HomeMy WebLinkAboutNCG020643_MONITORING INFO_20141219WaT��
STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT N0.
/V
DOC TYPE
❑HISTORICAL FILE
MONITORING REPORTS
DOC DATE
p (� () 19 () I '"
YYYYMMDD
Print ,'Yis form to PDF Return PDF of this form to DEMLR CO by email, cc DEMLR RO, DWR SPU. Send a copy to the permittee.
MINING PERMIT APPLICATION REVIEW FORM
for the
DIVISION OF WATER RESOURCES
Project Name: Pinner Pit DEMLR Permit # 74-75
PERMIT ACTION TYPE: Renewal
YES
f Ft
Have land disturbing activities
started? Date? {
County: Pitt Applicant's Email: NIA
NO Date Commencing
F t 2004
Latitude. 35.7074 Longitude:-77.4841
Please return comments to (at DEMLR CO): Judy Wehner
Comments due by: January 9, 20-15
SECTION BELOW TO BE FILLED OUT BY DWR:
Is the RO concerned that the operation, as proposed, would violate standards of water quality? No
Comments: Application review and on -site „review indicates that subject mine is in process of reclamation of
site Phase 11.
Watershed/Stream Name & Classification: Tar -Pamlico River Basin, Conetoe Creek, Classification C,_NSW
DWR Compliance Status of Mine: Compliant
Does this mine (or previous owner) have DWR back fees to pay? NIA If yes, amount:
Is this mine an active permit in BIMS? NCG20643
YES NO
401 Wetland Cert. required?
4 71,'. ,
X
401 Wetland Cert. existing?
F t Permit #
X
.Does,DWR RO.�have enough info'rmatio"ri #o ,.
termine if. a 401 certification is -required?,.
X
Is an O & M Plan needed? YES NO
Are wetlands disturbed atthis site?
Does DWR RO suspect or know of nearby
X
wetlands to the site?
JD`
Is a wetland delineation required prior to;
DWR issuing the permit? "
r cConsultant m
X
On'site? Fa' ,
Rav SPntPrnhPr , fn10
y PrOHais form to PDF Retum PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPIT. Send a copy to the permittee.
(Offsi#e?i
Stream Determination Needed?
F {
X
Stream. Determination Completed?,".r
! ,•
Does DWR RO need a statement that no
wetlands/streams are disturbed
F {
X
for this project from applicant?
Buffer•Determination Needed?
t�:• 1" ,t¢ ,.
X
Buffer Determination Completed?
r c
Recycle system permit existing?,
C- Permit# '
X ".
New Recycle System permit required?*
F
XNIA
Enough information to determine?
--
Non -discharge permit existing?.'
Permit #
X
F (Unknown,
Will wastewaters discharge to HQW waters
X7Q10
Permittee
with a 7Q10=0?
Flow: N/A
must
determine.
.f Has Violation
O&tU1 lequireri�ents' �.
{ •HQW17QIQ Concerns +'
Does DWR require. DEMLR'to hold`the
Ray-back.fees or;renew
permit,(e.g. so DWR,can review'it further'or .
`D R`perma
becausei'DWR requires, more information)?
Plea' the reason to
h
hold the permit:
_ s
RO'contact:
{ Hold, Until:
Mine must wait to dewater until an O&M plan is
X
approved?
Reviewed by:
DWR RO Surface Water: RLS Regional Office: WaRO Date: 01/07/2015
RO Aquifer Protection Section: Regional Office: Date:
Rav Sanfamhar 9Mf)
Print this foram to PDF Retum PDF of this foram to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
MINING PERMIT APPLICATION REVIEW FORM _
for the /PA. Dhe1r1% e,14k�
DIVISION OF WATER RESOURCES�a�-C6,/Nou--k-t QS
THIS SECTION TO BE FILLED OUT BY DEMLR: /0,-.
Project Name: Pinner Pit DEMLR Permit # 74-75
PERMIT ACTION TYPE: Renewal
YES
County: Pitt Applicant's Email: NIA
F-]I IJI
Have land disturbing activities
started? Date?
Latitude: 35.7074 Longitude:-77.4841
Please return comments to (at DEMLR CO): Judy Wehner
Comments due bv: January 9, 20-15
Date Commencin
2004_
Dt, t,I4
SECTION BELOW TO BE FILLED OUT BY DWR:
Is the RO concerned that the operation, as proposed, would violate standards of water quality?
Comments:
Watershed/Stream Name & Classification:
DWR Compliance Status of Mine:
Does this mine (or previous owner) have DWR back fees to pay? If yes, amount:
Is this mine an active permit in BIMS?
YES NO
40'I Wetland Cert. required?
401 Wetland Cert. existing?
r Permit #
r t
Does DWR RO have enough information to
determine if a 401 certification is rquired7
r {
r
Is an O & M Plan needed? YES NO
Does DWR RO suspect or know of nearby r
wetlands to the site? I
Print this form to PDF Return PDF of this fof7n to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee.
Stream Determination Needed?
+
r +
Stream Determination Completed?
Does DWR RO need a statement that no
wetlands/streams are disturbed
Cl +
F] +
for this project from applicant?
Buffet. Determination Needed?
Buffer Determination Completed?
r +
+
Recycle system permit existing?
�L� +Permit #
New Recycle System permit required?*
r +
❑ +
Enough information to determine?
Non-dischar a ermit e'xistin ?
g p g
+
�Permlt #'
C (Unknown.
Will wastewaters discharge to HQW waters
+
�1+7Q10
Permittee
must
with a 7Q10=0?
Flow:
determine.
Vas4Violation
+ O&M Requirements
;
+i
t
r + HQW17Q10"Concerns
Does DWR req`'uire DEIVIL' R to hold the. '
+ Pay°°back'�fees'or renew
+ ;`
permit (e.g: so, DWRL can' revieW it further or
DWR permit ,
r.' Other.
+
because DWR,requires,more.infoririation)?'
r
Please describe'the reason to'
hold th'e`permit:
RO contact:, -
Hold Until. '
Mine must wait to dewater until an O&M plan is
IJ
+
approved?
Reviewed by:
DWR RO Surface Water: Regional Office: Date:
RO Aquifer Protection Section: Regional Office: Date:
-1 . P............ 4..._ IA4I1