HomeMy WebLinkAboutWQ0019782_Final Permit_20200611ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANI£L SMITH
Director
NORTH CAROLINA
Environmental Quality
June 11, 2020
RHONDA ANDERSON — PRESIDENT/CEO
THE YOUNG MEN'S CHRISTIAN ASSOCIATION OF GREENSBORO, INC.
620 GREEN VALLEY ROAD — SUITE 210
GREENSBORO, NORTH CAROLINA 27408-7725
Subject: Permit No. WQ0019782
YMCA Camp Weaver WWTP
Wastewater Irrigation System
Guilford County
Dear Ms. Anderson:
In accordance with your permit renewal request received April 9, 2020, we are forwarding herewith
Permit No. WQ0019782 dated June 11, 2020, to The Young Men's Christian Association of Greensboro,
Inc. for the continued operation of the subject wastewater treatment and irrigation facilities. Please note
that this renewed permit shall become effective on October 1, 2020 (i.e., the day after the expiration date
of the existing permit).
This permit shall be effective from October 1, 2020 through December 31, 2026, shall void Permit
No. WQ0019782 issued January 28, 2015, and shall be subject to the conditions and limitations therein.
The Permittee shall submit a renewal application no later than July 4, 2026.
Please pay attention to the monitoring requirements listed Attachments A and B for they may differ
from the previous permit issuance. Failure to establish an adequate system for collecting and maintaining
the required operational information shall result in future compliance problems.
The Division has removed the following permit condition since the last permit issuance dated
January 28, 2015:
➢ Old Condition VL2. — This condition has been removed because the permit is not voidable.
The following permit conditions are new since the last permit issuance dated January 28,
2015:
➢ Condition 11. 11. — All setbacks applicable to 15A NCAC 02H .02190)(5) have been added.
➢ Condition 111.16. — Metering equipment shall be tested and calibrated annually.
➢ Condition IV.9. — The maintenance log shall now also include dates of flow measurement
device calibrations and irrigation equipment calibrations.
➢ Condition VL 10. — This permit shall not be renewed if the Permittee or any affiliation has not
paid the required annual fee.
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617
N11H fH (:Ai(1!.INA �
0O,toreWM—talQ"I 919,707.9000
Ms. Rhonda Anderson
June 11, 2020
Page 2 of 2
➢ Attachment A. — Upon review of the facility's annual soil sampling, the following parameters
have been added to the effluent monitoring requirements: Total Calcium (00916), Total
Magnesium (00927), Total Sodium (00929), and Sodium Adsorption Ratio (00931).
If any parts, requirements, or limitations contained in this permit are unacceptable, the Permittee
has the right to request an adjudicatory hearing upon written request within 30 days following receipt of
this permit. This request shall be in the form of a written petition, conforming to Chapter 150B of the North
Carolina General Statutes, and filed with the Office of Administrative Hearings at 6714 Mail Service
Center, Raleigh, NC 27699-6714. Otherwise, this permit shall be final and binding.
If you need additional information concerning this permit, please contact Poonam Giri at (919)
707-3656 or poonam.girikncdenr.gov.
Sincerely,
S. Daniel Smith, Director
Division of Water Resources
cc: Guilford County Health Department (Electronic Copy)
Winston-Salem Regional Office, Water Quality Regional Operations Section (Electronic Copy)
Laserfiche File (Electronic Copy)
Digital Permit Archive (Electronic Copy)
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENTAL QUALITY
RALEIGH
WASTEWATER IRRIGATION SYSTEM PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
The Young Men's Christian Association of
Greensboro, Inc.
Guilford County
FOR THE
continued operation of a 3,670 gallon per day (GPD) wastewater treatment and irrigation facility consisting
of:
a 10,000 gallon baffled septic tank; a 9,000 GPD rated MicroFast 9.0 with a 2,813 gallon settling zone and
effluent filter, as well as a 8,438 gallon biological treatment zone with a blower; an EIC Model 100 tablet
chlorinator; a duplex transfer pump station with an audible/visual high-water alarms; a 250,000 gallon 20-
millimeter (mm) synthetically lined storage lagoon; a duplex irrigation pump station with an audible/visual
high-water alarms; an effluent flow meter; a 1.64 acre drip irrigation area with approximately 28,800 linear
feet (LF) of irrigation tubing and approximately 11,900 emitters; a rain sensor; and all associated piping,
valves, controls, and appurtenances
to serve the YMCA Camp Weaver WWTP, with no discharge of wastes to surface waters, pursuant to the
application received April 9, 2020, and in conformity with the Division -approved plans and specifications
considered a part of this permit.
