HomeMy WebLinkAbout20100053 Ver 1_Site Plan_20100121
w
?4
C?J
?Z4
ELLERBE CREEK WATERSHED ASSOCIATION
DURHAM
COUNTY
LOCATION. DURHAM, NORTH CAROLINA
APPROX. 114 MILE SOUTH OF 1-85 AND GUESS ROAD
INTERSECTION - WITHIN CITY OF DURHAM
TYPE OF WORK STREAM ENHANCEMENT AND STABILIZATION
W INDEX OF SHEETS
1•••••••••••••••• TITLE SHEET
1-A• • • • • • • • • • • • • • STREAM CONVENTIONAL SYMBOLS, GENERAL NOTES,
STANDARD SPECIFICATIONS, AND VEGETATION SELECTION
W 1-B• • • • • • • • • • • • • • CONVENTIONAL SYMBOLS
2-2C • • • • • • • • • • • • • TYPICAL CROSS-SECTIONS AND DETAILS
3• • • • • • • • • • • • • • • • CONSTRUCTION SEQUENCE
4-7••••••••••••••PLAN VIEWS
EC-1 - EC-8• • • • • • EROSION CONTROL PLAN
M
V
W
L
a
WAW SSIR lN1R1' u,u1oRE NO e1? ^oTn?
xa nmeit
NC 116333 1 12011
GRAPHIC SCALE PREPARED FOR THE OFFICE OF. ^o^,.^?^?•
M111111 lkll
B PROJECT ENGINEER
WP.
80
00Rn
80802
P.Mrey
ELLERBE CREEK WATERSHED 00
• GU.. NORTH 01SOUw 21818
®
ASSOCIATION Fm 010-3.5490
S1^1835180
331 W. MAIN STREET, SUITE 503
DURHAM
NORTH CAROLINA
40 20 0 40 80 ,
27705 KEVIN TWEEDY
PE PRELIMINARY PLANS
,
PCTG7` 00 NOT USE FOR CONSTRUCTION
PLANS PH: 919-698-8161
EMAIL: ECWABOARD@ELLERBECREEK
ORG
. 7BZ7rxc Haze:
KAYNE VAN STELL
ALCYAGER
PROJECT
ECWA CONTACT. DIANA TETENS
EXEC077V8 D717HCTOR P8.
op % SIGNATURH.•
STREAM CONVENTIONAL SYMBOLS
GENERAL NOTES
PROJECT ENGINEER
°°=
ROCK J-HOOK
-®-
SAFETY FENCE
1.
THE CONTRACTOR IS REQUIRED TO INSTALL INSTREAM STRUCTURES USING
°0 A TRACK HOE WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE PRELIMINARY PLANS
cmTO ROCK VANE -TF- TAPE FENCE BOULDERS 4'X 3'X 2'. DO NOT USE FOR CONSTRUCTION
CM ROCK STEP POOL/ PERMANENT FENCE 2. WORK IS BEING PERFORMED AS AN ENVIRONMENTAL PROJECT ALONG A CITY
OUTLET PROTECTION PARK AND GREENWAY TRAIL. THE CONTRACTOR SHOULD MAKE ALL REASONABLE
ROCK CROSS VANE -FP- 100 YEAR FLOOD PLAIN EFFORTS TO REDUCE SEDIMENT LOSS, PROTECT PUBLIC SAFETY AND MINIMIZE
DISTURBANCE OF THE SITE WHILE PERFORMING THE CONSTRUCTION WORK.
DOUBLE DROP ROCK CROSS VANE cE CONSERVATION EASEMENT 3. CONSTRUCTION IS SCHEDULED TO BEGIN WINTER 2010.
"Rh?.n PPa a^er^FFa"e r^?
"epenvry Wfm"ey
¦ SIM
x
SINGLE WING DEFLECTOR
- - 355 - -
EXISTING MAJOR CONTOUR
4.
CONTRACTOR SHALL CONTACT NORTH CAROLINA "ONE-CALL" (1-800-6324949) ¦ oH1 ROUxn27555
ceT,
919.463
985.54M .5488
FFa 9I9
AND LAND QUALITY (919-791.4210) BEFORE ANY EXCAVATION BEGINS
.
DOUBLE WING DEFLECTOR EXISTING MINOR CONTOUR
5. CONTRACTOR SHALL COORDINATE TEMPORARY TRAIL DETOURS/CLOSINGS
FOOT BRIDGE WITH THE CITY OF DURHAM PARKS & RECREATION, ECWA, AND DESIGN ENGINEER.
ROOT WAD
J TEMPORARY STREAM CROSSING
ao LOG J-HOOK
ru-r PERMANENT STREAM CROSSING
® LOG VANE STANDARD SPECIFICATIONS
® TRANSPLANTED VEGETATION
® LOG WEIR
LOG CROSS VANE X TREE REMOVAL EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL
CONSTRUCTED RIFFLE TREE PROTECTION JUNE2006
® GEOLIFT
°° ° BOULDER CLUSTER 6.06 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
SLOPE BANKS, SEED AND MAT/
LOG STEP POOL BRUSH MATTRESS 6.62 SILT FENCE
CHANNEL FILL 6.63 TEMPORARY ROCK DAM
6.70 TEMPORARY STREAM CROSSING
**NOTE: ALL ITEMS ABOVE MAY NOT BE USED ON THIS PROJECT
VEGETATION SELECTION
The following table lists the woody \egetation for the project site. Exact spacing
densities and placement of species will be determined prior to site planting by a
qualified \egetation specialist based on current site conditions and apparent wetness
of planting locations, as defined in the construction specifications. The total planting
area is estimated to be approximately two (2) acres but may vary based on areas
disturbed during construction.
Containerized Trees - Random Spacing
Common name Scientific name Size Qnty
River Birch Betulanigra 3-7gal 3
American Sycamore Plantanus occidentalis 3-7 gal 2
Persimmon Diospyros virginiana 3-7 gal 3
Tulip Poplar Loodendron tulipifera 3-7 gal 2
Black Gum Nyssa sylvatica 3-7 gal 2
Swamp Chestnut Oak Quercus michauxii 3-7 gal 2
Northern Red Oak Quercus rubs 3-7 gal 2
Willow Oak Quercus phellos 3-7 gal 2
Total 18
Shrubs - Random Spacing
Common name Scientific name Size Qnty
Redbud Cercis canadensis 3 gal 4
Flowering Dogwood Corn us flonda 3-7 gal 4
American Hazelnut Corylus amencana 1 gal 4
Winterberry Holly flex verticillata 3-7 gal 4
Virginia Sweetspire Itea mrginica 3-7 gal 4
Spicebush Lindera benzoin 1 gal 4
Piedmont Azalea Rhododendron canescens 3 gal 4
Highbush Blueberry Vaccineum stemineum 3 gal 4
Blackhaw Viburnum Viburnumprunifolium 3gal 3
Arrowood Viburnum Viburnum dentatum 3 gal 3
Total 38
u
0
r
r
r
u
r
C
oorc
?r
nv
The following table lists temporary seed mix for the project site. All disturbed areas will be
stabilized using mulch and temporary seed as defined in the construction specifications,
Planting Dates Species Name Rate (Ibs./acre)
September to March Rye Grain (Cool Season) 120
April to August Millet (Warm Season) 40
Live staking will be applied to all restored streambanks following the details in this
plan set and as defined in the construction specifications.
Common Name Scientific Name Percentage
of Total Wetness
Tolerance
Elderberry Sambucus canadensis 20% FACW-
Silky Dogwood Cornus amonum 25% FACW+
Silky Willow Salcrsericea 25% OBL
Black Willow Salcrnigra 10% OBL
Ninebark Physocarpus opulifolius 20% FAC-
Permanent herbaceous seed mixtures for the project site shall be planted on disturbed areas throughout the floodplain,
riparian, and non-riparian buffer areas. Permanent herbaceous seed mixtures shall be applied with temporary seed, as
defined in the construction specifications.
Common Name Scientific Name
Percent of
Mixture
Seeding Density
(lbs/acre)
Wetness
Tolerance
Redtop Agrostis alba 15% 2.25 FACW
Virginia Wildrye Elymus vuginicus 15% 2.25 FAC
Swamp Sunflower Helianthosangustifolius 7% 1.5 FAC
Purple Lo?egrass Eragrostis spectabr1is 7% 0.75 FACU
Shallow Sedge Carexlunda 10% 0.75 FACW+
Indian Grass Sorgastmm nutans 7% 1.5 FACU
Soft Rush Juncus effusus 7% 0.75 FACW+
Lance-Leaved Tick Seed Coreopsis lanceolate 10% 1.5 FAC
Tioga Deer Tongue Dichantheliom clandestinom 15% 2.25 FACW
Black Eyed Susan Rudbeckia hPta 7% 1.5 FACU
*S.U.E = SUBSURFACE UTILITY ENGINEER
ROADS & RELATED ITEMS
Edge of Pavement ----------------------- ---------
Curb --- ---- ---- ----- ---- ---- ----- - --- -
Prop. Slope Stakes Cut ------------------ ------ C
Prop. Slope Stakes Fill ----------------- ------
Prop.Woven Wire Fence --------------- ------ $E
Prop. Chain Link Fence ............... ...... E3 E3
Prop. Barbed Wire Fence--------------- ------ ?0
Prop. Wheelchair Ramp ---------------- ------CR)
Curb Cut for Future Wheelchair Ramp - - - - - -
Exist. Guardrail ......................... .....
