Loading...
HomeMy WebLinkAbout20200772 Ver 1_Riparian Buffer Authorization_20200609State of North Carolina DWR Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information la. Name of project: Lot 388Eagle Ridge 1 b. County: Wake 1c. Nearest municipality: Garner 1d. Subdivision name: Eagle Ridge 1e. Is the project located in any of North Carolina's twenty coastal counties? If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: JLS HOMES LLC 2b. Deed Book and Page No. 017532 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 01864 2d. Responsible Party for Corporations): 2e. Street address: 107 Owensboro Ct 2f. City, state, zip: Raleigh, NC 27603 2g. Telephone no.: 9194227302 2h. Fax no.: 2i. Email address: Iclark@jlshomes.com 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ® Other, specify: 3b. Name: 3c. Business name if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name if applicable): 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 10-2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 16091911740 1 b. Site coordinates (in decimal degrees): Latitude: 35.672080 Longitude: 78.658450 1 c. Property size: .29 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Swift Creek/ Lake Benson 2b. Water Quality Classification of nearest receiving water: WS III; NSW;CA 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Wooded 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/z x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3e. Explain the purpose of the proposed project: 3f. Describe the overall project in detail, including the type of equipment to be used: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project(including all priorphases) in thepast? ❑ Yes ❑ No ® Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project(including all priorphases) in thepast? ❑ Yes ® No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑ No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Buffer Impacts 1a. Project is in which protected basin? ® Neuse ❑ Randleman ❑ Tar -Pamlico ❑ Jordan ❑ Catawba ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST this form. fill out Section D of Buffer impact number — Permanent (P) or Temporary T Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1 ®P El El Yes ®No 618 B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 1 c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC DMS proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC DMS. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ® Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. If due to site constraints, a BMP other than a level spreader is proposed, please provide a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Manual and attach a BMP Supplement Form. F. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public federal/state land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ® No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act NEPA/SEPA ? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ® No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated ❑ Yes ® No Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules 15A NCAC 02B .0200 ? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Les Clark / Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class Mail via the US Postal Service For government transportation projects sent by delivery service (UPS, FedEx, etc.): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, etc.): Karen Higgins Karen Higgins NCDWR — 401 & Buffer Permitting Branch OR NCDWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1617 Raleigh, NC 27604 6-2-20 Date FORM: BA 10-2013 Page 4 of 4 LEGEND NTS NOT TO SCALE STAGECREST DR EIP EXISTING IRON PIPE PP POWER POLE W/M WATER METER o TB TELEPHONE BOX SITTEE IPS IRON PIPE SET Ld CP&L TRANSFORMER Q CAN CABLE TV BOX L. POLE LIGHT POLE OHPL OVERHEAD POWER LINE 0 F.E.S. FLARED END SECTION (PIPE) RCP REINFORCED CONC. PIPE B.O.C. BACK OF CURB TEN -TEN RD F.H. FIRE HYDRANT C\O SEWER CLEAN OUT EIS EXISTING IRON STAKE M.H. MANHOLE ECM EXISTING CONCRETE MONUMENT VICINITY MAP (NTS) P.K. PARKER KALON NAIL 386 385 � \ 20' CITY OF RALEIGH SANITARY SEWER EASEMENT 20.00' 65.00' N 06' 15' 12"E 85.00' 10F IABLE WIDTH PUBLIC RM DRAIN EASEMENT TONK �\ o o PROPOSED 388 ZONE 2 o DISTURBANCE o 618 SQ.FT. oU o 1 _ o 00 00 Z p 00 N PROPOSED HOUSE 10' PUBLIC STREET TREE EASEMENT _\ z GRID NORTH, NAD 83 N.C. p M 2013, PG.989) (REF: B- 11.3 10,5' PORCH 82 20.7 34.3' PROPOSED IU DRIVE & cn in WALK S 06' 15' 12"W 85. OWENSBORO COURT (55' PUBLIC R/'W) NOTE: SHOWN IS LOT 388 OF 30 0 30 60 90 EAGLE RIDGE S/D - PHASE 6B REF: B.O.M.2013 PG.988-990 AREA = 0.292 ACRES GRAPHIC SCALE - FEET 107 OWENSBORNSBORO COURT THIS IS TO CERTIFY THAT THIS MAP WAS PRELIMINARY PLOT PLAN FOR: PREPARED ANPREMISES, FROMUAL SURVEY OF JLS HOMES MADEUNDERT MY SUPERVISION, AND THAT THERE ARE NOT ANY ENCROACHMENTS, EXCEPT AS NOTED TO THE BEST OF MY KNOWLEDGE. THAT THE RATIO OF PRECISION AS CALCULATED BY LATITUDES AND DEPARTURES IS 1:10,000. PANTHER CREEK TWSP., WAKE CO., N.C. THIS MAP WAS PREPARED FOR TITLE COMPANY USE SCALE 1 " = 30' MAY 18, 2020 AND IS NOT INTENDED FOR RECORDATION OR CONVEYANCES WITHOUT WRITTEN AUTHORIZATION ULDIN - WATKINS SURVEYING, P.A. OF THE SURVEYOR AND OTHER APPROPRIATE OFFICIALS. O. BOX 444 / 1301 W. BROAD ST. PROFESSIONAL LAND SURVEYOR PRELIMINARY PLAT [FUQUAYVARINA. NORTH CAROLINA 27526 L-3247 NOT FOR RECORDATION19) 552-9326 2768-388