This permit shall be effective from October 1, 2020 through December 31, 2026, shall void Permit No.
WQ0019782 issued January 28, 2015, and shall be subject to the following conditions and limitations:
I. SCHEDULES
A gauge to monitor waste levels in the 250,000 gallon synthetically lined storage lagoon shall be
installed within 60 days of the effective date of this permit. Caution shall be taken not to damage the
integrity of any liner (if present) when installing a gauge. [15A NCAC 02T .0108(b)(1)(B), 02T
.0505(d)]
2. The Permittee shall request renewal of this permit on Division -approved forins no later than July 4,
2026. [15A NCAC 02T .0105(b), 02T .0109]
WQ0019782 Version 4.0 Shell Version 200201 Page 1 of 8
IL PERFORMANCE STANDARDS
1. The Permittee shall maintain and operate the subject non -discharge facilities so there is no discharge to
surface waters, nor any contravention of groundwater or surface water standards. In the event the
facilities fail to perform satisfactorily, including the creation of nuisance conditions due to improper
operation and maintenance, or failure of the irrigation areas to assimilate the effluent, the Permittee
shall take immediate corrective actions, including Division required actions, such as the construction
of additional or replacement wastewater treatment or disposal facilities. [15A NCAC 02T
.0108(b)(1)(A)]
2. This permit shall not relieve the Permittee of their responsibility for damages to groundwater or surface
water resulting from the operation of this facility. [15A NCAC 02T .0108(b)(1)(A)]
3. Effluent quality shall not exceed the limitations specified in Attachment A. [15A NCAC 02T
.0108(b)(1)(A)]
4. Application rates, whether hydraulic, nutrient, or other pollutant, shall not exceed those specified in
Attachment B. [15A NCAC 02T .0108(b)(1)(A)]
5. The Permittee shall connect the irrigation system to a rain or moisture sensor designed to prevent
irrigation during precipitation events or wet conditions. [15A NCAC 02T .0505(x)]
6. Wastewater irrigation fields permitted on or after December 30, 1983 have a compliance boundary that
is either 250 feet from the wastewater irrigation area, or 50 feet within the property boundary,
whichever is closest to the wastewater irrigation area. Any exceedance of groundwater standards at or
beyond the compliance boundary shall require corrective action. Division -approved relocation of the
compliance boundary shall be noted in Attachment B. Multiple contiguous properties under common
ownership and permitted for use as a disposal system shall be treated as a single property with regard
to determination of a compliance boundary. [15A NCAC 02L .0106(d)(2), 02L .0107(b), 02T .0105(h),
G.S. 143-215.1(1), G.S. 143-215.1(k)]
7. The review boundary is midway between the compliance boundary and the wastewater irrigation area.
Any exceedance of groundwater standards at or beyond the review boundary shall require preventative
action. [15A NCAC 02L .0106(d)(1), 02L .0108]
8. The Permittee shall apply for a permit modification to establish a new compliance boundary prior to
any sale or transfer of property affecting a compliance boundary (i.e., parcel subdivision). [ 15A NCAC
02L .0107(c)]
9. No wells, excluding Division -approved monitoring wells, shall be constructed within the compliance
boundary except as provided for in 15A NCAC 02L .0107(g). [15A NCAC 02L .0107]
10. Except as provided for in 15A NCAC 02L .0107(g), the Permittee shall ensure any landowner who is
not the Permittee and owns land within the compliance boundary shall execute and file with the
Guilford County Register of Deeds an easement running with the land containing the following items:
a. A notice of the permit and number or other description as allowed in 15A NCAC 02L .0107(f)(1);
b. Prohibits construction and operation of water supply wells within the compliance boundary; and
c. Reserves the right of the Permittee or the State to enter the property within the compliance boundary
for purposes related to the permit.
The Director may terminate the easement when its purpose has been fulfilled or is no longer needed.