Prop. Guardrail ------------------------- ------
Equality Symbol -- ---- ---- ----- ----- ---- -
Pavement Removal ...................... ......
RIGHT OF WAY
Baseline Control Point------------------ ------
Existing Right of Way Marker ........ ... . ..... Q
Exist. Right of Way Line w/Marker . ...... ...... - ?j- -
Prop. Right of Way Line with Proposed
R/W Marker (Iron Pin & Cap) ........ ......
Prop. Right of Way Line with Proposed
(Concrete or Granite) RNV Marker ..... .-...-
Exist. Control of Access Line .... .... ..... ...... -------- A
Prop. Control of Access Line ............. ......
Exist. Easement Line ..................... ...... -E___.
Prop. Temp. Construction Easement Line ------ E
Prop. Temp. Drainage Easement Line --------- TBE
Prop. Perm. Drainage Easement Line --------- -PK
HYDROLOGY
Stream or Body of Water ............... .....
River Basin Buffer ......................... .... RBB
Flow Arrow ------- ----- ---- ---- ----- ---- _._...?
Disappearing Stream ..................... ..... ?. _
Spring -- ----- ---- ---- ----- ---- ------ -----
CY'.
Swamp Marsh --------- ---- ---- ------- --- - &
Shoreline -------- ----- ---- ---- ----- -- -- --------
Falls,Rapids --------- ---- ---- ----- -- ---- - -f- -
Prop Lateral, Tail, Head Ditches ......... .....
F FLOW
STRUCTURES
MAJOR
Bridge, Tunnel, or Box Culvert
............... CONC
Bridge Wing Wall, Head Wall
and End Wall ---------------------------- CONC4
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
CONVENTIONAL SYMBOLS
MINOR
Head & End Wall ................ coN? C NW
Pipe Culvert ---- ---- ---- ----- ---- ---- --- ?:= _
Footbridge --------- ----- ---- ---- ----- ---- > - ------<
Recorded Water Line ............... , ,-
Designated Water Line (S.U.E.*) ............. -,-,-
Sanitary Sewer -------------------------------- -ss-ss-
Recorded Sanitary Sewer Force Main ------ ?ss_FSS-
Drainage Boxes ................................ ?cs
Paved Ditch Gutter
UTILITIES
Exist. Pole -- ----- ---- ---- ----- --------- - •
Exist. Power Pole ............................... +
Prop. Power Pole ---- ---- ----- ---- ---- --- b
Exist. Telephone Pole .......................... +
Prop. Telephone Pole .......................... -
0-Exist. Joint Use Pole ...........................
Prop. Joint Use Pole ...........................
Telephone Pedestal---------------------------
U?G Telephone Cable Hand Hold .-.........
Cable TV Pedestal ............................ IKI
LPG TV Cable Hand Hold ....................
WG Power Cable Hand Hold ................
Hydrant---- ---- ----- ---- ---- ----- -------- 9
Satellite Dish .................................. 29
Exist. Water Valve ..............................
Sewer Clean Out .............................. 0+
Power Manhole --------- ---- ---- ----------- 0
Telephone Booth .............................. m
Cellular Telephone Tower .....................
Water Manhole ---------- ---- ---- ----------
Light Pole -- ---- ---- ----- ---- ---- --------- R
H-Frame Pole ------ ----- ---- ---- ----- --- H
Power Line Tower ..............................
Pole with Base -------- ----- ---- ----------- 0
Gas Valve -- ----- ---- ---- ----- --------- - 0
Gas Meter -- ----- ---- ---- ----- --------- -
Telephone Manhole ........................... (D
Power Transformer ....... . ... . ........... . ... . . 0
Sanitary Sewer Manhole .......................
Storm Sewer Manhole ........................
Tank; Water, Gas, Oil-------------------------
Water Tank With Legs ........................ O
Traffic Signal Junction Box ....................
Fiber Optic Splice Box ------------------------- f]
Television or Radio Tower ........... .... .....
Utility Power Line Connects to Traffic
Signal Lines Cut Into the Pavement-.-----.--- ?; Ts
Designated Sanitary Sewer Force Main(S.U.E.*)-Fss-Fss
Recorded Gas Line
Designated Gas Line (S.U.E.*) ...............
Storm Sewer ------- ---- ----- ---- --------- s s-
Recorded Power Line ........................ P P-
Designated Power Line (S.U.E.*) ............. _ P
Recorded Telephone Cable .................. -T-T-
Designated Telephone Cable (S.U.E.*) ------- --T- -T- -
Recorded LkG Telephone Conduit ------- -TC-TC-
Designated UG Telephone Conduit (S.U.E.*) --TC--TC--
Unknown Utility (S.U.E.*) ------------------ -TUTL--WL-
Recorded Television Cable - - - - - - - - - - - - - - - - - -TV-TV-
Designated Television Cable (S.U.E.*) ...-... --TW--TV--
Recorded Fiber Optics Cable --------------- -FO-FO-
Designated Fiber Optics Cable (S.U.E.*) --- . _ _FO--FO--
Exist. Water Meter . ... . ........... . . 0
U-G Test Hole (S.U.E.*) ----------------------- m
Abandoned According to U4G Record ........ ATTUI
End of Information ............................ Ea,.
BOUNDARIES & PROPERTIES
State Line ---- ----- ---- ---- ----- ---- ---- ------
County Line --------- ---- ---- ----- ---- ----
Township Line - ---- ----- ---- ---- --------- - -- --
City Line ------ ---- ---- ----- ---- ---- ----- - ---
Reservation Line ............................... . ------
Property Line--- ----- ---- ---- ----- ---------
Property Line Symbol .......................... FE
Exist. Iron Pin --- ----- ---- ---- ----- ------- E?
Property Corner -------- ---- ---- ----------- - +
Property Monument ........... .... ............ .
Property Number------------------------------ 123
Parcel Number ................................. 6
Fence Line ---- ----- ---- ---- ----- --------- -x-x-x-
Existing Wetland Boundaries .................. WW & ISBW
--WEB-_
High Quality Wetland Boundary .............. -WO WLB-
Medium Quality Wetland Boundaries......-. -MO WLB-
Low Quality Wetland Boundaries ............. -EO WLB-
Proposed Wetland Boundaries ................ -WLB-
Existing Endangered Animal Boundaries...-.. - - EAB- -
Existing Endangered Plant Boundaries ........ - _EPB- -
BUILDINGS & OTHER CULTURE
Buildings ................................ ......
Foundations .............................. ...... rJ
Area Outline --- ---- ----- ---- ---- -- ------
v
Gate ----- ---- ----- ---- ---- ----- ---- ----- Yom`
Gas Pump Vent or LPG Tank Cap ------ ----- 0
Church r
School - ---- ---- ----- ---- ---- ----- - ------
Park - ----- ---- ---- ----- ---- ---- --- -- - --
Cemetery --- ---- ----- ---- ---- ----- -- ----- ?r ]
Dam-- ---- ---- ----- ---- ---- ----- -- ------
Sign-- ---- ---- ----- ---- ---- ----- --- - ---
Well --- ---- ----- ---- ---- ----- ---- -- ----- 0
W
Small Mine --- ---- ----- ---- ---- ----- ----- x
Swimming Pool --- ---- ----- ---- ------ -----
TOPOGRAPHY
Loose Surface -- ---- ---- ----- ---- ------- -------
Hard Surface ---------------------------------
Change in Road Surface .................... ..............
Curb ---- ----- ---- ---- ----- ---- ----------
RightofWaySymbol ------------------------ R/W
Guard Post ---- ----- ---- ---- ----- ---- --- E) GP
Paved Walk -------
Bridge - ---- ---- ----- ---- ---- ----- ---- -
Box Culvert or Tunnel - - - - - - -
Ferry ---- ---- ----- ---- ---- ----- --------- -------
Culvert -- ----- ---- ---- ----- ---- --------- >-------------
Footbridge ---- ----- ---- ---- ----- ---- ---- --------------
Trail, Footpath -- ---- ---- ----- ---- ---- -- -
Light House . . . . .
