Loading...
HomeMy WebLinkAboutNC0041696_MONITORING INFO_20190101,�.,,iz,o STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. v� DOC TYPE ❑ FINAL PERMIT MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ YYYYM M DD Town of Valdese Lake Rhodhiss Wastewater Treatment Plant Annual Performance Report Fiscal Year July 2018 — June 2019 The Town of Valdese operates the Lake Rhodhiss Wastewater Treatment Facility located on Lake Rhodhiss, part of the Catawba River Basin. The Lake Rhodhiss Treatment Plant operates under the NPDES (National Pollutant Discharge Elimination System) Permit. The Plant also operates under a Permit for the distribution of Class A Residuals. The Class A Residuals, also known as compost is given to the public free of charge. Lake Rhodhiss Wastewater Treatment Facility 2100 Lake Rhodhiss Drive Phone (828) 879-2131 NPDES Permit # - NC0041696 Class Residuals Permit # - WQ0001990 Operator in Responsible Charge: Chris Bortnick This report is provided to meet the requirements of NC law (HB 1160). Copies are available at the Valdese Town Hall, the Lake Rhodhiss Wastewater Treatment Plant and on the Town of Valdese website http://townofvaidese.corn/pages/wastewater/ . The Lake Rhodhiss Wastewater Treatment Plant treated and discharged a total of 923.5 million gallons of wastewater during the fiscal year. That was an increase in flow over the previous years and resulted in an average daily flow of 2.53 million gallons per day. Over 5000 samples were collected and analyzed during the fiscal year and all quarterly Whole Effluent Toxicity Tests were passed during the previous fiscal year. During the fiscal year, the Town of Valdese received a total of two violations, of which were a direct result of rain events and equipment malfunction. The Town plans to pursue additional funding to address the issue of Inflow and Infiltration associated with significant rain events that cause dilemmas at the Lake Rhodhiss WWTP. There was no adverse effect to the environment as a result of these violations. Notice of Violations for 2018 — 2019 fiscal year April 2019 May 2019 pH Daily Minimum Not Reached pH Daily Maximum Exceeded Lake Rhodhiss Wastewater Treatment Plant Summary of Wastewater Flows July 1, 2018 — June 30, 201.9 All flows are expressed as million gallons (MG) July 2018 40.5 August 2018 68.2 September 2018 66.5 October 2018 82.2 November 2018 82.9 December 2018 103.0 January 2019 95.3 February 2019 87.5 March 2019 64.3 April 2019 62.4 May 2019 54.6 June 2019 116.1 Total (MG) 923.5 Average Month (MG) 76.9 Average Day (MG) 2.53 Town of Valdese Collection System 100 Whisnant Street PO Box 339 Phone (828) 879-2128 Coll. System Permit # WQCS00032 Operator in Responsible Charge: Bryan Duckworth The Town of Valdese maintains approximately 50 miles of sewer and 5 pump stations. During the July 2018 to June 2019 period, there were three (3) reportable spills. There were no adverse effects to the environment due to the reported spills. Valdese continues to maintain sewer right of ways and inspect the collection system. Spills: (1) Spills: (2) Spills: (3) January 2019 2100 Lake Rhodhiss Drive (WWTP) Pipe flange/coupler separated from grit removal system. 20 gallons reached surface waters June 2019 Cline Street Pump Station 6.25 inches of rain in 24-hr period; Inflow & Infiltration overloaded pump station capacity. 1500 gallons reached surface waters June 2019 2100 Lake Rhodhiss Drive NE (Hoyle Creek) Aerial line collapsed due to 10 inches of rain from storm event; elevated creek levels covered line, debris, eroded banks and base supports caused collapse. 75,000 gallons reached surface waters Copies of this report are available at: Town Hall at 102 Massel Ave SE Lake Rhodhiss Wastewater Treatment Plant at 2100 Lake Rhodhiss Drive. On the Town's website at www.townofvaldese.com For more detailed information, contact the Water Resources Director, Greg Padgett at 828-879- 2131 or gpadgett(a)valdesenc.gov