North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor , Director Secretary
March 28, 2011
Vulcan Materials Company
Attn: Tim Knopf, Environmental Engineer V
P.O. Box 4239
,Winston-Salem, NC 27115-4239 APR 0 4 2011
Subject: Representative Outfall Status �AMsro TS&V ct+
NPDES Stormwater Permit NCG020000
Certificates of Coverage NCG020115 - East Forsyth Quarry, &
NCG020082 - North Quarry
Vulcan Materials Company
Forsyth County
Dear Mr. Knopf:
Ron Boone, of the Winston-Salem Regional Office, has reviewed your requests for
Representative Outfall Status (ROS) for Vulcan Materials Company's (VMC) North Quarry and East
Forsyth Quarry, dated March 7, 2011. The results of his review are detailed below.
As we understand it:
East Forsyth Quarry, NCG020115: You are requesting ROS for SDO 003 to be
represented by SDO 005.
North Quarry, NCG020082: You are requesting ROS for.SDOs 004, 005, 006, and 007, to
be represented by SDO 003..
Based on the information and maps provided, as well as information gleaned from the
December, 2010, compliance evaluation inspections, we hereby approve both of these requests. In
accordance with 40 CFR §122.21(g)(7), you are authorized to sample SDO 005 as representative of
SDO 003 at the East Forsyth Quarry, and SDO 003 as representative of SDOs 004, 005, 006, and
007, at the North Quarry. This approval is effective with the next sampling event. Please note that all
other SDOs not expressly mentioned in this letter must still be sampled as required by the permit, i.e.
SDOs 001, 002, and 004 for the East Forsyth Quarry.
You are reminded that VMC is still required to conduct Qualitative Monitoring (QM) at all SDOs
at both quarrys, regardless of ROS. Also, please remember that any actions you initiate in response
to benchmark exceedences, as directed in the tiered response provisions of your permit, must
address all drainage areas represented by the representative outfall, where appropriate.
North Caro4na Division of Water Quality, Winston-Salem Regional Office
Location: 585 Waughtown St. Winston-Salem, North Carolina 27107
Phone: 336-771-50001 FAX: 336-77145301 Customer Service: 1-877-623.6748
Intemet: www.ncwaterqual;ty.org
NonrthCarolina
Naturally
An Equal Opportunity 4 Affirmative Action Employer
Vulcan Materials Company
Attn: Tim Knopf, Environmental Engineer
ROS NCGO20115 & NCG020082
March 28, 2011
Page 2 of 2
Please append this letter to your Stormwater Pollution Prevention Plans (SP3) or permits to
document that ROS has been approved. If changes, in drainage areas, structures, processes,
storage practices, or other activities occur that significantly alter the basis of this approval, ROS may
no longer be valid. You should either resume sampling at all SDOs, or reapply to this office for new
ROS based on the updated information.
Finally, although we have approved ROS for -both sites using this single letter, DWQ considers
each site ..completely independent of the other. Therefore, occurrences or activities that occur at one
sitegenerally do:iVOT; affect the other.
lf'ypu have any questions or comments concerning this letter, please contact Mr. Boone at
(336) 771-4967 or at ron.boone@ncdenr.gov.
Sincerely, .
W. Corey Basinger
Interim Regional Supervisor
Surface Water Protection Section
cc: Winston-Salem Regional Office
Stormwater.,Permitting: Unit.:
Central Files
f w NIC
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
July 2, 2010
Tim Knopf
Permit Engineer, Southern Region
Vulcan Materials Company
PO Box 4239
Winston-Salem, NC 27115-4239
Subject: Vulcan Construction Materials, LP
General Permit NCG020000
Request for Sampling Extension
Various Counties
Dear Mr. Knopf:
Dee Freeman
Secretary
We are writing in response to your request for an extension to collect the first semi-annual stormwater
sample under this permit. In your letter of June 23, 2010, you requested an extension to August 315t to comply with
sampling requirements at several Vulcan facilities across the state. Your letter cited reasons to support the request
that included:
• Hard copies of the new NCG020000 permit not being received until mid -February, when the permit had
become effective January 1, 2010;
• Spotty weather patterns resulting in storm events during non -operating hours that prevent sample
collection; and
• The need for additional time to train Sampling Personnel on significant changes in the permit.