[I5A NCAC 02L .0107(f)]
WQ0019782 Version 4.0 Shell Version 200201 Page 2 of 8
11. The facilities herein were permitted per the following setbacks:
a. The irrigation sites were originally permitted August 13, 2001. The setbacks for drip irrigation
sites originally permitted or modified from February 1, 1993 to August 31, 2006 are as follows (all
distances in feet):
i. Each private or public water supply source:
100
ii. Surface waters:
100
ill. Groundwater lowering ditches:
25
iv. Surface water diversions (upslope):
10
v. Surface water diversions (downslope):
25
vi. Each well with exception of monitoring wells:
100
vii. Each property line:
50 '
viii. Top of slope of embankments or cuts of two feet or more in vertical height:
15
ix. Each water line:
10
x. Each swimming pool:
100
xi. Public right of way:
50
xii. Nitrification field:
20
xiii. Each building foundation or basement:
15
' Setbacks to property lines are not applicable when the Permittee, or the entity from which the
Permittee is leasing, owns both parcels separated by the property line.
[15A NCAC 02H .02190)(5)]
b. The storage and treatment units were originally permitted August 13, 2001. The setbacks for
storage and treatment units originally permitted or modified from February 1, 1993 to August 31,
2006 are as follows (all distances in feet):
i. Each private or public water supply source: 100
ii. Surface waters: 50
in. Each well with exception of monitoring wells: 100
iv. Each property line: 50 1
v. Nitrification field: 20
' Setbacks to property lines are not applicable when the Permittee, or the entity from which the
Permittee is leasing, owns both parcels separated by the property line.
[15A NCAC 02H .02190)(5)]
WQ0019782 Version 4.0 Shell Version 200201 Page 3 of 8
III. OPERATION AND MAINTENANCE REQUIREMENTS
1. The Permittee shall operate and maintain the subject facilities as anon -discharge system. [15A NCAC
02T .0500]
2. The Permittee shall maintain an Operation and Maintenance Plan, which shall include operational
functions, maintenance schedules, safety measures, and a spill response plan. [15A NCAC 02T
.0507(a)]
3. Upon the Water Pollution Control System Operators Certification Commission's (WPCSOCC)
classification of the subject non -discharge facilities, the Permittee shall designate and employ a certified
operator in responsible charge (ORC), and one or more certified operators as back-up ORCs. The ORC
or their back-up shall operate and visit the facilities as required by the WPCSOCC. [15A NCAC 02T
.0117]
4. The Permittee shall maintain vegetative cover on the irrigation sites, such that crop health is optimal,
allows even effluent distribution, and allows inspection of the irrigation system. [15A NCAC 02T
.0507(b)]
5. The Permittee shall take measures to prevent effluent ponding in or runoff from the irrigation sites
listed in Attachment B. [15A NCAC 02T .0507(c)]
6. The Permittee shall not irrigate treated effluent during inclement weather, or when the soil is in a
condition that will cause ponding or runoff. [15A NCAC 02T .0505(x)]
7. Irrigation equipment shall be tested and calibrated once per permit cycle. [15A NCAC 02T .0507(d)]
8. Only treated effluent from YMCA Camp Weaver WWTP shall be irrigated on the sites listed in
Attachment B. [15A NCAC 02T .0501]
9. The Permittee shall not allow vehicles or heavy machinery on the irrigation area, except during
equipment installation or maintenance activities. [15A NCAC 02T .0507(e)]
10. The Permittee shall prohibit public access to the wastewater treatment, storage, and irrigation facilities.
[15A NCAC 02T .0505(q)]
11. The Permittee shall dispose or utilize generated residuals in a Division -approved manner. [15A NCAC
02T .0508, 02T .I 100].
