Loading...
HomeMy WebLinkAbout20100053 Ver 1_Site Plan_20100121 w ?4 C?J ?Z4 ELLERBE CREEK WATERSHED ASSOCIATION DURHAM COUNTY LOCATION. DURHAM, NORTH CAROLINA APPROX. 114 MILE SOUTH OF 1-85 AND GUESS ROAD INTERSECTION - WITHIN CITY OF DURHAM TYPE OF WORK STREAM ENHANCEMENT AND STABILIZATION W INDEX OF SHEETS 1•••••••••••••••• TITLE SHEET 1-A• • • • • • • • • • • • • • STREAM CONVENTIONAL SYMBOLS, GENERAL NOTES, STANDARD SPECIFICATIONS, AND VEGETATION SELECTION W 1-B• • • • • • • • • • • • • • CONVENTIONAL SYMBOLS 2-2C • • • • • • • • • • • • • TYPICAL CROSS-SECTIONS AND DETAILS 3• • • • • • • • • • • • • • • • CONSTRUCTION SEQUENCE 4-7••••••••••••••PLAN VIEWS EC-1 - EC-8• • • • • • EROSION CONTROL PLAN M V W L a WAW SSIR lN1R1' u,u1oRE NO e1? ^oTn? xa nmeit NC 116333 1 12011 GRAPHIC SCALE PREPARED FOR THE OFFICE OF. ^o^,.^?^?• M111111 lkll B PROJECT ENGINEER WP. 80 00Rn 80802 P.Mrey ELLERBE CREEK WATERSHED 00 • GU.. NORTH 01SOUw 21818 ® ASSOCIATION Fm 010-3.5490 S1^1835180 331 W. MAIN STREET, SUITE 503 DURHAM NORTH CAROLINA 40 20 0 40 80 , 27705 KEVIN TWEEDY PE PRELIMINARY PLANS , PCTG7` 00 NOT USE FOR CONSTRUCTION PLANS PH: 919-698-8161 EMAIL: ECWABOARD@ELLERBECREEK ORG . 7BZ7rxc Haze: KAYNE VAN STELL ALCYAGER PROJECT ECWA CONTACT. DIANA TETENS EXEC077V8 D717HCTOR P8. op % SIGNATURH.• STREAM CONVENTIONAL SYMBOLS GENERAL NOTES PROJECT ENGINEER °°= ROCK J-HOOK -®- SAFETY FENCE 1. THE CONTRACTOR IS REQUIRED TO INSTALL INSTREAM STRUCTURES USING °0 A TRACK HOE WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE PRELIMINARY PLANS cmTO ROCK VANE -TF- TAPE FENCE BOULDERS 4'X 3'X 2'. DO NOT USE FOR CONSTRUCTION CM ROCK STEP POOL/ PERMANENT FENCE 2. WORK IS BEING PERFORMED AS AN ENVIRONMENTAL PROJECT ALONG A CITY OUTLET PROTECTION PARK AND GREENWAY TRAIL. THE CONTRACTOR SHOULD MAKE ALL REASONABLE ROCK CROSS VANE -FP- 100 YEAR FLOOD PLAIN EFFORTS TO REDUCE SEDIMENT LOSS, PROTECT PUBLIC SAFETY AND MINIMIZE DISTURBANCE OF THE SITE WHILE PERFORMING THE CONSTRUCTION WORK. DOUBLE DROP ROCK CROSS VANE cE CONSERVATION EASEMENT 3. CONSTRUCTION IS SCHEDULED TO BEGIN WINTER 2010. "Rh?.n PPa a^er^FFa"e r^? "epenvry Wfm"ey ¦ SIM x SINGLE WING DEFLECTOR - - 355 - - EXISTING MAJOR CONTOUR 4. CONTRACTOR SHALL CONTACT NORTH CAROLINA "ONE-CALL" (1-800-6324949) ¦ oH1 ROUxn27555 ceT, 919.463 985.54M .5488 FFa 9I9 AND LAND QUALITY (919-791.4210) BEFORE ANY EXCAVATION BEGINS . DOUBLE WING DEFLECTOR EXISTING MINOR CONTOUR 5. CONTRACTOR SHALL COORDINATE TEMPORARY TRAIL DETOURS/CLOSINGS FOOT BRIDGE WITH THE CITY OF DURHAM PARKS & RECREATION, ECWA, AND DESIGN ENGINEER. ROOT WAD J TEMPORARY STREAM CROSSING ao LOG J-HOOK ru-r PERMANENT STREAM CROSSING ® LOG VANE STANDARD SPECIFICATIONS ® TRANSPLANTED VEGETATION ® LOG WEIR LOG CROSS VANE X TREE REMOVAL EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL CONSTRUCTED RIFFLE TREE PROTECTION JUNE2006 ® GEOLIFT °° ° BOULDER CLUSTER 6.06 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SLOPE BANKS, SEED AND MAT/ LOG STEP POOL BRUSH MATTRESS 6.62 SILT FENCE CHANNEL FILL 6.63 TEMPORARY ROCK DAM 6.70 TEMPORARY STREAM CROSSING **NOTE: ALL ITEMS ABOVE MAY NOT BE USED ON THIS PROJECT VEGETATION SELECTION The following table lists the woody \egetation for the project site. Exact spacing densities and placement of species will be determined prior to site planting by a qualified \egetation specialist based on current site conditions and apparent wetness of planting locations, as defined in the construction specifications. The total planting area is estimated to be approximately two (2) acres but may vary based on areas disturbed during construction. Containerized Trees - Random Spacing Common name Scientific name Size Qnty River Birch Betulanigra 3-7gal 3 American Sycamore Plantanus occidentalis 3-7 gal 2 Persimmon Diospyros virginiana 3-7 gal 3 Tulip Poplar Loodendron tulipifera 3-7 gal 2 Black Gum Nyssa sylvatica 3-7 gal 2 Swamp Chestnut Oak Quercus michauxii 3-7 gal 2 Northern Red Oak Quercus rubs 3-7 gal 2 Willow Oak Quercus phellos 3-7 gal 2 Total 18 Shrubs - Random Spacing Common name Scientific name Size Qnty Redbud Cercis canadensis 3 gal 4 Flowering Dogwood Corn us flonda 3-7 gal 4 American Hazelnut Corylus amencana 1 gal 4 Winterberry Holly flex verticillata 3-7 gal 4 Virginia Sweetspire Itea mrginica 3-7 gal 4 Spicebush Lindera benzoin 1 gal 4 Piedmont Azalea Rhododendron canescens 3 gal 4 Highbush Blueberry Vaccineum stemineum 3 gal 4 Blackhaw Viburnum Viburnumprunifolium 3gal 3 Arrowood Viburnum Viburnum dentatum 3 gal 3 Total 38 u 0 r r r u r C oorc ?r nv The following table lists temporary seed mix for the project site. All disturbed areas will be stabilized using mulch and temporary seed as defined in the construction specifications, Planting Dates Species Name Rate (Ibs./acre) September to March Rye Grain (Cool Season) 120 April to August Millet (Warm Season) 40 Live staking will be applied to all restored streambanks following the details in this plan set and as defined in the construction specifications. Common Name Scientific Name Percentage of Total Wetness Tolerance Elderberry Sambucus canadensis 20% FACW- Silky Dogwood Cornus amonum 25% FACW+ Silky Willow Salcrsericea 25% OBL Black Willow Salcrnigra 10% OBL Ninebark Physocarpus opulifolius 20% FAC- Permanent herbaceous seed mixtures for the project site shall be planted on disturbed areas throughout the floodplain, riparian, and non-riparian buffer areas. Permanent herbaceous seed mixtures shall be applied with temporary seed, as defined in the construction specifications. Common Name Scientific Name Percent of Mixture Seeding Density (lbs/acre) Wetness Tolerance Redtop Agrostis alba 15% 2.25 FACW Virginia Wildrye Elymus vuginicus 15% 2.25 FAC Swamp Sunflower Helianthosangustifolius 7% 1.5 FAC Purple Lo?egrass