From: Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil>
Sent: Monday, May 11, 2020 10:30 AM
To: Owen Carson
Cc: Moore, Andrew W; Leslie, Andrea J
Subject: [External] Sliver Line Park PCN - Need Additional Information
Attachments: Pages from SAW-2019-02099 ADMIN FILE APRIL 162020.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Hi Owen,
I'm finally getting a chance to look through the PCN and WRC's comments. Below are my comments/questions that need
to be addressed before PCN is considered complete:
1. On Plan Sheet LOA, there's a wetland impact that appears unaccounted for (see red circle on attached plan
sheet). This will need to be included in the PCN if not already.
2. For the boat ramp, will need linear footage of impact to river bank as well as cubic yards of material excavated
and/or filled below OHWM. Also, will need to provide information as to why ramp will be wider than 20-feet and
please address what type of/expected boats will be using the ramp. This will need to be included in the PCN.
3. Construction sequencing details for boat ramp notes installation of coffer dam. Will need details submitted for
the coffer dam and if below OHWM then will need to include in the PCN as temporary open water impact.
4. 1 will process the PCN under NWP #42 which should cover the wetland fill and the boat ramp — Andrew does this
work for you?
5. Please clarify if any trees/number of trees that will be removed along the French Broad River.
Let me know if you have any questions, thanks.
Amanda Jones
Regulatory Specialist
U.S. Army Corps of Engineers
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
828-271-7980 ext. 4225