Loading...
HomeMy WebLinkAboutNCG020273_COMPLETE FILE - HISTORICAL_20151123STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. 1v DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS D06 DATE ❑ a 0 I 5 (1 3- YYYYMMDD North Carolina Department of Environmental Quality Pat McCrory Governor Rick Solazzo Senior V.P.,.Environmental Affairs Unimin Corporation 258 Elm Street New Canaan, CT 06840 Dear Mr. Solazzo: November 19, 2015 Donald R. van der Vaart Secretary RECEIVED Nov 2 3 2015 CENTRAL FILES DWR SECTION Subject: General Permit No. NCG020000 Unimin Corporation — Buna Mine COC NCGO20273 Mitchell County In accordance with your request for renewal of a discharge permit received on May 30, 2014, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Energy, Mineral, and Land Resources. The Division may require modification or revocation and reissuance of the certificate of coverage (COC). Please be advised that EPA Region 4 staff who performed a Compliance Sampling Inspection (CSI) at the end of March 2015 and follow-up sampling in June 2015 at other industrial mineral mines in North Carolina raised concerns about metals levels in the discharges. The Stormwater Permitting Program identified mines like this one that have similar activities. During the term of this General Permit, this site may be evaluated further for an alternative permitting action, such as applying to the Division of Water Resources (DWR) for an individual NPDES discharge permit (or modification of its existing wastewater individual permit) prior to the expiration of this General Permit in 2020. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Energy, Mineral, and Land Resources, or permits required by the Division of Water Resources (DWR), Coastal Area Management Act, or any other federal or local governmental permit that may be required. If the conditions as stipulated in the COC are unacceptable to you, you may apply sooner for an individual NPDES discharge permit. Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: htt :II ortal.ncdenr.org/web/l r/ Mailing Address: 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 - 919-707-92001 FAX: 919-715-8801 An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 1 10% Post Consumer Paper NCG020273 Renewal COC November 19, 2015 Page 2 If you have any questions concerning this permit, please contact Bradley Bennett at telephone number (919) 807-6378, or Bethany Georgoulias at telephone number (919) 807-6372. Sincerely, for Tracy E. Davis, P.E., CPM cc: Toby Vinson, DEMLR land Quality Section Tom Beinick, DWR Water Quality Permitting Section Stan Aiken, DEMLR Asheville Regional Office RE Linda Wiggs, DWR Asheville Regional Office Kip Tyler, EPA Region IV NPDES Permitting and Enforcement Branch Stormwater Permitting Program Files DWR Central Files Certificate of Coverage Page I of I STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020273 STORMWATER AND WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Unimin Corporation is hereby authorized to discharge stormwater arid/or wastewater, as provided in the original Certificate of Coverage (COC), or subsequent COC modification, from a facility located at: Buna Mine Hwy 226 N Spruce Pine Mitchell County to receiving waters designated as North Toe River, class C;Tr water(s) in the French Broad River Basin (s) in accordance with the stormwater pollution management requirements, monitoring and reporting requirements, and other conditions set forth in Parts I, II, 111, IV, V, and VI of General Permit No. NCG020000 as attached. This Certificate of Coverage shall become effective October I, 2015. This Certificate of Coverage shall remain effective for