One of the reasons for your request was the new provision that monthly monitoring will apply for the
remainder of the permit term, should the mine ever fail to collect a sample during a scheduled monitoring period
(footnote 1 of Table 1 in Part lil). While considering your request, the Stormwater Permitting Unit (SPU) realized this
provision may unfairly affect permittees who obtain coverage under NCG020000 in the middle of a monitoring
period. The SPU has written up guidance to address this situation and related conflicts in the permit text (see
attachment).
Recognizing there were possible conflicts with this provision that our guidance now addresses, DWQ will
grant your request for an extension to collect a stormwater sample by August 31, 2010. However, we note that
Vulcan Materials Company should have been prepared to comply with permit monitoring requirements prior to
receiving hard copies of the permit in mid -February. Specifically:
Wetlands and Stormwater Branch
1617 Mail Service Center, Raleil Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807.64941 Customer Service:' 1-877-623-6748
Internet: www.ncwaterquality.org
An Equal Opporlunity 1 Affirmative Action Employer
One
NoaliCai-olina
Natrutatty
Vulcan Materials Company
Monitoring Extension Request
July 2, 2010
• The SPU met on several occasions with the North Carolina Aggregates Association (NCAA) through the
NCG020000 renewal process, beginning in August 2009. Vulcan Materials is a member of NCAA, and a
representative of the company attended the initial meeting.
• The provision that triggers monthly monitoring for failure to sample came out of discussions with industry
representatives during these meetings and was incorporated into the final permit as a result.
• The definition of representative storm event also changed as a result of these discussions with NCAA to
increase sampling opportunities during operating hours. A representative storm event in NCG020000 now
only requires a period of 48 hours of no rain prior to the event.
• An advance copy of the final permit was forwarded to the Executive Director of the NCAA on December 29,
2009 and subsequently distributed to NCAA members. The final NCG020000 permit was available to all
permittees on the DWQ website when it became effective in January 2010.
• Stormwater sampling requirements are not new with this renewal, even though sampling is now semi-
annual (instead of annual in the previous permit). Vulcan should have already been familiar with the
stormwater sampling requirements.
If you have any questions regarding this letter, please contact Bethany Georgoulias at (919) 807-6372.
Sincerely,
`G T
Bradley Bennett
cc: Stormwater Permitting Unit Files
DWQ Regional Offices (All)
Jay Stem, NC Aggregates Association
Attachment
June 23, 2010
Mr. Bradley Bennett, Stormwater Permitting Supervisor
NCDENR-Division of Water Quality
Surface Water Protection
512 North Salisbury Street
Raleigh, N.C. 27604
Subject: Vulcan Construction Materials, LP
General Permit NCG020000
Request for Sampling Extension
Dear Mr. Bennett,
I spoke with Ms- Bethany Georgoulias today about Vulcan Construction
Materials, LP respectfully requesting an extension of time beyond June 30th to
collect the first storm water sample for 2010. Ms. Georgoulias advised me to this
request to you for consideration.
Vulcan received its genera! permit packages in mid -February; packages were
post marked February 13t". The permit, as you are aware, was the,fiirst to be
modified requiring increased analytical monitoring, developing and implementing
an SPPP replacing the SBMP Plan and Benchmark with Tiered response
replacing Cut -Off Concentrations, requiring time to review and implement.
Since Vulcan received its permits the weather patterns have been spotty with
little wide spread patterns. Many storm events have occurred during non -
operating hours, obviously preventing sample collection within the first 30
minutes of discharge.
Although Vulcan has begun collecting storm water samples, we have a number
yet to be collected and with the current weather outlook completion by June 30t"
will be a challenge.
With Vulcan receiving its permits 45 days+/- into the permit term and realizing the
need to develop Storm water SPPP plans and train some nineteen Water
Sampling Personnel of the changes with the significantly altered permit, I
respectfully request an extension to August 31St to collect our first semi-annual
storm water sample and maintain semi-annual sampling. Our plan is to sample at
the first possible representative storm, so as to accommodate the 60 day
MIDEAST DIVISION, VULCAN CONSTRUCTION MATERIALS, LP
P.O. BOX 4239 • WINSTON-SALEM, NORTH CAROLINA 27115-4239 • TELEPHONE 336-767-4600
requirement between samples. This will not relieve us from taking our semi-
annual sample during the second half of the year.
