HomeMy WebLinkAboutNCG020716_COMPLETE FILE - HISTORICAL_20151123�f D
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
DQ
DOC TYPE
01"HISTORICALFILE
❑ MONITORING REPORTS
DOC DATE
❑ ��� � �'a �
YYYYMMDD
North Carolina Department of Environmental Quality
Pat McCrory
Governor
Gregory Taveras
The Quartz Corp USA
P.O. Box 309
Spruce Pine, NC 28777
Dear Mr. Taveras:
Donald R. van der Vaart
Secretary
November 19, 2015 RECEIVED
NOV 2 3 2015
CENTRAL PILES
DWR SECTION
Subject: General Permit No. NCG020000
The Quartz Corp USA -
Pete Lawson Mine
COC NCGO20716
Mitchell County
In accordance with your request for renewal of a discharge permit received on June 30, 2014, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and
the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency
dated October 15, 2007 (or as subsequently amended).
Please take notice that this certificate of coverage is not transferable except after notice to the
Division of Energy, Mineral, and Land Resources. The Division may require modification or revocation and
reissuance of the certificate of coverage (CDC).
Please be advised that EPA Region 4 staff who performed a Compliance Sampling Inspection (CSI) at
the end of March 2015 and follow-up sampling in June 2015 at other industrial mineral mines in North
Carolina raised concerns about metals levels in the discharges. The Stormwater Permitting Program
identified mines like this one that have similar activities. During the term of this General Permit, this site may
be evaluated further for an alternative permitting action, such as applying to the Division of Water Resources
(DWR) for an individual NPDES discharge permit (or modification of its existing wastewater individual permit)
prior to the expiration of this General Permit in 2020.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Energy, Mineral, and Land Resources, or permits required by the Division of water Resources
(DWR), Coastal Area Management Act, or any other federal or local governmental permit that may be
required. If the conditions as stipulated in the CDC are unacceptable to you, you may apply sooner for an
individual NPDES discharge permit.
Division of Energy, Mineral, and Land Resources
Energy Section • Geological Survey Section • Land Quality Section
512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http:Nportal.ncdenr.org/web/Ir/
Mailing Address: 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 i 919-707-92001 FAX: 919-715-8801
An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper
M
NCG020716 Renewal CDC
November 19, 2015
Page 2
If you have any questions concerning this permit, please contact Bradley Bennett at telephone number
(919) 807-6378, or Bethany Georgoulias at telephone number (919) 807-6372.
Sincerely,
for Tracy E. Davis, P.E., CPM
cc: Toby Vinson, DEMLR Land Quality Section
Tom Belnick, DWR Water Quality Permitting Section
Stan Aiken, DEMLR Asheville Regional Office RE
Linda Wiggs, DWR Asheville Regional office
Kip Tyler, EPA Region IV NPDES Permitting and Enforcement Branch
Stormwater Permitting Program Files
DWR Central Files
Certificate of Coverage
Page I of I
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020716
STORMWATER AND WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
The Quartz Corp USA
is hereby authorized to discharge stormwater and/or wastewater, as provided in the original Certificate of
Coverage (COC), or subsequent COC modification, from a facility located at:
Pete Lawson Mine
Gouges Creek Rd
Spruce Pine
Mitchell County
to receiving waters designated as Gouges Creek, class WS-IV;Tr water(s) in the French Broad River
Basin(s) in accordance with the stormwater pollution management requirements, monitoring and
reporting requirements, and other conditions set forth in Parts I, 11, 11I, IV, V, and VI of General Permit
No. NCG020000 as attached.
This Certificate of Coverage shall become effective October 1, 2015,
This Certificate of Coverage shall remain effective for the duration of the General Permit.
Signed this day October 1, 2015.
for Tracy E. Davis, P.E., CPM
Director, Division of Energy, Mineral and Land Resources
By the Authority of the Environmental Management Commission
http://portal.ncdenr.org/web/Ir/2015-erenewal 1 1 /19/2015
North Carolina Department of Environmental Quality
Technical Bulletin for N.C. General NPDES Permit NCG020000 (Mining
Emkonmenral Activities) Division of Energy, Mineral, and Land Resources
Qualiry
Technical Bulletin for NCG020000 (Mining) Last Revised 10/812015
What activities are covered by this general permit?
