HomeMy WebLinkAboutNCG020081_COMPLETE FILE - HISTORICAL_20110322STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
�v
DOC TYPE
HISTORICAL FILE
❑ MONITORING REPORTS
DOC DATE
) a i
YYYYM M DD
HCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Mr. Tim Knopf
Vulcan Materials Company
11.0. Box 4239
Winston-Salem, NC 27115-4239
Dear Mr. Knopf:
Division of Water Quality
Coleen H. Sullins
Director
March 22, 2011
Subject: Representative Outjall Status Request
NPDES General Stormwater Permit No. NCG020081
Vulcan Materials Company — Smith Grove Quarry
Davie County
Dee Freeman
Secretary
The Winston-Salem Regional Office staff have reviewed the "Representative Outfall Status Request Form"
received on March 7, 2011. Specifically, Vulcan Materials requested if stormwater discharge outfall (SDO) 003
could be granted representative outfall status for stormwater outfall 004. Based on the information provided and a
site visit conducted on March 16"' we are approving this request. In accordance with 40 CFR § 122.21 (g)(7), you
are authorized to sample outfall number 003 as a representative outfall and analytical sampling at outfall 004 is
waived. This approval is effective with the next sampling event. Please note that Part III, Section D of the permit
still requires that the Qualitative Monitoring must still be performed at least annually at outfa11004.
Please remember that any actions you initiate in response to benchmark exceedences as directed in the tiered
response provisions of your permit must address all drainage areas represented by SDO 003, where appropriate.
Please append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit to document that
representative outfall status has been approved. If changes in drainage areas, structures, processes, storage
practices, or other activities occur that significantly alter the basis of this approval, representative outfall status may
no longer be valid. You should either resume sampling at all SDOs, or reapply to this office for representative
outfall status based on updated information. If you have any questions or comments concerning this letter, please
contact Mike Mickey or me at (336) 771-5000.
cc: Winston-Salem Regional Office
Central Office/Stormwater Permitting Unit
Central Files
North Carolina Division of Water Quality, Winston-Salem Regional Office
Location: 585 Waughtown St. Winston-Salem, Norih Carolina 27107
Phone: 335-771-50001 FAX: 336-771-46301 Customer Service:1-877-623-6748
Internet: www.ncwaterquality.org
An Equal Opportu6ty 1 Affirmative Action Employer
Sincerely,
W. Corey Basinger
Interim Regional Supervisor
Surface Water Protection Section
NorthCarolina
Naturally
,ti, _ _ ._. _ _..
.'�
nl�C� oZ��SJ I- 4W AiZA.
b- Qcs RCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
July 2, 2010
Tim Knopf
Permit Engineer, Southern Region
Vulcan Materials Company
PO Box 4239
Winston-Salem, NC 27115-4239
Subject: Vulcan Construction Materials, LP
General Permit NCG020000
Request for Sampling Extension
Various Counties
Dear Mr. Knopf:
'Dee Freeman
Secretary
We are writing in response to your request for an extension to collect the first semi-annual stormwater
sample under this permit. In your letter of June 23, 2010, you requested an extension to August 31" to comply with
sampling requirements at several Vulcan facilities across the state. Your letter cited reasons to support the request
that included:
• Hard copies of the new NCG020000 permit not being received until mid -February, when the permit had
become effective January 1, 2010;
• Spotty weather patterns resulting in storm events during non -operating hours that prevent sample
collection; and
• The need for additional time to train Sampling Personnel on significant changes in the permit.
One of the reasons for your request was the new provision that monthly monitoring will apply for the
remainder of the permit term, should the mine ever fail to collect a sample during a scheduled monitoring period
(footnote 1 of Table 1 in Part III). While considering your request, the Stormwater Permitting Unit (SPU) realized this
provision may unfairly affect permittees who obtain coverage under NCG020000 in the middle of a monitoring
period. The SPU has written up guidance to address this situation and related conflicts in the permit text (see
attachment).
