Loading...
HomeMy WebLinkAbout20051798 Ver 2_401 Application_201001210s-11a8 ua- CARY PARKS, RECREATION AND CULTURAL RESOURCES January 20, 2010 Mr. Ian McMillan DL?kOLBGY[9 NC DWQ, 401/Wetlands Unit JAN ? 1650 Mail Service Center 2Q1? Raleigh, NC 27699-1650 ?NM?ST ?&W Dear Mr. McMillan, The attached documents for the Black Creek Greenway Segment III Phase IV project are being submitted for Buffer Rule approval. Please let us know if you need any additional information. Regards, Paul Kuhn, RLA, ASLA Senior Parks Planner- Town of Cary 316 N. Academy Street, Cary, NC 27513 PO Box 8005, Cary, NC 27512-8005 919.469.4360, Fax 469.4344 TOWN Of CARY 316 North Academy Street -Cary, NC 27513-PO Box 8005-Cary, NC 27512-8005 te1919-469-4061 - fax 919-469-4344- www.townofcary.org 0F W A rf;,, Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes N No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes N No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Black Creek Greenway Segment III Phase IV 2b. County: Wake 2c. Nearest municipality / town: Cary 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: NA U 1J 3. Owner Information 3a. Name(s) on Recorded Deed: JAN Town of Cary 3b. Deed Book and Page No. 02983 0871 DENR•WAMRoMrry WETLANDS AM 3c. Responsible Party (for LLC if applicable): NA 3d. Street address: P.O. Box 8005 3e. City, state, zip: Cary, NC 27512-8005 3f. Telephone no.: 919-469-4360 3g. Fax no.: 919-469-4344 3h. Email address: NA Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: Sr. Parks Planner 4b. Name: Paul Kuhn 4c. Business name (if applicable): Town of Cary Parks, Recreation, & Cultural Resources 4d. Street address: P.O. Box 8005 4e. City, state, zip: Cary, NC 27512-8005 4f. Telephone no.: 919-469-4360 4g. Fax no.: 919-469-4344 4h. Email address: pual.kuhn@townofcary.org 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 075305197293 Latitude: 35.785625 1 b. Site coordinates (in decimal degrees): Longitude: - 78.821859 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 286.45 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Bond Lake proposed project: 2b. Water Quality Classification of nearest receiving water: C;NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project is located within an existing park. Proposed improvements are for the existing trail system. 3b. List the total estimated acreage of all existing wetlands on the property: 2 Acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 23,870 LF 3d. Explain the purpose of the proposed project: Design a kiosk hub where two major trails connect 3e. Describe the overall project in detail, including the type of equipment to be used: Heavy equipment wil be used to install improvements 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ? No ® Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ? No ®Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose of 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary required? T Greenway/ ? Yes 61 ®P ? T Hiking UT-1 to Crabtree Creek ® No 0 SF 256.2 SF Trails B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 0 SF 256.2 SF 6i. Comments: Existing Condition is mowed lawn D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Due to existing utilities we were unable to avoid a buffer impact at this location. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Silt fence and tree protection fence will be installed to project buffers. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this project? ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 6 of 10 PCN Form -Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. NA 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zo ne 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes No Comments: For this project, no new storm pipes were added in the riparian buffer 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 12.3% 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Plan in place to handle collection, detention, and routing of surface runoff, and to improve water quality & sediment retention ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Town of Cary ® Phase II ? NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ®Yes ? No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. NA Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No impacts? ® Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Field Office 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? USFWS Field Office 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? SHPO 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: Project creates no fill in the floodplain 8c. What source(s) did you use to make the floodplain determination? GIS Maps KLA(kK A Applicant/Agent's Printed Name Signature Applicant/Agent's Date (Agent's signature is valid only if an authorization letter from the applicant is provided. Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version January 7, 2010 Town of Cary PO BOx 8005 Cary, NC 27512 RE: Black Creek Greenway Segment 3 Phase IV Town of Cary Project Number. 09-SP-055 Wake County Real Estate ID Number(s): 0102447 Dear Sir or Madam: Planning Department j JA A/ 2G,?n ftnAZSAN WArr- QUA f i y Sr??K; W.1 TER Oft" I am pleased to advise that on January 4, 2010 the Development Review Committee approved the above referenced site plan subject to the following Special Conditions of Approval: Development authorized-by this rmi /approval may not take place until a new water and/or sewer connection permit is issued per Chapter 36 of the Cary Code of Ordinances This approval does not guarantee issuance of a utility connection permit by the Town Special Conditions of Approval: The following comments must be addressed in the master set (reproducible set) submitted for approval. If outstanding comments are not addressed, the master set will be returned without the required staff signatures: [Ver. 2] [Edited By David Spencer) Modify the minimumsign height for W11-2 to seven feet. [Ver. 2] [Edited By Kevin Hales] Created with idtPlans Review Pale 1 of 6 Please show the locations of the W11-2NV16-7P signs on the layout plan and denote the sign types. Modify the detail sheet to remove reference to W16-9P and replace with W16-7P. Based on our previous conversations and e-mails, please revise the note regarding the maintenance of Streetprint to be more specific about the fact that Public Works will be responsible for maintenance. [Ver. 21 [Edited By Laura Cove] We cannot approve a site plan with alternates. Please select one plan and proceed accordingly. If the plan changes at a later date after approval, it can be modified through an official process. Also ttie concrete Header overtop the sewer line. We don't allow structures of any kind within the sewer easement. Here there is no sewer easement b/c its TOC property. In most cases easements are 10' on either side of the sewer line. Greenway trails are allowed in the easements b/c they are maintained and easily repaired. The detail has been revised so that there is