Eragrostis spectabr1is 7% 0.75 FACU Shallow Sedge Carexlunda 10% 0.75 FACW+ Indian Grass Sorgastmm nutans 7% 1.5 FACU Soft Rush Juncus effusus 7% 0.75 FACW+ Lance-Leaved Tick Seed Coreopsis lanceolate 10% 1.5 FAC Tioga Deer Tongue Dichantheliom clandestinom 15% 2.25 FACW Black Eyed Susan Rudbeckia hPta 7% 1.5 FACU *S.U.E = SUBSURFACE UTILITY ENGINEER ROADS & RELATED ITEMS Edge of Pavement ----------------------- --------- Curb --- ---- ---- ----- ---- ---- ----- - --- - Prop. Slope Stakes Cut ------------------ ------ C Prop. Slope Stakes Fill ----------------- ------ Prop.Woven Wire Fence --------------- ------ $E Prop. Chain Link Fence ............... ...... E3 E3 Prop. Barbed Wire Fence--------------- ------ ?0 Prop. Wheelchair Ramp ---------------- ------CR) Curb Cut for Future Wheelchair Ramp - - - - - - Exist. Guardrail ......................... ..... Prop. Guardrail ------------------------- ------ Equality Symbol -- ---- ---- ----- ----- ---- - Pavement Removal ...................... ...... RIGHT OF WAY Baseline Control Point------------------ ------ Existing Right of Way Marker ........ ... . ..... Q Exist. Right of Way Line w/Marker . ...... ...... - ?j- - Prop. Right of Way Line with Proposed R/W Marker (Iron Pin & Cap) ........ ...... Prop. Right of Way Line with Proposed (Concrete or Granite) RNV Marker ..... .-...- Exist. Control of Access Line .... .... ..... ...... -------- A Prop. Control of Access Line ............. ...... Exist. Easement Line ..................... ...... -E___. Prop. Temp. Construction Easement Line ------ E Prop. Temp. Drainage Easement Line --------- TBE Prop. Perm. Drainage Easement Line --------- -PK HYDROLOGY Stream or Body of Water ............... ..... River Basin Buffer ......................... .... RBB Flow Arrow ------- ----- ---- ---- ----- ---- _._...? Disappearing Stream ..................... ..... ?. _ Spring -- ----- ---- ---- ----- ---- ------ ----- CY'. Swamp Marsh --------- ---- ---- ------- --- - & Shoreline -------- ----- ---- ---- ----- -- -- -------- Falls,Rapids --------- ---- ---- ----- -- ---- - -f- - Prop Lateral, Tail, Head Ditches ......... ..... F FLOW STRUCTURES MAJOR Bridge, Tunnel, or Box Culvert ............... CONC Bridge Wing Wall, Head Wall and End Wall ---------------------------- CONC4 STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CONVENTIONAL SYMBOLS MINOR Head & End Wall ................ coN? C NW Pipe Culvert ---- ---- ---- ----- ---- ---- --- ?:= _ Footbridge --------- ----- ---- ---- ----- ---- > - ------< Recorded Water Line ............... , ,- Designated Water Line (S.U.E.*) ............. -,-,- Sanitary Sewer -------------------------------- -ss-ss- Recorded Sanitary Sewer Force Main ------ ?ss_FSS- Drainage Boxes ................................ ?cs Paved Ditch Gutter UTILITIES Exist. Pole -- ----- ---- ---- ----- --------- - • Exist. Power Pole ............................... + Prop. Power Pole ---- ---- ----- ---- ---- --- b Exist. Telephone Pole .......................... + Prop. Telephone Pole .......................... - 0-Exist. Joint Use Pole ........................... Prop. Joint Use Pole ........................... Telephone Pedestal--------------------------- U?G Telephone Cable Hand Hold .-......... Cable TV Pedestal ............................ IKI LPG TV Cable Hand Hold .................... WG Power Cable Hand Hold ................ Hydrant---- ---- ----- ---- ---- ----- -------- 9 Satellite Dish .................................. 29 Exist. Water Valve .............................. Sewer Clean Out .............................. 0+ Power Manhole --------- ---- ---- ----------- 0 Telephone Booth .............................. m Cellular Telephone Tower ..................... Water Manhole ---------- ---- ---- ---------- Light Pole -- ---- ---- ----- ---- ---- --------- R H-Frame Pole ------ ----- ---- ---- ----- --- H Power Line Tower .............................. Pole with Base -------- ----- ---- ----------- 0 Gas Valve -- ----- ---- ---- ----- --------- - 0 Gas Meter -- ----- ---- ---- ----- --------- - Telephone Manhole ........................... (D Power Transformer ....... . ... . ........... . ... . . 0 Sanitary Sewer Manhole ....................... Storm Sewer Manhole ........................ Tank; Water, Gas, Oil------------------------- Water Tank With Legs ........................ O Traffic Signal Junction Box .................... Fiber Optic Splice Box ------------------------- f] Television or Radio Tower ........... .... ..... Utility Power Line Connects to Traffic Signal Lines Cut Into the Pavement-.-----.--- ?; Ts Designated Sanitary Sewer Force Main(S.U.E.*)-Fss-Fss Recorded Gas Line Designated Gas Line (S.U.E.*) ............... Storm Sewer ------- ---- ----- ---- --------- s s- Recorded Power Line ........................ P P- Designated Power Line (S.U.E.*) ............. _ P Recorded Telephone Cable .................. -T-T- Designated Telephone Cable (S.U.E.*) ------- --T- -T- - Recorded LkG Telephone Conduit ------- -TC-TC- Designated UG Telephone Conduit (S.U.E.*) --TC--TC-- Unknown Utility (S.U.E.*) ------------------ -TUTL--WL- Recorded Television Cable - - - - - - - - - - - - - - - - - -TV-TV- Designated Television Cable (S.U.E.*) ...-... --TW--TV-- Recorded Fiber Optics Cable --------------- -FO-FO- Designated Fiber Optics Cable (S.U.E.*) --- . _ _FO--FO-- Exist. Water Meter . ... . ........... . . 0 U-G Test Hole (S.U.E.*) ----------------------- m Abandoned According to U4G Record ........ ATTUI End of Information ............................ Ea,. BOUNDARIES & PROPERTIES State Line ---- ----- ---- ---- ----- ---- ---- ------ County Line --------- ---- ---- ----- ---- ---- Township Line - ---- ----- ---- ---- --------- - -- -- City Line ------ ---- ---- ----- ---- ---- ----- - --- Reservation Line ............................... . ------ Property Line--- ----- ---- ---- ----- --------- Property Line Symbol .......................... FE Exist. Iron Pin --- ----- ---- ---- ----- ------- E? Property Corner -------- ---- ---- ----------- - + Property Monument ........... .... ............ . Property Number------------------------------ 123 Parcel Number ................................. 6 Fence Line ---- ----- ---- ---- ----- --------- -x-x-x- Existing Wetland Boundaries .................. WW & ISBW --WEB-_ High Quality Wetland Boundary .............. -WO WLB- Medium Quality Wetland Boundaries......-. -MO WLB- Low Quality Wetland Boundaries ............. -EO WLB- Proposed Wetland Boundaries ................ -WLB- Existing Endangered Animal Boundaries...-.. - - EAB- - Existing Endangered Plant Boundaries ........ - _EPB- - BUILDINGS & OTHER CULTURE Buildings ................................ ...... Foundations .............................. ...... rJ Area Outline --- ---- ----- ---- ---- -- ------ v Gate ----- ---- ----- ---- ---- ----- ---- ----- Yom` Gas Pump Vent or LPG Tank Cap ------ ----- 0 Church r School - ---- ---- ----- ---- ---- ----- - ------ Park - ----- ---- ---- ----- ---- ---- --- -- - -- Cemetery --- ---- ----- ---- ---- ----- -- ----- ?r ] Dam-- ---- ---- ----- ---- ---- ----- -- ------ Sign-- ---- ---- ----- ---- ---- ----- --- - --- Well --- ---- ----- ---- ---- ----- ---- -- ----- 0 W Small Mine --- ---- ----- ---- ---- ----- ----- x Swimming Pool --- ---- ----- ---- ------ ----- TOPOGRAPHY Loose Surface -- ---- ---- ----- ---- ------- ------- Hard Surface --------------------------------- Change in Road Surface .................... .............. Curb ---- ----- ---- ---- ----- ---- ---------- RightofWaySymbol ------------------------ R/W Guard Post ---- ----- ---- ---- ----- ---- --- E) GP Paved Walk ------- Bridge - ---- ---- ----- ---- ---- ----- ---- - Box Culvert or Tunnel - - - - - - - Ferry ---- ---- ----- ---- ---- ----- --------- ------- Culvert -- ----- ---- ---- ----- ---- --------- >------------- Footbridge ---- ----- ---- ---- ----- ---- ---- -------------- Trail, Footpath -- ---- ---- ----- ---- ---- -- - Light House . . . . . VEGETATION Y Single Tree --- ---- ---- ----- ---- ----------- fl Single Shrub -- ---- ---- ----- ---- --------- o Hedge --- ---- ----- ---- ---- ----- --------- Y, Woods Line ------ ---- ----- ---- ---- ----- - Orchard ---- ----- ---- ---- ----- ---- ------- Qt€ts€ Vineyard --- ---- ----- ---- ---- ----- ------- - RAILROADS (-VINEYARD 1 Standard Gauge L)7' MASP iFAMV RR Signal Milepost ......................... o YLIFPoSf JS Switch ........................................ ? Mcm i n u u 0 r C u 0 i i c oon TYPICAL RIFFLE AND BANKFULL BENCH CROSS SECTION (APPLIES TO STA. 37+50 TO STA. 40+50) TOP OF TERRACE ?ARIES11 WLM ?VARIES? 2 D D-Mac , BACK OF FLO DDPLAIN BENCH y TOP OF BANK/BANKFULL W6 RIFFLE WITH BANKFULL BENCH ELLERBE CREEK RIFFLE Width of Bankfull (Wbkf) 36.9 Average Depth (D) 2.6 Maximum Depth (D-Max) 3.5 Width to Depth Ratio (Wbkf 1 D) 13.0 Bankfull Area (Abkf) 105.0 Bottom Width (Wb) 22.9 NOTES 1. DURING CONSTRUCTION CORNERS OF DESIGN CHANNEL WILL BE ROUNDED AND A THALWEG WILL BE SHAPED PER DIRECTION OF ENGINEER. 2. TYPICAL CROSS-SECTION DIMENSIONS MAY BE MODIFIED PER DIRECTION OF THE ENGINEER BASED ON EXISTING CONDITIONS DURING INSTALLATION. DOUBLE WING DEFLECTOR A L 20° TO 30° 113 BOTTOM 1/3 BOTTOM 113 BOTTOM WIDTH OF CHANNEL WIDTH OF CHANNEL WIDTH OF CHANNEL LL HEADER ROCK o F tRM P BACK FILL WITH AWELL GRADED r MIX OF CLASS A AND B STONE A FLOW f A' n . a 0 ? ? a FI NO GAPS BETWEEN ROCKS F007 FIRST ROCK ROCK) TIED INTO STREAMBANK SCOUR POOL (EXCAVATED) PER DIRECTION OF ENGINEER PLAN VIEW 12 BANKFULL HEADER ROCK FLOW 2% T0 4%SLOPE T STREAMBED ? ELEVATION RM'X'PROFILEVIEW FOOTER ROCK NOTE: NO SLOPE FOR ARMS Y BZ BACK FILL WITH A WEI MIX OF CLASS A AN FILTER BACK FILL WITH A WELL GRADED SECTION B - B' : NOTE BOULDERS MUST BE AT LEAST 4' X 3' X 2'. GEOLIFT PROJECT ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION N aksr EnplnearlnA Inc. F STAKE TOP LAYER ' .n eo.ao Faaana5 P-" OF MATTING IN 6" TRENCH gpEEp (Typ) : slim 2m (SEE MATTING DETAIL) vn ,Nei .5 ?BUann5+5 TOP OF Fm: sle,sm.MW BANK EROSION CONTROL MATTING 1,5'LIFT OF COMPACTED ENCOMPASSES LIFT ON-SITE SOIL (TYP) FLOODPLAIN LIVE BRANCH CUTTINGS (SEE PLANTING PLAN FOR SPECIES) POINT BAR OF CHANNEL BED MATERIAL UNDISTURBED EARTH (SEE TYPICAL SECTIONS) FINISHED BED ELEVATION APPROX. 6" OF STONE TOE ABOVE BASEFLOW BASEFLO. O OO a OC ?O STONE TOE APPROX. 1 FT BELOW FINISHED BED ELEVATION O o D o ? FOUNDATION', MIX OF CLASS A AND CLASS 1 RIPRAP NOTES: 1. IF CONSTRUCTION IS NOT DURING THE DORMANT SEASON, INSTALL SOIL LIFTS. DURING THE FOLLOWING DORMANT SEASON, INSTALL LIVE STAKES (SEE DETAIL) ON 2'-3' CENTERS ON SOIL LIFTS. SINGLE WING DEFLECTOR A m i A' I m 0 0 A L_ ROCK DOTER ROCK A' 1/3 BOTTOM WIDTH OF CHANNEL z SECTION A - A' FILTER FABRIC O HEADER ROCK o r P BACK FILL WITH A WELL GRADED MIX OF CLASS A AND B STONE 12 BANKFULL HEADER ROCK FLOW A' s f 0 FLOWS 2% TO 4% SLOPE 20°T030° NO GAPS STREAMBED BETWEEN ELEVATION ROCKS FOOTER ROCK / m "? qRM ARMX'PROFILE VIEW ' NOTE: NO SLOPE FOR ARMS Y BZ FOOTER ROCK : NOTE BOULDERS MUST BE AT LEAST 4'X TX 2'. FIRST ROCK TIED INTO STREAMBANK BACK FILL WITH A WEI MIX OF CLASS A AN FILTER SECTION B - B' [N KUUK FOOTER ROCK I BACK FILL WITH A WELL GRADED MIX OF CLASS A AND B STONE-7 SECTIONA - A' ROCK STEP-POOL CHANNEL 1 OUTFALL PROTECTION of BACK TO TO PLAN VIEW NUMBER OF !RS MAY VARY 'EP INVERT ELEVATION X OF CLASS A, CLASS B, ID CLASS 2 STONE ELL GRADED MIX OF ASS A AND CLASS B STONE IX TOP OF BANKWIDTH ROCK CROSS VANE r C u 0 r u i 0 t 1 C FLOW 1 113 BOTTOM WIDTH 4t C 7 Y C SELL -" I VANE ARM SCOUR POOL NOGAPS -VANEANGLE BETWEEN 20* TO 30* BOULDERS C. PLAN VIEW H = STEP Y SILL A STEP INVERT ELEVATION HEADER BOULDER FLT FOOTER BOULDER -WELL GRADED MIX OF CLASS A AND CLASS B STONE POOL / (_-) A' NON-WOVEN FILTER FABRIC POOL TO POOL SPACING VARIES. SEE NOTE All FOR SPACING REQUIREMENTS. PROFILE VIEW A-A' = O VARIES I6-0"TO 20'-0" 2 U w m w m 0 0 EXISTING GROUND TE 1. BOULDERS MUST BE AT LEAST2'X2'X TAND NOT EXCEED 4'X TX 2'. 