NCG020000 coveraae authorizes:
• Stormwater discharges associated with mining and quarrying of non-metallic minerals (except fuels),
mine excavation, processing, and vehicle maintenance activities (VMA) at mine sites.
• Wastewater discharges (dewatering, process wastewater, wastewater recycle system overflows).
• Operation of wastewater treatment systems (Authorization to Construct no longer required).
NCG020000 coverage Is NOT APPLICABLE to:
• Borrow Pits covered by the NC DOT statewide stormwater permit.
• Peat mining, coal mining, metal mining, or oil & gas extraction operations.
• Wastewater not specifically identified by the general permit.
What are key stormwater requirements?
NCG020000 requires periodic discharge monitoring and a Stormwater Pollution Prevention Plan (SPPP):
• Develop and implement an SPPP, and update it at least annually.
• Inspect Stormwater Best Management Practices (BMPs) once every seven (7) calendar days.
• Semi-annual analytical monitoring and qualitative (visual) monitoring.
• Report stormwater monitoring data once a year by March 1 st to DEQ Central Office.
• Report benchmark exceedances or Tier 2 monitoring to the DEMLR Regional Office within 30 days.
• Respond to benchmark exceedances according to Tier response requirements.
What are key wastewater requirements?
NCG020000 stipulates wastewater treatment facility operational requirements and periodic discharge
monitoring:
• Notify DEQ if facility fails to perform satisfactorily or creates nuisance conditions.
• Only DEQ-evaluated flocculants may be used, if administered according to maximum application doses.
• Quarterly analytical monitoring for first year, or until four consecutive samples comply with all limits (then
semi-annual monitoring allowed). Quarterly monitoring schedule resumes upon any limit violation.
• Settleable solids (SS) monitoring applies to discharges to HQW, ORW, SA, SB, PNA, or Tr designated waters.
• Total Suspended Solids (TSS) limits specific to industrial sand mines, and to any mine discharging to HQW.
• Report wastewater effluent monitoring data once a year (by March ist) to DEQ Central Office.
• Report effluent limitation violations to the DEMLR Regional Office within 30 days.
• Effluent turbidity levels above the water quality standard prompt upstream and downstream monitoring.
What has changed from the previous permit?
Some changes specific to Stormwater:
• Reduced BMP inspections (weekly) for active
mines: additional allowances for inactive mines
that qualify for "dormant status."
• Changes to SPPP Annual Update.
• "Measureable storm event" (any size that results in
a discharge) replaces "Representative" event.
• New benchmarks and Tiers specific to turbidity.
• Total Flow and event duration no longer required.
• pH removed from VMA monitoring.
Some changes specific to Wastewater:
• May drop to semi-annual WW monitoring after four
quarterly samples that comply with all limitations.
. Turbidity instream monitoring is required if effluent
levels above the water quality standard.
• SS monitoring for sensitive waters only (HQW, etc.)
• TSS limits apply to industrial sand mines and HQWs.
Charges from the last permit are detailed in the
"Response to Comments and Summary of Changes"
Document for the 2015 NCG02 GP on our website.
PAGE TECHNICAL BULLETIN FOR N.C. GENERAL NPDES PERMIT NCGO20000 (MINING ACTIVITIES)
Frequently Asked Questions
What if my mine is inactive?
The permit makes allowances for
inactive mines that have sus-
pended all industrial activities
and that certify to DEMLR that
the site has been stabilized. If
approved for "dormant status,"
these operations qualify for re-
duced BMP inspections and may
be exempted from outfall moni-
toring by the Regional Engineer.
Do I have to monitor all
outfalls?
Yes. However, you may request
Representative Outfall Status
(ROS). If approved, ROS allows
monitoring at fewer outfalls. To
request ROS, submit an ROS Re-
quest Form to the DEMLR Region-
al Office. The form is available
on our website (below).
Also, the Regional Office may
exempt mines with "dormont sta-
tus" from analytical and/or quali-
tative monitoring.
What if I sell my business, or
the name changes?
You are required to notify DEMLR
of those. changes in writing, and
continuation of permit coverage
is subject to the Director's ap-
proval. Please submit the Name/
Ownership Change form located
on our Program website.
