Loading...
HomeMy WebLinkAbout20200516 Ver 1_USACE Questions_20200611Moore, Andrew W From: Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Sent: Monday, May 11, 2020 10:30 AM To: Owen Carson Cc: Moore, Andrew W; Leslie, Andrea J Subject: [External] Sliver Line Park PCN - Need Additional Information Attachments: Pages from SAW-2019-02099 ADMIN FILE APRIL 162020.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Owen, I'm finally getting a chance to look through the PCN and WRC's comments. Below are my comments/questions that need to be addressed before PCN is considered complete: 1. On Plan Sheet LOA, there's a wetland impact that appears unaccounted for (see red circle on attached plan sheet). This will need to be included in the PCN if not already. 2. For the boat ramp, will need linear footage of impact to river bank as well as cubic yards of material excavated and/or filled below OHWM. Also, will need to provide information as to why ramp will be wider than 20-feet and please address what type of/expected boats will be using the ramp. This will need to be included in the PCN. 3. Construction sequencing details for boat ramp notes installation of coffer dam. Will need details submitted for the coffer dam and if below OHWM then will need to include in the PCN as temporary open water impact. 4. 1 will process the PCN under NWP #42 which should cover the wetland fill and the boat ramp — Andrew does this work for you? 5. Please clarify if any trees/number of trees that will be removed along the French Broad River. Let me know if you have any questions, thanks. Amanda Jones Regulatory Specialist U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 828-271-7980 ext. 4225