2. FOOTERS SHALL BE INSTALLED SUCH THAT 114 TO 113 OF THE LENGTH IS DOWNSTREAM OF THE HEADER. 3. SOIL SHALL BE WELL COMPACTED AROUND BURIED PORTION OF FOOTERS WITH BUCKET OF TRACK HOE. 4. INSTALL TYPE 2 NON-WOVEN FILTER FABRIC UNDERNEATH FOOTER BOULDERS. 5. UNDERCUT POOL BED ELEVATION 12 INCHES TO ALLOW FOR LAYER OF STONE. B. INSTALL EROSION CONTROL MATTING ALONG COMPLETED BANKS SUCH THAT THE EROSION CONTROL MATTING AT THE TOE OF THE BANK EXTENDS DOWN TO THE UNDERCUT ELEVATION. 7. INSTALL WELL GRADED MIX OF CLASS A, CLASS B, AND CLASS 2 STONE ALONG SIDE SLOPES TO A DEPTH OF 12 INCHES. 8. FINAL CHANNEL BED SHAPE SHOULD BE ROUNDED, COMPACTED, AND CONCAVE, WITH THE ELEVATION OF THE BED APPROXIMATELY 0.5 FT DEEPER IN THE CENTER THAN AT THE EDGES. B. STEP HEIGHT (H) SHALL NOT EXCEED 0,8 FT. 10. MINIMUM POOL DEPTH (D) SHALL BE NO LESS THAN 1.4 FT. 11. IN GENERAL, POOL TO POOL SPACING SHALL BE NO LESS THAN B FT AND NO GREATER THAN 37 FT BASED ON EXISTING CONDITIONS SUCH AS SLOPE AND SUITABLE FILL MATERIAL WELL GRADED MIX OF / CUSS A, CLASS B AND J COIR FIBER MATTING CLASS2STONE D=POOL DEPTH WELL GRADED MIX OF CUSS AAND CUSS B STONE POOL CROSS SECTION B-B' BACKFILL WITH WELL GRADED MIX OF CUSS AAND CLASS B STONE CUSS B STONE CLASSASTONE -a FILTER FABRIC 1 10' MINIMUM SECTION A - A' 112 BANKFULL? FLOW STREAM BE?'' ELEVATION CLASS B STONHEADER ROCK BACKFILL WITH WELL GRADED MIX OF CUSS A AND CUSS B STONE CLASSA STON/-/ 4%T07%SLII- PROFILE VIEW C - C' 1. BOULDERS MUST BE AT LEAST4' x 3'x 2'. 2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF SIX FEET. FOOTER ROCK 3. DIGATRENCH BELOW THE BED FOR FOOTER ROCKS AND PUCE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK. FILTER FABRIC 4. CONSTRUCT FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 5. USE CLASS B STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASSA STONE TO FILL GAPS ON UPSTREAM SIDE OF CUSS B STONE. 8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE PROFILE VIEW B - B' WITH A WELL GRADED MIX OF CLASS A AND CLASS B STONE TO THE ELEVATION OF VANE ARM ONE HALF THE HEADER ROCK PC M PROJECT ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Ml,h-I9FkceEnplnearlnAI- ¦ 88601p.nv Pa-i Suite 2m ¦ C-NORI ROLINA21518 PM1ene: 819.463.5488 Fm: 818,433.5488 = VARIES 1U-V'TO 20'-0" 2 i i m m 0 0 U 'L 7'.p Y U NONWOVEN FILTER FABRIC POOL CROSS SECTION C-C' CROSS VANE INVERTIGRADE POINT BAKER PROJECT REFERENCE N0. SHEET NO. LIVE STAKING BRUSH MATTRESS ! PROJECT ENGINEER A 4 I~ PRELIMINARY PLANS WS STAKES 3 FT SPACING 4 DO NOT USE FOR CONSTRUCTION m BIODEGRADABLE TWINE TOP OF STREAMBANK SECURED TO STAKES m Michael Baker Engineering Inc. m TOE OF BANK . 9? ?CeT,eROR-C ROLINnn8+8 FM1ane:S1S463.51e8 BOTTOM OF CHANNEL NOTES 90 BR ANCHES MIN PER 3.3 FT BRANCHES OF3141NCHT011NCH TYPICAL STAKE L STAIOESSHOULDBECUTANDINSTALLEDONTHESAMEDAY. DIAMETER SHOULD EQUAL THE 2. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT. 3. STAKES MUST BE INSTALLED NTH BUDS POINTING UPWARDS. OF THE OTERIAL AN UP D EAD LENGTH THE BANK TO 20% OF THE MATERIAL CAN BE DEAD TE 4. STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANK 5. STAKES SHOULD BE 12 TO 2 INCHES IN DIAMETER AND I8"TO 30"LONG. '0' MATERIAL TO ADD BULK 1. BOARD FOR STAKE SHOULD BE2"x4"xi8". 6. STAKES SHOULD BE INSTALLED LEAVING 115 OF STAKE ABOVE GROUND. '- 2. SAW 2 x 4 TIMBER DIAGONALLY TO PRODUCE CROSS-SECTI ON VIEW OF LIVE STAKING SPEC IFICATION 2 DEAD STOUT STAKES. FLOW OPTIONAL COVER LOG (DEAD LIMB OR TRUNK OF TREE, 4 INCHES IN PLAN VIEW DIAMETER OR GREATER) STAKE CTYP.) ON-SITE ALLUVIUM BRUSH LAYER 2'. y? TOP OF STREAMBANK SQUARE CUT TOP COVER LOG BUDS FACING UPWARD v?/??? . LIVE CUTTING MIN. 12" DIA. 18"- 30" LENGTH APPROX. 6" OF STONE TOE ABOVE BASEFLOW m 1 1 1 1. 1 1 1' 1' ? QN ELEVATION 1 I 1 1 f PLANT STAKES F ROM TOP OF BANK TO TOE OF BANK NATURAL ? ?\ \? ?\y\ \ \? ?\? 1.. 1 1 1 1 I / 1 f 1 1 1 i 1.. 1 STREAMBEO I/ I 6X J \ \ TOE OF SLOPE ANGLE CUT 30-45 DEGREES APPROX. 1' OF STONE TOE BELO W BASEFLOW ADD MIX OF CLASS AAND CLASS I STONE AT TOE OF BANK LIVE STAKE DETAIL NOTES: PLAN VI EW OF LIVE STAKING SPECIFICATION CROSS SECTION 1. EXCAVATE BANK TOA2:1SLOPE. 2. CREATE 12" DEEP TRENCH. 3. STAKE AND TIE BRUSH LAYER INTO TRENCH. 4. BACK FILL 3" OF ON-SITE ALLUVIUM OVER BRUSH LAYER. 5. REFER TO SPECIFICATIONS FOR PLANT SPECIES. TRANSPLANTED VEGETATION TRANSPLANTED VEGETATION AND ROOTMASS N TRANSPLANTED VEGETATION AND ROOTMASS TOP OFSTRE AMBA K \ \ // ® TOP OF BANK Y I \ I TOE OF BANK ? , - - - - TOE OF BANK \ .- ? ? - - - _ - BOTTOM OF CHANNEL PLAN VIEW CROSS SECTION VIEW NOTES: 1. EXCAVATE A HOLE IN THE BANK TO BE STABILIZED THAT WILL ACCOMMODATE THE SIZE OF TRANSPLANT TO BE PLACED. BEGIN EXCAVATION AT THE TOE OF THE BANK 2. EXCAVATE TRANSPLANT USING A FRONT END LOADER. EXCAVATE THE ENTIRE ROOT MASS AND AS MUCH ADDITIONAL SOIL MATERIAL AS POSSIBLE, IF ENTIRE ROOT MASS CANNOT BE EXCAVATED IN ONE BUCKET LOAD, THE TRANSPLANT IS TOO LARGE AND ANOTHER SHOULD BE SELECTED. 3. PLACE TRANSPLANT IN THE BANK TO BE STABILIZED SO THAT VEGETATION IS ORIENTATED VERTICALLY. 4. FILL IN ANY HOLES AROUND THE TRANSPLANT AND COMPACT, 5. ANY LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED. 6. PLACE MULTIPLE TRANSPLANTS CLOSE TOGETHER SUCH THAT THEYTOUCH. rC M ? 