What do I do when my permit
expires?
Permitees are not required to sub-
mit an application for renewal un-
less directed by the Division. The
permittee should continue to
abide by this general permit if it
expires and renewed coverage
has not yet been issued.
What is wastewater, and what
is stormwater at a mine site?
Any water contacting an actively
mined area, water used to pro-
cess mined materials, and mine
dewatering wafer are all consid-
ered "wastewater." For some
mines, "mine dewatering" also
means wet pit overflows, and not
just pumped -out water. Any
stormwater that commingles with
these waters is "wastewater."
"Stormwater" includes runoff from
areas related to mining, pro-
cessing, or raw material storage
areas, such as haul roads or pro-
cessing plant areas at the mine.
Sometimes the answer is not clear
because of how broad the defini-
tions are. For example, N.C. con-
siders runoff from areas that con-
tain overburden only (no mined
or processed material), and that
does not commingle with
wastewater (including runoff from
the mine), to be stormwater. if
you are unsure about discharges,
please contact the DEMLR Re-
gional Office for assistance.
Does a certified lab need to
analyze my samples?
Monitoring under NPDES permits
must be conducted in accord-
ance with test procedures ap-
proved in federal regulations in 40
CFR § 136. All labs certified by
LAST REV. 1018/ 15
North Carolina perform analysis in
accordance with those proce-
dures. While N.C. certification re-
quirements do not apply to testing
stormwater-only discharges, data
gathered under an NPDES permit
must still conform to federal re-
quirements. Using a North Caroli-
na certified lab is one way to en-
sure compliance. A list of certified
labs is available from: http://
portal.ncdenr.org/web/wq/lab/
cert/
What if I pull samples for my
analytical monitoring, and I'm
unable to get a sample or valid
results for a parameter?
If this happens, please sample for
the missing parameter during the
next measureable storm event or
wastewater discharge.
If I sample my discharge, do
have to do visual monitoring at
the same time?
You may, but it is not necessary
under NCG02. Some other gen-
eral permits require it, however.
What if there is no flow for a
period between two samples
that exceed a benchmark? Are
those consecutive exceedances?
Yes. This scenario still puts you in
Tier 2. The new permit is more
clear about how the Tier 2 trigger
omits periods of no discharge.
Who can help me with" questions?,
Your questions about stormwater permit requirements
can be addressed to the DEMLR Offices:
Asheville Office........... (828) 296-4500 Washington Office....... (252) 946-6481
Fayetteville Office....... (910) 433-3300 Wilmington Office........ (910) 796-721 S
Mooresville Office....... (704) 663-1699 Winston-Salem Office... (336) 776-9800
Raleigh Office ............ (919) 791-4200 Central Office ............. (919) 707-9220
Helpful Link:
DEMLR Stormwater Permitting Program:
http://portal.ncdenr.org/web/ir/stormwater
M
ANNUAL SUMMARY DISCHARGE MONITORING
REPORT (DMR) — STORMWATER
SUBMIT TO CENTRAL OFFICE*
General Permit No. NCG020000
Calendar Year
'Report ALL STORMWATER monitoring data on this form (include "No Flow"I"No Discharge" and Benchmark
Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year.
Certificate of Coverage No. N0002 ❑❑❑❑
Facility Name:
County:
Phone Number: ( ) Total no. of SDOs monitored
Certified Laboratory Lab #.
Lab #
Stormwater Discharge Outfall. (SDO) No. VMA Outfall? Yes ❑ No ❑
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑
Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes.. received approval from DEMLR to reduce monitoring frequency ❑
No, turbidity benchmark exceedances did not require monthly monitoring ❑
Other ❑
r. �
Outfall"Nol
a:
_ T '�
ti Total'-
'Rainfall,s
inches;.,_.°(VMA),.,
y p {
� �TSS;
{`"mgll:`
h .'
SS, r
'` mkll:.
.T' '•-jyL
Turbidit
.. Yr
�'NTU
y 4 (' (• -
Upstream
(U)>Turb�dity,
a ,r NTU
h 4„h 4.^
Dowristream
` ` 'l
(D) Turtiid�ty,
,; `; NTU
`� y� ; `.
'` b k'f
-polar
None olar''
OG; img11.