only asphalt over the sewerline. The kiosk has been offset so it is outside of the "20" easement. The double-barrel headwall is right on top of the sewer line. No structures are allowed on top of existing or proposed sewer lines. [Ver. 2] [Edited By Kevin Hales] [Ver. 21 [Edited By Kevin Hales] Utility lines added (Sewer & Water) . Created Mth idtPlans Review Page 2 of 6 I'd recommend moving the Kiosk so that is not right over the sewer line. If this sewer line needs to be repaired then the Kiosk will be torn up. In lieu of indicating "alternatives" in the plan set, propose the fully-funded option as the project scope. Since no new utilities are necessary, you can handle reduced budget allocations as construction "sequencing" concerns rather than proposing several alternate scenarios. If you are not funded to construct "alternative 2" then simply construct "alternative 1" only or no additional parking. Then, if funding becomes available within the 5 years that the plan is valid, you can construct "alternative 2" without a new site plan. Show the existing utility lines in the area of work and the areas that would traditionally be required easements (10 feet either side of the line) on the landscape plan. Remove any vegetation proposed within the "easements". The utility lines were added as requested, but the area typically required for a utility easement still has plants shown within it. There should be no plant material within 10 feet of any water or sewer line (services are not considered utility lines for this purpose). [Ver. 2] [Edited By Kevin Hales] BEFORE ANY WORK CAN BEGIN ON THIS PROJECT, with exception of early grading permits (Policy 66), the following items must be submitted to the Planning Department: Please submit a master set (reproducible set) of the approved plans for signature in addition to a digital copy of the master set (be sure to include a copy of this letter of notification with the submittal of the master set). The plans must include all information shown on the original drawings, as approved by the Development Review Committee, as well as any remaining requirements or conditions of the approval addressed in this letter. Alterations to the plans, beyond the scope of those indicated above, must be approved by the Town of Cary Staff prior to incorporation into the master set. Each plan sheet within the master set will be initialed by staff as approved and then be returned to you. All new and existing streets shown on this plan, whether public or private, must be labeled with approved names. SUBMITTAL OF CONSTRUCTION PLAN PACKAGE After you receive the signed master plan set, you will receive a checklist outlining the number of plans to be returned in order to complete the review process. All items indicated on the checklist must be returned to the Town of Cary Planning Department prior to the issuance of any building permit and prior to beginning construction. • Notify the Town of Cary Engineering Department at (919) 469-4039 that construction is about to commence. Please note that all documents delivered to, or to be picked up from, Town Hall should go through the Inspections & Permits Department, located on the first floor of Town Hall. PLEASE NOTE THE FOLLOWING SPECIAL ITEMS: Plan approval becomes null and void if no substantial progress is begun within two years of the approval date (see definition under Substantial Progress in Chapter 12 of the LDO and refer to LDO Section 3.9.2 (K) Effect and Duration of the Plan Approval). In