Recognizing there were possible conflicts with this provision that our guidance now addresses, DWQ will
grant your request for an extension to collect a stormwater sample by August 31, 2010. However, we note that
Vulcan Materials Company should have been prepared to comply with permit monitoring requirements prior to
receiving hard copies of the permit in mid -February. Specifically:
Wetlands and Stormwater Branch
1617 Mail Service Center, Raleigh„Norlh Carolina 27699-1fi17
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 �+
Phone: 919-807-63001FAX: 91M07-64941CustomOIIE
erService:l-877-623-6748 110 l cih0�ll7cl
Internet: www.ncwaterquality.arg ��I�lll'���lf
An Equal Opportunity 4 Affirmative Aclion Employer
Vulcan Ifaterials Company
Monitoring Extension Request
Jadv2, 2010
• The SPU met on several occasions with the North Carolina Aggregates Association (NCAA) through the
NCG020000 renewal process, beginning in August 2009. Vulcan Materials is a member of NCAA, and a
representative of the company attended the initial meeting.
• The provision that triggers monthly monitoring for failure to sample came out of discussions with industry
representatives during these meetings and was incorporatedinto the final permit as a result.
• The definition of representative storm event also changed as a result of these discussions with NCAA to
increase sampling opportunities during operating hours. A representative storm event in NCG020000 now
only requires a period of 48 hours of no rain prior to the event.
• An advance copy of the final permit was forwarded to the Executive Director of the NCAA on December 29,
2009 and subsequently distributed to NCAA members. The final NCG020000 permit was available to all
permittees on the DWQ website when it became effective in January 2010.
• Stormwater sampling requirements are not new with this renewal, even though sampling is now semi-
annual (instead of annual in the previous permit). Vulcan should have already been familiar with the
stormwater sampling requirements.
If you have any questions regarding this letter, please contact Bethany Georgoulias at (919) 807-6372.
Sincerely,
Bradley Bennett
cc: Stormwater Permitting Unit Files
DWQ Regional Offices (All)
Jay Stem, NC Aggregates Association
Attachment
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Nillaral Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
February 7, 2005
D Gray Kimel
Vulcan Construction Materials LP
PO Box 4239
Winston Salem, NC 27115
Subject: NPDES Stormwater Permit Coverage Renewal
Vulcan Construction Materials- Mocksville
COC Number NCG020081
Davie County
Dear Permittee:
In response to your renewal application for continued coverage under general permit NCG020000 the Division of Water
Quality (DWQ) is forwarding herewith the reissued stormwater general permit. Please review the new permit to familiarize
yourself with the changes in the reissued permit. The general permit authorizes discharges of stormwater and some types of
wastewater, You must meet the provisions of the permit for the types of discharges present at your facility. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
• A new Certificate of Coverage
• A copy of General Stormwater Permit NCG020000
+ A copy of a Technical Bulletin for the general permit
• Five copies of Discharge Monitoring Report (DMR) Forms - wastewater and stormwater
• Five copies of Qualitative Monitoring Report Form
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification
or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other
permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable
federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
If you have any questions regarding this permit package please contact Aisha Lau of the Central Office Stormwater Permitting
Unit at (919) 733-5083, ext.578.
Sincerelv,
for Alan W. Klimek, P.E.
cc: Central Files
Stormwater & General Permits Unit Files
Winston-Salem Regional Office
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617
Internet: h2o.enr.state.nc.uslsulstormwater.html 512 N. Salisbury St. Raleigh, NC 27604
N,,orthCarolinu
JvQlurally
Phone (919) 733 -70 15 Customer Service
FAX (919)733-9612 1-877-623-6748
An Equal OpportunitylAffirmative Action Employer- 50% Recycled110% Post Consumer Paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020081
STORMWATER AND PROCESS WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and
the Federal Water Pollution Control Act, as amended,
Vulcan Construction Materials LP
is hereby authorized to discharge stormwater and to operate treatment systems and discharges associated
with mine dewatering wastewater and process wastewater from a facility located at
Vulcan Construction Materials- Mocksville
123 Vulcan Trl
Mocksville
Davie County
to receiving waters designated as Cedar Creek, a class C stream in the Yadkin -Pee Dee River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II,
III, IV, V, and VI of General Permit No. NCG020000 as attached.
