Loading...
HomeMy WebLinkAboutNCG140449_Rescission Denial_20200528ROY COOPER rovc'r or MI HAEL S. RE A Soaaary BRIAN WR.ENN A c -,")irec tor The Lane Construction Corporation Casey P Hurley 30 Hwy 152E NC China Grove, NC 28023 Environmental Qualitj, May 28, 2020 Subject: Rescission of NPDES Stormwater Permit Temporary Concrete Batch Plant — Lane Construction Certificate of Coverage: NCG140449 Gaston County On May 04, 2020 the Division of Energy, Mineral and Land Resources received your request to rescind your coverage under NPDES Stormwater Permit NCG140449. After inspection of the facility on May 13, 2020 it was determined that rescission of this permit could not be granted until all dumping and construction activity has stopped and the site is cleared of debris and waste. If you have questions about this matter, please contact the Stormwater staff in our Mooresville Regional Office at 704-663-1699. cphurlev@laneconstruct.com Sincerely, for Brian Wrenn Acting Director North C.,arotina Dqjartment oP Envtronms ntai Qumtty j Di i,iaaofL reog% O e ai and Land Pkrsouras 512 North SaFt,hur, Street 1 16,12 Mail Servk-'e 0zoliyr I Rat6grh, Norio Cnroiina 2T699,1612 Compliance Inspection Report Permit: NCG140449 Effective: 08/01/17 Expiration: 06/30/22 Owner : The Lane Construction Company SOC: Effective: Expiration: Facility: Temporary Concrete Batch Plant - Lane Constr County: Rowan 1500 N US Hwy 29 Region: Mooresville China Grove NC 28023 Contact Person: Christopher Ange Title: Phone: 336-406-9060 Directions to Facility: 185 N to exit 68 left onto Hwy 152, drive 152, drive — 1.1 mi, use right lane to take ramp to 185 N/US 601 merge onto US 29, drive 0.2 mi facility is on the right. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/13/2020 Entry Time 01:45PM Exit Time: 02:OOPM Primary Inspector: Kenny Llywelyn Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140449 Owner - Facility: The Lane Construction Company Inspection Date: 05/13/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection performed due to a request our office received for a rescission of the permit Operations has stopped. Most of the plant is dissaembled ready for transport. Basins are still functioning. Debris and concrete waste is still present on site. While performing the inspection a concrete truck cleaned out his truck beside the basin in a pit. It is recommended that the rescission request not be granted until all dumping and construction activty has stopped. Also, the site needs to be cleaned up of all debris and waste. The site needs to be restored to the condition it was prior to operations started. Page 2 of 3 Permit: NCG140449 Owner - Facility: The Lane Construction Company Inspection Date: 05/13/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Yes No NA NE ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑ ❑ ❑ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ Comment: Site inspection was performed as a request to close out the permit. There were no people on the site to meet to review any documentation. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Outfalls were observed. Yes No NA NE ❑❑❑■ ■❑❑❑ Page 3 of 3