Loading...
HomeMy WebLinkAboutNCS000572_MONITORING INFO_20190430STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. DOC TYPE El FINAL PERMIT LE -MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE n Do) o/ � V YYYYMMDD DUKE �. ENERGY® April 30, 2019 NC Dept. of Environmental Quality Attention: Central Files Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Duke Energy Carolinas - East Dan River Combined Cycle Station 864 S Edgewood Rd Eden NC 27288 Subject: Duke Energy Carolinas, LLC NPDES Stormwater Discharge Monitoring Report for: Dan River Combined Cycle Station -- NC000572 — Rockingham County In accordance with Part III, E(2) of the above referenced NPDES Stormwater permit, the original and one copy of the Year 4-Period 1 semiannual monitoring report for Outfail SW001, SW009 and SW010 are enclosed. The period for sampling ends on June 30, 2019. Outfalls were sampled on March 25, 2019 and the report was issued April 9, 2019. Outfalls SW003, SW003A, SW003B, SW004, SW005, SW006, and SW011 were physically removed during the Fall 2017. NCDEQ WSRO sent a letter dated January 29, 2018 stating these outfalls now sheet flow and therefore are no longer in the permit. Outfalls SW007, SW007A and SW008 were removed from the permit in a letter from NCDEO WSRO dated July 14, 2017 due to the lack of industrial activity in the drainage area. Please direct any correspondence or questions concerning the Dan River Combined Cycle NPDES Stormwater Program to Dana Newcomb at (336) 635-3186 or Joyce Dishmon at (336) 623-0238. Respectfully, Michael Lanning General Manager Dan River Combined Cycle Station Record Type Code: ENV-50-02 Document Number: 8-6 Mailed by Certified Mail: r] Ol.S_I 1 3a UU)b SDI} STORMWATER DISCHARGE OUTFALL (SDO) iMONITORING REPORT Permit Number NCS000572 SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Dan River Combined Cycle Station COUNTY Rockingham PERSON COLLECTING SAMPLE(S) Staff PHONE NO. (336) 635-31.86 CERTIFIED LABORATORY(S) Duke Energy of the Carolinas, LLC Lab #248 Sheaiv Environmental Services, NC Lab #329 SIGNATURE OF PER,NIITTEE OR DESIGNEE REQUIRED. Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected 50050 00400 00530 00600 00625 00630 00556 Total Flow (if app.) Total Rainfall pH Solids, Total Suspended- Concentration Total Nitrogen Total Kjeldahl Nitrogen Nitrite + Nitrate Oil & Grease moldd/ yr MG inches SU m L m m m L m L SW001 03/25/19 NIA 0.2 7.5 1<5 0.59 j 0.37 0.22 j <5.0 Outfall No. Date Sample Collected 50050 00400 00530 01022 01092 01097 01002 'Total Flow (if app.) Total Rainfall pH Solids, Total Suspended - Concentration Boron, Total (as B) Zinc; Total (as Zn) Antimony, Total (as Sb) Arsenic, Total as (As) mo/dd/ •r MG inches SU m L m L m /L m L m L SWO09 03/25/19 NIA 10.2 17.6 <5 0.082 <0.005 1 <0.001 <0.001 Outfall No. Date Sample Collected 01012 01027 01034 01042 01051 01067 01147 01077 Beryllium, Total (as Be) Cadmium, Total (as Cd) Chromium, Total (as Cr) Copper, Total (as Cu) Lead, Total (as Ph) Nickel, Total (as Ni) Selenium, Total (as Se) Silver, Total (as Ag) mo/dd/ -r m L m- L m L m L m L m L m L m L SW009 03/25/19 <0.001 <0.001 <0.001 0.00103 <0.001 0.00267 <0.001 <0.0002 Outfall