The Vulcan facilities covered by this General Permit are as follows:
NORTH QUARRY--►NCG020082
STOKESDALE QUARRY
`• NCG020191
GREYSTONE QUARRY
NCG020154
ELKIN QUARRY
—NCG020159
ENKA QUARRY
—NCG020151
115 QUARRY
4NCG020160
YADKIN QUARRY (Inactive)
_NCG020183
PINEVILLE QUARRY
---NCG020049
EAST FORSYTH QUARRY
—NCG020115
ROCKINGHAM QUARRY
—NCG020107
CLEAR CREEK QUARRY
+•-NCG020201
CABARRUS QUARRY
-NCG020172
LENOIR QUARRY
—NCG020026
MORGANTON QUARRY
:—NCG020177
SPRUCE PINE QUARRY
L-NCG020511
BOONE QUARRY
vK'G020251
GOLD HILL QUARRY
—NtG020108
SOUTH FORK QUARRY (Inactive)
NGG020441
PENROSE QUARRY
_�'NCG020000
HENDERSONViLLE QUARRY
.rNCG0201-16
SMITH GROV.= QUARRY
L NCG020081
BURKE QUARRY (Inactive)
NCG020691
HIGH SHOALS QUARRY (Inactive)
NCG020190
Thank you for your consideration of this request and please contact me with any
questions at 336-744-2019 or knopft@vmcmail.com.
Sincerely,
Tim Knopf
Permit Engineer, Southern Region
4
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
July 2, 2010
Tim Knopf t
Permit Engineer, Southern Region
Vulcan Materials Company
PO Box 4239
Winston-Salem, NC 27115-4239
Subject: Vulcan Construction Materials, LP
General Permit NCG020000
Request for Sampling Extension
Various Counties
Dear Mr. Knopf:
'Dee Freeman
Secretary
We are writing in response to your request for an extension to collect the first semi-annual stormwater
sample under this permit. In your letter of June 23, 2010, you requested an extension to August 3151 to comply with
sampling requirements at several Vulcan facilities across the state. Your letter cited reasons to support the request
that included:
Hard copies of the new NCG020000 permit not being received until mid -February, when the permit had
become effective January 1, 2010;
Spotty weather patterns resulting in storm events during non -operating hours that prevent sample
collection; and
• The need for additional time to train Sampling Personnel on significant changes in the permit.
One of the reasons for your request was the new provision that monthly monitoring will apply for the
remainder of the permit term, should the mine ever fail to collect a sample during a scheduled monitoring period
(footnote 1 of Table 1 in Part 111). While considering your request, the Stormwater Permitting Unit (SPU) realized this
provision may unfairly affect permittees who obtain coverage under NCG020000 in the middle of a monitoring
period. The SPU has written up guidance to address this situation and related conflicts in the permit text (see
attachment).
Recognizing there were possible conflicts with this provision that our guidance now addresses, DWQ will
grant your request for an extension to collect a stormwater sample by August 31, 2010. However, we note that
Vulcan Materials -Company should have been prepared to comply with permit monitoring requirements prior to
receiving hard copies of the permit in mid -February. Specifically:.
Wetlands and Stormwater Branch
1617 Mail Service Center, Rafeigh,?!orth Carolina 27699.1617
Location: 512 N. Salisbury St. Ralelgh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1.877.623-6748
tntemet: www,ncwaterquality.org
An Equal Oppcounily 4 Affirmative Action Employer
0110
NoahCarolina
All a,ally
Vulcan Materials Company
Monitoring Extension Request
July 2, 2010
• The SPU met on several occasions with the North Carolina Aggregates Association (NCAA) through the
NCG020000 renewal process, beginning in August 2009. Vulcan Materials is a member of NCAA, and a
representative of the company attended the initial meeting.