- . - »
c',„_,New
Motor.Oil
,Usage}
Stormwater
Benchmarks
NedkafB NO"'
FOca
Circle '
Benchmark
100150
�.1
circle
Banehmadr
50/25/10
_NIA __
Standard
tan�`daple
� NIA.
urda
srwapptn
15
>55 garlmo.
avarapa raqulrea
T�it�'�ab;
oacmo
:Dat0am0le,.
, Colledtedi 'M
moldd! r='
0
Mimi=
=I=
M
Permit Date 10/112015 — 9/30/2020
Last Revised 10-2-2015
Certificate of Coverage No. NCG02 ❑❑❑❑
Additional Outfall Attachment (make copies as needed for additional outfalls)
Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑
Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes, received approval from DEMLR to reduce monitoring frequency ❑
No, turbidity benchmark exceedances did not require monthly monitoring ❑
Other ❑
Outfall No.
Total
Rainfall
inches
J,
Upstream n Downstream
TSS Ss,..- Turbidity, (U) Turbidity, (D) Turbidity,
NTU
'mgll mlN, ': r-NTU NTU
:,.. `' ..
Non=polar,
O�G m' 11Usage—,
, . g
(VMA)
""1.New
. Motor Oil,'
allmo. ,
Stormwater,
Benchmarks
lndlcate NO
eFt°�e a
Circle - Circle NIA NIA
benchmark Benchmark
100150 0.1 50I25110 standard aaAPilities Standard appllea
15
>55gaumo:
average requires
70d.Gnrnonitnriar
-Date Sample
.Collected,
Permit Date 101112015 — 9/30/2020
Last Revised 10-2-2015
Certificate of Coverage No. NCG02 ❑❑❑❑
Additional Outfall Attachment (make copies as needed for additional outfalls)
Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑
Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes, received approval from DEMLR to reduce monitoring frequency ❑
No, turbidity benchmark exceedances did not require monthly monitoring ❑
Other ❑
° Total =' Turbidity, }h�� _
,OutfaH`No. y T$S,.. SS, tYr
C Rainfallmgll : m111 :. ,, NTU i
inches T
Upstream Downstream
(U) Turbidity, (D) Turbidity,
`F NTU _ .' NTU.
Non- olar`.
p
O&G,' mg11'
(VMA)'
New f
1
Motor Oil`
Usage:
allmo.
Stormwater BenchmarkBencCirclehmark
hrdfcate NO Benchmark Benchmark
Benchmarks aFtfkVad;e , 109150 , 0.1. 50/25/10
NIA NIA
sae^aa�a apples standard apples
1 `�
'SSgaUm°
average regWros
tar
TSS and ORG monitoring
_:Date Sample
': Collected; ,
-mdlddljr
Permit Date 10I112015 — 9/30/2020
Last Revised 10-2-2015
Certificate of Coverage No. N0002 ❑❑❑❑
CERTIFICATION
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Required by 40 CFR §122.221
Signature
Date
Mail Annual Summary Stormwater DMR to the NCDEQ Central Office:
Note the address is correct Central Files -is housed in DWR (not DEMLR)
N.C. Department of Environmental'Quality (DEQ)
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
Central Files Telephone (919) 807-6300
Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at:
(919) 707-9220
Permit Date 10i112015 -- 9/30/2020
Last Revised 10-2-2015
ANNUAL SUMMARY DISCHARGE MONITORING
REPORT (DMR) —WASTEWATER
SUBMIT- TO CENTRAL OFFICE*
General Permit No. NCG020000
Calendar Year
*Report ALL WASTEWATER monitoring data on this form (include "No Flow"I"No Discharge" and Limit Violations) from
the previous calendar year to the DEQ by MARCH 1 of each year.
Certificate of Coverage No. NCG02
Facility Name:
County:
Phone Number: (_
Certified Laboratory
Lab #
Lab #
Total no. of outfalls monitored
Wastewater (WW) Discharge Outfall No.
Is this an industrial sand mine (See 40 CFR §436 Subpart D)7
Yes ❑
No ❑
Does this outfall discharge WW to SA waters?
Yes ❑
No ❑
Does this outfall discharge WW to SB or PNA waters?
Yes ❑
No ❑
Does this outfall discharge WW to HQW or ORW waters?