VEGETATION Y
Single Tree --- ---- ---- ----- ---- ----------- fl
Single Shrub -- ---- ---- ----- ---- --------- o
Hedge --- ---- ----- ---- ---- ----- --------- Y,
Woods Line ------ ---- ----- ---- ---- ----- -
Orchard ---- ----- ---- ---- ----- ---- ------- Qt€ts€
Vineyard --- ---- ----- ---- ---- ----- -------
-
RAILROADS (-VINEYARD 1
Standard Gauge
L)7' MASP iFAMV
RR Signal Milepost ......................... o
YLIFPoSf JS
Switch ........................................ ?
Mcm
i
n
u
u
0
r
C
u
0
i
i
c
oon
TYPICAL RIFFLE AND BANKFULL BENCH CROSS SECTION
(APPLIES TO STA. 37+50 TO STA. 40+50)
TOP OF TERRACE
?ARIES11 WLM ?VARIES?
2 D D-Mac , BACK OF FLO DDPLAIN BENCH
y TOP OF BANK/BANKFULL
W6
RIFFLE WITH BANKFULL BENCH
ELLERBE CREEK RIFFLE
Width of Bankfull (Wbkf) 36.9
Average Depth (D) 2.6
Maximum Depth (D-Max) 3.5
Width to Depth Ratio (Wbkf 1 D) 13.0
Bankfull Area (Abkf) 105.0
Bottom Width (Wb) 22.9
NOTES
1. DURING CONSTRUCTION CORNERS OF DESIGN CHANNEL WILL BE ROUNDED
AND A THALWEG WILL BE SHAPED PER DIRECTION OF ENGINEER.
2. TYPICAL CROSS-SECTION DIMENSIONS MAY BE MODIFIED PER DIRECTION
OF THE ENGINEER BASED ON EXISTING CONDITIONS DURING INSTALLATION.
DOUBLE WING DEFLECTOR
A
L
20° TO 30°
113
BOTTOM 1/3
BOTTOM 113
BOTTOM
WIDTH OF
CHANNEL WIDTH OF
CHANNEL WIDTH OF
CHANNEL
LL
HEADER ROCK o
F
tRM P BACK FILL WITH AWELL GRADED
r MIX OF CLASS A AND B STONE A
FLOW f A'
n .
a 0 ?
? a
FI
NO GAPS
BETWEEN
ROCKS
F007 FIRST ROCK
ROCK) TIED INTO
STREAMBANK
SCOUR POOL (EXCAVATED)
PER DIRECTION OF ENGINEER
PLAN VIEW
12 BANKFULL HEADER ROCK
FLOW 2% T0 4%SLOPE
T
STREAMBED ?
ELEVATION
RM'X'PROFILEVIEW FOOTER ROCK
NOTE: NO SLOPE FOR ARMS Y BZ
BACK FILL WITH A WEI
MIX OF CLASS A AN
FILTER
BACK FILL WITH A WELL GRADED
SECTION B - B'
:
NOTE
BOULDERS MUST BE AT LEAST 4' X 3' X 2'.
GEOLIFT
PROJECT ENGINEER
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
N
aksr EnplnearlnA Inc.
F
STAKE TOP LAYER '
.n
eo.ao Faaana5 P-"
OF MATTING IN 6" TRENCH gpEEp (Typ) : slim 2m
(SEE MATTING DETAIL) vn ,Nei .5 ?BUann5+5
TOP OF
Fm: sle,sm.MW
BANK
EROSION CONTROL MATTING
1,5'LIFT OF COMPACTED
ENCOMPASSES LIFT
ON-SITE SOIL (TYP)
FLOODPLAIN
LIVE BRANCH CUTTINGS (SEE
PLANTING PLAN FOR SPECIES) POINT BAR OF CHANNEL
BED MATERIAL
UNDISTURBED EARTH (SEE TYPICAL SECTIONS)
FINISHED BED
ELEVATION
APPROX. 6" OF STONE
TOE ABOVE BASEFLOW
BASEFLO.
O
OO
a
OC
?O STONE TOE APPROX.
1 FT BELOW FINISHED
BED ELEVATION
O o D
o ?
FOUNDATION',
MIX OF CLASS A
AND CLASS 1 RIPRAP
NOTES:
1. IF CONSTRUCTION IS NOT DURING THE DORMANT SEASON, INSTALL SOIL LIFTS.
DURING THE FOLLOWING DORMANT SEASON, INSTALL LIVE STAKES (SEE DETAIL)
ON 2'-3' CENTERS ON SOIL LIFTS.
SINGLE WING DEFLECTOR
A m
i
A' I m
0
0
A
L_
ROCK
DOTER ROCK
A'
1/3
BOTTOM
WIDTH OF
CHANNEL z SECTION A - A' FILTER FABRIC
O
HEADER ROCK
o
r
P
BACK FILL WITH A WELL GRADED
MIX OF CLASS A AND B STONE
12 BANKFULL HEADER ROCK
FLOW A'
s
f 0
FLOWS
2% TO 4% SLOPE
20°T030°
NO GAPS STREAMBED
BETWEEN ELEVATION
ROCKS
FOOTER ROCK
/
m "?
qRM ARMX'PROFILE VIEW
'
NOTE: NO SLOPE FOR ARMS Y BZ
FOOTER ROCK
:
NOTE
BOULDERS MUST BE AT LEAST 4'X TX 2'.
FIRST ROCK
TIED INTO
STREAMBANK
BACK FILL WITH A WEI
MIX OF CLASS A AN
FILTER
SECTION B - B'
[N KUUK
FOOTER ROCK I
BACK FILL WITH A WELL GRADED
MIX OF CLASS A AND B STONE-7
SECTIONA - A'
ROCK STEP-POOL CHANNEL 1 OUTFALL PROTECTION
of
BACK
TO
TO
PLAN VIEW
NUMBER OF
!RS MAY VARY
'EP INVERT ELEVATION
X OF CLASS A, CLASS B,
ID CLASS 2 STONE
ELL GRADED MIX OF
ASS A AND CLASS B STONE
IX TOP OF BANKWIDTH
ROCK CROSS VANE
r
C
u
0
r
u
i
0
t
1
C
FLOW
1
113 BOTTOM WIDTH
4t C
7
Y
C
SELL
-" I
VANE
ARM
SCOUR POOL
NOGAPS
-VANEANGLE BETWEEN
20* TO 30* BOULDERS
C.
PLAN VIEW
H = STEP
Y
SILL
A STEP INVERT ELEVATION
HEADER BOULDER
FLT
FOOTER BOULDER
-WELL GRADED MIX OF
CLASS A AND CLASS B STONE
POOL /
(_-) A'
NON-WOVEN
FILTER FABRIC
POOL TO POOL SPACING
VARIES. SEE NOTE All FOR
SPACING REQUIREMENTS.
PROFILE VIEW A-A'
=
O VARIES I6-0"TO 20'-0" 2
U
w
m w
m
0 0
EXISTING
GROUND
TE
1. BOULDERS MUST BE AT LEAST2'X2'X TAND NOT EXCEED 4'X TX 2'.
2. FOOTERS SHALL BE INSTALLED SUCH THAT 114 TO 113 OF THE LENGTH
IS DOWNSTREAM OF THE HEADER.
3. SOIL SHALL BE WELL COMPACTED AROUND BURIED PORTION OF FOOTERS
WITH BUCKET OF TRACK HOE.
4. INSTALL TYPE 2 NON-WOVEN FILTER FABRIC UNDERNEATH FOOTER BOULDERS.
5. UNDERCUT POOL BED ELEVATION 12 INCHES TO ALLOW FOR LAYER OF STONE.
B. INSTALL EROSION CONTROL MATTING ALONG COMPLETED BANKS SUCH THAT
THE EROSION CONTROL MATTING AT THE TOE OF THE BANK EXTENDS DOWN
TO THE UNDERCUT ELEVATION.
7. INSTALL WELL GRADED MIX OF CLASS A, CLASS B, AND CLASS 2 STONE
ALONG SIDE SLOPES TO A DEPTH OF 12 INCHES.
8. FINAL CHANNEL BED SHAPE SHOULD BE ROUNDED, COMPACTED, AND
CONCAVE, WITH THE ELEVATION OF THE BED APPROXIMATELY 0.5 FT
DEEPER IN THE CENTER THAN AT THE EDGES.
B. STEP HEIGHT (H) SHALL NOT EXCEED 0,8 FT.
10. MINIMUM POOL DEPTH (D) SHALL BE NO LESS THAN 1.4 FT.
11. IN GENERAL, POOL TO POOL SPACING SHALL BE NO LESS THAN B FT AND
NO GREATER THAN 37 FT BASED ON EXISTING CONDITIONS SUCH AS SLOPE
AND SUITABLE FILL MATERIAL
WELL GRADED MIX OF /
CUSS A, CLASS B AND J COIR FIBER MATTING
CLASS2STONE D=POOL DEPTH
WELL GRADED MIX OF
CUSS AAND CUSS B STONE
POOL CROSS SECTION B-B'
BACKFILL WITH WELL GRADED MIX OF
CUSS AAND CLASS B STONE
CUSS B STONE
CLASSASTONE -a
FILTER FABRIC 1
10' MINIMUM
SECTION A - A'
112 BANKFULL?
FLOW
STREAM BE?''