This certificate of coverage shall become effective February 7, 2005.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day February 7, 2005
for Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Bill Holman, Secretary
Kerr T. Stevens, Director
February 22, 2000
LTI.EXA
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
R. M. POPLIN
VULCAN CONSTRUCTION MATERIALS, LP - SMITH GROVE QUARRY
P. O. BOX 4239
WINSTON-SALEM, NC 27115
Subject: Reissue - NPDES Stormwater Permit
Vulcan Construction Materials, LP - Smith Grove Quarry
COC Number NCG020081
Davie County
Dear Permittee:
In response to your renewal application for continued coverage under general permit NCG020MO, the Division of
Water Quality (DWQ) is forwarding herewith the reissued sormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1981
The following information is included with your permit package:
* A copy of general stormwater permit NCG020000
* Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form
* A copy of a Technical Bulletin on this permit which outlines permit components and
addresses frequently asked questions
* A Certificate of Coverage for your facility
* DWQ fee schedule
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility
for compliance with any other applicable federal, state, or local law rule, standard, ordinance, order, judgment, or
decree.
Please note that in 1998 Senate Bill 1366 established changes to the permit fee structure for DWQ permits effective
January 1, 1999. This change requires that you pay an annual fee to assure continued coverage under this permit.
You will be invoiced for this fee beginning next year. A copy of the current fee schedule is included with this letter.
If you have any questions regarding this permit package please contact Tony Evans of the Central Office Stormwater
and General Permits Unit at (919) 733-5083, ext. 584
Sincerely,
for Kerr T. Stevens
Director, Division of Water Quality
cc: Central Files
Winston-Salem Regional Office
Stormwater and General Permits Unit Files
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733.9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020081
STORMWATER AND PROCESS WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
VULCAN CONSTRUCTION MATERIALS, LP
is hereby authorized to discharge stormwater and to operate or continue operation of treatment systems and
discharges associated with mine dewatering and process wastewater from a facility located at
VULCAN CONSTRUCTION MATERIALS, LP - SMITH GROVE QUARRY
1-40 AT FARMINGTON ROAD
M OC KS V ILLE
DAVIE COUNTY
to receiving waters designated as Cedar Creek in the Yadkin - Pee Dee River Basin in accordance with the effluent
limitations, monitoring requirements, and other conditions set forth in Parts I, 11. III, IV, V. and VI of General
Permit No. NCG020000 as attached.
This certificate of coverage shall become effective February 22, 2000.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day February 22, 2000,
for Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carolina
Department of Environment, Health and Natural Resources
Division of Environmental Management
512 North Salisbury Street • Raleigh, North Carolina 27604
James B. Hunt, Jr., Governor A. Preston Howard, Jr., P. E
Jonathan B. Howes, Secretary Director
April 30, 1993
R. M. Poplin
P O Box 4239
Winston-Salem, NC 27115
Subject: General Permit No. NCG020000
Vulcan Materials -Smith Grove Quarry
COC NCG020081
Davie County
Dear Mr. Poplin:
In accordance with your application for discharge permit received on February 1, 1993, we are
forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general
permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the
Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated
December 6, 1983.
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to request an individual permit by submitting an individual permit
application. Unless such demand is made, this certificate of coverage shall be final and binding.
Please take notice that this certificate of coverage is not transferable except after notice to the Division
of Environmental Management. The Divsion of Environmental Management may require modification or
revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required by the
Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area
Management Act or any other Federal or Local governmental permit that may be required.