Yes ❑
No ❑
If so, what is the 7Q10 flow rate? or Tidally influenced waters,
7Q10 not available ❑
Does this outfall discharge WW to Trout (Tr) designated waters?
Yes ❑
No ❑
Were there any limit violations in the calendar year?
Yes ❑
No ❑
Outfall No.
DailyfFtow
Rate, cfs
"pH,
SU
TSS,:, z
r� mg11
E 1
SS;
mll/l, ��
irapplabler
Discharge.
_ Turbidity_;`
:;"NTU'
Upstream''
(U);Turbidity,+
NTU
Downstream.
.(D) Turbidity;
AM
.fecal
Coliforin,
C611100 ml
Effluent'
'Limitations
Mo. Ave ! Daily Max.
-
HQW or ORW
56% of
7Q10
-
!ndlcato NO FLOW
rrappllcable
freshwater
6.0-9.0
sa1vva6er
6.,84.5
tndu$Mal Sand'
25145
H,,N ,ORW
-20/M
HOW or ORW
Ln Tr or PHA
-10115.
-
Haw; ORw,
SA, SO, PNA,
or any T`O1"
0.110.2
-
No Limit
q alrcle lity Standda`a
that applies.
50/25/10
v
NIA
Standard
Oapplies
NIA
Staand�ard applies
NIA
-
Date'Sample.`
Collected,.
-
molddl r:'tlow
Permit Date 101112015 - 9/30/2020
Last Revised 10-2-2015
Certificate of Coverage No. NCG02 ❑❑❑❑
Additional Outfall Attachment (make copies as needed for additional outfalls)
Wastewater (WW) Discharge Outfall No.
Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑
Does this outfall discharge WW to SA waters? Yes ❑ No ❑
Does this outfall discharge WW to SB or PNA waters? Yes ❑ No ❑
Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑
If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑
Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑
Were there any limit violations in the calendar year reported? Yes ❑ No ❑
z r
4
Outfall,No:-
' Daily Flow
Rate,'cfs
:pH,
SU
,Ai 3
TSS--
m 11
:. SS, I
ml/l",
`'
Discharge
Turbidity,
NTU
Upstream {',
U Turbidity,
NTU
Downstream
D Turbidity,
- NTU '
Fecal,",
•'Coliform,,'
co11100 ml'
SA
•
Effluent
;Limitations
. Mo. Ave I Daily Max.
HOW or ORW
50% of
7Q10
Indicate NO FLOW
,l appl,cable
freshwater
6.0-9.0 .
saltwater`
6.8-8.5
Industrial Sand
25I45
HOW or ORw
A 20/30
HOW or ORW
to Tr or PNA
10/15
HOW, ORW,
SA, 313, PNA,
or any Trout
0.110.2
-
No Limit
Circle Water
y„appliieeaa�
- 501f25/10
NIA • '
Water Quality
Standard applies
NIA
Water Quality
Standard applies
NIA
Date Sample
Colcted,MEN
J. molddl -r .
Permit Date 1011/2015 — 9/30/2020
Last Revised 10-2-2015
Certificate of Coverage No. NCG02 ❑❑❑❑
Additional Outfall Attachment (make copies as needed for additional outfalls)
Wastewater (WW) Discharge Outfall No.
Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑
Does this outfall discharge WW to SA waters? Yes ❑ No ❑
Does this outfall discharge WW to SIB or PNA waters? Yes ❑ No []
Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑
If so, what is the 7010 flow rate? or Tidally influenced waters, 7Q10 not available ❑
Does this outfall discharge WW to Trout jr) designated waters? Yes ❑ No ❑
Were there any limit violations in the calendar year reported? Yes ❑ No ❑
Outfall }No.} '
r'
Daily -Flow. pH,
f Rate, cfs 5U '
-TSS, -SS, - ,
mg/1 , 'mlll ;,':
,lappflcable
Discharge Upstream
.Turbidity, ,(U),Turbidity,
NTU: NTU
Fecal•
Downstream Coliform; i
(D) Turbidity, coll900 rril
NTU SA
Effluent
Lmitations
Mo. Ave f pally Max.