ELEVATION
CLASS B STONHEADER ROCK
BACKFILL WITH WELL GRADED MIX OF
CUSS A AND CUSS B STONE
CLASSA STON/-/
4%T07%SLII-
PROFILE VIEW C - C'
1. BOULDERS MUST BE AT LEAST4' x 3'x 2'.
2. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER
ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND
THEN UPSTREAM TO A MINIMUM OF SIX FEET.
FOOTER ROCK 3. DIGATRENCH BELOW THE BED FOR FOOTER ROCKS AND PUCE FILL ON UPSTREAM
SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMBANK.
FILTER FABRIC 4. CONSTRUCT FOLLOWING ANGLE AND SLOPE SPECIFICATIONS.
5. USE CLASS B STONE TO FILL GAPS ON UPSTREAM SIDE OF BOULDERS, AND CLASSA
STONE TO FILL GAPS ON UPSTREAM SIDE OF CUSS B STONE.
8. AFTER ALL STONE HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE
PROFILE VIEW B - B' WITH A WELL GRADED MIX OF CLASS A AND CLASS B STONE TO THE ELEVATION OF
VANE ARM ONE HALF THE HEADER ROCK
PC
M
PROJECT ENGINEER
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
Ml,h-I9FkceEnplnearlnAI-
¦ 88601p.nv Pa-i
Suite 2m
¦ C-NORI ROLINA21518
PM1ene: 819.463.5488
Fm: 818,433.5488
= VARIES 1U-V'TO 20'-0" 2
i i
m m
0 0
U 'L 7'.p Y U
NONWOVEN
FILTER FABRIC
POOL CROSS SECTION C-C'
CROSS VANE INVERTIGRADE POINT
BAKER PROJECT REFERENCE N0. SHEET NO.
LIVE STAKING BRUSH MATTRESS !
PROJECT ENGINEER
A
4 I~ PRELIMINARY PLANS
WS STAKES 3 FT SPACING 4 DO NOT USE FOR CONSTRUCTION
m
BIODEGRADABLE TWINE
TOP OF STREAMBANK SECURED TO STAKES
m
Michael Baker Engineering Inc.
m
TOE OF BANK
. 9?
?CeT,eROR-C ROLINnn8+8
FM1ane:S1S463.51e8
BOTTOM OF CHANNEL NOTES 90 BR ANCHES MIN PER 3.3 FT
BRANCHES OF3141NCHT011NCH TYPICAL STAKE
L STAIOESSHOULDBECUTANDINSTALLEDONTHESAMEDAY. DIAMETER SHOULD EQUAL THE
2. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT.
3. STAKES MUST BE INSTALLED NTH BUDS POINTING UPWARDS.
OF THE OTERIAL AN UP D
EAD
LENGTH THE
BANK
TO 20%
OF THE MATERIAL CAN BE DEAD
TE
4. STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANK
5. STAKES SHOULD BE 12 TO 2 INCHES IN DIAMETER AND I8"TO 30"LONG. '0' MATERIAL TO ADD BULK 1. BOARD FOR STAKE SHOULD BE2"x4"xi8".
6. STAKES SHOULD BE INSTALLED LEAVING 115 OF STAKE ABOVE GROUND. '- 2. SAW 2 x 4 TIMBER DIAGONALLY TO PRODUCE
CROSS-SECTI ON VIEW OF LIVE STAKING SPEC IFICATION 2 DEAD STOUT STAKES.
FLOW
OPTIONAL COVER LOG
(DEAD LIMB OR TRUNK
OF TREE, 4 INCHES IN
PLAN VIEW DIAMETER OR GREATER)
STAKE CTYP.)
ON-SITE ALLUVIUM
BRUSH LAYER
2'. y? TOP OF STREAMBANK SQUARE CUT TOP COVER LOG
BUDS FACING UPWARD v?/???
. LIVE CUTTING
MIN. 12" DIA.
18"- 30" LENGTH
APPROX. 6" OF STONE TOE
ABOVE BASEFLOW
m 1 1 1 1. 1 1 1' 1' ? QN
ELEVATION
1 I 1 1 f PLANT STAKES F ROM
TOP OF BANK TO TOE OF BANK
NATURAL ? ?\ \? ?\y\ \ \? ?\?
1.. 1
1 1 1
I / 1 f
1 1
1 i
1.. 1 STREAMBEO I/ I 6X
J \ \
TOE OF SLOPE ANGLE CUT 30-45 DEGREES APPROX. 1' OF STONE TOE BELO W BASEFLOW
ADD MIX OF CLASS AAND
CLASS I STONE AT TOE OF BANK
LIVE STAKE DETAIL NOTES:
PLAN VI EW OF LIVE STAKING SPECIFICATION CROSS SECTION 1. EXCAVATE BANK TOA2:1SLOPE.
2. CREATE 12" DEEP TRENCH.
3. STAKE AND TIE BRUSH LAYER INTO TRENCH.
4. BACK FILL 3" OF ON-SITE ALLUVIUM OVER BRUSH LAYER.
5. REFER TO SPECIFICATIONS FOR PLANT SPECIES.
TRANSPLANTED VEGETATION
TRANSPLANTED VEGETATION AND ROOTMASS
N
TRANSPLANTED VEGETATION AND ROOTMASS
TOP OFSTRE AMBA
K
\
\
// ® TOP OF BANK Y
I
\ I
TOE OF BANK
? , - - - - TOE OF BANK \ .- ? ? - - - _ - BOTTOM OF CHANNEL
PLAN VIEW
CROSS SECTION VIEW
NOTES:
1. EXCAVATE A HOLE IN THE BANK TO BE STABILIZED THAT WILL
ACCOMMODATE THE SIZE OF TRANSPLANT TO BE PLACED.
BEGIN EXCAVATION AT THE TOE OF THE BANK
2. EXCAVATE TRANSPLANT USING A FRONT END LOADER.
EXCAVATE THE ENTIRE ROOT MASS AND AS MUCH ADDITIONAL
SOIL MATERIAL AS POSSIBLE, IF ENTIRE ROOT MASS CANNOT BE
EXCAVATED IN ONE BUCKET LOAD, THE TRANSPLANT IS TOO LARGE
AND ANOTHER SHOULD BE SELECTED.
3. PLACE TRANSPLANT IN THE BANK TO BE STABILIZED SO THAT
VEGETATION IS ORIENTATED VERTICALLY.
4. FILL IN ANY HOLES AROUND THE TRANSPLANT AND COMPACT,
5. ANY LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED.
6. PLACE MULTIPLE TRANSPLANTS CLOSE TOGETHER SUCH THAT
THEYTOUCH.
rC
M
?
7
C
a
d
C
m
m
i
nM
n?
CONTAINERIZED PLANTING SPECIFICATIONS
PRUNE PROPORTIONATELY TO COMPENSATE
FOR REDUCTION OF ROOTS AND TO PROMOTE
NATURAL CHARACTER OF GROWTH
DO NOT REMOVE LEADER
THIN BRANCHES AND
FOLIAGE BY 113 RETAINING
NORMAL TREE SHAPE
WATER RETENTION RING
FINISHED GRADE -
TREE OR SHRUB SHALL BE
INSTALLED SO THAT 118
OF THE ROOT BALL WILL
BE ABOVE FINISHED GRADE
Z-? a
\ MULCH
J.
\ 1 Fr-TRI E OR SHRUB SHALL BE
TALLED SO THAT 118 OF
ROOT BALL WILL BE
OVE FINISHED GRADE
COMPACT BACKFILL
\ \ WATER RETENTION RING
\
VARIES FINISHED GRADE MULCH
TREE OR SHRUB PLANTING DETAIL
(SLOPING GROUND) COMPACT BACKFILL
TREE OR SHRUB PLANTING DETAIL
WATER RETENTION RING
FINISHED GRADE -
COMPACT BACKFILL SCARIFY BED TO A DEPTH OF 5"
SHRUB BED PLANTING DETAIL
SHRUB SHALL BE INSTALLED SO
THAT 1/8 OF THE ROOT BALL WILL
BE ABOVE GRADE
MULCH 4" MULCH PLANTS MAY BE PLANTED EITHER BEFORE
OR AFTER MULCHING OPERATION
rrr^ FINISHED GRADE
SCARIFY TO A MINIMUM DEPTH OF
5" OR 2" DEEPER THAN CONTAINER
GROUNDCOVER PLANTING DETAIL
TOP OF STREAMBANK
i
r
u
0
r
r
u
i
0
i
i
?r
nv
PLANTING NOTES SUMMARY:
1. THE PLANTING ACTIVITIES SHALL ADHERE TO THE CONSTRUCTION SPECIFICATIONS
AS DEFINED IN SECTIONWAND AS SHOWN ON THE PLAN DETAILS. SEE SHEET I-A
FOR VEGETATION SELECTION TO BE PLANTED WITHIN THE CONSERVATION EASEMENT
2. THE EXACT SPECIES PLACEMENT WILL BE DETERMINED PRIOR TO SITE PLANTING BY
A QUALIFIED VEGETATION SPECIALIST BASED ON SPACING RECOMMENDATIONS,
SITE CONDITIONS, AND APPARENT WETNESS OF PLANTING LOCATIONS. ANY CHANGES TO
THE PLANTING LOCATIONS, SPACING DENSITIES, OR VEGETATION SELECTION
MUST BE APPROVED BY THE ENGINEER BEFORE PLANTING BEGINS.
