # Lab # Total no. of outfalls monitored Wastewater (WW) Discharge Outfall No. Is this an industrial sand mine (See 40 CFR §436 Subpart D)7 Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No ❑ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑ If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑ Were there any limit violations in the calendar year? Yes ❑ No ❑ Outfall No. DailyfFtow Rate, cfs "pH, SU TSS,:, z r� mg11 E 1 SS; mll/l, �� irapplabler Discharge. _ Turbidity_;` :;"NTU' Upstream'' (U);Turbidity,+ NTU Downstream. .(D) Turbidity; AM .fecal Coliforin, C611100 ml Effluent' 'Limitations Mo. Ave ! Daily Max. - HQW or ORW 56% of 7Q10 - !ndlcato NO FLOW rrappllcable freshwater 6.0-9.0 sa1vva6er 6.,84.5 tndu$Mal Sand' 25145 H,,N ,ORW -20/M HOW or ORW Ln Tr or PHA -10115. - Haw; ORw, SA, SO, PNA, or any T`O1" 0.110.2 - No Limit q alrcle lity Standda`a that applies. 50/25/10 v NIA Standard Oapplies NIA Staand�ard applies NIA - Date'Sample.` Collected,. - molddl r:'tlow Permit Date 101112015 - 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Wastewater (WW) Discharge Outfall No. Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No ❑ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑ If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑ Were there any limit violations in the calendar year reported? Yes ❑ No ❑ z r 4 Outfall,No:- ' Daily Flow Rate,'cfs :pH, SU ,Ai 3 TSS-- m 11 :. SS, I ml/l", `' Discharge Turbidity, NTU Upstream {', U Turbidity, NTU Downstream D Turbidity, - NTU ' Fecal,", •'Coliform,,' co11100 ml' SA • Effluent ;Limitations . Mo. Ave I Daily Max. HOW or ORW 50% of 7Q10 Indicate NO FLOW ,l appl,cable freshwater 6.0-9.0 . saltwater` 6.8-8.5 Industrial Sand 25I45 HOW or ORw A 20/30 HOW or ORW to Tr or PNA 10/15 HOW, ORW, SA, 313, PNA, or any Trout 0.110.2 - No Limit Circle Water y„appliieeaa� - 501f25/10 NIA • ' Water Quality Standard applies NIA Water Quality Standard applies NIA Date Sample Colcted,MEN J. molddl -r . Permit Date 1011/2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Wastewater (WW) Discharge Outfall No. Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SIB or PNA waters? Yes ❑ No [] Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑ If so, what is the 7010 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout jr) designated waters? Yes ❑ No ❑ Were there any limit violations in the calendar year reported? Yes ❑ No ❑ Outfall }No.} ' r' Daily -Flow. pH, f Rate, cfs 5U ' -TSS, -SS, - , mg/1 , 'mlll ;,': ,lappflcable Discharge Upstream .Turbidity, ,(U),Turbidity, NTU: NTU Fecal• Downstream Coliform; i (D) Turbidity, coll900 rril NTU SA Effluent Lmitations Mo. Ave f pally Max. HOW or ORW freshwater 50% of 6.0-9.0 7010 sa�i1e" 6,8-8.5owor Indkate NO FLOW HapAllcable Indushial Sand - 25145 . Haw, ORW, HOW or ORW SA, SB, PNA, or any Tut 20130 , 0. 0.110.2 Mad Tr or PNA 10115 No Limit NIA Circle Water Quality Standard es Standardtappl that applies: 501251 e10 NIA . lity Standard applies NIA `Date Sample' Collected, `.-molddl r--- - Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 M Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Required by 40 CFR §122.221 Signature Date Mail Annual Summary Wastewater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMI_R Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Perm it'Date 101112015-913012020 Last Revised 10-2-2015 BENCHMARK EXCEEDANCE or TIER 2 DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TO REGIONAL OFFICE* General Permit No. NCG020000 `Use this form if any stormwater samples have EXCEEDED A BENCHMARK or if the facility, is in TIER 2 MONITORING for any parameter (including TIER 2 for.Turbidity). Send sample results to the DEMLR Regional Office within 30 days of receipt from the laboratory. Certificate of Coverage No. NCG02 ❑❑Q❑ Facility