HOW or ORW freshwater
50% of 6.0-9.0
7010 sa�i1e"
6,8-8.5owor
Indkate NO FLOW
HapAllcable
Indushial Sand -
25145 . Haw, ORW,
HOW or ORW SA, SB, PNA,
or any Tut
20130 ,
0. 0.110.2
Mad Tr or PNA
10115
No Limit NIA
Circle Water
Quality Standard es
Standardtappl
that applies:
501251 e10
NIA .
lity
Standard applies NIA
`Date Sample'
Collected,
`.-molddl r--- -
Permit Date 10/1/2015 — 9/30/2020
Last Revised 10-2-2015
M
Certificate of Coverage No. NCG02 ❑❑❑❑
CERTIFICATION
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Required by 40 CFR §122.221
Signature
Date
Mail Annual Summary Wastewater DMR to the NCDEQ Central Office:
Note the address is correct — Central Files is housed in DWR (not DEMLR)
N.C. Department of Environmental Quality (DEQ)
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, NC 27699-1617
Central Files Telephone (919) 807-6300
Questions? Contact DEMI_R Stormwater Permitting Staff in the Central Office at:
(919) 707-9220
Perm it'Date 101112015-913012020
Last Revised 10-2-2015
BENCHMARK EXCEEDANCE or TIER 2 DISCHARGE MONITORING REPORT (DMR) — STORMWATER
SUBMIT TO REGIONAL OFFICE*
General Permit No. NCG020000
`Use this form if any stormwater samples have EXCEEDED A BENCHMARK or if the facility, is in TIER 2 MONITORING for any parameter
(including TIER 2 for.Turbidity). Send sample results to the DEMLR Regional Office within 30 days of receipt from the laboratory.
Certificate of Coverage No. NCG02 ❑❑Q❑
Facility Name: Sample Collection Period: Period 1 ❑ Period.2 ❑ Calendar Year
County: For Monthly Monitoring: Month
Phone Number: Person Collecting. Samples:
Certified Laboratory: Lab #,
Lab'#
Has this -facility had 4 or more.benchmark exceedances for any single parameter, at anyone SW discharge outfall (SDO)? Yes ❑ No ❑
Have you contacted the Regional Office? Yes ❑ No ❑
Whom at the Region did you speak with?
Part A: Stormwater Monitorina Reauirements (no VMA. see next oaae for outfalls with VMA)
-. sy i ..
' :, ----:'
Outfall- ,=
Now~;
. r
- '-
Date, Sample
- Collected
.._ `s'
'. 3`TotalT;
Rainfall _
- y .r ra•. _
Isithls,SDO
in Tier 2? ��
} , Tota! "'�
� : Suspended
;Solids {TSS),
mg
. -i�^'�
Settleable
Solids, L
.m ill`` �'
., �- �: �
�-
_ Tuihidity, NTU
r, '
Upstream (U);
Turbidi
WTU�
Downstream (D)
�Turbidi
'NTUy,
_ =
:r
T
goldd!
tf�
sor NO FLO
W
inches
3
- -YIN •
100" -
. 50 (olzw, How, tr, PHA)
0.1
50
25 (lakes,resermtrs,saltwaten)
10 (trsshwaterYrdesignatea
streams lakes, and reservoirs
NIA
Water Quallty
Standard applies
NIA
Water Quality
Standard applies
Permit Date 10/112016 — 9130/2020 Last Revised 10-2-2015
Page 1 of 3
Certificate of Coverage No. NCG02 ❑❑❑❑
Part A: Stormwater Monitoring Requirements (no VMA), Cont.
Outfall `T.
No,
Date Sample.
Collected
• _Total �'
Rainfall
Is.tiils,SDO;
h Tier 2?
�.
;-Suspended.
-°iSolids (TSS),
Y._ _ "mgll
,Settleable
>.Solids,
mill .
e�Turbitlity; NTU .
y -
Upstream (U)
Turbidity, -
r "NTU
Downstream_ (D)
Turbidity;: -.
'NTU
moldldlyr
oR "NO FROW,r
inches
YIN
100
50 (ORW,HOW, Tr, PHA I
0.1
50
-25 (lakes,reserwlrs,salt watenl
10 (treshwaterTrdeslpnated
streams lakes and raservoln
NIA
WaterQualityWaterOappli
Standard applies
NIA
uality
Standard applies
Part B: Stormwater Monitoring Requirements for SDOs with Vehicle Maintenance Activities (VMA) where facilities use > 55 gallons of new
motor oil a -month if averaged'over the calendar year. NOTE. Other parameters only for outfalls that include both mining activities and VMA.