3. THE SUPPLEMENTAL PLANTING AREAS TOTAL APPROXIMATELY TWO (2) ACRES
BUT MAY VARY BASED ON AREAS DISTURBED DURING CONSTRUCTION.
ANY ENCROACHMENTS WITHIN THE PLANTING AREAS SUCH AS CULVERTS,
DRAINAGE OUTFALLS, UTILITY EASEMENTS, TRAILS, ETC. WILL BE IDENTIFIED PRIOR
TO PLANTING ACTIVITIES.
4. THE CONTRACTOR SHALL INSTALL ALL VEGETATION DURING THE APPROPRIATE SEASON
FOR EACH SPECIES TYPE. THE PLANTING SEASON FOR THE TREES, SHRUBS, AND LIVE STAKES
SHALL BE FROM DECEMBER TO FEBRUARY AS DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS.
NO PLANTING SHALL OCCUR IF THE SOIL IS FROZEN.
CONSTRUCTION SEQUENCE - ELLERBE CREEK
Michael Baker Engineering, Inc. will provide construction observation during the construction phase of this project
The following construction sequence shall be used during implementation of the plan.
1. Prior to beginning any land disturbing activities, notification and approval must be granted from the US Army Corp
of Engineers, NC Division of Water Quality, and NCDENR Division of Land Resources - Land Quality Section. Any
work performed shall be in accordance with the NC Erosion Control Planning and Design Manual.
2. The Contractor shall contact North Carolina "One Call" Center (1.800.632.4949) and Land Quality (919.791.4210)
before any excavation begins.
3. The Contractor shall mobilize equipment and materials to the site using the construction entrances off Albany St.
(upstream), Carolina Ave., and Guess Rd. (downstream) and install temporary construction entrances according to
the plans and specifications.
4. The Contractor shall install silt fence and safety fence before storing all equipment and materials in staging areas
as shown on the plans.
5. The Contractor shall utilize the haul roads and temporary stream crossings as shown on the plans.
6. Channel work within the active stream shall be conducted while stream flow is low. In general, the Contractor
shall work from upstream to downstream and in-stream structures shall be installed using a pump around or flow
diversion measure. Bank protection includes transplants, brush mattresses, geolifts, and/or seeding with matting.
Silt fence shall be placed between stockpiles and the existing channel as shown on the plans.
7. Immediately upon completion of bank grading, the slopes will be reseeded and matted with the specified erosion
control matting. The Contractor shall not disturb any area larger than they can completely stabilize in one day. All
disturbed stream banks must be stabilized by the end of each day.
8. Upon completion of the channel work and bank stabilization, all disturbed areas including staging areas and haul
roads, shall be seeded and covered with mulch. Permanent seeding mixtures shall be applied as shown on the
vegetation selection. Temporary seeding shall be applied in all areas susceptible to erosion (i.e. disturbed ditch
banks, steep slopes, and spoil areas) such that ground cover is established within 21 working days following
completion of any phase of grading. Permanent ground cover shall be established for all disturbed areas within 15
working days or 90 calendar days (whichever is shorter) following completion of construction.
9. The Contractor shall remove temporary stream crossings and erosion control measures. All waste material must
be removed from the project site.
10. The Contractor shall plant woody vegetation, live stakes, and apply permanent seeding at the appropriate time of
the year and as described in the planting details and specifications.
11. The Contractor shall ensure that the site is free of trash and leftover materials prior to demobilization of
equipment from the site.
BAKER PROJECT REFERENCE NO.
V
r -.
-`,. `
,,,.. --•.? , .- `- .. ,..?...
° ......__ " JI
J`
PROJECT ENGINB
, .
- --- - -- --- - ----
--
-- - ,r
--- ----
PRELIMINARY
y
•'" .__ e"" ? „r f ? i ? - W NOT USE FOR CON87
r
f
1
r _
1
J•
„< f
,. J
.. ?.
1• r MII
N.,
, ?-
.,.? ?. )f e j S.iW
Ph... 919
F.: 919
9
.
r
f i
t
,
1 f ?
_
%HILWIDALEL r I "'?
.-
?
GOLF COURSE ,
1 ,..
1
1 ?..
I
i
l
p
C
?
I
I
I
1
1
OC
C
1
DO NOT DISTURB
t+ ,: EXISTING SANITARY SEINER DO NOT DISTURB EXISTING
f' _____OVERHEAD UTILITY _® v®
REMOVE INVASIVE SPECIES
AND LIVE STAKE BANK 0
DO NOT DISTURB L E ?F CE c
DO NOT DISTURB E Q
1
+ EXISTING TREE EXISTING FENCE INSTALL GEOLIFTAND STAMI& 0
S REMOVE INVASIVE SPECIES
, SLOPE
MAT
AND LIVE STAKE BANK 12" RCP WI CIASSAAND WSTONE
O
BEGIN REACH ,
t
1 ' r~^°
~ -? RXISTING EDGE _..
BENCHING LIMITS ?"
O
STA. 10+00,00
2+00
+p} OF CHANNEL
1+00 FEXI STING BEDROCK
i N
11+00
14+00 5+00
16+00 l
? 19+00 Q
l i _.-
-- ?. _ - - - _- - I-
`°- REPAIR EROSION ALONG EIkTSTING W
-..,,., • DIRT PATH. FILL, COMPACT, AND
?
-? STABILIZ 1EWITHSEEDANDMATTING
?? INSTALL GEOLIFT cs
?"?.. _..•' (1tlx50) INSTALL SINGLE WING DEFLECTOR U)
°- REMOVE INVASIVE SPECIES, E AND BRUSH MATTRESS.
SLOPE, MAT, AND LIVE STAKE BANK USE EXISTING BOULDERS IN CREEK W
f? E WHEN AVAILABLE Z
1
E EXISTING
J
J INSTALLOR R CE EXISTING FIL FABRI E TOP OF BANK E CE
?
ADD CLASS I AND 2 STONE B SEEDAND MAT.
\
UNDER BRIDGE TO STABILIZE SIDE SLOPES DO NOT DISTURB • /
$
U
J 1
. EXISTING SANITARY SEWER !
\ j 1 c
• \ r r "??"f...
_-
?. ^h DO NOT DISTURB EXISTING ?.
' vl 'Jf OVERHEAD UTILITY .......
? ?'1 - - - a ®e a
n ... ane
'
C 1
L
i
i
1¦
J ., mq
C
C
U
I
I
I
I
C
PC
CJ-
i
i
I
c
c
F
c
F
u
u
u
u
z
2
L
Q
g
..........-
O
O
O
O
O
CV)
F -
w
w
w
z_
J
2
U
Q
1 ` r
6
J rf
J?
1 ` ?'` 1t
f l ( T'
8
i i
Jf `.
i
J ! 0
1
J
J/
t C
r t ,? DO NOT DISTURB
EXISTING SANITARY SEWER O
0
O +
O
0
r
r
r
0
Oc
sC
?C
O ..........
.®???
CE
CE CE CE
r C CE
O ?
SEEDANDMAT
SLOP Lop
C7 K
TABILIZE EXISTING OUTFACE BAN ALONG ISTING
S S
INSTALL STEP-POOL
?
IBU XRY DITCH
TTHOLASSAANDB STONE OUTLET PROTECTION
1
BENCHING LIMITS
- _BENCHINlGUMITS BENCHING LIMITS 35+0
- - - - -
-
31+0+0 ?2+00 33+06 =4=
36+0
-- -_ -_ - --- ---
--
- W
Z INSTALL 1LYz4U
INSTALL DOUBLE
EXISTING EDGE ?
