Town of Valdese
Lake Rhodhiss Wastewater Treatment Plant
Annual Performance Report
Fiscal Year July 2018 — June 2019
The Town of Valdese operates the Lake Rhodhiss Wastewater Treatment Facility located on
Lake Rhodhiss, part of the Catawba River Basin. The Lake Rhodhiss Treatment Plant operates
under the NPDES (National Pollutant Discharge Elimination System) Permit. The Plant also
operates under a Permit for the distribution of Class A Residuals. The Class A Residuals, also
known as compost is given to the public free of charge.
Lake Rhodhiss Wastewater Treatment Facility
2100 Lake Rhodhiss Drive
Phone (828) 879-2131
NPDES Permit # - NC0041696
Class Residuals Permit # - WQ0001990
Operator in Responsible Charge: Chris Bortnick
This report is provided to meet the requirements of NC law (HB 1160). Copies are
available at the Valdese Town Hall, the Lake Rhodhiss Wastewater Treatment Plant and on the
Town of Valdese website http://townofvaidese.corn/pages/wastewater/ .
The Lake Rhodhiss Wastewater Treatment Plant treated and discharged a total of 923.5
million gallons of wastewater during the fiscal year. That was an increase in flow over the
previous years and resulted in an average daily flow of 2.53 million gallons per day. Over 5000
samples were collected and analyzed during the fiscal year and all quarterly Whole Effluent
Toxicity Tests were passed during the previous fiscal year. During the fiscal year, the Town of
Valdese received a total of two violations, of which were a direct result of rain events and
equipment malfunction. The Town plans to pursue additional funding to address the issue of
Inflow and Infiltration associated with significant rain events that cause dilemmas at the Lake
Rhodhiss WWTP. There was no adverse effect to the environment as a result of these violations.
Notice of Violations for 2018 — 2019 fiscal year
April 2019
May 2019
pH Daily Minimum Not Reached
pH Daily Maximum Exceeded
Lake Rhodhiss Wastewater Treatment Plant
Summary of Wastewater Flows
July 1, 2018 — June 30, 201.9
All flows are expressed as million gallons (MG)
July 2018
40.5
August 2018
68.2
September 2018
66.5
October 2018
82.2
November 2018
82.9
December 2018
103.0
January 2019
95.3
February 2019
87.5
March 2019
64.3
April 2019
62.4
May 2019
54.6
June 2019
116.1
Total (MG)
923.5
Average Month (MG)
76.9
Average Day (MG)
2.53
Town of Valdese Collection System
100 Whisnant Street
PO Box 339
Phone (828) 879-2128
Coll. System Permit # WQCS00032
Operator in Responsible Charge: Bryan Duckworth
The Town of Valdese maintains approximately 50 miles of sewer and 5 pump stations.
During the July 2018 to June 2019 period, there were three (3) reportable spills. There were no
adverse effects to the environment due to the reported spills. Valdese continues to maintain
sewer right of ways and inspect the collection system.
Spills: (1)
Spills: (2)
Spills: (3)
January 2019
2100 Lake Rhodhiss Drive (WWTP)
Pipe flange/coupler separated from grit removal system.
20 gallons reached surface waters
June 2019
Cline Street Pump Station
6.25 inches of rain in 24-hr period; Inflow & Infiltration overloaded pump station
capacity.
1500 gallons reached surface waters
June 2019
2100 Lake Rhodhiss Drive NE (Hoyle Creek)
Aerial line collapsed due to 10 inches of rain from storm event; elevated creek
levels covered line, debris, eroded banks and base supports caused collapse.
75,000 gallons reached surface waters
Copies of this report are available at:
Town Hall at 102 Massel Ave SE
Lake Rhodhiss Wastewater Treatment Plant at 2100 Lake Rhodhiss Drive.
On the Town's website at www.townofvaldese.com
For more detailed information, contact the Water Resources Director, Greg Padgett at 828-879-
2131 or gpadgett(a)valdesenc.gov