• The provision that triggers monthly monitoring for failure to sample came out of discussions with industry
representatives during these meetings and was incorporated into the final permit as a result.
• The definition of representative storm event also changed as a result of these discussions with NCAA to
increase sampling opportunities during operating hours. A representative storm event in NCG020000 now
only requires a period of 48 hours of no rain prior to the event.
• An advance copy of the final permit was forwarded to the Executive Director of the NCAA on December 29,
2009 and subsequently distributed to NCAA members. The final NCG020000 permit,was available to all'
permittees on the DWQ website when it became effective in January 2010. r
• Stormwater sampling requirements are not new with this renewal, even though sampling is now semi-
annual (instead of annual in the previous permit). Vulcan should have already been familiar with the
stormwater sampling requirements.
If you have any questions regarding this letter, please contact Bethany Georgoulias at (919) 807-6372.
Sincerely,
�54 ff
Bradley Bennett
cc: Stormwater Permitting Unit Files
DWQ Regional Offices (All)
Jay Stem, NC Aggregates Association
Attachment
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
July 1, 2010
To: Stormwater Permitting Unit
From: Bradley Bennett, Stormwater Permitting Unit Supervisor
Subject: Guidance for Monthly Monitoring Triggers under General Permit NCG020000
This memo provides guidance on the provisions in the recently renewed NCG020000 General
Permit for Mining Activities that increase monitoring as a result of failure to monitor according to
permit terms. The guidance addresses how. the Division of Water Quality (DWQ) will implement the
provision for mining operations that come under coverage of the permit in the middle of a semi-
annual (for stormwater) or quarterly (for wastewater) monitoring period. This guidance also clarifies
how permittees may be relieved of monthly monitoring.
The new NCG020000 permit became effective on January 1, 2010. Changes from the previous
permit include a provision that triggers monthly monitoring for the remainder of the permit term in
the event the permittee fails to comply with, the monitoring schedule in accordance with permit terms
(Footnote 1 in Tables 1, 4, and 7 of Part III). This trigger applies to circumstances other than
instances of no discharge during the monitoring period or adverse weather conditions that prevent a
sample from being collected during the period.
In the permit, DWQ did not clarify what happens if a permittee obtains coverage mid -cycle
and has less time to take a sample before the end of the scheduled period (for example, a Certificate -of .
Coverage (COC) effective in mid -May and a sampling period ends June 30"). That permittee is
unfairly put at a higher risk of being "kicked into" monthly monitoring for the entire permit term.
The Stormwater Permitting Unit (SPU) will address the shortfall at the time of Cl issuance
in the following way: When staff determines that a COC effective date means the permittee may
not have enough time to reasonably collect a stormwater and/or wastewater sample, the SPU may
advise the permittee that the first compliance sampling period begins on the date of the upcoming
monitoring event period. That extension will be communicated in the cover letter.
What is also unclear in the permit is that the Regional Office (RO) may still relieve a permittee
from monthly sampling after an earlier failure to sample during a scheduled period, EITHER as part
of Tier 3—in the event that a permittee is also sampling monthly because of four benchmark
exceedances (stormwater)—OR independently, should DWQ conclude the change is justified
(stormwater or wastewater). The RO may alleviate the monthly monitoring requirement in either
case, if the RO and SPU determine it appropriate. The permit text inadvertently conflicts with
DWQ's intent on this point.