Name: Sample Collection Period: Period 1 ❑ Period.2 ❑ Calendar Year County: For Monthly Monitoring: Month Phone Number: Person Collecting. Samples: Certified Laboratory: Lab #, Lab'# Has this -facility had 4 or more.benchmark exceedances for any single parameter, at anyone SW discharge outfall (SDO)? Yes ❑ No ❑ Have you contacted the Regional Office? Yes ❑ No ❑ Whom at the Region did you speak with? Part A: Stormwater Monitorina Reauirements (no VMA. see next oaae for outfalls with VMA) -. sy i .. ' :, ----:' Outfall- ,= Now~; . r - '- Date, Sample - Collected .._ `s' '. 3`TotalT; Rainfall _ - y .r ra•. _ Isithls,SDO in Tier 2? �� } , Tota! "'� � : Suspended ;Solids {TSS), mg . -i�^'� Settleable Solids, L .m ill`` �' ., �- �: � �- _ Tuihidity, NTU r, ' Upstream (U); Turbidi WTU� Downstream (D) �Turbidi 'NTUy, _ = :r T goldd! tf� sor NO FLO W inches 3 - -YIN • 100" - . 50 (olzw, How, tr, PHA) 0.1 50 25 (lakes,resermtrs,saltwaten) 10 (trsshwaterYrdesignatea streams lakes, and reservoirs NIA Water Quallty Standard applies NIA Water Quality Standard applies Permit Date 10/112016 — 9130/2020 Last Revised 10-2-2015 Page 1 of 3 Certificate of Coverage No. NCG02 ❑❑❑❑ Part A: Stormwater Monitoring Requirements (no VMA), Cont. Outfall `T. No, Date Sample. Collected • _Total �' Rainfall Is.tiils,SDO; h Tier 2? �. ;-Suspended. -°iSolids (TSS), Y._ _ "mgll ,Settleable >.Solids, mill . e�Turbitlity; NTU . y - Upstream (U) Turbidity, - r "NTU Downstream_ (D) Turbidity;: -. 'NTU moldldlyr oR "NO FROW,r inches YIN 100 50 (ORW,HOW, Tr, PHA I 0.1 50 -25 (lakes,reserwlrs,salt watenl 10 (treshwaterTrdeslpnated streams lakes and raservoln NIA WaterQualityWaterOappli Standard applies NIA uality Standard applies Part B: Stormwater Monitoring Requirements for SDOs with Vehicle Maintenance Activities (VMA) where facilities use > 55 gallons of new motor oil a -month if averaged'over the calendar year. NOTE. Other parameters only for outfalls that include both mining activities and VMA. • ' " Outfall a No T 4, t :r_ , Date Sample' T Collected ,. . „ • 'Total Rainfall VMA TSS;1 a ry "` mg�;l z tVMA only Non -polar-,- Q&G mg/1- `-VMA- only .New Motor Oil Use--- {gallmo. ). !f applicable SSA mill: - If applicable T.urbidity,: , NTU - If applicable _ Upstream (U) Turbidiyi. NTU . If applicable Downstream.(D) Turbidity, ' NTU m oiadlyr or "NOFLOW" Inches $100/50 15 55 0.1 60/25/10 NIA NIA Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 Page 2 of 3 r Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Required by 40 CFR §122.22] Signature Date Mail Benchmark ExceedancelTier 2 DMR to Your DEMLR Regional Office Land Quality Section: 2090 US Highway 70 Swannanoa, NC 28778 (828) 296-4500 3800 Barrett Drive Raleigh, NC 27609 (919) 7914200 TON-SALEM REGI( 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27103 (336) 776-9800 Permit Date 10/1/2015 — 9/30/2020 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 WASHINGTON° REGIONAL OFFICE 943 Washington Square Mall Washington, NC 27889 (252) 946-6481 Questions for The Central Office Stormwater Permitting Program? (919) 707-9220 MOORESVILLE REGIONAL OFFICE_ 610 East Center Avenue/Suite 301 Mooresville, NC 28115 (704) 663-1699 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910) 796-7215 Last Revised 10-2-2015 Page 3 of 3 LIMIT VIOLATION DISCHARGE MONITORING REPORT (DMR) —WASTEWATER SUBMIT TO REGIONAL OFFICE* General Peemit-No. NCG020000 Use this form if any wastewater samples have EXCEEDED A WASTEWATER LIMIT for any parameter. Send sample results to the DEMLR Regional Office within 30 days of receipt from the laboratory. Certificate of Coverage No. NCG02 Facility Name: Sample Collection Period: Qtr 1 ❑ Qtr 2 ❑ Qtr 3 ❑ Qtr 4 ❑ Calendar Year County: If Monthly Monitoring: Month Phone Number: (_� Person Collecting Samples: Certified Laboratory: Lab # Lab # Is this an industrial sand mine? Yes ❑ No ❑ Discharge to HOW or ORW waters? Yes ❑ No ❑ Discharge to SA waters? Yes ❑ No ❑ Discharge to Tr (Trout) -waters? Yes ❑ No ❑ Discharge to SB or PNA waters? Yes ❑ No ❑ If HOW, what is the 7010 flow rate? or Tidal, 7010 not available ❑ Wastewater.Monitorinq Reaulrements ;OutfalhL No-�y '--' 3 '. • Date Sample ;.Daily '--Collected` _'a.e.