no case shall the plan approval be considered valid for more than five years from the original approval date. Signage is a separate approval process and has not been reviewed nor approved as a part of this development plan Please be advised any person conducting business in the Town of Cary, either by maintaining a business location within the Town limits; personally or through agents, soliciting business within the Town or picking up and /or delivering goods and services within the Town, is responsible for obtaining a Privilege License (Business License). For information please call Kelli LaFrance-Girard at (919) 460-4952. Before erecting any signs on the property, you must obtain a sign permit. Please contact Brent Reck, Zoning Compliance Supervisor at (919) 462-3885 for information regarding temporary signs, or Debra Grannan at (919) 460-4980 regarding permanent signage. No change can be made to this site plan unless the Town of Cary Planning Department is notified. If you have any questions regarding the approved plan or if I can be of any assistance, please contact me at (919) 462-3944. Sincerely, Kevin A. Hales Created Gvith idtPlans Review Page 3 of 6 Correct the common name of shumard oak in the Alternate Plant Schedule. It currently appears as "lace bark elm". Senior Planner cc Stan Godwin, Engineering Field Technician Supervisor Doug McRainey, Parks, Recreation & Cultural Resources Wayne Nicholas, Planning Manager Brent Reck, Zoning Compliance Supervisor File Town of Cary Attn: Paul Kuhn PO Box 8005 The Town of Cary, NC 27512 Created with idtPlans Review Page 4 of 6 Statement of Fees No Fees Found Created w(th idtPlans Review Page 5 of 6 INSPECTIONS & PERMITS DEPARTMENT The commercial building permit process is a completely separate process from the site plan approval process. The following items must be submitted to the Inspections and Permits Department to obtain your building permit: • Completed application (available in the Inspections & Permits Department) • Four (4) complete sets of building plans, including plumbing, mechanical and electrical • One (1) set of approved site plans showing all site utilities, including plumbing, mechanical and electrical • Water system calculations (GPM) • Sewer flow calculations (GPD) • Grease interceptors or oil separators must be approved by the Town's Utility Pre-Treatment Coordinator. (919-462-3871) Complete Appendix "B" from State Building Code • Minimum plumbing facilities calculations shown on plan per table 407 of volume II Created with idtPlans Review page 6 of 6 _ z r~ ~ M _ r i it 41 , aj 41?" z,~,'~,,,,~ ~ e~~ ~ ~ ~ 1,1 a, }'fir., it F_"`.': ! ~ i ~ _ I t. Yr ( t t ~,~~~.,;~~t~; ; e ~ ~ , s 3 r~~r ~ ~ %r' ~ r ~ 4 ~ ~ gJ !'~i f 'if%i. ~ J s ~ ~ 1~ 1 ~ O i F ~E ~'r i~ e f., 's ~1`"E ,y r a'° i.~ ~ ~ , ~~'L;,. t o ~ ' j.: t ~yh~! `fig ,~~.,y •.n ~ t~r~"~ I r ~~7~-.~~~. ~w _ . ~ s ~ ~ ~ o L'~ ,r~F f'i @ T , ~ , .f•.~~ f`, I+~. 4i fjff~JShvt `~I '+`y' ~ fs+~ ~ ~ ~ ~ ~ ~ ~ a 9- - . ~ r1 ~ ~'t 4f t ~ 1M ~A ~ ~ "'''-vp l i ~trl ;?,fix ~l ~ ~ y ,N ~ tp ~ ~ ~ t ~ ! G~ ~ i ess A r ouse oa ~ . r r ii~ ~t°~`S, f~ r`'~ ~ t~t, ~ ~~il t, ~"^-.z ( N h r lin s a ort a o a f'~ . t ~ ,i'~ I ~ ~ fY f ~ 4' T wn - ~ , ~vner. o o a ~ ; N#etra Park Dr. r~~' ~,r~~ lmpravement , . 7 1 72 I E in 53 5 - R a state e ~~r , t . ~.I I M Site u r-~ 9I J,. 1,~ r si i y ~~1 4 T I A a e' ac es r~~, ota c e j'~1 ~ J .~Y.lt~ r ~~f•~,~~,~ -~-J 2j ~11 i y I s J..`h J ~ i~~ Z nin . ~.