HomeMy WebLinkAboutNCS000572_MONITORING INFO_20190430STORMWATER DIVISION CODING SHEET
NCS PERMITS
PERMIT NO.
DOC TYPE
El FINAL PERMIT
LE -MONITORING REPORTS
❑ APPLICATION
❑ COMPLIANCE
❑ OTHER
DOC DATE
n Do) o/ � V
YYYYMMDD
DUKE
�. ENERGY®
April 30, 2019
NC Dept. of Environmental Quality
Attention: Central Files
Division of Water Resources
1617 Mail Service Center
Raleigh, NC 27699-1617
Duke Energy Carolinas - East
Dan River Combined Cycle
Station
864 S Edgewood Rd
Eden NC 27288
Subject: Duke Energy Carolinas, LLC
NPDES Stormwater Discharge Monitoring Report for:
Dan River Combined Cycle Station -- NC000572 — Rockingham County
In accordance with Part III, E(2) of the above referenced NPDES Stormwater permit, the original
and one copy of the Year 4-Period 1 semiannual monitoring report for Outfail SW001, SW009
and SW010 are enclosed. The period for sampling ends on June 30, 2019. Outfalls were
sampled on March 25, 2019 and the report was issued April 9, 2019.
Outfalls SW003, SW003A, SW003B, SW004, SW005, SW006, and SW011 were physically
removed during the Fall 2017. NCDEQ WSRO sent a letter dated January 29, 2018 stating
these outfalls now sheet flow and therefore are no longer in the permit. Outfalls SW007,
SW007A and SW008 were removed from the permit in a letter from NCDEO WSRO dated July
14, 2017 due to the lack of industrial activity in the drainage area.
Please direct any correspondence or questions concerning the Dan River Combined Cycle
NPDES Stormwater Program to Dana Newcomb at (336) 635-3186 or Joyce Dishmon at (336)
623-0238.
Respectfully,
Michael Lanning
General Manager
Dan River Combined Cycle Station
Record Type Code: ENV-50-02
Document Number: 8-6
Mailed by Certified Mail: r] Ol.S_I 1 3a UU)b SDI}
STORMWATER DISCHARGE OUTFALL (SDO)
iMONITORING REPORT
Permit Number NCS000572 SAMPLES COLLECTED DURING CALENDAR YEAR: 2019
(This monitoring report shall be received by the Division no later than 30 days from
the date the facility receives the sampling results from the laboratory.)
FACILITY NAME Dan River Combined Cycle Station COUNTY Rockingham
PERSON COLLECTING SAMPLE(S) Staff PHONE NO. (336) 635-31.86
CERTIFIED LABORATORY(S) Duke Energy of the Carolinas, LLC Lab #248
Sheaiv Environmental Services, NC Lab #329
SIGNATURE OF PER,NIITTEE OR DESIGNEE
REQUIRED.
Part A: Specific Monitoring Requirements
Outfall
No.
Date
Sample
Collected
50050
00400
00530
00600
00625
00630
00556
Total
Flow (if app.)
Total
Rainfall
pH
Solids, Total
Suspended-
Concentration
Total Nitrogen
Total Kjeldahl
Nitrogen
Nitrite +
Nitrate
Oil & Grease
moldd/ yr
MG
inches
SU
m L
m
m
m L
m L
SW001
03/25/19
NIA
0.2
7.5
1<5
0.59 j
0.37
0.22 j
<5.0
Outfall
No.
Date
Sample
Collected
50050
00400
00530
01022
01092
01097
01002
'Total
Flow (if app.)
Total
Rainfall
pH
Solids, Total
Suspended -
Concentration
Boron, Total
(as B)
Zinc; Total (as
Zn)
Antimony,
Total (as Sb)
Arsenic, Total
as (As)
mo/dd/ •r
MG
inches
SU
m L
m L
m /L
m L
m L
SWO09
03/25/19
NIA
10.2
17.6
<5
0.082
<0.005
1 <0.001
<0.001
Outfall
No.
Date
Sample
Collected
01012
01027
01034
01042
01051
01067
01147
01077
Beryllium,
Total (as Be)
Cadmium,
Total (as Cd)
Chromium,
Total (as Cr)
Copper, Total
(as Cu)
Lead, Total
(as Ph)
Nickel, Total
(as Ni)
Selenium,
Total (as Se)
Silver, Total
(as Ag)
mo/dd/ -r
m L
m- L
m L
m L
m L
m L
m L
m L
SW009
03/25/19
<0.001
<0.001
<0.001
0.00103
<0.001
0.00267
<0.001
<0.0002
Outfall
Date
01059
71900
34671
39488-
39492
39496
39500
39504
39508
No.