7 C a d C m m i nM n? CONTAINERIZED PLANTING SPECIFICATIONS PRUNE PROPORTIONATELY TO COMPENSATE FOR REDUCTION OF ROOTS AND TO PROMOTE NATURAL CHARACTER OF GROWTH DO NOT REMOVE LEADER THIN BRANCHES AND FOLIAGE BY 113 RETAINING NORMAL TREE SHAPE WATER RETENTION RING FINISHED GRADE - TREE OR SHRUB SHALL BE INSTALLED SO THAT 118 OF THE ROOT BALL WILL BE ABOVE FINISHED GRADE Z-? a \ MULCH J. \ 1 Fr-TRI E OR SHRUB SHALL BE TALLED SO THAT 118 OF ROOT BALL WILL BE OVE FINISHED GRADE COMPACT BACKFILL \ \ WATER RETENTION RING \ VARIES FINISHED GRADE MULCH TREE OR SHRUB PLANTING DETAIL (SLOPING GROUND) COMPACT BACKFILL TREE OR SHRUB PLANTING DETAIL WATER RETENTION RING FINISHED GRADE - COMPACT BACKFILL SCARIFY BED TO A DEPTH OF 5" SHRUB BED PLANTING DETAIL SHRUB SHALL BE INSTALLED SO THAT 1/8 OF THE ROOT BALL WILL BE ABOVE GRADE MULCH 4" MULCH PLANTS MAY BE PLANTED EITHER BEFORE OR AFTER MULCHING OPERATION rrr^ FINISHED GRADE SCARIFY TO A MINIMUM DEPTH OF 5" OR 2" DEEPER THAN CONTAINER GROUNDCOVER PLANTING DETAIL TOP OF STREAMBANK i r u 0 r r u i 0 i i ?r nv PLANTING NOTES SUMMARY: 1. THE PLANTING ACTIVITIES SHALL ADHERE TO THE CONSTRUCTION SPECIFICATIONS AS DEFINED IN SECTIONWAND AS SHOWN ON THE PLAN DETAILS. SEE SHEET I-A FOR VEGETATION SELECTION TO BE PLANTED WITHIN THE CONSERVATION EASEMENT 2. THE EXACT SPECIES PLACEMENT WILL BE DETERMINED PRIOR TO SITE PLANTING BY A QUALIFIED VEGETATION SPECIALIST BASED ON SPACING RECOMMENDATIONS, SITE CONDITIONS, AND APPARENT WETNESS OF PLANTING LOCATIONS. ANY CHANGES TO THE PLANTING LOCATIONS, SPACING DENSITIES, OR VEGETATION SELECTION MUST BE APPROVED BY THE ENGINEER BEFORE PLANTING BEGINS. 3. THE SUPPLEMENTAL PLANTING AREAS TOTAL APPROXIMATELY TWO (2) ACRES BUT MAY VARY BASED ON AREAS DISTURBED DURING CONSTRUCTION. ANY ENCROACHMENTS WITHIN THE PLANTING AREAS SUCH AS CULVERTS, DRAINAGE OUTFALLS, UTILITY EASEMENTS, TRAILS, ETC. WILL BE IDENTIFIED PRIOR TO PLANTING ACTIVITIES. 4. THE CONTRACTOR SHALL INSTALL ALL VEGETATION DURING THE APPROPRIATE SEASON FOR EACH SPECIES TYPE. THE PLANTING SEASON FOR THE TREES, SHRUBS, AND LIVE STAKES SHALL BE FROM DECEMBER TO FEBRUARY AS DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS. NO PLANTING SHALL OCCUR IF THE SOIL IS FROZEN. CONSTRUCTION SEQUENCE - ELLERBE CREEK Michael Baker Engineering, Inc. will provide construction observation during the construction phase of this project The following construction sequence shall be used during implementation of the plan. 1. Prior to beginning any land disturbing activities, notification and approval must be granted from the US Army Corp of Engineers, NC Division of Water Quality, and NCDENR Division of Land Resources - Land Quality Section. Any work performed shall be in accordance with the NC Erosion Control Planning and Design Manual. 2. The Contractor shall contact North Carolina "One Call" Center (1.800.632.4949) and Land Quality (919.791.4210) before any excavation begins. 3. The Contractor shall mobilize equipment and materials to the site using the construction entrances off Albany St. (upstream), Carolina Ave., and Guess Rd. (downstream) and install temporary construction entrances according to the plans and specifications. 4. The Contractor shall install silt fence and safety fence before storing all equipment and materials in staging areas as shown on the plans. 5. The Contractor shall utilize the haul roads and temporary stream crossings as shown on the plans. 6. Channel work within the active stream shall be conducted while stream flow is low. In general, the Contractor shall work from upstream to downstream and in-stream structures shall be installed using a pump around or flow diversion measure. Bank protection includes transplants, brush mattresses, geolifts, and/or seeding with matting. Silt fence shall be placed between stockpiles and the existing channel as shown on the plans. 7. Immediately upon completion of bank grading, the slopes will be reseeded and matted with the specified erosion control matting. The Contractor shall not disturb any area larger than they can completely stabilize in one day. All disturbed stream banks must be stabilized by the end of each day. 8. Upon completion of the channel work and bank stabilization, all disturbed areas including staging areas and haul roads, shall be seeded and covered with mulch. Permanent seeding mixtures shall be applied as shown on the vegetation selection. Temporary seeding shall be applied in all areas susceptible to erosion (i.e. disturbed ditch banks, steep slopes, and spoil areas) such that ground cover is established within 21 working days following completion of any phase of grading. Permanent ground cover shall be established for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction. 9. The Contractor shall remove temporary stream crossings and erosion control measures. All waste material must be removed from the project site. 10. The Contractor shall plant woody vegetation, live stakes, and apply permanent seeding at the appropriate time of the year and as described in the planting details and specifications. 11. The Contractor shall ensure that the site is free of trash and leftover materials prior to demobilization of equipment from the site. BAKER PROJECT REFERENCE NO. V r -. -`,. ` ,,,.. --•.? , .- `- .. ,..?... ° ......__ " JI J` PROJECT ENGINB , . - --- - -- --- - ---- -- -- - ,r --- ---- PRELIMINARY y •'" .__ e"" ? „r f ? i ? - W NOT USE FOR CON87 r f 1 r _ 1 J• „< f ,. J .. ?. 1• r MII N., , ?- .,.? ?. )f e j S.iW Ph... 919 F.: 919 9 . r f i t , 1 f ? _ %HILWIDALEL r I "'? .- ? GOLF COURSE , 1 ,.. 1 1 ?.. I i l p C ? I I I 1 1 OC C 1 DO NOT DISTURB t+ ,: EXISTING SANITARY SEINER DO NOT DISTURB EXISTING f' _____OVERHEAD UTILITY _® v® REMOVE INVASIVE SPECIES AND LIVE STAKE BANK 0 DO NOT DISTURB L E ?F CE c DO NOT DISTURB E Q 1 + EXISTING TREE EXISTING FENCE INSTALL GEOLIFTAND STAMI& 0 S REMOVE INVASIVE SPECIES , SLOPE MAT AND LIVE STAKE BANK 12" RCP WI CIASSAAND WSTONE O BEGIN REACH , t 1 ' r~^° ~ -? RXISTING EDGE _.. BENCHING LIMITS ?" O STA. 10+00,00 2+00 +p} OF CHANNEL 1+00 FEXI STING BEDROCK i N 11+00 14+00 5+00 16+00 l ? 