J BRUSH MATTRESS WING DEFLECTOR
EXISTING TOP OF BANK OF CHANNEL
REMOVE SMALL TREES
S INSTALL GEOLIFT CE
U
G) R E
E
Q
5
cE
NOT DISTURB Q
PROPOSE OP OF BANK EXISTING TREE, STABILIZE EXISTING 8" PVC
I'
-(S"EE 9E'YAIL SHEET 2) WITH CLASS A AND B STONE (n
. `-..SLOPE, SEED AND MAT i
`-LEFT BANK AT 2:1
3-8+0U
37+00 - LLI
.. w
_n7NGHjNG? -
LiM TS-
RESHAPE THALWEG r ,
INSTALL DOTIBLE WING DEFLECTOR V
RE-USEEXISTING BOULDERS
E
J
BAKER PROJECT REFERENT
116333
PROJE(
+
z+ 1
i - PRELIMIN
W NOT USE 1
? \1 Y\
7 +
1
l
+
i 1 +
+
{
+ ? i l
1 1
+
0 f STABILIZE EXIST. 12" CPP WITH
{
? CLASS AB B STONE APRON INSTALL STEP-POOL OUTLET PROTECTION
+:i
{ 1f
\ {
'
Q ...,. AND REBUILD EASEMENT CROSSING WITH 1
CLASS AAND B STONE D"OT DISTURB EXISTING
+ SANITARY SEVYER
r
°°°. ' -....... _...„.....
INSTALL BRUSH MATTRESS 4
r
42+00 INSTALL 1940ESS
BRUSH MATTR
D, .. EKI TING TOP OF BANK
43 0 CE - --^ f"'
f
f0 _ E
L
W l - REMOVE DEBRIS AND TREE
IN CHANNEL
J "--
W 5CMNO
'
-. -
Z a
kISTING'EDGE.„
.I REMOVE
INVASIVE SPECIES
INSTALL ROCK OF CHANNEL
AN LIVESTA BANK
D
CROSS VANE
RESHAPETHALWEGAND.RJFFLE. `?
INSTALL DOUBLE CROSS-SECTION DI
MENSION
,,
E D REACH r
..?,
.--
......
WING DEFLECTOR
J .. .
INSTALL GEOLIFT AND
UR AREA °..' ~..? ~..?
BACKFILL S STA.44+8788 .-
gP
cE DO
N
T DIST
B 1
,
Q
UR
.% E EXISTINGTREES
-
T
0
0
C
U
I
0
c
o^
?r
I¦
- 4 r +r
i I t
1 ? k ? ...
\4 t t
Im
?. w
,l
1
r
1 ? +
l
`i
? l l
w
STD. NO. DESCRIMON SYMBOL
6.06 TEMPORARY GRAVEL CONSTRUCTION ACCESS-----------
6.62 SILT FENCE ------------------------------------x--HF
6.63 TEMPORARY ROCK DAM -----------------------------
6.70 TEMPORARY STREAM CROSSING ---------------------- j= ;
ELLERBE CREEK WATERSHED ASSOCIATION
WAW wu loDlrcl' YEOMIQILE Na - 'IOfn
Na men
NC 116333 EC-1 8
w
M
ti
W
L
EROSION CONTROL PLAN
LOCATION. DURHAM, NORTH CAROLINA
APPROX. M MILE SOUTH OF 1-85 AND GUESS ROAD
INTERSECTION - WITHIN CITY OF DURHAM
TYPE OF WORK STREAM ENHANCEMENT AND STABILIZATION
i
GRAPHIC SCALES PROJECT STANDARDS PREPARED LN THE OFFICE OF.
Mi,homl Betel Enpineerino Im PROJECT ENGINEER
•W e.g.nq P-
THE FOLLOWING STANDARDS AS THEY APPEAR IN THE "NC EROSION CONTROL • Summo
-INn21
1e
Ne?
a
PLANNING AND DESIGN MANUAL" AND ARE APPLICABLE TO THIS PROJECT AND a
6
.n.
°
"
°
THIS PROJECT CONTAINS BY REFERENCE IIERREBY ARE CONSIDERED PART OF TIM PLANS. Pa
:
p,psgy app
EROSION CONTROL PLANS
FOR ALL PHASES OF 6.06 TEMPORARY GRAVEL CONSTRUCTION ACCESS
40 20 0 40 80
CONSTRUCTION.
KEVIN TWEEDY
PE PRELIMINARY PLANS
6.62 SILT FENCE ,
PROJECT ENGINEER 00 NOT USE FOR CDNB'fRUGT10N
PLANS
6.63 TEMPORARY ROCK DAM
TOTAL DISTURBED AREA = 10.5 Acres LEZTMG DATE-
KAYNE VAN STELL
6.70 TEMPORARY STREAM CROSSING PRDJEGT MANAGER
PR.
SJGN97IIRR
BAKER PROJECT REFERENCE N0. SHEET NO.
1
PROJECT ENGINEER
TEMPORARY SILT FENCE ORANGE SAFETY FENCE
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
NOTES:
1. PROVI DE USTEEL POST OF THE SELF-FASTENER
8' MAX. WITH V41RE ANGLE STEEL TYPE.
(8' MAX. WITHOUT WIRE, 2. PROVIDE CAPS ON TOP OF STEEL POSTS.
REQUIRES USE OF EXTRA
WIRE OR PLASTIC ZIP TIES NTH STRENGTH FILTER FABRIC) T-POSTS SHALL BE 1.33 LBILF STEEL WITH A MINIMUM
AMINIMUM TENSILE STRENGTH LENGTH OF5 FEET AND SHALL BE CONSTRUCTED SO
OF 50 LE, SHALL BE USED TO (,V MAX. WITHOUT WIRE, AS TO ALLOW FOR FASTENING OF THE FABRIC
Ml,h-I &kar Enplnearlnp Inc.
.. 04 1p'"? ""R"a+'
CONSTRUCT THE FENCE NORMALSTRENGTH . Czoo
°xnns+e
•
FILTER FABRIC) pnan.Netiaasraq
Fm:919,4E3.54M
MESH CONSISTING OF
14 GAGE WIRE AT MAX
STEEL POST CAP
SPACING OF 8"x8"
" ---? STEEL POST
WIRE MESH FI
FABRIC STANDARD OR EXTRA L_ L_ L_ L_ L L L L L_ L_ L_ L_ L L L L L_ L_ L_ L_ L L L L L_ L_ L_
FILTER FABRIC STRENGTH SYNTHETIC FIBER CERTIFIED BY THE L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L L
L
L
L
L
L
L
L
L
L
MANUFACTURER TO COMPLY WITH MATERIAL _
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
REQUIREMENTS IN ASTM STANDARDS D 8481, 4832, 4491, L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
4751, AND 4355. _
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
L L L L L L L L L L L L L L L L L L L L L L L L L L
L S
1
MECHANICALLY COMPACTED FILL _
_ i,
2 PASSES OF DEVI
L
ST
'
CE L L L L L L L L L L L L L L L L L L L L L L L L L L
L
EXERTING AT
EA
ON
BD _
_
ORANGE, W RESISTANT,
BOTH BIDER OF FENCE FENCE HEIGHT L L
L
L
L L L L L
L
L
L
L L L L L
L
L
L
L L L L L
L
L HIGH-TENSILE STRENGTH.
MAX 24'
ABOVE E GROUND _
_
_
_
_
_
_
_
_
_
_
_
_
L
L
L
L L L L L
L
L
L
L L L L L
L
L
L
L L L L L
L
L
L POLY BARRIDADE FABRIC (TYPICAL)
RUNOFF _
_
_
_
_
_
_
_
_
_
_
_
_
_
_
?
DIRECTION NOTES: GRADE-
- - - - - - - - - - - - - - - -
- -
1.) AVOID JOINTS, UNAVOIDABLE JOINTS MUST HAVE 4 FEET OF CLOTH
OVERLAP AND SHOULD TIE INTO THE NEXT ADJACENT POST. E T =III III ?1 1=1 I II? I I I-I I I -I I I-I I? ,111 ,111 iiiiii
" = -
II-'
I
_
III B III
III
I? 2.) PLACE ON CONTOUR EXCEPT ENDS WHICH SHOULD BE VABOVE
GRADE TO PREVENT CUT AROUND. III III I
-
--
- 3.) WRAP APPROX. B"OF FABRIC AROUND ENO POSTS AND SECURE
POST DEPTH
2A" MINIMUM
4" WITH TIES.
4.) REMOVE ONCE AREA IS STABLE. _
_
- IIII
STEEL POST -Z DEPTH
I
FILTER FABRIC
IIII IIII
IIII III
_ I CI I I_ -III (-
IIII IIII
IIII-IIIIII
1=1 I I-I I I
TREE PROTECTION FENCE
8' STEEL T POST
(FACTORY PAINTED)
ORANGE, UV RESISTANT,
HIGH-TENSILE STRENGTH
POLY BARRICADE FABRIC (TYPICAL) _
?? ?