Wetlands and Stormwater Branch
1617 Mail Service Center, Raleigh, North Carolina 27699.1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-6494 1 Customer Service: 1-877-623-6748
Internet: vruw.ncwaterquality org
An Enual Onocr inliv 4 Affirmative Adon Emnlover
One
NortliCaroiina
r
DWQ Guidance for 1llonthly Monitoring Provisions in NCG020000 Mining Permit
July 1., 201.0
cc: Stormwater Permitting Guidance Materials File
DWQ Supervisor, Fayetteville Regional Office
DWQ Supervisor, Raleigh Regional Office
DWQ Supervisor, Winston-Salem Regional Office
Jay Stem, NC Aggregates Association
DWQ Supervisor, Asheville Regional Office
DWQ Supervisor, Mooresville Regional Office
DWQ Supervisor, Washington Regional Office
DWQ Supervisor, Wilmington Regional Office
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, 11.E. Director
Division 01, Water Quality
February 7, 2005
D Gray Kimel
Vulcan Construction Materials LP
PO Box 4239
Winston Salem, NC 27115
Subject: NPDES Stormwater Permit Coverage Renewal
Vulcan Construction Materials -North Quarry
COC Number NCG020082
Forsyth County
Dear Permittee:
In response to your renewal application for continued coverage under general permit NCG020000 the Division of Water
Quality (DWQ) is forwarding herewith the reissued stormwater general permit. Please review the new permit to familiarize
yourself with the changes in the reissued permit. The general permit authorizes discharges of stormwater and some types of
wastewater. You must meet the provisions of the permit for the types of discharges present at your facility. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the slate of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
A new Certificate of Coverage
■ A copy of General Stormwater Permit NCG020000
• A copy of a Technical Bulletin for the general permit
■ Five copies of Discharge Monitoring Report (DMR) Forms - wastewater and stormwater
Five copies of Qualitative Monitoring Report Form
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification
or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other
permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable
federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater Permitting
Unit at (919) 733-5083, ext.578.
Sincerelv./I_
far Alan W. Klimek, P.E.
cc: Central Files
Stormwater & General Permits Unit Files
Winston-Salem Regional Office
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1017
Internet: h2o.enr.state.nc.uslsulstormwater.html 512 N, Salisbury St. Raleigh, NC 27604
One
No •thCarolina
`1�lllllr�tllJ
Phone (919) 733-7015 Customer Service
FAX (919) 733-96t2 1.877-623-6748
An Equal OpportunitylAHirmative Action Employer — 50% Recyded110% Post Consumer Paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020082
STORMWATER AND PROCESS WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and
the Federal Water Pollution Control Act, as amended,
Vulcan Construction Materials LP
is hereby authorized to discharge stormwater and to operate treatment systems and discharges associated
with mine dewatering wastewater and process wastewater from a facility located at
Vulcan Construction Materials -North Quarry
4401 N Patterson Ave
Winston Salem
Forsyth County
to receiving waters designated as Mill Creek, a class C stream in the Yadkin -Pee Dee River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11,
III, IV, V, and VI of General Permit No. NCG020000 as attached.
This certificate of coverage shall become effective February 7, 2005.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day February 7, 2005
for Alan W. Klimek, P.E„ Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Kerr T. Stevens, Director
February 22, 2000
R. M. POPLIN
VULCAN CONSTRUCTION MATERIALS, LP - NORTH QUARRY
P. 0. BOX 4239
WINSTON-SALEM, NC 27115
Dear Permittee:
1 � •
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
Subject: Reissue - NPDES Stormwater Permit
Vulcan Construction Materials, LP - North Quarry
COC Number NCG020082
Forsyth County
In response to your renewal application for continued coverage under general permit NCG020000, the Division of
Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6. 1983,
The following information is included with your permit package:
m A copy of general stormwater permit NCG020000
* Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form
* A copy of a Technical Bulletin on this permit which outlines permit components and
addresses frequently asked questions
* A Certificate of Coverage for your facility
* DWQ fee schedule
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law rule, standard, ordinance, order, judgment, or
decree.
Please note that in 1998 Senate Bill 1366 established changes to the permit fee structure for DWQ permits effective
January I, 1999. This change requires that you pay an annual fee to assure continued coverage under this permit.
You will be invoiced for this fee beginning next year. A copy of the current fee schedule is included with this letter.
if you have any questions regarding this permit package please contact Tony Evans of the Central Office Stormwater
and General Permits Unit at (919) 733-5083, ext. 584
Sincerely,
for Kerr T. Stevens
Director, Division of Water Quality
cc: Central Files
Winston-Salem Regional Office
Stormwater and General Permits Unit Files i
,l
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020082
STORMWATER AND PROCESS WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
VULCAN CONSTRUCTION MATERIALS, LP
is hereby authorized to discharge stormwater and to operate or continue operation of treatment systems and
discharges associated with mine dewatering and process wastewater from a facility located at
VULCAN CONSTRUCTION MATERIALS, LP - NORTH QUARRY
4401 N PATTERSON AVENUE
WINSTON-SALEM
FORSYTH COUNTY
to receiving waters designated as Mill Creek in the Yadkin - Pee Dee River Basin in accordance with the effluent
limitations, monitoring requirements, and other conditions set forth in Parts I,1I, 111, IV, V, and VI of General
Permit No. NCG020000 as attached.