the duration of the General Permit. Signed this day October 1, 2015. pw� for Tracy E. Davis, P.E., CPM Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission http:/Iportal.ncdenr.org/web/Ir/2015-erenewa1 11 /19/2015 North Carolina Department of Environmental Quality Technical Bulletin for N.C. General NPDES Permit NCG020000 (Mining Environmental Activities) Division of Energy, Mineral, and Land Resources Quality Technical Bulletin for NCG020000 (Mining) Last Revised 101812015 What activities are covered by this general permit? NCG020000 coverage authorizes: • Stormwater discharges associated with mining and quarrying of non-metallic minerals (except fuels), mine excavation, processing, and vehicle maintenance activities (VMA) at mine sites. • Wastewater discharges (dewatering, process wastewater, wastewater recycle system overflows). • Operation of wastewater treatment systems (Authorization to Construct no longer required). NCG020000 coverage is NOT APPLICABLE to: • Borrow Pits covered by the NC DOT statewide stormwater permit. • Peat mining, coal mining, metal mining, or oil & gas extraction operations. • Wastewater not specifically identified by the general permit. What are key stormwater requirements? NCG020000 requires periodic discharge monitoring and a Stormwater Pollution Prevention Plan (SPPP): • Develop and implement an SPPP, and update it at least annually. • Inspect Stormwater Best Management Practices (BMPs) once every seven (7) calendar days. • Semi-annual analytical monitoring and qualitative (visual) monitoring. • Report stormwater monitoring data once a year by March 1 st to DEQ Central Office. • Report benchmark exceedances or Tier 2 monitoring to the DEMLR Regional Office within 30 days. • Respond to benchmark exceedances according to Tier response requirements. What are key wastewater requirements? NCG020000 stipulates wastewater treatment facility operational requirements and periodic discharge monitoring: • Notify DEQ if facility fails to perform satisfactorily or creates nuisance conditions. • Only DEQ-evaluated flocculants may be used, if administered according to maximum application doses. • Quarterly analytical monitoring for first year, or until four consecutive samples comply with all limits (then semi-annual monitoring allowed). Quarterly monitoring schedule resumes upon any limit violation. • Settleable solids (SS) monitoring applies to discharges to HQW, ORW, SA, SB, PNA, or Tr designated waters. • Total Suspended Solids (TSS) limits specific to industrial sand mines, and to any mine discharging to HQW. • Report wastewater effluent monitoring data once a year (by March 1 st) to DEQ Central Office. • Report effluent limitation violations to the DEMLR Regional Office within 30 days. • Effluent turbidity levels above the water quality standard prompt upstream and downstream monitoring. What has changed from the previous permit? Some changes specific to Stormwater: • Reduced BMP inspections (weekly) for active mines; additional allowances for inactive mines that qualify for "dormant status." • Changes to SPPP Annual Update. • "Measureable storm event" (any size that results in a discharge) replaces "Representative" event. • New benchmarks and Tiers specific to turbidity. • Total Flow and event duration no longer required. • pH removed from VMA monitoring. Some changes specific to Wastewater: • May drop to semi-annual WW monitoring after four quarterly samples that comply with all limitations. • Turbidity instream monitoring is required if effluent levels above the water quality standard. • SS monitoring for sensitive waters only (HQW, etc.) . TSS limits apply to industrial sand mines and