Sample
Collected
Thallium,
Total (as TI)
Mercury,
Total, Method
1631E
PCB-1016
PCB-1221
PCB-1232
PCB-1242
PCB-1248
PCB-1254
PCB-1260
mo/dd/yr
mg/L
ng/L
AWL
µg/L
µg/L
µg/L
µg/L
vg/L
µg/L
SW009
03/25/19
<0.0002
10.799
<0.40
1 <0.40
1 <0.40
<0.40
<0.40
<0,40
<0.40
Form SWU-247, last revised 2/22012
Page I of 3
Outfall
No.
Date
Sample
Collected
00556
Oil & Grease
mo/dd/ r
m 7L
SWO09
03/25/19
<5.0
Outfall
No.
Date
Sample
Collected
50050
00400
00530
01022
01092
014197
01002
'Total
Flow (if app.)
Total
Rainfall
pH
Solids, Total
Suspended-
Concentration-
Boron, Total
(as B)
Zinc, Total (as
Zn)
Antimony,
Total (as Sb)
Arsenic, Total
as (As)
mo/dd/ r
MG
inches
SU
m L
m L
m L
m /L
m L
SW010
03/26/13 1
NIA
0.2
17.3
1 <5
0.201
10.007
<0.001
<0.00I
Outfall
No.
Date
Sample
Collected
01012
01027
01034
01042
01051
01067
01147
01077
Beryllium,
Total (as Be)
Cadmium;
Total (as Cd)
Chromium,
Total (as Cr)
Copper, Total
(as Cu)
Lead, Total
(as Ph)
Nickel, Total
(as Ni)
Selenium,
Total (as Se)
Silver, 'Total
(as Ag)
mo/dd/ r
m L
m L
m L
m L
m L
mgtL
m L
m L
S«'010
03/26/19
<0.0111
<0.001
<0.001
0.00106
<0.001
<0.001
<0.001
<0.0002
Outfall
No.
Date
Sample
Collected
01059
71900
34671
39488
39492
39496
39500
39504
39508
'Thallium,
Total (as TI)
Mercury,
Total, Method
1631 E
PCB-1016
PCB-1221
PCB-1232
PCB-1242
PC13-1248
PCB-1254
PCB-1260
mo/dd/yr
mg/L
ng/L
µg/L
pg/L
µglL
µg/L
µg/L
µg/L
µg/L
SW010
03/26/19
<0.0002 12.24
<0.40
<0.40
<0.40
<0.40
<0.40
<0.40
<0.40
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month'? > yes x no
(if yes, complete Part B)
Part B: Vehicle Maintenance Activity Monitoring Requirements
Outfall
No.
Date
Sample . "
Collected
50050
00556
00530
00400
Total Flow '
(if applicable)
Total
Rainfall
Oil & Grease
(if appl.)
Non -polar
O&G/TPH
(Method 1664
SGT-HEM), if
appl.
"Total -
Suspended
Solids
pH
New Motor
Oil Usage
mo/dd/ yr"
MG
incties
mg
m
unit
al/mo '
STORM EVENT CHARACTERISTICS: Mail Original and one copy to:
Division of Water Quality
Form SWU-247.. last revised 2/2/2012
Page 2 of 3
Date: 03/25/19-03/26/ 19
Total Event Precipitation (inches): 0.2"
Event Duration (hours): NA (only if applicable — see permit.)
(if more than one storm event was sampled)
Attn: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
(Date)
Form SWU-247, last remised 21212012
Page 3 of 3
STOR,NI«`ATER DISCHARGE OUI'FALL (SDO)
' y MONITORING REPORT
Permit Number NCS000572 r SAMPLES COLLECTED DURING CALENDAR YEAR: 2019
(This monitoring report shall be received by the Division no later than 30 days from
the date the facility receives the sampling results from the laboratory.)
FACILITY NAME Dan River Combined Cvcle Station COUNTY Rockingham
PERSON COLLECTING SAMPLE(S) _Staff PHONE NO. (336) 635-3186
CERTIFIED LABORATORY(S) Duke I e_Egy of the Carolinas, LLC Lab #248
Shealv Environmental Services, NC Lai) #329
SIGNATURE OF PERMiTTEE OR DESIGNEE
REQUIRED.
Part A: Specific Monitoring Requirements
Outfall
No.
Date
Sample
Collected
50050
00400
00530
00600
00625
00630
00556
I`otal
Flow (if app.)
Total
Rainfall
pH
Solids, Total
Suspended-
Concentration
Total Nitrogen.
Total Kjeldahl
'Nitrogen
Nitrite +
Nitrate
Oil &Grease
mo/dd/ r
MG
inches
SU
m /L
m /L
m g/L,
m g/L.
-m /L
SAIN'OOl
103125119
N/A
0.2
17.5
<5
0.59
0.37
0.22
<5.0
Outi'all
Date-
50050
00400
00530
01022
01092-
01097
01002
No.
Sample .
Collected
Total
Flow'(if app.)
Total
Rainfall
pH
Solids, Total
.:Suspended -
Concentration
Boron, Total
(as B)
'Zinc , I I'otal.(as
Zn)
Antimony, ;'
Total (as Sb) `r
Arsedic, Total
as (AS).-.,_
•mo/dd/ yr
MG'
inches
SU
m /L
m /L
m /I
EL/ L
m L .