19+00 Q l i _.- -- ?. _ - - - _- - I- `°- REPAIR EROSION ALONG EIkTSTING W -..,,., • DIRT PATH. FILL, COMPACT, AND ? -? STABILIZ 1EWITHSEEDANDMATTING ?? INSTALL GEOLIFT cs ?"?.. _..•' (1tlx50) INSTALL SINGLE WING DEFLECTOR U) °- REMOVE INVASIVE SPECIES, E AND BRUSH MATTRESS. SLOPE, MAT, AND LIVE STAKE BANK USE EXISTING BOULDERS IN CREEK W f? E WHEN AVAILABLE Z 1 E EXISTING J J INSTALLOR R CE EXISTING FIL FABRI E TOP OF BANK E CE ? ADD CLASS I AND 2 STONE B SEEDAND MAT. \ UNDER BRIDGE TO STABILIZE SIDE SLOPES DO NOT DISTURB • / $ U J 1 . EXISTING SANITARY SEWER ! \ j 1 c • \ r r "??"f... _- ?. ^h DO NOT DISTURB EXISTING ?. ' vl 'Jf OVERHEAD UTILITY ....... ? ?'1 - - - a ®e a n ... ane ' C 1 L i i 1¦ J ., mq C C U I I I I C PC CJ- i i I c c F c F u u u u z 2 L Q g ..........- O O O O O CV) F - w w w z_ J 2 U Q 1 ` r 6 J rf J? 1 ` ?'` 1t f l ( T' 8 i i Jf `. i J ! 0 1 J J/ t C r t ,? DO NOT DISTURB EXISTING SANITARY SEWER O 0 O + O 0 r r r 0 Oc sC ?C O .......... .®??? CE CE CE CE r C CE O ? SEEDANDMAT SLOP Lop C7 K TABILIZE EXISTING OUTFACE BAN ALONG ISTING S S INSTALL STEP-POOL ? IBU XRY DITCH TTHOLASSAANDB STONE OUTLET PROTECTION 1 BENCHING LIMITS - _BENCHINlGUMITS BENCHING LIMITS 35+0 - - - - - - 31+0+0 ?2+00 33+06 =4= 36+0 -- -_ -_ - --- --- -- - W Z INSTALL 1LYz4U INSTALL DOUBLE EXISTING EDGE ? J BRUSH MATTRESS WING DEFLECTOR EXISTING TOP OF BANK OF CHANNEL REMOVE SMALL TREES S INSTALL GEOLIFT CE U G) R E E Q 5 cE NOT DISTURB Q PROPOSE OP OF BANK EXISTING TREE, STABILIZE EXISTING 8" PVC I' -(S"EE 9E'YAIL SHEET 2) WITH CLASS A AND B STONE (n . `-..SLOPE, SEED AND MAT i `-LEFT BANK AT 2:1 3-8+0U 37+00 - LLI .. w _n7NGHjNG? - LiM TS- RESHAPE THALWEG r , INSTALL DOTIBLE WING DEFLECTOR V RE-USEEXISTING BOULDERS E J BAKER PROJECT REFERENT 116333 PROJE( + z+ 1 i - PRELIMIN W NOT USE 1 ? \1 Y\ 7 + 1 l + i 1 + + { + ? i l 1 1 + 0 f STABILIZE EXIST. 12" CPP WITH { ? CLASS AB B STONE APRON INSTALL STEP-POOL OUTLET PROTECTION +:i { 1f \ { ' Q ...,. AND REBUILD EASEMENT CROSSING WITH 1 CLASS AAND B STONE D"OT DISTURB EXISTING + SANITARY SEVYER r °°°. ' -....... _...„..... INSTALL BRUSH MATTRESS 4 r 42+00 INSTALL 1940ESS BRUSH MATTR D, .. EKI TING TOP OF BANK 43 0 CE - --^ f"' f f0 _ E L W l - REMOVE DEBRIS AND TREE IN CHANNEL J "-- W 5CMNO ' -. - Z a kISTING'EDGE.„ .I REMOVE INVASIVE SPECIES INSTALL ROCK OF CHANNEL AN LIVESTA BANK D CROSS VANE RESHAPETHALWEGAND.RJFFLE. `? INSTALL DOUBLE CROSS-SECTION DI MENSION ,, E D REACH r ..?, .-- ...... WING DEFLECTOR J .. . INSTALL GEOLIFT AND UR AREA °..' ~..? ~..? BACKFILL S STA.44+8788 .- gP cE DO N T DIST B 1 , Q UR .% E EXISTINGTREES - T 0 0 C U I 0 c o^ ?r I¦ - 4 r +r i I t 1 ? k ? ... \4 t t Im ?. w ,l 1 r 1 ? + l `i ? l l w STD. NO. DESCRIMON SYMBOL 6.06 TEMPORARY GRAVEL CONSTRUCTION ACCESS----------- 6.62 SILT FENCE ------------------------------------x--HF 6.63 TEMPORARY ROCK DAM ----------------------------- 6.70 TEMPORARY STREAM CROSSING ---------------------- j= ; ELLERBE CREEK WATERSHED ASSOCIATION WAW wu loDlrcl' YEOMIQILE Na - 'IOfn Na men NC 116333 EC-1 8 w M ti W L EROSION CONTROL PLAN LOCATION. DURHAM, NORTH CAROLINA APPROX. M MILE SOUTH OF 1-85 AND GUESS ROAD INTERSECTION - WITHIN CITY OF DURHAM TYPE OF WORK STREAM ENHANCEMENT AND STABILIZATION i GRAPHIC SCALES PROJECT STANDARDS PREPARED LN THE OFFICE OF. Mi,homl Betel Enpineerino Im PROJECT ENGINEER •W e.g.nq P- THE FOLLOWING STANDARDS AS THEY APPEAR IN THE "NC EROSION CONTROL • Summo -INn21 1e Ne? a PLANNING AND DESIGN MANUAL" AND ARE APPLICABLE TO THIS PROJECT AND a 6 .n. ° " ° THIS PROJECT CONTAINS BY REFERENCE IIERREBY ARE CONSIDERED PART OF TIM PLANS. Pa : p,psgy app EROSION CONTROL PLANS FOR ALL PHASES OF 6.06 TEMPORARY GRAVEL CONSTRUCTION ACCESS 40 20 0 40 80 CONSTRUCTION. KEVIN TWEEDY PE PRELIMINARY PLANS 6.62 SILT FENCE , PROJECT ENGINEER 00 NOT USE FOR CDNB'fRUGT10N PLANS 6.63 TEMPORARY ROCK DAM TOTAL DISTURBED AREA = 10.5 Acres LEZTMG DATE- KAYNE VAN STELL 6.70 TEMPORARY STREAM CROSSING PRDJEGT MANAGER PR. SJGN97IIRR BAKER PROJECT REFERENCE N0. SHEET NO. 1 PROJECT ENGINEER TEMPORARY SILT FENCE ORANGE SAFETY FENCE PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION NOTES: 1. PROVI DE USTEEL POST OF THE SELF-FASTENER 8' MAX. WITH V41RE ANGLE STEEL TYPE. (8' MAX. WITHOUT WIRE, 2. PROVIDE CAPS ON TOP OF STEEL POSTS. REQUIRES USE OF EXTRA WIRE OR PLASTIC ZIP TIES NTH STRENGTH FILTER FABRIC) T-POSTS SHALL BE 1.33 LBILF STEEL WITH A MINIMUM AMINIMUM TENSILE STRENGTH LENGTH OF5 FEET AND SHALL BE CONSTRUCTED SO OF 50 LE, SHALL BE USED TO (,V MAX. WITHOUT WIRE, AS TO ALLOW FOR FASTENING OF THE FABRIC Ml,h-I &kar Enplnearlnp Inc. .. 04 1p'"? ""R"a+' CONSTRUCT THE FENCE NORMALSTRENGTH . Czoo °xnns+e • FILTER FABRIC) pnan.Netiaasraq Fm:919,4E3.54M MESH CONSISTING OF 14 GAGE WIRE AT MAX STEEL POST CAP SPACING OF 8"x8" " ---? STEEL POST WIRE MESH FI FABRIC STANDARD OR EXTRA L_ L_ L_ L_ L L L L L_ L_ L_ L_ L L L L L_ L_ L_ L_ L L L L L_ L_ L_ FILTER FABRIC STRENGTH SYNTHETIC FIBER CERTIFIED BY THE L L L L L L L L L L L L L L L L L L L L L L L L L L MANUFACTURER TO COMPLY WITH MATERIAL _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ REQUIREMENTS IN ASTM STANDARDS D 8481, 4832, 4491, L L L L L L L L L L L L L L L L L L L L L L L L L L L 4751, AND 4355. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ L L L L L L L L L L L L L L L L L L L L L L L L L L L S 1 MECHANICALLY COMPACTED FILL _ _ i, 2 PASSES OF DEVI L ST ' CE L L L L L L L L L L L L L L L L L L L L L L L L L L L EXERTING AT EA ON BD _ _ ORANGE, W RESISTANT, BOTH BIDER OF FENCE FENCE HEIGHT L L L L L L L L L L L L L L L L L L L L L L L L L L L HIGH-TENSILE STRENGTH. MAX 24' ABOVE E GROUND _ _ _ _ _ _ _ _ _ _ _ _ _ L L L L L L L L L L L L L L L L L L L L L L L L L L L POLY BARRIDADE FABRIC (TYPICAL) RUNOFF _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ? DIRECTION NOTES: GRADE- - - - - - - - - - - - - - - - - - - 1.) AVOID JOINTS, UNAVOIDABLE JOINTS MUST HAVE 4 FEET OF CLOTH OVERLAP AND SHOULD TIE INTO THE NEXT ADJACENT POST. E T =III III ?1 1=1 I II? I I I-I I I -I I I-I I? ,111 ,111 iiiiii " = - II-' I _ III B III III I? 2.) PLACE ON CONTOUR EXCEPT ENDS WHICH SHOULD BE VABOVE GRADE TO PREVENT CUT AROUND. III III I - -- - 3.) WRAP APPROX. B"OF FABRIC AROUND ENO POSTS AND SECURE POST DEPTH 2A" MINIMUM 4" WITH TIES. 4.) REMOVE ONCE AREA IS STABLE. _ _ - IIII STEEL POST -Z DEPTH I FILTER FABRIC IIII IIII IIII III _ I CI I I_ -III (- IIII IIII IIII-IIIIII 1=1 I I-I I I TREE PROTECTION FENCE 8' STEEL T POST (FACTORY PAINTED) ORANGE, UV RESISTANT, HIGH-TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) _ ?? ? EXISTING PLANT LIMIT OF CANOPY, DRIPLINE _.J-- PNLT CANOPY, DRIPLINE PLANT CANOPY, DRIPLINE ? v TREE PROTECTION AREA PLAN VIEW OF PROTECTIVE FENCING ' 18 VARIABLE AS DIRECTED DO NOT ENTER BY THE ENGINEER AROUND SINGLE TREE- EXPAND AS NECESSARY - 'a J J WARNING SIGN DETAIL L L L L L L L L L -L L L L MIN. 12-1/! GA 4"K4"WOOD POSTS MIN 10 GA WIRES 12" 1P" 2" X 4" WOOD RAILS . WIRE . LINE L L L L L PRO7Bt7?7 AREA L L L TIES PRmfnmt AUA MIN. EXISTING PLANT Lj_ L L L L L sxt9 L ORANGE, UV RESISTANT, ro wT RNM 12„ LIMIT OF CANOPY, DRIPLINE NOTES: 1. ALL PLANTS TO BE SAVED SHALL BE PROTECTED BY FENCING GRADE L L L L L L HIGH-TENSILE STRENGTH. L L L L POLY BARRIDADE FABRIC (TYPICAL) 12" 12 2"X4"HORIZ. AS SHOWN IN THIS DETAIL, WOOD RAILS 2. CONTRACTOR SHALL INSTALL FENCING PRIOR TO BEGINNING WARNING SIGN ANY CONSTRUCTION OR GRADING ACTIVITY, 3. CONTRACTOR SHALL CALL FOR INSPECTION AND APPROVAL X-O" OF PROTECTIVE FENCING PRIOR TO BEGINNING ANY CONSTRUCTION 6'4Y, OR GRADING. O C 4. PROTECTIVE FENCING SHALL BE LOCATED AT OR OUTSIDE DRIPLINE ' . . MIN OF TREES AND 1 MINIMUM OUTSIDE SHRUBS OR OTHER PLANTS. PERFORATED PLASTIC FENCE DETAIL WOOD FEN CE DETAIL PLAN VIEW OF PROTECTIVE FENCING AROUND SINGLE TREE- EXPAND AS NECESSARY rt M 7 c a d c m m i n? BAKER PROJECT REFERENCE N0. SHEET NO. TEMPORARY CULVERTED STREAM CROSSING 1 TEMPORARY ROCK DAM PROJECT ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION NOTES: FLOW 1. ENSURE ADEQUATE COMPACTED FILL TO PROTECT AGAINST CULVERT COLLAPSE. zz zz 2. MAINTAIN SIDE SLOPES & EDGES TO MINIMIZE EROSION TO THE RECEIVING WATER. i 3. INSTALL SILT FENCE ALONG EDGES OF CLASS AB STONE TO CONTROL SEDIMENT RUNOFF. Michael Baker Engineering Inc. y CONSTRUCTION AREA UPSTREAM r° 2f S.iW 00 Peiky nns+e Do,,,en. 919.463.5488 RO P 1 COVER FILL MATERIAL ?:A1A,4m.1AN \ NTH 6 INCHES CLASSAIB STONE / STILLING BASIN 2 FT MAX DEPTH #57 STONE PLOWS 1 1? ?1 \ ( . ) J 12BANKFULL MAX MUM DEPTH FILTER FABRIC #57 STONE FILTER FABRIC L 10' 10, _?_ CLASS 8 STONE EXISTING CHANNEL CROSS SECTION b° 41° 7 PLAN VIEW FILTER FA BRIC 36 EXISTING FOR OR DRAINAGE GROUND CLASS AB STONE DRAINAGE DITCH OUTFALL CMP (CORRUGATED METAL PIPE) NOTES', 1. CLEAN OUT STILLING BASIN OF TRAPPED SEDIMENT PRIOR TO REMOVAL. CROSS SECTION VIEW 2. DO NOT USE ROCK DAMS INACTIVE STREAM CHANNELS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE EROSION CONTROL MATTING 1.5 INCH ROOFING NAIL PLACE COIR FIBER MATTING IN 6INCH DEEP TRENCH, STAKE, BACKFILL, AND COMPACT TOP OF STREAMBANK TOE OF SLOPE LARGE STAKES BOTTOM OF CHANNEL TYPICAL LARGE MATTING STAKE PUBLIC ROAD PLACE: COIR.FIBER MATTING AT TOE OF SLOPE.. - - - - - - - - - - - - - - - - - - - - - SECURE MATTING VMYH LARGE MATTING STAKE CROSS SECTION VIEW LEG LENGTH 17.00IN43.i6 CM TAPERED TO POINT) WIDTH 1.00IN 2.54 CM PUBLIC ROAD THICKNESS 1.00IN 2.54 CM 8" MINIMUM THICKNESS OF NOTES R-00 WASHED CLASS A STONE ? 1. BANKS SHOULD BE SEEDED PRIOR TO 0 R=40 OF MATTING. 2. USE C-7 MATTING. 0 0 0 0 3. LARGE STAKES SHOULD NOT BE SPACED FURTHER THAN 16" APART. 0 Z 4. PLACE LARGE STAKES ALONG ALL SEAMS, FILTER FABRIC N IN THE CENTER OF BANK AND TOE OF SLOPE. 0 NOTES, TRENCH TRENCH 12'MIN SPECIFICATION NO.6.06- CONSTRUCTION ACCESS"N.C. EROSION AND SEDIMENT 1 1 1 1 1 1 1 1 1 1 / 1 TOP OF STREAMBANK 0 CONTROL PLANNING AND DESIGN MANUAL DECEMBER 1993" TOP OF STREAMBANK 1 1 1 1 1 1 1 1 1 1 / 1 __________________________ _ STAKES 1 1 1 1 1 1 1 1 1 1 / 1 LARGE 1 1 1 1 1 1 1 1 1 1 1 STAKES / 1 1 1 1 1 1 1 1 1 / 1 TYPICAL SMALL MATTING STAKE 1 1 1 1 1 1 1 1 1 1 / 1 COIR FIBER MATTING 1 1 1 1 1 1 1 1 1 1 / 1 TO BE EXTENDED TO TOE OF SLOPE LEG LENGTH 11,00IN 7.94C HEAD WIDTH 1251N 3.16 CM PLAN VIEW LARGE HEADTHICKNESS 0.40IN1.02CM STAKES LEGWIDTH 0.60 IN 1.52C APERED TO POIN LEGTHICKNESS 0.40 IN 1.02 CM TOTAL LENGTH 12001N 30.48 C C ri ei Li w ?i CI ID i C C a C C m m nM r.? BAKER PROJECT REFERENCE N0. SHEET NO. 1 TEMPORARY STREAM CROSSING - WOOD MAT PROJECT ENGINEER TYPICAL PUMP AROUND OPERATION PRELIMINARY PLANS WOOD MAT DO NOT USE FOR CONSTRUCTION CLASS B STONE STABILIZED INLET ?Y' NkhFel &ksr EnplnearlnALnc. PUMP-AROUND PUMP CHANNELBOTTOM , ¦ S.iW 2N 6aite (SEE PROJECT SPECIAL PROVISIONS( ; ; . ; , ; O ¦ cxn. No6ix3.5Q8 nns+e Finaa: et6e6 IMPERVIOUS DIKE . . .FILTER-FABRIC. Fa:819,W.64AJ CROSS SECTION SILT FEN CE CLASS B STONE RAMP 1 TEMPORARY FLEXIBLE HOSE T Q NOTES: WOOD MAT = 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW F 2, HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE WORK BEGINS. STREAM CHANNEL p 3. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM, 3 4, LINE STREAMBANKAND ACCESS RAMP AREA NTH NON-WOVEN FILTER FABRIC. PLAN VIEW NOTES: 5, INSTALL STREAM CROSSING AT RIGHT ANGLE TO THE FLOW. 8. TRANSPLANT SOD FROM ORIGINAL STREAMBANK ONTO SIDE SLOPES FOR LATER USE. 1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS 7. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL OF CHANNEL. EXISTING CHANNEL 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS BY INSTALLING SILT FENCE ON ALL FOUR CORNERS ADJACENT TO THE STREAM. SEE SILT FENCE DETAIL. FROM STREAM FLOW. B. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD MAT. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN p. THE WOOD MAT SHALL BE OF SUFFICIENT SIZE AND MDTH TO SUPPORT THE LARGEST VEHICLE CROSSING THE CHANNEL. BE STABILIZED IN ONE WORKING DAY. 10. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED, RECOMMENDED AT A 5',1 SLOPE. TEMPORARY 4. THE PUMP-AROUND PUMP SHOULD ADEQUATELY CONVEY 1 CFS EXIBLE HOSE (450 GALLONS PER MINUTE), IMPERVIOUS DIKE (SEE PROJECT SPECIAL PROVISIONS) DEWATERING PUMP SPECIAL STILLING BASIN STABILIZED OUTLET - (SEE PROJECT SPECIAL PROVISIONS) CONSTRUCT WITH A MIX OF BOULDERS AND CLASS B STONE TO STABILIZE STREAM AT PUMP AROUND OUTLET SPECIAL STILLING BASIN INSTALL2INCH PAD OF #57 STONE BETWEEN SPECIAL STILLING BASIN EXISTING GROUND AND FILTER FABRIC FILTER FABRIC 15-20 FT SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1. INSTALL STABILIZED OUTLETAT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY FLEXIBLE HOSE THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE TO THE SPECIAL STILLING BASIN OR STABILIZED OUTLET. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THEWORKARFA. THIS WATER WILL FLOW INTO A SPECIAL STILLING BASIN. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE STARTING NTH THE DOWNSTREAM DIKE FIRST. 7. THE CONTRACTOR WILL COMPLETE ALL GRADING AND STABILIZATION IN ONE DAY WITHIN THE PUMP AROUND AREA BETWEEN THE IMPERVIOUS DIKES. 8. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE SPECIAL STILLING BASIN AND STABILIZED OUTLET AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. m v v m x a v w M M r? i c a a c m m 0 aM 4. nM r.? 1 r Y f I` I` I? DO NOT DISTURB EXISTING SANITARY SEWER DO NOT DISTURB EXISTING CD OVERHEAD UTILITY O O t HAUL ROAD D DO NOT DISTURB - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - - DO NOT DISTURB 04 CESS ADD CLASS B STONE-AT STREAM Ar - - -- - -- - -- - -- - EXISTING TREES? - -- - -- - -- - - - -- IMITS OF DISTURBANCE OS'ON - EXISTING FENCE P TO PRIEVENT CHANNEL EROSION. RAM RAMP SLOPE NOT TO EXCEED 3:1.. Fz P To P' '-MP SLO n 7 u e u C C c a ? i i oc o,. -- - -- - -- - -- - - - - - - - - - - 1. HAUL ROAD HAUTROAD it _ T L MITS OF DISTURBANCE xr r' DO NOT DISTURB EXISTING SANITARY SEWER TEMPORARY GRAVEL CONSTRUCTION ENTRANCE \ -? . ....... ............ ...... STAGING AREA --DO NOT DISTURB EX[STING OVERHEAD UTILITY i i i i i i t 1 t t f,. 1 tl J1 ?- l I NOTE: CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT EXISTING PAVEMENTS, WALKS, GREENWAYS, AND STREETS FROM DAMAGE. D HAUL ROAD HAUL ROAD FOR LIGHT D VEHICULAR/ RUBBER TIRED TRAFFIC ONLY 0 u i I t SaO? IIt 1 1 C l U E C r u i i i i i F c u u u u z u LL z U Q ?. ?\. ? 1 l ? r 1 JJ i n ? l `b ,,..,.. I I HAUL ROAD ELLEA NOTE HAUL ROAD FOR LIGHT EROSION : CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ', ; ' .. VEHICUWi/RUBBERTIRED EXISTING PAVEMENTS, WALKS, GREENWAYS, AND STREETS FROM DAMAGE. . ° TRAFFIC ONLY d0 ?? 0 0 0 0 0 ro F N U W w w w z J 2 U Q BAKER PROJECT REF! Pill r r , ; ' ? PRELIM j 1 4 ., r' If r ` ,1 00 NOT 1 A- a / ? f J rr i ' ' o DO NOT DISTURB FXISTING SANITARY SEWER .'x O L''A T T ?? O V ' .._.._.._.._.._.._.._ LIMITS OF DISTLRBANU.. _.._.._.._.. _.._.._.,_.._ .._.._.._.._ .._.._.._.._.._.._.. .._.._ ++ _ ?..-•, \ U gAN?E•i ? ??OS ? HAUL ROAD ?.. _.._ L1M?T? N M TEMPORARY STREAM " ++ +1 Q CROSSING w/ % CMP TEMPORARY ? , 39+00 ROCK DAM +, 38+00 U - - N BENCHING LIMITS - _ BENCHINGLIMITS BENCHINGLIMITS 35+00 '+37+00 , -- -, W 1 3j+0+U 32+00 y 33ih04 , ?r =4.0? 36+00 , V - - - . 111 / - - - _ _ W _- _._.-._._ - - -.- _ - - / --- - + U) i H'HHH' \ ` _ N G? iHi.-I-r+iF-uZ L ~ w HAULROAD I I I + ` + + J MM ^?r l '?i HAUL OAD HI HIHI l cl) .._.._.._.._..-,._.._. . a.._.._. - - ._,. _.,.-.._,._..- •,- • STAGING AREA I f , + ?nH ?,.+iHIHI HI I I 1 ` + + \ Hir+ 5 STAGINGAREA w Z . ?? ? ?itiL I +? ` ? BTOCKPILE?ARFL `"''? Q -- _ LIMITS OF DISTURBANCE % - - STURBANCE ? LIMITS OF DI - Q TREE PROTECTION (TYP.) ADD CLASS B STONE,AT STREAM ACCESS C L TEMPORARY GRAVEL RANCE R RAMP TO PREVENT CHANNEL EROSION. RAMP+SLOPE NOT TO EXCEED 3:1. , CONST UCTION ENT DONOTDISTURB EXIST. D UTILIT ?. OVERHEA Y - - --- ---------- ...... - -- - ------- --- - --- F u 0 C C u i 0 i I i OIC, oC r' ---., f, ,• -,...? x o ' w r' , f f '? r 1 `? ,?,} D HAUL ROAD EROS) NOTE . HAUL ROAD FOR LIGHT D VEHICULAR I RUBBER TIRED CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT TRAFFIC ONLY 40 EXISTING PAVEMENTS, WALKS, GREENWAYS, AND STREETS FROM DAMAGE. I BAKER PROJECT REFERENCI ';F Jj 1 PROJECT 14 ? i 1 {? ? 4 PRELIMIN) W NOT USE P< r l ; , { 1 Jr 4 i i i } i t , i Q ? ? t C 1 ,' i 1 t ? ? 1 1 + f t t 1 ? t. 1 , f r ? Q ? t i ti V t ? ?L? x.x ? - - i i --, O f ? - - •- ..? 1 DO'NOT DISTURB EXISTING n ' SANITARY SEVYER ! 1 TEMPORARY 41+0( 4 + ?. 43+00 ! ._ (? - - --- - ---- --- - I v _...... T J W I IHIHIHiHIHiHiHI iHIH ?/ l E U L C C U I I i i C oc ?r HiHIHi HIH+I IHi ,R z HAUL ROAD HAUL ROAD -? E D REACH. STA. 44+87.98 ::-- NI?I I t ? t IF-YIF-iM-iIH,HIY?I ILEARFA -- -- - --.._.._,._- LV w.. t STCCKP •--.-- I 1 CQ DG.Npr DISTURB i ? t t t, t, A 1 l ? ?. _NO TREES C EXIST[ 3.. w t t v J ?V ` l t r e? ..-.. ,i ` 4 V ,i 1 i _..._ _ 'i ? i i /i) t } t t t I r ? 4? Il ? t' t ELLERBJ ?rwuLROAD EROSION CC HAUL ROAD FOR LIGHT NOTE: D VEHICULAR I RUBBER TIRED CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT .?' TRAFFIC ONLY 40 ZO Q EXISTING PAVEMENTS, WALKS, GREENWAYS, AND STREETS FROM DAMAGE. '