HQWs. Changes from the last permit are detailed in the "Response to Comments and Summary of Changes" Document for the 2015 NCG02 GP on our website. PACE TECHNICAL BULLETIN FOR N.C. GENERAL NPOES PERMIT NCG020000 (MINING ACTIVITIES) Frequently Asked Questions What if my mine is inactive? The permit makes allowances for Inactive mines that have sus- pended all industrial activities and that certify to DEMLR that the site has been stabilized. If approved for "dormant status," these operations qualify for re- duced 8MP inspections and may be exempted from outfall moni- toring by the Regional Engineer. Do I have to monitor all outfalls? Yes. However, you may request Representative Outfall Status f ROS). If approved, ROS allows monitoring at fewer outfalls. To request ROS, submit an ROS Re- quest Form to the DEMLR Region- al Office. The form is available on our website (below). Also, the Regional Office may exempt mines with "dormant sta- tus" from analytical and/or quali- tative monitoring. What if I sell my business, or the name changes? You are required to notify DEMLR of those changes in writing, and continuation of permit coverage is subject to the Director's ap- proval. Please submit the Name/ Ownership Change form located on our Program website. What do I do when my permit expires? Permitees are not required to sub- mit an application for renewal un- less directed by the Division. The permittee should continue to abide by this general permit if it expires and renewed coverage has not yet been issued. What is wastewater, and what is stormwater at a mine site? Any water contacting an actively mined area, water used to pro- cess mined materials, and mine dewatering water are all consid- ered "wastewater." For some mines, "mine dewatering" also means wet pit overflows, and not just pumped -out water. Any stormwater that commingles with these waters is "wastewater." "stormwater" includes runoff from areas related to mining, pro- cessing, or raw material storage areas, such as haul roads or pro- cessing plant areas at the mine. Sometimes the answer is not clear because of how broad the defini- tions are. For example, N.C. con- siders runoff from areas that cori- tain overburden only (no mined or processed m(iterial), and that does not commingle with wastewater (including runoff from the mine), to be stormwater. If you are unsure about discharges, please contact the DEMLR Re- gional Office for assistance. Does a certified lab need to analyze my samples? Monitoring under NPDES permits must be conducted in accord- ance with test procedures ap- proved in federal regulations in 40 CFR § 136. All labs certified by LAST REV. 101811 S North Carolina perform analysis in accordance with those proce- dures. While N.C. certification re- quirements do not apply to testing stormwater-only discharges, data gathered under an NPDES permit must still conform to federal re- quirements. Using a North Caroli- no certified lab is one way to en- sure compliance. A list of certified labs is available from: http:// . portal.ncdenr.org/web/wq/lab/ cert/ What if I pull samples for my analytical monitoring, and I'm unable to get a sample or valid results for a parameter? If this happens, please sample for the missing parameter during the next measureable storm event or wastewater discharge. If I sample my discharge, do have to do visual monitoring at the same time? You may, but it is not necessary under NCG02. Some other gen- eral permits require it, however. What if there is no flow for a period between two samples that exceed a benchmark? Are those consecutive exceedances? Yes. This scenario still puts you in Tier 2. The new permit is more clear about how the Tier 2 trigger omits periods of no discharge. Who can help me with questions? y Your questions about stormwater permit requirements ' can be addressed to the DEMLR Offices: Asheville Office........... (828) 296-4500 Washington Office....... (252) 946-6481 Fayetteville Office....... (910) 433-3300 Wilmington Office........ (910) 796-7215 Mooresville Office....... (704) 663-1699 Winston-Salem Office... (336) 776-9800 Raleigh Office ............ (919) 791-4200 Central Office ............. (919) 707-9220 Hell2ful_Link: DEMLR Stormwater Permitting Program: http://portal.ncdenr.org/web/ir/stormwater ANNUAL SUMMARY DISCHARGE MONITORING REPORT DMR—STORMWATER SUBMIT TO CENTRAL OFFICE' General Permit No. NCG020000 Calendar Year "Report ALL STORMWATER monitoring data on this form (include "No Flow"i"No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. ' Certificate of Coverage No. N0002 ❑QFI❑ Facility Name: County: Phone Number: ( ) Total no. of SDOs monitored Certified Laboratory Lab # Lab # Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No Total - Rainfall - �: inches TSS;- mgll,,; SS, r mh11 e 4 fi Turbidity, '-,NTIJ.r r Upstream' [U)Turbidity,'- f , .NTU-r Downstream" (D�;Turbidity,.-Non-polar_ �`r'• NTU t 4, - . k O8Lq 'n fl. 9 ;(VMA) L New Motor Oil, ,Usage allmo. Jtormwater Benchmarks tndk r. No ; Loic�an� Circle Benchmark 160150 �- Circle -- Benchmark 50/25/10 NIA Water0.1 Standard appiiatr - NIA . Standard apipiesi - ,. 1 5 >55ga1lmo. average requires rOda morUto�rinlar ,Date. Sample Collected, `molddl r' -MEMO Permit Date 901112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Covera0e No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ ' Total TSS, Outfall No Rainfall, .. mgh ' inches T SS, .. mill Upstream ` Turbidity,. (U) Turbidity, NTU • .NTU Downstream (D) Turbidity, Non -polar 08�G`, m 11 � .NTU- 9 (VMA) New . Motbr Oil � Usage. allmo Circle Stormwater lndtcate No aanchmark Benchmarks avalkF1.0ab '100150 0.1 Circle NIA Benchmark 50/25/10 Standard applles NIA . e Standard apwaterquality Water plies 1 `� �55 eaumo. avarago requires T08G monitoringSS and ar .Date Sample Collected; molddl r Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ■❑ Outfall No, ; -` - t Upsfreariil Downstream' V', 'New Total TSS, SS, Turbidity, U Turbidit , i] ,Turbidit , Non -polar.. Motor Oil (.) Y (.) Y Rainfall, - - mgll mlll •NTU , -NTU : NTU ' ' ., 08tG, mgll Usage . inches �: ;(.VMA) allmo. Stormwater Benchmarks Circle circle NIA N/A '55 gallmo. +edkato NO Benchmark Benchmark average requires aFLlicenlre 100150 0,1 50/25/10 Standaid applWater ies Standard applli s 15 TD Gnmonit� ar Date Sample collected,,, molddl r Permit Date 1011i2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.221 Signature Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: . Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR,Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 10/1/2015 — 9/3012020 Last Revised 10-2-2015 ANNUAL SUMMARY DISCHARGE MONITORING REPORT. (DMR) —WASTEWATER SUBMIT TO CENTRAL OFFICE' General Permit No. NCO020000 Calendar .Year 'Report ALL WASTEWATER monitoring data on this form (include "No Flow"/"No Discharge" and Limit Violations) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG02 Facility Name: County: Phone Number: { ) Certified Laboratory Lab # Lab # Total no. of outfalls monitored Wastewater (WW) Discharge Outfall No. Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No ❑ Does this outfall discharge WW to HOW or ORW waters? Yes ❑ No ❑ If so, what is -the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW.to Trout jr) designated waters? Yes ❑ No ❑ Were there any limit violations in the calendar year? Yes ❑ No ❑ Outfall No i r Daily,Flow, Rate, cfs pH;' , SU`.mg_ ' TSS;� /I 'SS, mill' lieap+lcaPm, Discharge Turbidity,`, ' .NTU " ,' upstream ' (U) Turbidi_ty,. NTU i • ,Downstream. ,(D)°Turbidity, NTU Fecalw y Coliform, coll'!00 MI. SA Efflrient Limitations Mo. Ave I Oally Max. HOW or ORW - 50% of 7Q10 kidkote No FLOW lraPP!lceAla heshwater . 6.0-9.0 saltWater 6.8-8.5 Industrial Sand 25145 „a,,roRw 20/30 •HQWoFORW kail Tr or PNA 10115 HQ,, o Rw, $A,sa,PNA or any Trout 0/� 2 L.110.. No Limit Circle Water quality Standard thalappplles:- 50/25/10 NIA WaterQuallty Standard applies NIA Water quality Standard applies . NIA e _. .• Date Sample Collected, . il r mola' 0 Mimi= I Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Wastewater (WW) Discharge Outfall No. Is this an industrial sand mine (See'40 CFR §436 Subpart D)? Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SIB or PNA waters? Yes ❑ No ❑ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑ If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑ Were there any limit violations in the calendar year reported? Yes ❑ No ❑ Outfall No..' : Daily:Flow Rate, cfs pH, SU ,.TSS; -,SS, ';mgll .:. ., rill/l Ilappllcable Discharge .Turbidity, NTU - .. � Upstream . Downstream (U).Turbidity„ (D) Turbidityi' -'NTU .- NTU Fecal :Coliform; . co11160 ml SA - HRw or ORW Effluent 50% of Limitations 7Q10 Mo. Ave I Oally Max. Indicate NO FLOW If applicable freshwater 6.0-9.0 saltwater 6.8-8.5 Industrial Sand 25I45 HQW, ORW.: HQW or ORW ' SA, SIB. PNA, 20/30 or arty Trout HQW or ORW , 0.110.2 and Tr or PNA 1 0I1 5 _ No Limit Qua Circle S Standard that applfos: - 5OIZ511 O .. . NIA N/A ' _ Standard applies Stwamlata applies NIA . Date Sample i 'Collected; „ molddlyr, Permit Date 1011t2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. N0002 ❑❑❑❑ Additional Outfall Attachment (make copies as needed for additional outfalls) Wastewater (WW) Discharge Outfall No. Is this an industrial sand mine (See 40 CFR §436 Subpart D)? Yes ❑ No ❑ Does this outfall discharge WW to SA waters? Yes ❑ No ❑ Does this outfall discharge WW to SIB or PNA waters? Yes ❑ No ❑ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑ If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Were there any limit violations in the calendar Yes❑ No❑ Yes ❑ No ❑ ti? Outfall No. Daily Flow pH; , TSS, . SS,Discharge Rate, cfs. SU mgll mill HanF!leable Upstream, Downstream Coliform;' Turbidity, (U) Turbidity, (Dffurbidity,. col/100 ml" NTU . NTU NTU SA Industrial Sand HOWarORW freshwater HGW,ORW, Effluent 50%of 6.0-9.0 HQWorORW SA.SB.PNA. Limitations 7Q10 `a'""'t°r 20130 . or any 6.8-8.5 HQW or oRw 0.110.2 Mo. Ave 1 Daily Max. Indhate NO FLOW L Q Tr or PHA sapplfcabfe 10115 No Limit NIA NIA. Q a'l ty Water rd Standard applies Standardappliesapplies NIA that applies: 5012rrI1 v Date Sample Collected'. molddl r , Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Required by 40 CFR §122.221 Signature Date Mail Annual Summary Wastewater DMR to the NCDEQ Central Office: Note the address is correct - Central Files is housed in D WR (not DEMLR) N.C. Department of. Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 101112015 — 9130/2020 Last Revised 10-2-2015 BENCHMARK EXCEEDANCE or TIER 2 DISCHARGE MONITORING REPORT (DMR) -- STORMWATER :SUBMIT TOREGIONAL. OFFICE*_ General Permit No. NCG020000 *Use this form if any stormwater-samples have EXCEEDED.A BENCHMARK or if the facility is in TIER 2 MONITORING for any parameter (including TIER 2 for Turbidity). Send sample results to the DEMLR Regional Office within 30 days of receipt from the laboratory.. Certificate of Coverage No. NCG02 ❑❑❑❑ Facility Name: Sample Collection Period: Period 1 ❑ Period 2 ❑ Calendar Year County: For Monthly Monitoring: Month Phone Number: Person Collecting Samples: Certified Laboratory: Lab # Lab # Has this•facility had 4 or more benchmark.exceedances for any single parameter, at anyone SW discharge outfall (SDO)? Yes ❑ No ❑ Have you contacted the Regionai'Office? Yes ❑ ' No ❑ - Whom at'the Region did you speWwith? Part A: Stormwater Monitoring Revuirements (no VMA, see next page for outfalls with VMA) ... Outfall - iNo » • ,Date, Sample Collected - " _'; Total .