EXISTING PLANT
LIMIT OF CANOPY, DRIPLINE _.J--
PNLT CANOPY,
DRIPLINE
PLANT CANOPY,
DRIPLINE
? v
TREE PROTECTION AREA
PLAN VIEW OF PROTECTIVE FENCING ' 18 VARIABLE AS DIRECTED
DO NOT ENTER BY THE ENGINEER
AROUND SINGLE TREE- EXPAND AS NECESSARY -
'a J
J
WARNING SIGN DETAIL L L L L L L L L L -L L L L MIN. 12-1/! GA
4"K4"WOOD POSTS
MIN
10
GA WIRES 12" 1P"
2" X 4" WOOD RAILS .
WIRE
.
LINE L L L L L PRO7Bt7?7 AREA L L L TIES PRmfnmt AUA MIN.
EXISTING PLANT Lj_
L L L L L sxt9 L ORANGE, UV RESISTANT, ro wT RNM 12„
LIMIT OF CANOPY, DRIPLINE NOTES:
1. ALL PLANTS TO BE SAVED SHALL BE PROTECTED BY FENCING GRADE
L L L L L L HIGH-TENSILE STRENGTH.
L L L L POLY BARRIDADE FABRIC (TYPICAL) 12"
12 2"X4"HORIZ.
AS SHOWN IN THIS DETAIL, WOOD RAILS
2. CONTRACTOR SHALL INSTALL FENCING PRIOR TO BEGINNING WARNING SIGN
ANY CONSTRUCTION OR GRADING ACTIVITY,
3. CONTRACTOR SHALL CALL FOR INSPECTION AND APPROVAL X-O"
OF PROTECTIVE FENCING PRIOR TO BEGINNING ANY CONSTRUCTION 6'4Y,
OR GRADING.
O
C
4. PROTECTIVE FENCING SHALL BE LOCATED AT OR OUTSIDE DRIPLINE
' .
.
MIN
OF TREES AND 1
MINIMUM OUTSIDE SHRUBS OR OTHER PLANTS.
PERFORATED PLASTIC FENCE DETAIL WOOD FEN CE DETAIL
PLAN VIEW OF PROTECTIVE FENCING
AROUND SINGLE TREE- EXPAND AS NECESSARY
rt
M
7
c
a
d
c
m
m
i
n?
BAKER PROJECT REFERENCE N0. SHEET NO.
TEMPORARY CULVERTED STREAM CROSSING 1
TEMPORARY ROCK DAM
PROJECT ENGINEER
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
NOTES:
FLOW 1. ENSURE ADEQUATE COMPACTED FILL TO PROTECT AGAINST CULVERT COLLAPSE.
zz zz 2. MAINTAIN SIDE SLOPES & EDGES TO MINIMIZE EROSION TO THE RECEIVING WATER.
i
3. INSTALL SILT FENCE ALONG EDGES OF CLASS AB STONE TO CONTROL SEDIMENT RUNOFF.
Michael Baker Engineering Inc.
y CONSTRUCTION AREA UPSTREAM r°
2f S.iW 00 Peiky
nns+e
Do,,,en. 919.463.5488
RO
P
1 COVER FILL MATERIAL ?:A1A,4m.1AN
\ NTH 6 INCHES CLASSAIB STONE
/ STILLING BASIN
2 FT
MAX DEPTH #57 STONE PLOWS
1
1? ?1
\ (
.
) J
12BANKFULL
MAX MUM DEPTH
FILTER FABRIC
#57 STONE FILTER FABRIC
L
10' 10,
_?_
CLASS 8 STONE
EXISTING CHANNEL
CROSS SECTION b° 41°
7
PLAN VIEW FILTER FA
BRIC 36 EXISTING
FOR OR DRAINAGE GROUND
CLASS AB STONE
DRAINAGE DITCH
OUTFALL CMP
(CORRUGATED METAL PIPE)
NOTES',
1. CLEAN OUT STILLING BASIN OF TRAPPED SEDIMENT PRIOR TO REMOVAL.
CROSS SECTION VIEW
2. DO NOT USE ROCK DAMS INACTIVE STREAM CHANNELS.
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE EROSION CONTROL MATTING 1.5 INCH
ROOFING
NAIL
PLACE COIR FIBER MATTING IN 6INCH DEEP
TRENCH, STAKE, BACKFILL, AND COMPACT
TOP OF STREAMBANK
TOE OF SLOPE
LARGE STAKES BOTTOM OF CHANNEL
TYPICAL LARGE MATTING STAKE
PUBLIC ROAD PLACE: COIR.FIBER MATTING AT TOE OF SLOPE..
- -
- - - - - - - - - - -
- - - - - - - - SECURE MATTING VMYH LARGE MATTING STAKE
CROSS SECTION VIEW LEG LENGTH 17.00IN43.i6 CM TAPERED TO POINT)
WIDTH 1.00IN 2.54 CM
PUBLIC ROAD THICKNESS 1.00IN 2.54 CM
8" MINIMUM THICKNESS OF NOTES
R-00 WASHED CLASS A STONE
? 1. BANKS SHOULD BE SEEDED PRIOR TO
0 R=40 OF MATTING.
2. USE C-7 MATTING.
0 0 0 0 3. LARGE STAKES SHOULD NOT BE SPACED
FURTHER THAN 16" APART.
0 Z 4. PLACE LARGE STAKES ALONG ALL SEAMS,
FILTER FABRIC
N IN THE CENTER OF BANK AND TOE OF SLOPE.
0 NOTES, TRENCH TRENCH
12'MIN SPECIFICATION NO.6.06- CONSTRUCTION ACCESS"N.C. EROSION AND SEDIMENT 1 1 1 1 1 1 1 1 1 1 / 1 TOP OF STREAMBANK
0 CONTROL PLANNING AND DESIGN MANUAL DECEMBER 1993" TOP OF
STREAMBANK 1 1 1 1 1 1 1 1 1 1 / 1
__________________________ _ STAKES
1 1 1 1 1 1 1 1 1 1 / 1
LARGE 1 1 1 1 1 1 1 1 1 1 1
STAKES
/ 1 1 1 1 1 1 1 1 1 / 1 TYPICAL SMALL MATTING STAKE
1 1 1 1 1 1 1 1 1 1 / 1 COIR FIBER MATTING
1 1 1 1 1 1 1 1 1 1 / 1 TO BE EXTENDED TO
TOE OF SLOPE
LEG LENGTH 11,00IN 7.94C
HEAD WIDTH 1251N 3.16 CM
PLAN VIEW LARGE HEADTHICKNESS 0.40IN1.02CM
STAKES LEGWIDTH 0.60 IN 1.52C APERED TO POIN
LEGTHICKNESS 0.40 IN 1.02 CM
TOTAL LENGTH 12001N 30.48 C
C
ri
ei
Li
w
?i
CI
ID
i
C
C
a
C
C
m
m
nM
r.?
BAKER PROJECT REFERENCE N0. SHEET NO.
1
TEMPORARY STREAM CROSSING - WOOD MAT PROJECT ENGINEER
TYPICAL PUMP AROUND OPERATION
PRELIMINARY PLANS
WOOD MAT DO NOT USE FOR CONSTRUCTION
CLASS B STONE
STABILIZED INLET
?Y' NkhFel &ksr EnplnearlnALnc.
PUMP-AROUND PUMP CHANNELBOTTOM , ¦ S.iW 2N
6aite
(SEE PROJECT SPECIAL PROVISIONS(
; ; . ; , ; O
¦ cxn. No6ix3.5Q8 nns+e
Finaa: et6e6
IMPERVIOUS DIKE . .
.FILTER-FABRIC.
Fa:819,W.64AJ
CROSS SECTION
SILT FEN CE
CLASS B STONE RAMP
1
TEMPORARY FLEXIBLE HOSE
T
Q NOTES: WOOD MAT
= 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW
F 2, HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE WORK BEGINS. STREAM CHANNEL
p 3. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM,
3 4, LINE STREAMBANKAND ACCESS RAMP AREA NTH NON-WOVEN FILTER FABRIC. PLAN VIEW
NOTES: 5, INSTALL STREAM CROSSING AT RIGHT ANGLE TO THE FLOW.
8. TRANSPLANT SOD FROM ORIGINAL STREAMBANK ONTO SIDE SLOPES FOR LATER USE.
1. EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS 7. MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOT ENTER EXISTING CHANNEL
OF CHANNEL.
EXISTING CHANNEL 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS
BY INSTALLING SILT FENCE ON ALL FOUR CORNERS ADJACENT TO THE STREAM. SEE SILT FENCE DETAIL.
FROM STREAM FLOW. B. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE EDGE OF THE MUD MAT.
3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN p. THE WOOD MAT SHALL BE OF SUFFICIENT SIZE AND MDTH TO SUPPORT THE LARGEST VEHICLE CROSSING THE CHANNEL.
BE STABILIZED IN ONE WORKING DAY. 10. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TO EQUIPMENT UTILIZED, RECOMMENDED AT A 5',1 SLOPE.