Date 01059 71900 34671 39488- 39492 39496 39500 39504 39508 No. Sample Collected Thallium, Total (as TI) Mercury, Total, Method 1631E PCB-1016 PCB-1221 PCB-1232 PCB-1242 PCB-1248 PCB-1254 PCB-1260 mo/dd/yr mg/L ng/L AWL µg/L µg/L µg/L µg/L vg/L µg/L SW009 03/25/19 <0.0002 10.799 <0.40 1 <0.40 1 <0.40 <0.40 <0.40 <0,40 <0.40 Form SWU-247, last revised 2/22012 Page I of 3 Outfall No. Date Sample Collected 00556 Oil & Grease mo/dd/ r m 7L SWO09 03/25/19 <5.0 Outfall No. Date Sample Collected 50050 00400 00530 01022 01092 014197 01002 'Total Flow (if app.) Total Rainfall pH Solids, Total Suspended- Concentration- Boron, Total (as B) Zinc, Total (as Zn) Antimony, Total (as Sb) Arsenic, Total as (As) mo/dd/ r MG inches SU m L m L m L m /L m L SW010 03/26/13 1 NIA 0.2 17.3 1 <5 0.201 10.007 <0.001 <0.00I Outfall No. Date Sample Collected 01012 01027 01034 01042 01051 01067 01147 01077 Beryllium, Total (as Be) Cadmium; Total (as Cd) Chromium, Total (as Cr) Copper, Total (as Cu) Lead, Total (as Ph) Nickel, Total (as Ni) Selenium, Total (as Se) Silver, 'Total (as Ag) mo/dd/ r m L m L m L m L m L mgtL m L m L S«'010 03/26/19 <0.0111 <0.001 <0.001 0.00106 <0.001 <0.001 <0.001 <0.0002 Outfall No. Date Sample Collected 01059 71900 34671 39488 39492 39496 39500 39504 39508 'Thallium, Total (as TI) Mercury, Total, Method 1631 E PCB-1016 PCB-1221 PCB-1232 PCB-1242 PC13-1248 PCB-1254 PCB-1260 mo/dd/yr mg/L ng/L µg/L pg/L µglL µg/L µg/L µg/L µg/L SW010 03/26/19 <0.0002 12.24 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 <0.40 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month'? > yes x no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample . " Collected 50050 00556 00530 00400 Total Flow ' (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. "Total - Suspended Solids pH New Motor Oil Usage mo/dd/ yr" MG incties mg m unit al/mo ' STORM EVENT CHARACTERISTICS: Mail Original and one copy to: Division of Water Quality Form SWU-247.. last revised 2/2/2012 Page 2 of 3 Date: 03/25/19-03/26/ 19 Total Event Precipitation (inches): 0.2" Event Duration (hours): NA (only if applicable — see permit.) (if more than one storm event was sampled) Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Form SWU-247, last remised 21212012 Page 3 of 3 STOR,NI«`ATER DISCHARGE OUI'FALL (SDO) ' y MONITORING REPORT Permit Number NCS000572 r SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME Dan River Combined Cvcle Station COUNTY Rockingham PERSON COLLECTING SAMPLE(S) _Staff PHONE NO. (336) 635-3186 CERTIFIED LABORATORY(S) Duke I e_Egy of the Carolinas, LLC Lab #248 Shealv Environmental Services, NC Lai) #329 SIGNATURE OF PERMiTTEE OR DESIGNEE REQUIRED. Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected 50050 00400 00530 00600 00625 00630 00556 I`otal Flow (if app.) Total Rainfall pH Solids, Total Suspended- Concentration Total Nitrogen. Total Kjeldahl 'Nitrogen Nitrite + Nitrate Oil &Grease mo/dd/ r MG inches SU m /L m /L m g/L, m g/L. -m /L SAIN'OOl 103125119 N/A 0.2 17.5 <5 0.59 0.37 0.22 <5.0 Outi'all Date- 50050 00400 00530 01022 01092- 01097 01002 No. Sample . Collected Total Flow'(if app.) Total Rainfall pH Solids, Total .:Suspended - Concentration Boron, Total (as B) 'Zinc , I I'otal.