SW009
0 /25/19
1 NIA
0.2
17.6
<5
0.082
<0.005
1 <0.001
<0.001
.Outfall -
No.
Date
Sample
Collected
01012 -
.01027
01034
01042.
01051
01067
01147' � :
� 01077,
Beryllium;
Total,'(as Be)
Cadmium,
Total (as Cd)
Chromium,
Total (as Cr)
Copper,.Total
(as Cu)
Lead; Total.
(as Pb)
Nickel, Total
(as NO
Selenium-
Total (as. Se)
Silver; Total.
(as Ag)
nib/dd/yr =
m L
m •/L
•mom L
m /L
nt /L
mgL
m IL
mg/L.
SWO09
03/25/19
<0.001
<0.001
I <0.001 J0.00103
<0.00I
0.00267
<0.001
<0.0002
Outfall
No.
Date -
Sample
Collected
01059.
.71900
34671
39488.
39492
39496
'39500
139504
39508
Thallium,
Total (as TI)
Mercury,
Total, I1NIethod
1631E
PCB_ -1016
PCB-1.221
PCB-1,232
PCB-1242 _
PCB-1248.
.PCB-1254
'PCB-1260-
mo/ddlyr
mg/L
ng/L
ttg/L
µg/L
µg/L
µg/L
µg/L
µgIL
µg/L
SW009
03/25/19
<0.0002
0.799
<0.40
<0.40
<0.40
<0.40
<0.40 1
<0.40
<0.40
Form SWU-247. last revised 21212012
Pa-c I of 3
Outfall,
No.
Date
Sample
Collected
00556
Oily&.Grease
mo/dd/ yr
m L
S111009
03/25/I9
1 <5.0
Outfall
No.-
=Date
Sample
I.CoIllected •
50050
00400
00530
01022
01092
'01097
01002
:Total:
Flow`(if app.)
Total
Rainfall
pH,
Solids, Total
Suspended -
Concentration
Boron, Total
(as B)
Zinc, Total'(as
Zn)
Antimony;
.-Total (as Sb)
Arsenic, Total
as (As).
mo/dd/vr
NIG'
inches
SU
m /L
m L
m L
m L
m IL
SW WO
03/26/19
NIA
0.2
7.3
<5
0.201
0.007
<0.001
<0.001
Outfall'Date-
No.
Sample,
'Collected
01012-� -
01027 --
01034
01042
01051
01067.
01-147.
01077
Beryllium,.
Total(as.Be)-
;Cadmium,.
Total,(as Cd)'
Chromium,
Total (as Cr)
Copper, Total
(as'Cu).
Lead, Total
(as Pb)
Nickel, "total
(as Ni)
:Selenium,
Total (as Se)
;Silver, Total .
(as Ag)
.mo/dd/vr
m L
m' L
m L
m L
m /L
m
m /L
m /L
SW010
03/26/19
<0.001
<0.001
<0.001
0,00106
<0.00I
<0.00I
<0.001
<0.0002
Outfall
Date =
01059
71900•, .
34671
39488
39492
39496
39500
395044
39508
No.
Sample.
Collected'
'Thallium,
'-Total,(as Tl) '
Mercury,
Total, Method
1631 E
-PCB-10I6
PCB-1221
PCB-1232
PCB-1242
PCB-1248'
PCB-1254
PCB-1260
Emoldd/yr
mg/L
nglL
µg/L
µglL
µg/L-
µg/L
µg/L
µg/L
µg/L
SWI}1[}
1}3126/19
1 <0.0002
12.24
1 <0.40
1 <0.40
<0.40
<0.40
<0.40
1 <0.40
<0.40
Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes x no
(if yes, complete Part B)
Part Bt Vehicle Maintenance AC ivity Monitoring Requirements
Outfall
No.
Date.
Sample
Collected
50050.
00556
00530
00400,
'Total Flow
(if applicable)
_
Total
Rainfall
Oil & Grease
(if appl.)
Non -polar
O&G/TPH
(Method 1664
SGT-HEM), if
appl.
Total
Suspended
Solids
pH-
New Motor
Oil Usage
mo/dd/ r`
°MG
inchesm
u/
nit
al/mo
ti
STORM EVENT CHARACTERISTICS: —�
Mail Original and one copy to:
Division of Water Quality
Form SWU-247, last revised 2/2/2012-
Page 2 of 3
Date: 03/25/ 19-03/26/ 19
Total Event Precipitation (inches): 0?"
Event Duration (hours): NA (only iI'applicahlc —see permit.)
(if' more than one storm event was sampled)
Attn: Central Files
1617 Mail Service Center
Ralei,,h. North Carolina 27699-1617
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person
or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief', true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisounient for knowing violations."
(Signature of Permittee)
(Date)
Form S W U-247. last revised 2212012
Pa,c 3 of 3