- Rainfall ; - --�x-4 - lsthis'SDO in Tier 2? r a Total.. Suspended t'3olids'(T,SS),-k .m911 ,-- Settleable Solids,, ;, mill ;,=`''} - Turbidity,.NTU - My - - » - Upstream,(U). Turbidity,__ NTU - - - Downstream.(D): _:Turbidity,, NTU s �y molddlyr , Aor :ENO FLOW' ,. inches tz.. .,: YIN - 100 rJO (ORW, HOW, Tr, PNA) 0.1 - . - . s0 25 (lalcas, rsaervohs, Sall waters) 10 (freshwater Trdesignated streams lakes and rase—Irs NIA Water Quality standard applies NIA Water Quality Standard applies Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 Page 1 of 3 Certificate of Coverage No. NCG02 ❑❑❑❑ Part A: Stormwater Monito"ring Requirements (no VMA), Cont. Outfali" No. f : Date Sample Collected = Total :_: ' Rainfall Is this SDO m Tier 2? ,Suspended °q Solids; =TSS ( ) F t m911 0 ESeit' iible� Solids,. mlI , - w Turbidity, NTU .: .C: Upstream (U) Turbidity,. NTU' Downstream (D). Turbidity, .' NTU = molddlyr, Or r`NO FLOW" inches YIN - - 100 50 (ORIN,HOW,Tr,PNA) _� -0.1 -- 50 25 pakes,reae-,wm,sattwat.r.j 10 (fieahwaterTrdeslgnated streams [ekes and reserwlra NIA WaterQuallty Standard applies NIA Water Quality Standard applies Part B: Stormwater Monitoring Requirements for SDOs with Vehicle Maintenance Activities (VMA) where facilities use > 55 gallons of new motor oil a month if averaged'over the calendar year. NOTE. Other parameters only for outfalls that include both mining activities and VMA. OutfallE ,, fVo E ,, Date Sample •, Collected t. r Total "Rainfall" VMA, 3 TSS, `,' mgll' _ `#(gallmo.)ti �.VMAonI y _ f`Ndn polar . '08�G,'--mg11 'VMA'oril , y New Motor r -Qii Use . elf,. applicableIf SS;. mill' -1 `applicable" Turbidity,: - NTU ` if applicable Upstream (U) Turbidity, -NTU• if applicable Downstream (D) Turbidity, NTU molddlyr UT r`NO.F.LOW" inches 100I50 is. 55 0.1 50/25/10 N/A NIA Termit.Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 Page 2 of 3 Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.22] Signature Date Mail Benchmark Exceedance/Tier 2 DMR to Your DEMLR Regional Office Land Quality Section: 'ASHEVILLE.REGIONAL OFFICE_ �2090 US Highway 70 Swannanoa, NC 28778 (828) 296-4500 3800 Barrett Drive Raleigh, NC 27609 (919) 7914200 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27103 (336) 776-9800 Permit Date 1011/2015 — 9/3012020 FAVE'ITEVILLE'REGIONAL OFFICE 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 WASHINGTON REGIONAL.OFFICE 943 Washington Square Mall Washington, NC 27889 (252) 946-648I Questions for The Central Office I Stormwater Permitting Program? (919) 707-9220 MOORESVILLE.REGIONAL OFFICE 610 East Center Avenue/Suite 301 Mooresville, NC 28115 (704)663-1699 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910)796-7215 Last Revised 10-2-2015 Page 3 of 3 T LIMIT VIOLATION DISCHARGE MONITORING REPORT (DMR) — WASTEWATER SUBMIT TO REGIONAL OFFICE* General Permit No. NCG020000 "Use this form if any wastewater samples have EXCEEDED A WASTEWATER LIMIT for any parameter. Send sample results to the DEMLR Regional Office within 30 days of receipt from the laboratory. Certificate of Coverage No. NCG02 ❑❑❑❑ Facility Name: Sample Collection Period, Qtr 1 ❑ Qtr 2 ❑ Qtr 3 ❑ Qtr 4 ❑ Calendar Year County: If Monthly Monitoring: Month Phone Number: ( ) Person Collecting Samples: Certified Laboratory: Lab # Lab # Is this an.Industriai sand mine? Yes ❑ No ❑• Discharge to HQW or ORW waters? Yes ❑ No ❑ Discharge to SA waters? Yes ❑ No ❑ Discharge to Tr (Trout) waters? Yes ❑ No ❑ Discharge to SB or PNA waters? Yes ❑ No ❑ If HQW, what is the 7Q10 flow rate? or Tidal, 7010 not available ❑ Wastewater Monitoring Reauirements T} OutFall= No Date Sample; -Collected ..r w Daily, Flow. Rate, cfs —� w. " ` 77 pH, ' SU' °i . a Total `"Suspended Solids {TSS), . '' mgll r :,r `t - Settleable Solids, M_ i17111� .NePRllcabre Discharge Turbidity, NTU; ;'; - Upstream {U)` Turbidity, NTU ? - Downstream {D} Turbidi#y, -_NTU' " " - - Fecal ' Coliform, ' "co11100"ml. SA molddlyr Or "NO FL -OW "' d HQW orORW 50% of 7Q10 sre NO FLOWN rndkapplicable freshwater 6.0-9.0 saltwater 6.8-8.6 Mduetrlal Sand 25145 HQWorORW 20130 NOW or ORW Anj Tr or PNA 10115 HQW, ORW, SA, SB, - PNA, or any Trout 0.110.2 No Limit Circle W Water Quality Standard thatappues: 5012ti110 NIA water Quality Standardapplles NIA water Quality Standard applies NIA Permit Date 10/112016 — 9/30/2020 Last Revised 11-18-2015 Page 1 of 3 Certificate of Coverage No. NCG02 ❑❑❑❑ Wastewater Monitoring Requirements, .cont. Outfall Date Sample ,Collected -Daily Flow "'Rate,' cfs � ' "pH, , . ' SU ' „ -Total' ,Suspended Solids (TS5); mgll w + Settleable Solids; mill' H !!cable _P Discharge Turbidity, NTU' � Upstream (U), Turbidity, NTU _ Downstream ;(�) Turbidity, NTU " •Fecal - :Coliform, co11100 ml SA - mol dl�-r d Y Or "NO FLOW" HQW orORW 0 - rJ0 % Of 7010 Q htdkah lVO FLOwA lkable freshwater 6.0-9.0 saltwater . 6.8-$•5 Industrial Sand. 25145 - •7 HOW or ORW 20130 - HOW orORWIn¢TrorPN4 -10115 HOW, ORW� $A, SO. . f'N/4 or any Trout _ .0.1I0.2 No -Limit- OtrcleWaterQualltyStmdard thalapplka: 50/25/10 NIA WalerOuallty Standertlappltes N/A N WaterQuallty Standardapptles N/A Permit Date 10/112015 — 9/30/2020 Last Revised-11-18-2015 Page 2 of 3 Certificate of Coverage No. NCG02 ❑❑❑❑ CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.22] Signature Date Mail Limit Violation DMR to Your DEMLR Regional Office Land Quality Section: 2090 US Highway 70 Swannanoa, NC 28778 (828) 2964500 RALEIGH REGIONAL OFF_ ICE 3800 Barrett Drive Raleigh, NC 27609 (919) 791-4200 WINSTON-SALEM REGIONAV OFFICE 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27103 (336) 776-9800 Permit Date 10/112015 — 9/30/2020 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 (910) 433-3300 WASH INGTONREGIONAL OFFICE 943 Washington Square Mall T Washington, NC 27889 (252) 946-6481 CENTRAL OFFICE Questions for The Central Office Stormwater Permitting Program? (919) 707-9220 MOORESVILLE. REGIONAU.OFFICE 610 East Center Avenue/Suite 301 Mooresville, NC 28115 (704) 663-1699 WILMINGTON REGIONAL OFFICE_ 127 Cardinal Drive Extension Wilmington, NC 28405-2845 (910)796-7215 Last Revised 11-18-2015 Page 3 of 3 K4*AIr NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out thisform, please visit. bttl2:./ /portal.ncd?nt, r{�/web/Ir/nudes-stormwater/ Permit No.: j]f�/�/_/_/_//�/�/ or Certificate of Coverage No.: Facility Name: County: Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): Phone No. Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ❑ Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these. definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have'been atleast 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receiving Stream: _ Describe the industrial activities that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: _ 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013