^? c•- as -C— 9," -Flow RatTe- .1 cfs- ��pH,, f SU ;'Suspended lTl SSC.j, A -Settleable ml/l` ikab Discharge f-i ` Upstream-{Uj v Downstream Turbidity; NTU Fecal.., Cotiorm, ol10c0m, lgIf or "NO FLOW" "-` - HQW or ORW 50% of - 7Q10 lndkate NO FLOW N frestrmter 6.0-9.0 saltwater - 6.8-8.6 - ' Industrial Sand 2rJ145. _ _ HOw or ORW 20/30 HOW orORW and -Tr or PNA ` 10115 a HOW. ORW, SA, 56, PNA, or any Trout 0.110.2 'No Limit Circle W�,Pp� Quality 50/25/10 NIA Standard vIf NIA Standard ester uvW NIA ' Permit Date 1Oil 12016 — 9/30/2020 Last Revised 11-18-2015 Page 1 of 3 Certificate of Coverage No. NCG02 ❑❑❑❑ Wastewater Monitorina Reauirements. Cont. .- "Outall • :,Date .Sample,, .Daily:Flow� `cl�Lt U. pH;m,Suspended - - y mg1l . Settleable Solid mill «Happlkable' `•_'Discharged. 'NTU Turbidity.-'Turbidity, -Upstream (U), Downstream (D)Turbi Turbidity, NTU Fecal, Coliform,.' col/1100 ml SA molddlyi' Or "NO FLOW" Haw or ORW 50% of ' 7 10 �. lnakare MO FLOW A appikable freshwater 6.0-9.0 saft"ter 6.8-8.5 Industrial Sand •.., 25145 HQWoraRW 20I30' HOW orORW �g Tr or PNA 10115 HQW, ORW, SA, Se, PNA, or any Trout 0:110.2 t - No Limit circle Water Quality Standard that applies: 50/25110. NIA Water Quell Standard aPPi NIA �e R■�a PP NIA Permit Date 10/1/2015 — 9/3012020 Last Revised 11-18-2015 Page 2 of 3 Certificate of Coverage No. NCG02 000❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122,22] Signature Date Mail Limit Violation DMR to Your DEMLR Regional Office Land Quality Section: 2090 US Highway 70 Swannanoa, NC 28778 (828)296-4500 RALE_ IGH;REGIONAL-OFFICE 3800 BarrettDrive Raleigh, NC 27609 (919) 791-4200 WONSTON SALEM RREEGIONA_L` OFFICE 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27103 (336) 776-9800 Permit Date 10/1/2015 — 9/30/2020 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 943 Washington Square Mall Washington, NC 27889 (252)946-6481 CENTRAL.OFFICE I Questions for The Central Office Stormwater Permitting Program? (919) 707-9220 610 East Center Avenue/Suite 301 Mooresville, NC 28115 (704) 663-1699 W1 LM I NGTON_ REGIONAL,OFFICE 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910) 796-7215 Last Revised I1-18-2015 Page 3 of 3 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: Permit No.: I�//_/_/_/_ /_/_/�/ or Certificate of Coverage No.: Facility Name: County: _ Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): Phone No. Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ❑ Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receivinu Stream: Describe the industrial activities that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number which hest describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No B. is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242. Last modified 7/31/2013 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit. http://portal.nQdeor.ore/web/Ir//nodes-stormwater/ Permit No.: �[/�/_/_/_/ _ /_/_/_/ or Certificate of Coverage No.: Facility Name: County: Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): Phone No. Was this a 'Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ❑ Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfaii and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SwU-242, East modified 7/31/2013 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receivine Stream: Describe the industrial activities that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013