12. The Permittee shall not divert or bypass untreated or partially treated wastewater from the subject
facilities. [15A NCAC 02T .05050)]
13. Freeboard in the 250,000 gallon synthetically lined storage lagoon shall not be less than two feet at any
time. [15A NCAC 02T .0505(d)]
14. A gauge to monitor waste levels in the 250,000 gallon synthetically lined storage lagoon shall be
provided. This gauge shall have readily visible permanent markings, at inch or tenth of a foot
increments, indicating the following elevations: maximum liquid level at the top of the temporary liquid
storage volume; minimum liquid level at the bottom of the temporary liquid storage volume; and the
lowest point on top of the dam. [15A NCAC 02T .0507(f)]
15. A protective vegetative cover shall be established and maintained on all berms, pipe runs, erosion
control areas, surface water diversions, and earthen embankments (i.e., outside toe of embankment to
maximum allowable temporary storage elevation on the inside of the embankment). Trees, shrubs, and
other woody vegetation shall not be allowed to grow on the earthen dikes or embankments. Earthen
embankments shall be kept mowed or otherwise controlled and accessible. [15A NCAC 02T .0507(g)]
WQ0019782 Version 4.0 Shell Version 200201 Page 4 of 8
16. Metering equipment shall be tested and calibrated annually. [15A NCAC 02T .0507(d)]
IV. MONITORING AND REPORTING REQUIREMENTS
The Permittee shall conduct and report any Division required monitoring necessary to evaluate this
facility's impact on groundwater and surface water. [15A NCAC 02T .0108(c)]
2. A Division -certified laboratory shall conduct all analyses for the required effluent, groundwater, and
surface water parameters. [15A NCAC 02H .0800]
3. Flow through the treatment facility shall be continuously monitored, and daily flow values shall be
reported on Form NDMR. Facilities with a permitted flow less than 10,000 GPD may estimate their
flow from water usage records provided the water source is metered. [15A NCAC 02T .0105(k), 02T
.0108(c)]
4. The Permittee shall monitor the treated effluent at the frequencies and locations for the parameters
specified in Attachment A. [15A NCAC 02T .0108(c)]
5. The Permittee shall maintain records tracking the amount of effluent irrigated. These records shall
include the following information for each irrigation site listed in Attachment B:
a. Date of irrigation;
b. Volume of effluent irrigated;
c. Site irrigated;
d. Length of time site is irrigated;
e. Continuous weekly, monthly, and year-to-date hydraulic (inches/acre) loadings;
f. Continuous monthly and year-to-date loadings for any non -hydraulic parameter specifically
limited in Attachment B;
g. Weather conditions; and
h. Maintenance of cover crops.
[15A NCAC 02T .0108(c)]
6. Freeboard (i.e., waste level to the lowest embankment elevation) in the 250,000 gallon synthetically
lined storage lagoon shall be measured to the nearest inch or tenth of a foot, and recorded weekly.
Weekly freeboard records shall be maintained for five years, and shall be made available to the Division
upon request. [15A NCAC 02T .0108(c)]
7. Three copies of all monitoring data (as specified in Conditions IV.3. and IVA.) on Form NDMR for
each PPI and three copies of all operation and disposal records (as specified in Conditions IV.S. and
IV.6.) on Form NDAR-1 for every site in Attachment B shall be submitted on or before the last day of
the following month. If no activities occurred during the monitoring month, monitoring reports are still
required documenting the absence of the activity. All information shall be submitted to the following
address:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
[15A NCAC 02T .0105(l)]
WQ0019782 Version 4.0 Shell Version 200201 Page 5 of 8
8. The Permittee shall maintain a record of all residuals removed from this facility. This record shall be
maintained for five years, and shall be made available to the Division upon request. This record shall
include:
a. Name of the residuals hauler;
b. Non -Discharge permit number authorizing the residuals disposal, or a letter from a municipality
agreeing to accept the residuals;
c. Date the residuals were hauled; and
d. Volume of residuals removed.
[15A NCAC 02T .0508(b)]
9. A maintenance log shall be kept at this facility. This log shall be maintained for five years, and shall
be made available to the Division upon request. This log shall include:
a. Date of flow measurement device calibration;
b. Date of irrigation equipment calibration;
c. Visual observations of the plant and plant site; and
d. Record of preventative maintenance (e.g., changing of equipment, adjustments, testing, inspections
and cleanings, etc.).
[15A NCAC 02T .0507(h)]
10. An annual representative soils analysis (i.e., Standard Soil Fertility Analysis) shall be conducted on
each irrigation site listed in Attachment B. These results shall be maintained at the facility for five
years, and shall be made available to the Division upon request. Each Standard Soil Fertility Analysis
shall include the following parameters:
Acidity
Exchangeable Sodium Percentage
Phosphorus
Base Saturation (by calculation)
Magnesium
Potassium
Calcium
Manganese
Sodium
Cation Exchange Capacity
Percent Humic Matter
Zinc
Copper
pH
[15A NCAC 02T .0108(c)]
11. Noncompliance Notification:
The Permittee shall report to the Winston-Salem Regional Office, telephone number (336) 776-9800,
within 24 hours of first knowledge of the following:
a. Treatment of wastes abnormal in quantity or characteristic, including the known passage of a
hazardous substance.
b. Any process unit failure (e.g., mechanical, electrical, etc.) rendering the facility incapable of
adequate wastewater treatment.
c. Any facility failure resulting in a discharge to surface waters.
d. Any time self -monitoring indicates the facility has gone out of compliance with its permit
limitations.
e. Ponding in or runoff from the irrigation sites.