• ' "
Outfall a
No T
4, t
:r_ ,
Date Sample'
T Collected
,. . „
•
'Total
Rainfall
VMA
TSS;1 a
ry "` mg�;l
z
tVMA only
Non -polar-,-
Q&G mg/1-
`-VMA- only
.New Motor
Oil Use---
{gallmo. ).
!f applicable
SSA
mill:
-
If applicable
T.urbidity,: ,
NTU
-
If applicable _
Upstream (U)
Turbidiyi.
NTU .
If applicable
Downstream.(D)
Turbidity, '
NTU
m oiadlyr
or "NOFLOW"
Inches
$100/50
15
55
0.1
60/25/10
NIA
NIA
Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015
Page 2 of 3
r
Certificate of Coverage No. NCG02 ❑❑❑❑
CERTIFICATION
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations." (Required by 40 CFR §122.22]
Signature
Date
Mail Benchmark ExceedancelTier 2 DMR to Your DEMLR Regional Office Land Quality Section:
2090 US Highway 70
Swannanoa, NC 28778
(828) 296-4500
3800 Barrett Drive
Raleigh, NC 27609
(919) 7914200
TON-SALEM REGI(
450 Hanes Mill Road, Suite 300
Winston-Salem, NC 27103
(336) 776-9800
Permit Date 10/1/2015 — 9/30/2020
225 Green Street
Systel Building Suite 714
Fayetteville, NC 28301-5043
(910) 433-3300
WASHINGTON° REGIONAL OFFICE
943 Washington Square Mall
Washington, NC 27889
(252) 946-6481
Questions for The Central Office
Stormwater Permitting Program?
(919) 707-9220
MOORESVILLE REGIONAL OFFICE_
610 East Center Avenue/Suite 301
Mooresville, NC 28115
(704) 663-1699
127 Cardinal Drive Extension
Wilmington, NC 28405-2845
(910) 796-7215
Last Revised 10-2-2015
Page 3 of 3
LIMIT VIOLATION DISCHARGE MONITORING REPORT (DMR) —WASTEWATER
SUBMIT TO REGIONAL OFFICE*
General Peemit-No. NCG020000
Use this form if any wastewater samples have EXCEEDED A WASTEWATER LIMIT for any parameter.
Send sample results to the DEMLR Regional Office within 30 days of receipt from the laboratory.
Certificate of Coverage No. NCG02
Facility Name: Sample Collection Period: Qtr 1 ❑ Qtr 2 ❑ Qtr 3 ❑ Qtr 4 ❑ Calendar Year
County: If Monthly Monitoring: Month
Phone Number: (_� Person Collecting Samples:
Certified Laboratory: Lab #
Lab #
Is this an industrial sand mine?
Yes ❑
No ❑
Discharge to HOW or ORW waters? Yes ❑ No ❑
Discharge to SA waters?
Yes ❑
No ❑
Discharge to Tr (Trout) -waters? Yes ❑ No ❑
Discharge to SB or PNA waters?
Yes ❑
No ❑
If HOW, what is the 7010 flow rate? or Tidal, 7010 not available ❑
Wastewater.Monitorinq Reaulrements
;OutfalhL
No-�y '--' 3 '. •
Date Sample ;.Daily
'--Collected`
_'a.e.^? c•- as -C—
9,"
-Flow
RatTe- .1 cfs-
��pH,,
f SU
;'Suspended
lTl SSC.j,
A
-Settleable
ml/l`
ikab
Discharge
f-i `
Upstream-{Uj
v
Downstream
Turbidity;
NTU
Fecal..,
Cotiorm,
ol10c0m, lgIf
or "NO FLOW"
"-` -
HQW or ORW
50% of
- 7Q10
lndkate NO FLOW N
frestrmter
6.0-9.0
saltwater -
6.8-8.6
- '
Industrial Sand
2rJ145. _ _
HOw or ORW
20/30
HOW orORW and -Tr or PNA
` 10115 a
HOW. ORW, SA, 56,
PNA, or any Trout
0.110.2
'No Limit
Circle W�,Pp� Quality
50/25/10
NIA
Standard vIf
NIA
Standard ester uvW
NIA
'
Permit Date 1Oil 12016 — 9/30/2020 Last Revised 11-18-2015
Page 1 of 3
Certificate of Coverage No. NCG02 ❑❑❑❑
Wastewater Monitorina Reauirements. Cont.