This certificate of coverage shall become effective February 22, 2000.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day February 22, 2000.
for Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
Department of Environment, Health and Natural Resources
Division of Environmental Management
512 North Salisbury Street - Raleigh, North Carolina 27604
James B. Hunt, Jr., Governor
Jonathan B. Howes, Jr., Secretary
May 7, 1993
R. M. Poplin
P O Box 4239
Winston-Salem, NC 27115
A. Preston Howard, Jr., P. E.
Director
Subject: General Permit No. NCG020000
Vulcan Materials Company -North Quarry
COC NCG020082
Forsyth County
Dear Mr. Poplin:
In accordance with your application for discharge permit received on February 1, 1993, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general
permit. Issuance of this certificate of coverage supersedes the individual NPDES permit No. NC0065609.
This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the
Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
December 6, 1983.
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the Division
of Environmental Management. The Division of Environmental Management may require modification or
revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area
Management Act or any other Federal or Local governmental permit that may be required.
If you have any questions concerning this permit, please contact Ms. Susan Robson at telephone number
9191733-5083.
cc
Sincerely,
Original Signed By
Coleen K Sullins
A. Preston Howard, Jr.
Director
Winston-Salem Regional Office
Pollution Prevention Pays
P.O. Box 29535, Raleigh, North Carolina 27626.0535 Telephone 919-733-7015
An Equal Opportunity Affirmative Action Employer
.= s
GENERAL PERMI? S
COPIES OF PERMITS ARE TO BE SENT
TO THE FOLLOWING:
SIGNED ORGINAL TO APPLICANT **
SIGNED COPY TO CENTRAL FILES
ROPY TO REGIONAL OFFICE
PY TO P&E FILE
COPY TO COMPLIANCE
_COPY TO WAKE COUNTY
.COPY TO MECKLENBURG COUNTY
,_-,COPY TO TRAINING & CERT.**
**ATTACH COPY OF GENERAL PERMIT
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DIVSION OF ENVIRONMENTAL MANAGEMENT
STORMWATER, MINE DEWATERING, AND/OR OVERFLOW FROM
PROCESS WATER RECYCLE SYSTEMS DISCHARGES
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Vulcan Materials Company
is hereby authorized to continue operation of a treatment system for mine dewatering and a closed -loop system
consisting of four process settling ponds with a natural drainageway and downgradient pond and discharge treated
wastewater and stormwater from two points from a facility located at
North Quarry
Patterson Avenue
Forsyth County
to receiving waters designated as Mil] Creek in the Yadkin -Pee Dee River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III
and IV of General Permit No. NCG020000 as attached.
This certificate of coverage shall become effective May 7, 1993
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day May 7, 1993
Original Signed 9Y
Coleen H. Sullins
A. Preston Howard, Jr., P.E., Director
Division of Environmental Management
By Authority of the Environmental Management Commission
� r�ilr
,I rWINSTON-SALEM (COURTHOUSE) 4.3 Mr. O S
LEXINGTON 25 Mt. 1
I
' l ikU
lu
jku UP b
1 - � � �., (� �-' `. t�.��� �iii�' ���� �I ' � �� III 1_• _ .��'�
•.-.. � fr - _ ��v �' � �\. � , � � � Y� 'III-O � � � al
? � +t =f `ark .: i��r '<��_, �� ••�� CQ,� ,.
q� ti` � � ,fit.' -jam � oo. III /J � .-•\ � �� ,C��-_+_ -��_/� \��.
c3p / •/ I r l
8530
� Ill' ��"�;� ` �! ' j � � �. ��• r%
(WALKERTOWN) o �WAI,KERTOWm 6 Mr. S
4956 It NW c.*. KERNERSVrLLE r3 Mr. �+
� o N