Emergencies requiring reporting outside normal business hours shall call the Division's Emergency
Response personnel at telephone number (800) 662-7956, (800) 858-0368, or (919) 733-3300. All
noncompliance notifications shall file a written report to the Winston-Salem Regional Office within
five days of first knowledge of the occurrence, and this report shall outline the actions proposed or
taken to ensure the problem does not recur. [15A NCAC 02T .0108(b)(1)(A)]
WQ0019782 Version 4.0 Shell Version 200201 Page 6 of 8
V. INSPECTIONS
1. The Permittee shall perform inspections and maintenance to ensure proper operation of the wastewater
treatment and irrigation facilities. [15A NCAC 02T .0507(i)]
2. The Permittee shall inspect the wastewater treatment and irrigation facilities to prevent malfunctions,
facility deterioration, and operator errors that may result in discharges of wastes to the environment,
threats to human health, or public nuisances. The Permittee shall maintain an inspection log that
includes the date and time of inspection, observations made, and maintenance, repairs, or corrective
actions taken. The Permittee shall maintain this inspection log for a period of five years from the date
of the inspection, and this log shall be made available to the Division upon request. [15A NCAC 02T
.0507(h), 02T .0507(i)]
Division authorized representatives may, upon presentation of credentials, enter and inspect any
property, premises, or place related to the wastewater treatment and irrigation facilities permitted herein
at any reasonable time for determining compliance with this permit. Division authorized
representatives may inspect or copy records maintained under the terms and conditions of this permit,
and may collect groundwater, surface water, or leachate samples. [G.S. 143-215.3(a)(2)]
VI. GENERAL CONDITIONS
1. Failure to comply with the conditions and limitations contained herein may subject the Permittee to a
Division enforcement action. [G.S. 143-215.6A, 143-215.613, 143-215.6C]
2. This permit is effective only with respect to the nature and volume of wastes described in the permit
application, and Division -approved plans and specifications. [G.S. 143-215.1(d)]
3. Unless specifically requested and approved in this permit, there are no variances to administrative codes
or general statutes governing the construction or operation of the facilities permitted herein. [15A
NCAC 02T .0105(n)]
4. The issuance of this permit does not exempt the Permittee from complying with all statutes, rules,
regulations, or ordinances that other jurisdictional government agencies (e.g., local, state, and federal)
may require. [15A NCAC 02T .0105(c)(6)]
5. If the permitted facilities change ownership, or the Pennittee changes their name, the Permittee shall
submit a permit modification request on Division -approved forms. The Permittee shall comply with
all terms and conditions of this permit until the permit is transferred to the successor -owner. [G.S. 143-
215.1(d3)]
6. The Permittee shall retain a set of Division -approved plans and specifications for the life of the facilities
permitted herein. [15A NCAC 02T .0105(o)]
7. The Permittee shall maintain this permit until the proper closure of all facilities permitted herein, or
until the facilities permitted herein are permitted by another authority. [15A NCAC 02T .01050)]
WQ0019782 Version 4.0 Shell Version 200201 Page 7 of 8
8. This permit is subject to revocation or modification upon 60-day notice from the Division Director, in
whole or part for:
a. violation of any terms or conditions of this permit or Administrative Code Title 15A Subchapter
02T;
b. obtaining a permit by misrepresentation or failure to disclose all relevant facts;
c. the Permittee's refusal to allow authorized Department employees upon presentation of credentials:
I. to enter the Permittee's premises where a system is located or where any records are required
to be kept;
ii. to have access to any permit required documents and records;
iii. to inspect any monitoring equipment or method as required in this permit; or
iv. to sample any pollutants;
d. the Permittee's failure to pay the annual fee for administering and compliance monitoring; or
e. a Division determination that the conditions of this permit are in conflict with North Carolina
Administrative Code or General Statutes.
[15A NCAC 02T .0110]
9. Unless the Division Director grants a variance, expansion of the facilities permitted herein shall not
occur if any of the following apply:
a. The Permittee or any parent, subsidiary, or other affiliate of the Permittee has been convicted of
environmental crimes under G.S. 143-215.6B, or under Federal law that would otherwise be
prosecuted under G.S. 143-215.6B, and all appeals of this conviction have been abandoned or
exhausted.
b. The Permittee or any parent, subsidiary, or other affiliate of the Permittee has previously abandoned
a wastewater treatment facility without properly closing the facility.
c. The Permittee or any parent, subsidiary, or other affiliate of the Permittee has not paid a civil
penalty, and all appeals of this penalty have been abandoned or exhausted.
d. The Permittee or any parent, subsidiary, or other affiliate of the Permittee is currently not compliant
with any compliance schedule in a permit, settlement agreement, or order.
e. The Permittee or any parent, subsidiary, or other affiliate of the Permittee has not paid an annual
fee.