~L~, o c rj ~ j ~~4 ' ~~"4 ~ ~ ;efl . - ~ ago Riv r B sin I f,: r k W r hed Neuse e a r he . ra tree ee ate s ate s r; 'r ~ ~~-fir°' 4 4 { 1 i A r i l m rv ous c es o to e ~ ota t i • E,I ~ ~ ~ 1; 1 , E~ ~ ~ ~ f ~ t ~y 4 ~ nom. fi f f~- t ' ~,'L t ~ sir ~ 5 ~ a ~"'~i ~ ~ , ~ i fi . J;' r r-~^' ;ice ~i f ,5~~~ 47/ ~ s ~ W' ~ ~ t _ r i ~ f~ g~:^~~~S ~ ~ s ~ ~ . ~ J, it L ~ ~ • Lr r ; s f is `v"',''i t4 t 4 . m J ~ ~ f ! N © . V? T~ r ^~r: ~x~ ~ Ua U L ~ _ - ® Z y 0 LL NOTE: NO S~~VIFICANT ~ NEW TRAIL~~TQ MATCH I I ~ ~ ~ 1 ~ ~ ~ I VEGETATION ~ ~ ~ W[~IIN ~ y GRADE OF EXf~~'ING TRAIL- ~ ~ ~ ~ ~ I ? ~ ~ ~ ~ 0 - fi ~ I I IIMITS OF WORK L` ~ ~ ~ ~ ` ` ~ ENSURE POSITIi~, DRAINAGE ~ ~ ~ i , ~`~I I I AWAY FROM TRAM;`,, ~ ~ I i l W W I si• ~I~o, _ a1 y x. ~ ~ ~ ~ ~ _3 ~ ~ ~ _ - ~ 2,1;1, ~ ~ ~ ~ ~ ~ I ~ ~ ~ - I ~ I ~ I i - - `,L G ~ ~ ~ ~ ~ ~ I , ~ ~ 911., ~ ~ ~ ~ ~ ~ a i ~ i ~~~L ~ ~ ~ ~ nz. ~ i s~;~i, ~ ~ ~ 4 ~ _ I < I ~ ~ _ z 1 ~ ~ I Nq I . ` ~ ~ ~ -3~8~ ~ , r ~ ~ W ~ ~ ~ ~VL ( ~ 1 ~ ~ ~ ~ ~ ~ ~ ~ i i ~ ~ ~ ~ \ ~ ~ ~ , ~i~ F _ I X , ~ ` 35 ~ ~ B ~ - - VTB / / / ~ ~ ~ 1361 ' ' U'~B - / ~ ~ ~ ~ ~ / I / ~ ~ ~ I I- / / i~ ` I / / ~ ` ~ ~ ~ ~1 ~ W ~ I~''" ~ ~ ~ / _ ~ X354 ~ ~ ~ ~ ~ ~ 3 ~c`~ / FP y , ~ \ ~ 1_54 - FP ~ ~ /o~/ ~ -1- / ~ / SEE LA-9 DETAIL 24 'L;x-- y ~ , . ~ 1 ~j ASPAALT 1 ~ / i / / FOR KIOSK HUB DETAIL o ~j 1 / L ~ 1 ~ , i i 1 ~ ( I P~ / i~ I ~P/ j .ii 1 ~ ~ ~ l~~ ~ i ~ ~ LS' ,i ~ 2 a ~ ~S E 2 . - - ~ ~c~' Z~ - ~ ~ ,oa ti~ ZEN - / / i ~ h~~=r a~ - ~ FFER 6' CH RAI % - B~jFFER FFER ~ I ~ ; ~~s~~~ ~ .ZONE? ._.rR ~ ~ ~I ~ - s~ ~R~ARjp,N~BUFFE 11~ Z Oe , / ~ ~ -~-gyp ~N BU / / "RIPARIAN j ~ i ~ ii 1~ .b'' 1CU ~ . •L / / ~6 -/G / SOFT SURFA~`1 / / G ~ ~ '%~a/~~Y i 1 \ ` p ~ / ~ - REMOVE ~TLCH , \ • ~~:::..a.~ ~ / cC ~ - - y j Y _ ~ _ _ - M ASPHALT ~ ~ = - _ - D Mfl _ - , ~ ~ e ~ x =i ~3E.1- ~ - ~ ~ ~ a ~e ~ ~ ~ ~ ~ A\ _ _ - _ - ~ ~ ~ ~ - - LIMITS OF WORK a ~ - LIMITS OF WORK c~ ~ > ~ ~ ~Cµ i i ~ 00 ~ ~ ~T;-' ~ ~ ~ • Mph i ~ i i ` ~ ~ M~ i ~ i i s1 5~ 5 G 6 i ~tN i ~ G 6 ~ ~ ~ ~ ~ kh. » ~ ss~ ~ ~t ~ BUFFER IMPACT EA`'~i ~ pSPN~' i ~ ~ ~ ~ ~ ~~0 ~ Y~ ~~iUU~iiii~y ~ ti ~ Y- ~ 6 ~ CENTS i 5t1N ~ ~ . ~ \ y CENZE ~B 5n~ ~ ; . ~ i s ~ _ PLASTIC PIPES, e~ ~ \ oiTCH o i o s , ~ ~ ~ ~y.~5~ ~~j' y L ~ ~i iii i I ~ }1 ~p y err - %'~eso _ , _ oyF~, i ~ , - BUFFF,&--IivIPACT ti~ ~d~l ~ , 1- - E~ F 1, ® Z E~ ~ y Bl 249.8 SF s ~ UR ,c FF ~ ~ -~c _ - B REMOVE FLAREIl' ~ ~ BU o` ~ 1._._•---•-. . - z: B Q ~ N m w= h P ~ _ ~ - - ~ , RIP y;- RI END SECTI S ® , , (FOR PUBLIC ACCESS~~~` gjpE ~ _ ~ ~ ~ ~ TO BE INSTALLED PBI~1i ~ ~ .~-1~i - - - ~ ~ ~ ~ Q: ' ~ ~ 5° ~ = ':'a 1 `N SI E'~bNLY ~ '~~',a 5 1 ~ ~ ~ (WEST Il ~ ~ 1' P ~ - - TO D 0T'1TI0N `J ' ~ ~ ~ ti d yti ~ ~ I;,, - 'S ; ~ 1~ ~ ~ I~'~ ~t i-.-~-•-' i ~ I ~ i I ~ , ~ ~ i ~ ~ '---•~NS~'AI;L 4 CONCRETE FLARED END SECTIO S ~ ~ I. ~ I ~ i ~ i I ; ,-ZONE ' i ON EACH END OF THE EXISTING HDPE PEE. I ~ ~ F.,R ~ ~ I ,-ZONE? ~ ~ ~ .i / .o ; ~ " DFFER ~ ~ 1 ~ - BUFF I B ~ ~ USE ADAPTORS PROVIDED BY MANUFACTURER I, y , ARC ~ I,.~ • RItpAR~ , ,RIP ~o~ • SUFFER ~ ~ I ~S - ~ ~ REMOVE & REPLAC •~IP RAP ~ ;~5- ~ ~ TO CONNECT. 1; , I S! ~ ; ~ ~ l:' - ~ AS RE(~UIRED TO I STALL FLARED pp" 1 ~ , l ~ MH i , Q ~ ;1,' ~ 1 / ~ i TOP RIM = 351.78 , ~ , ~ . ~ END SECTIONS. J %f _ 1 INV. IN 24") 336.86 i 1 ~ y ~ ~ / / , ; I / ~ i i i INV. OU (24") = 336.87 ~ i ' / / ~ / / / / / - ~ yam.-_ / ~ RE3. / ZO % 3 . ~ . B y , ~ zB i ~ ~ / ZO ~ ~ i ~ ~ v ;r ~ ~ - ~ 1~ i ~ ~ ~ i r / / F _ _ _ _ _ _ _ ~ , ~ ~ , Project: Black Crk. Project By: PK Drawn By. LM Compiled By: PS Date: 07 28 09 Scale: 1 "=30' SHEET NO. 1 i