If you have any questions concerning this permit, please contact Ms. Susan Robson at telephone number
9191733-5083.
cc:
Sincerely,
Original Signed By
Coleen H. Sullins
A. Preston Howard, Jr., P. E.
Winston-Salem Regional Office
Pollution Prevention Pays
P.O.Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015
An Equal Opportunity Affirmative Action Employer
• � r
a %
GENERAL PERMITS
COPIES OF PERMITS ARE TO BE SENT
TO THE FOLLOWING:
SIGNED ORGINAL TO APPLICANT **
SIGNED COPY TO CENTRAL FILES
COPY TO REGIONAL OFFICE
COPY TO P&E FILE
COPY TO COMPLIANCE
COPY TO WAKE COUNTY
_COPY TO MECKLENBURG COUNTY
_COPY TO TRAINING & CERT.**
**ATTACH COPY OF GENERAL PERMIT
•"t S r t.i1r..,
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES
DMSION OF ENVIRONMENTAL MANAGEMENT
STORMWATER, MINE DEWATERING, AND/OR OVERFLOW FROM
PROCESS WATER RECYCLE SYSTEMS DISCHARGES
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Vulcan Materials Company
is hereby authorized to continue operation of a treatment system for mine dewatering and a closed -loop system
consisting of four process settling ponds with a natural drainageway and downgradient pond and discharge treated
wastewater from two point from a facility located at
Smith Grove Quarry
Farmington Road
Davie County
to receiving waters designated as Cedar Creek in the Yadkin -Pee Dee River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II,111
and IV of General Permit No. NCG020000 as attached.
This certificate of coverage shall become effective April 30, 1993
This Certificate of Coverage shall remain in effect for the duration of the General Permit
Signed this day April 30, 1993
Original Signed By
Coleen H. Sullins
A. Preston Howard, Jr., P.E., Director
Division of Environmental Management
By Authority of the Environmental Management Commission
S
V Olco
4 l 1. � � , : �f .-1�� •' o _ , 1 < ( I ,� _ 'l �• , I �� �. , (� �� _ `., i1l , \\ '.�
�� \ - ^, '� II,I •:� v%/ , J�'�� /1 � �� I)1�L'41I�} •� -ll�� �JI� I ''. .i'���}:{L``� ..,} L1 (�l,'.il�l \� l� `'� �I�tl �� i 1'
'"
1', !. `(` �� t.
Iilk
�t
I�~���., t I, . f' , . / `� ` ►+ t � ./ -t � I i •� �� � '-{ t�•�1 \1j1 �� •I Ill L l�l. l�l \ �J � — � 1
'}` � f I 'i1'`\\ 1 I ' 4 �� � '�� I �' l •�ri ` � • �( !� �—��II ll '�.{ ��1� l�r (II�J'����r�$��� S Jff `}j 4'` �`_./� I /, — �'i/� � � � 1 { 1�
,I„� (r • I •� 1 _ 1�-�{ t� ✓ } �r �- J� S�\ �f�g �. '� l` 1' I``
� '� �. >�J11 �,•( r "t( (• �••i�, ! �0.'1 � ''' -��='J4�'-��,.'1�,�� rl'� -,.—����. Il I ,_..�,I��\
�� C� rv�- I � I I � {� r• � �� , ���� • I •�� / ' ' i �/ .- �f� - ��\ ' - � I`� • � /i �' I � �' _ �r,• • Ir I 1 �r �� J
��r ���4� ''� ` i�(�/! 'i�, "` �- ' I• ,i -' �` - rry, ',� hl`-�� f \�)114+ (,
1 " r fi tl I
CP
I }� iI �`—,. 1 {r L'r f, , �/ -� finOF
:
�
CSF J- , ' 1 - - ,� • ' - �' ' 1 r I r I
4 _ -1 i r 1', .HIV ' - , ,I 1, :�. �� _ (' - 'fi �fl{' i' ''�I I�''rJ{ %71 5�•• � � t� � '� _
N: `� �Q �_ r r�{ j (�I` •� .,�1. 1 rt .J
} Pr } � ;'1 .� '� � \ V �' r'� ' - _ I t' r . .\ 1� , r� U ; .•,r ,' �I _\11 •It . .. � l i •� i % (� �� � I�.
1 + I � ) I \ '� / S ll� ;l� ° � I /I�I ( ,'/. --/ / '1,�. �r��1,�, � a },•� "��� � ��`�:�`',x Ir f 1•'