.-
"Outall
•
:,Date .Sample,,
.Daily:Flow�
`cl�Lt
U.
pH;m,Suspended
-
-
y
mg1l
.
Settleable
Solid
mill
«Happlkable'
`•_'Discharged.
'NTU
Turbidity.-'Turbidity,
-Upstream (U),
Downstream
(D)Turbi Turbidity,
NTU
Fecal,
Coliform,.'
col/1100 ml
SA
molddlyi'
Or "NO FLOW"
Haw or ORW
50% of '
7 10
�.
lnakare MO FLOW A
appikable
freshwater
6.0-9.0
saft"ter
6.8-8.5
Industrial Sand
•.., 25145
HQWoraRW
20I30'
HOW orORW �g Tr or PNA
10115
HQW, ORW, SA, Se,
PNA, or any Trout
0:110.2
t -
No Limit
circle Water Quality Standard
that applies:
50/25110.
NIA
Water Quell
Standard aPPi
NIA
�e R■�a
PP
NIA
Permit Date 10/1/2015 — 9/3012020 Last Revised 11-18-2015
Page 2 of 3
Certificate of Coverage No. NCG02 000❑
CERTIFICATION
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations." [Required by 40 CFR §122,22]
Signature
Date
Mail Limit Violation DMR to Your DEMLR Regional Office Land Quality Section:
2090 US Highway 70
Swannanoa, NC 28778
(828)296-4500
RALE_ IGH;REGIONAL-OFFICE
3800 BarrettDrive
Raleigh, NC 27609
(919) 791-4200
WONSTON SALEM RREEGIONA_L`
OFFICE
450 Hanes Mill Road, Suite 300
Winston-Salem, NC 27103
(336) 776-9800
Permit Date 10/1/2015 — 9/30/2020
225 Green Street
Systel Building Suite 714
Fayetteville, NC 28301-5043
(910) 433-3300
943 Washington Square Mall
Washington, NC 27889
(252)946-6481
CENTRAL.OFFICE
I
Questions for The Central Office
Stormwater Permitting Program?
(919) 707-9220
610 East Center Avenue/Suite 301
Mooresville, NC 28115
(704) 663-1699
W1 LM I NGTON_ REGIONAL,OFFICE
127 Cardinal Drive Extension
Wilmington, NC 28405-2845
(910) 796-7215
Last Revised I1-18-2015
Page 3 of 3
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this form, please visit:
Permit No.: I�//_/_/_/_ /_/_/�/ or Certificate of Coverage No.:
Facility Name:
County: _
Inspector:
Date of Inspection:
Time of Inspection:
Total Event Precipitation (inches):
Phone No.
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.)
❑ Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or "measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions, if applicable.
A "representative storm event' is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event' is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee or Designee)
Page 1 of 2
SWU-242, Last modified 7/31/2013
1. Outfall Description:
Outfall No. Structure (pipe, ditch, etc.)
Receivinu Stream:
Describe the industrial activities that occur within the outfall drainage area:
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors:
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.):
4. Clarity: Choose the number which hest describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
B. is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242. Last modified 7/31/2013
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
Forguidance on filling out this form, please visit. http://portal.nQdeor.ore/web/Ir//nodes-stormwater/
Permit No.: �[/�/_/_/_/ _ /_/_/_/ or Certificate of Coverage No.:
Facility Name:
County:
Inspector:
Date of Inspection:
Time of Inspection:
Total Event Precipitation (inches):
Phone No.
Was this a 'Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.)
❑ Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or "measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfaii
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee or Designee)
Page 1 of 2
SwU-242, East modified 7/31/2013
1. Outfall Description:
Outfall No. Structure (pipe, ditch, etc.)
Receivine Stream:
Describe the industrial activities that occur within the outfall drainage area:
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors:
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.):
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 7/31/2013