Loading...
HomeMy WebLinkAboutNCG020643_MONITORING INFO_20141219WaT�� STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. /V DOC TYPE ❑HISTORICAL FILE MONITORING REPORTS DOC DATE p (� () 19 () I '" YYYYMMDD Print ,'Yis form to PDF Return PDF of this form to DEMLR CO by email, cc DEMLR RO, DWR SPU. Send a copy to the permittee. MINING PERMIT APPLICATION REVIEW FORM for the DIVISION OF WATER RESOURCES Project Name: Pinner Pit DEMLR Permit # 74-75 PERMIT ACTION TYPE: Renewal YES f Ft Have land disturbing activities started? Date? { County: Pitt Applicant's Email: NIA NO Date Commencing F t 2004 Latitude. 35.7074 Longitude:-77.4841 Please return comments to (at DEMLR CO): Judy Wehner Comments due by: January 9, 20-15 SECTION BELOW TO BE FILLED OUT BY DWR: Is the RO concerned that the operation, as proposed, would violate standards of water quality? No Comments: Application review and on -site „review indicates that subject mine is in process of reclamation of site Phase 11. Watershed/Stream Name & Classification: Tar -Pamlico River Basin, Conetoe Creek, Classification C,_NSW DWR Compliance Status of Mine: Compliant Does this mine (or previous owner) have DWR back fees to pay? NIA If yes, amount: Is this mine an active permit in BIMS? NCG20643 YES NO 401 Wetland Cert. required? 4 71,'. , X 401 Wetland Cert. existing? F t Permit # X .Does,DWR RO.�have enough info'rmatio"ri #o ,. termine if. a 401 certification is -required?,. X Is an O & M Plan needed? YES NO Are wetlands disturbed atthis site? Does DWR RO suspect or know of nearby X wetlands to the site? JD` Is a wetland delineation required prior to; DWR issuing the permit? " r cConsultant m X On'site? Fa' , Rav SPntPrnhPr , fn10 y PrOHais form to PDF Retum PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPIT. Send a copy to the permittee. (Offsi#e?i Stream Determination Needed? F { X Stream. Determination Completed?,".r ! ,• Does DWR RO need a statement that no wetlands/streams are disturbed F { X for this project from applicant? Buffer•Determination Needed? t�:• 1" ,t¢ ,. X Buffer Determination Completed? r c Recycle system permit existing?, C- Permit# ' X ". New Recycle System permit required?* F XNIA Enough information to determine? -- Non -discharge permit existing?.' Permit # X F (Unknown, Will wastewaters discharge to HQW waters X7Q10 Permittee with a 7Q10=0? Flow: N/A must determine. .f Has Violation O&tU1 lequireri�ents' �. { •HQW17QIQ Concerns +' Does DWR require. DEMLR'to hold`the Ray-back.fees or;renew permit,(e.g. so DWR,can review'it further'or . `D R`perma becausei'DWR requires, more information)? Plea' the reason to h hold the permit: _ s RO'contact: { Hold, Until: Mine must wait to dewater until an O&M plan is X approved? Reviewed by: DWR RO Surface Water: RLS Regional Office: WaRO Date: 01/07/2015 RO Aquifer Protection Section: Regional Office: Date: Rav Sanfamhar 9Mf) Print this foram to PDF Retum PDF of this foram to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. MINING PERMIT APPLICATION REVIEW FORM _ for the /PA. Dhe1r1% e,14k� DIVISION OF WATER RESOURCES�a�-C6,/Nou--k-t QS THIS SECTION TO BE FILLED OUT BY DEMLR: /0,-. Project Name: Pinner Pit DEMLR Permit # 74-75 PERMIT ACTION TYPE: Renewal YES County: Pitt Applicant's Email: NIA F-]I IJI Have land disturbing activities started? Date? Latitude: 35.7074 Longitude:-77.4841 Please return comments to (at DEMLR CO): Judy Wehner Comments due bv: January 9, 20-15 Date Commencin 2004_ Dt, t,I4 SECTION BELOW TO BE FILLED OUT BY DWR: Is the RO concerned that the operation, as proposed, would violate standards of water quality? Comments: Watershed/Stream Name & Classification: DWR Compliance Status of Mine: Does this mine (or previous owner) have DWR back fees to pay? If yes, amount: Is this mine an active permit in BIMS? YES NO 40'I Wetland Cert. required? 401 Wetland Cert. existing? r Permit # r t Does DWR RO have enough information to determine if a 401 certification is rquired7 r { r Is an O & M Plan needed? YES NO Does DWR RO suspect or know of nearby r wetlands to the site? I Print this form to PDF Return PDF of this fof7n to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. Stream Determination Needed? + r + Stream Determination Completed? Does DWR RO need a statement that no wetlands/streams are disturbed Cl + F] + for this project from applicant? Buffet. Determination Needed? Buffer Determination Completed? r + + Recycle system permit existing? �L� +Permit # New Recycle System permit required?* r + ❑ + Enough information to determine? Non-dischar a ermit e'xistin ? g p g + �Permlt #' C (Unknown. Will wastewaters discharge to HQW waters + �1+7Q10 Permittee must with a 7Q10=0? Flow: determine. Vas4Violation + O&M Requirements ; +i t r + HQW17Q10"Concerns Does DWR req`'uire DEIVIL' R to hold the. ' + Pay°°back'�fees'or renew + ;` permit (e.g: so, DWRL can' revieW it further or DWR permit , r.' Other. + because DWR,requires,more.infoririation)?' r Please describe'the reason to' hold th'e`permit: RO contact:, - Hold Until. ' Mine must wait to dewater until an O&M plan is IJ + approved? Reviewed by: DWR RO Surface Water: Regional Office: Date: RO Aquifer Protection Section: Regional Office: Date: -1 . P............ 4..._ IA4I1