(as Zn) Antimony, ;' Total (as Sb) `r Arsedic, Total as (AS).-.,_ •mo/dd/ yr MG' inches SU m /L m /L m /I EL/ L m L . SW009 0 /25/19 1 NIA 0.2 17.6 <5 0.082 <0.005 1 <0.001 <0.001 .Outfall - No. Date Sample Collected 01012 - .01027 01034 01042. 01051 01067 01147' � : � 01077, Beryllium; Total,'(as Be) Cadmium, Total (as Cd) Chromium, Total (as Cr) Copper,.Total (as Cu) Lead; Total. (as Pb) Nickel, Total (as NO Selenium- Total (as. Se) Silver; Total. (as Ag) nib/dd/yr = m L m •/L •mom L m /L nt /L mgL m IL mg/L. SWO09 03/25/19 <0.001 <0.001 I <0.001 J0.00103 <0.00I 0.00267 <0.001 <0.0002 Outfall No. Date - Sample Collected 01059. .71900 34671 39488. 39492 39496 '39500 139504 39508 Thallium, Total (as TI) Mercury, Total, I1NIethod 1631E PCB_ -1016 PCB-1.221 PCB-1,232 PCB-1242 _ PCB-1248. .PCB-1254 'PCB-1260- mo/ddlyr mg/L ng/L ttg/L µg/L µg/L µg/L µg/L µgIL µg/L SW009 03/25/19 <0.0002 0.799 <0.40 <0.40 <0.40 <0.40 <0.40 1 <0.40 <0.40 Form SWU-247. last revised 21212012 Pa-c I of 3 Outfall, No. Date Sample Collected 00556 Oily&.Grease mo/dd/ yr m L S111009 03/25/I9 1 <5.0 Outfall No.- =Date Sample I.CoIllected • 50050 00400 00530 01022 01092 '01097 01002 :Total: Flow`(if app.) Total Rainfall pH, Solids, Total Suspended - Concentration Boron, Total (as B) Zinc, Total'(as Zn) Antimony; .-Total (as Sb) Arsenic, Total as (As). mo/dd/vr NIG' inches SU m /L m L m L m L m IL SW WO 03/26/19 NIA 0.2 7.3 <5 0.201 0.007 <0.001 <0.001 Outfall'Date- No. Sample, 'Collected 01012-� - 01027 -- 01034 01042 01051 01067. 01-147. 01077 Beryllium,. Total(as.Be)- ;Cadmium,. Total,(as Cd)' Chromium, Total (as Cr) Copper, Total (as'Cu). Lead, Total (as Pb) Nickel, "total (as Ni) :Selenium, Total (as Se) ;Silver, Total . (as Ag) .mo/dd/vr m L m' L m L m L m /L m m /L m /L SW010 03/26/19 <0.001 <0.001 <0.001 0,00106 <0.00I <0.00I <0.001 <0.0002 Outfall Date = 01059 71900•, . 34671 39488 39492 39496 39500 395044 39508 No. Sample. Collected' 'Thallium, '-Total,(as Tl) ' Mercury, Total, Method 1631 E -PCB-10I6 PCB-1221 PCB-1232 PCB-1242 PCB-1248' PCB-1254 PCB-1260 Emoldd/yr mg/L nglL µg/L µglL µg/L- µg/L µg/L µg/L µg/L SWI}1[} 1}3126/19 1 <0.0002 12.24 1 <0.40 1 <0.40 <0.40 <0.40 <0.40 1 <0.40 <0.40 Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes x no (if yes, complete Part B) Part Bt Vehicle Maintenance AC ivity Monitoring Requirements Outfall No. Date. Sample Collected 50050. 00556 00530 00400, 'Total Flow (if applicable) _ Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH- New Motor Oil Usage mo/dd/ r` °MG inchesm u/ nit al/mo ti STORM EVENT CHARACTERISTICS: —� Mail Original and one copy to: Division of Water Quality Form SWU-247, last revised 2/2/2012- Page 2 of 3 Date: 03/25/ 19-03/26/ 19 Total Event Precipitation (inches): 0?" Event Duration (hours): NA (only iI'applicahlc —see permit.) (if' more than one storm event was sampled) Attn: Central Files 1617 Mail Service Center Ralei,,h. North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief', true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisounient for knowing violations." (Signature of Permittee) (Date) Form S W U-247. last revised 2212012 Pa,c 3 of 3