[15A NCAC 02T .0120(b), 02T .0120(d)]
10. This permit shall not be renewed if the Permittee or any affiliation has not paid the required annual fee.
[15A NCAC 02T .0120(c)]
Permit issued this the 11"' day of June 2020
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
S. Daniel Smith, Director
Division of Water Resources
By Authority of the Environmental Management Commission
Permit Number WQ0019782
WQ0019782 Version 4.0 Shell Version 200201 Page 8 of 8
ATTACHMENT A — LIMITATIONS AND MONITORING REQUIREMENTS
PPI 001— WWTP Effluent
Permit Number: WQ0019782 Version: 4.0
EFFLUENT CHARACTERISTICS
EFFLUENT LIMITS
MONITORING REQUIREMENTS
PCS
Code
Parameter Description
Units of
Measure
Monthly
Average
Monthly
Geometric Mean Daily Minimum Daily Maximum
Measurement
Frequency
Sample
Type
00310
BOD, 5-Day (20 °C)
mg/L
4 x Year'
Grab
00916
Calcium, Total (as Ca)
mg/L
4 x Year'
Grab
50060
Chlorine, Total Residual
mg/L
Weekly
Grab
31616
Coliform, Fecal MF, M-FC Broth, 44.5 °C
#/100 mL
4 x Year'
Grab
50050
Flow, in Conduit or thru Treatment Plant
GPD
3,670
Monthly
Estimate
00927
Magnesium, Total (as Mg)
mg/L
4 x Year'
Grab
00610
Nitrogen, Ammonia Total (as N)
mg/L
4 x Year'
Grab
00625
Nitrogen, Kjeldahl, Total (as N)
mg/L
4 x Year'
Grab
00620
Nitrogen, Nitrate Total (as N)
mg/L
4 x Year'
Grab
00600
Nitrogen, Total (as N)
mg/L
4 x Year'
Grab
00400
pH
su
Weekly
Grab
00665
Phosphorus, Total (as P)
mg/L
4 x Year'
Grab
00931
Sodium Adsorption Ratio
ratio
4 x Year'
Calculated
00929
Sodium, Total (as Na)
mg/L
4 x Year'
Grab
70300
Solids, Total Dissolved — 180 °C
mg/L
4 x Year'
Grab
1. 4 x Year sampling shall be conducted every March, June, September, and December.
WQ0019782 Version 4.0 Attachment A Page 1 of 1
THIS PAGE BLANK
ATTACHMENT B — APPROVED LAND APPLICATION SITES AND LIMITATIONS
The Young Men's Christian Association of Greensboro, Inc. — YMCA Camp Weaver WWTP
Permit Number: WQ0019782 Version: 4.0
IRRIGATION AREA INFORMATION
APPLICATION LIMITATIONS
Field
Owner
County
Latitude
Longitude
Net
Dominant
Parameter
Hourly
Yearly
Units
Acreage
Soil Series
Rate
Max
I
The Young Men's Christian
Guildford
36.027773'
-79.681710'
0.37
01284 — Non -Discharge Application Rate
0.4
38.3
inches
Association of Greensboro, Inc.
2
The Young Men's Christian
Guildford
36.027508'
-79.681820'
0.37
01284 — Non -Discharge Application Rate
0.4
38.3
inches
Association of Greensboro, Inc.
3
The Young Men's Christian
Guildford
36.026903'
-79.681013'
0.45
01284 — Non -Discharge Application Rate
0.4
38.3
inches
Association of Greensboro, Inc.
4
The Young Men's Christian
Guildford
36.027155'
-79.68105 V
0.45
01284 — Non -Discharge Application Rate
0.4
38.3
inches
Association of Greensboro, Inc.
Totals
1.64
WQ0019782 Version 4.0 Attachment B Page 1 of 1
INIQ0019782 I
ti
YMCA Camp Weaver
Min
Wastewater Irrigation System
,� 3` s I I i i i
LV
Ir
f .
le le
rO5OO1t,3 Crail
,
Septic Tank
Goggle E-ar-th
@ 2020 Google
(-YMCA Property
IT
,,,krY.MCA Camp Weaver
, V
VVVVTF
Well
fO
019782
--1-000 ft