TEMPORARY 4. THE PUMP-AROUND PUMP SHOULD ADEQUATELY CONVEY 1 CFS
EXIBLE HOSE (450 GALLONS PER MINUTE),
IMPERVIOUS DIKE
(SEE PROJECT SPECIAL PROVISIONS)
DEWATERING PUMP
SPECIAL STILLING BASIN
STABILIZED OUTLET - (SEE PROJECT SPECIAL PROVISIONS)
CONSTRUCT WITH A MIX OF
BOULDERS AND CLASS B STONE
TO STABILIZE STREAM AT
PUMP AROUND OUTLET
SPECIAL STILLING BASIN
INSTALL2INCH PAD OF
#57 STONE BETWEEN
SPECIAL STILLING BASIN
EXISTING GROUND AND FILTER FABRIC
FILTER FABRIC
15-20 FT
SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND
1. INSTALL STABILIZED OUTLETAT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA.
2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY FLEXIBLE HOSE THAT
WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE TO THE SPECIAL STILLING BASIN OR
STABILIZED OUTLET.
3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION.
4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS IF NEEDED TO DEWATER THE
ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER
THEWORKARFA. THIS WATER WILL FLOW INTO A SPECIAL STILLING BASIN.
5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLAN AND
FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE.
6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE
IMPERVIOUS DIKE REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE STARTING
NTH THE DOWNSTREAM DIKE FIRST.
7. THE CONTRACTOR WILL COMPLETE ALL GRADING AND STABILIZATION IN ONE DAY WITHIN THE PUMP
AROUND AREA BETWEEN THE IMPERVIOUS DIKES.
8. ONCE THE WORKING AREA IS COMPLETED, REMOVE THE SPECIAL STILLING BASIN AND STABILIZED
OUTLET AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH.
m
v
v
m
x
a
v
w
M
M
r?
i
c
a
a
c
m
m
0
aM
4.
nM
r.?
1
r
Y
f
I`
I`
I?
DO NOT DISTURB
EXISTING SANITARY SEWER DO NOT DISTURB EXISTING CD
OVERHEAD UTILITY O
O
t
HAUL ROAD
D
DO NOT DISTURB
- -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -- - -
DO NOT DISTURB 04
CESS
ADD CLASS B STONE-AT STREAM Ar
- - -- - -- - -- - -- -
EXISTING TREES? - -- - -- - -- - - - --
IMITS OF DISTURBANCE
OS'ON
-
EXISTING FENCE
P TO PRIEVENT CHANNEL EROSION.
RAM
RAMP SLOPE NOT TO EXCEED 3:1.. Fz
P To P'
'-MP SLO
n
7
u
e
u
C
C
c
a
?
i
i
oc
o,.
-- - -- - -- - -- - - - - - - - - - -
1.
HAUL ROAD
HAUTROAD
it
_ T
L MITS OF DISTURBANCE
xr
r'
DO NOT DISTURB
EXISTING SANITARY SEWER
TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE
\ -?
. ....... ............ ...... STAGING AREA --DO NOT DISTURB EX[STING
OVERHEAD UTILITY
i
i
i
i
i
i
t 1
t
t f,.
1 tl
J1
?- l
I NOTE:
CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT
EXISTING PAVEMENTS, WALKS, GREENWAYS, AND STREETS FROM DAMAGE.
D HAUL ROAD
HAUL ROAD FOR LIGHT
D VEHICULAR/ RUBBER TIRED
TRAFFIC ONLY
0
u
i
I
t SaO?
IIt 1 1 C
l
U
E
C
r
u
i
i
i
i
i
F
c
u
u
u
u
z
u
LL
z
U
Q
?. ?\.
?
1 l ?
r
1
JJ i n
? l `b
,,..,..
I I
HAUL ROAD ELLEA
NOTE HAUL ROAD FOR LIGHT EROSION
:
CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT ', ;
' .. VEHICUWi/RUBBERTIRED
EXISTING PAVEMENTS, WALKS, GREENWAYS, AND STREETS FROM DAMAGE. . ° TRAFFIC ONLY
d0 ??
0
0
0
0
0
ro
F
N
U
W
w
w
w
z
J
2
U
Q
BAKER PROJECT REF!
Pill
r
r ,
;
' ?
PRELIM
j
1 4 ., r' If r `
,1 00 NOT 1
A-
a
/ ?
f J rr i '
' o
DO NOT DISTURB
FXISTING SANITARY SEWER .'x O
L''A
T
T
??
O V
'
.._.._.._.._.._.._.._ LIMITS OF DISTLRBANU.. _.._.._.._.. _.._.._.,_.._ .._.._.._.._ .._.._.._.._.._.._.. .._.._
++ _ ?..-•, \
U
gAN?E•i
? ??OS
?
HAUL ROAD ?.. _.._ L1M?T?
N
M TEMPORARY STREAM
"
++
+1
Q CROSSING w/ %
CMP TEMPORARY
?
, 39+00
ROCK DAM
+, 38+00 U
- -
N BENCHING LIMITS
- _ BENCHINGLIMITS BENCHINGLIMITS 35+00 '+37+00 , -- -, W
1 3j+0+U 32+00 y
33ih04 , ?r =4.0? 36+00
,
V
- -
- . 111
/ - - - _ _
W _- _._.-._._ - -
-.- _ - - / ---
- + U)
i
H'HHH'
\
` _
N G? iHi.-I-r+iF-uZ
L
~
w HAULROAD I I
I +
`
+
+ J
MM ^?r l '?i
HAUL OAD
HI HIHI
l
cl) .._.._.._.._..-,._.._. . a.._.._. - - ._,. _.,.-.._,._..- •,- • STAGING AREA I
f ,
+ ?nH
?,.+iHIHI
HI I
I 1 `
+
+ \
Hir+
5 STAGINGAREA
w
Z . ?? ? ?itiL
I +?
` ? BTOCKPILE?ARFL `"''? Q
-- _
LIMITS OF DISTURBANCE %
-
-
STURBANCE
?
LIMITS OF DI
-
Q TREE PROTECTION (TYP.) ADD CLASS B STONE,AT STREAM ACCESS
C
L TEMPORARY GRAVEL
RANCE
R RAMP TO PREVENT CHANNEL EROSION.
RAMP+SLOPE NOT TO EXCEED 3:1. ,
CONST
UCTION ENT
DONOTDISTURB EXIST.
D UTILIT
?.
OVERHEA
Y
- - --- ----------
......
- -- - ------- --- - ---
F
u
0
C
C
u
i
0
i
I
i
OIC,
oC
r'
---., f, ,• -,...?
x
o ' w r' , f
f '? r
1 `? ,?,} D HAUL ROAD EROS)
NOTE . HAUL ROAD FOR LIGHT
D VEHICULAR I RUBBER TIRED
CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT TRAFFIC ONLY 40
EXISTING PAVEMENTS, WALKS, GREENWAYS, AND STREETS FROM DAMAGE. I
BAKER PROJECT REFERENCI
';F Jj 1
PROJECT
14 ? i
1 {? ?
4
PRELIMIN)
W NOT USE P<
r l
;
,
{ 1
Jr
4 i
i i }
i
t ,
i Q
?
? t
C
1
,'
i 1 t ? ? 1 1 + f
t
t 1
? t. 1 ,
f
r ?
Q
? t
i ti
V t ?
?L? x.x
?
- - i i --,
O f
? - - •- ..?
1
DO'NOT DISTURB EXISTING n
'
SANITARY SEVYER ! 1
TEMPORARY
41+0( 4 +
?. 43+00
!
._
(? - -
--- -
---- --- -
I
v _......
T
J
W I IHIHIHiHIHiHiHI iHIH ?/
l
E
U
L
C
C
U
I
I
i
i
C
oc
?r
HiHIHi HIH+I IHi ,R
z HAUL ROAD
HAUL ROAD
-? E D REACH.
STA. 44+87.98 ::--
NI?I I t ? t
IF-YIF-iM-iIH,HIY?I
ILEARFA -- -- - --.._.._,._- LV w..
t
STCCKP •--.-- I
1
CQ DG.Npr DISTURB i ? t t t, t, A 1 l ? ?.
_NO TREES
C EXIST[
3..
w t
t
v
J
?V ` l t r
e?
..-.. ,i ` 4 V ,i
1 i
_..._ _ 'i
? i
i
/i) t
} t
t t
I r ?
4? Il ? t' t
ELLERBJ
?rwuLROAD
EROSION CC
HAUL ROAD FOR LIGHT
NOTE: D VEHICULAR I RUBBER TIRED
CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO PROTECT .?' TRAFFIC ONLY 40 ZO Q
EXISTING PAVEMENTS, WALKS, GREENWAYS, AND STREETS FROM DAMAGE. '