Loading...
HomeMy WebLinkAboutWQCS00047_NOV-2020-DV-0198 Response_20200601NC Dept of Environmental Quality -111N - 9 2020 p Raleigh Regional Office \`�artn+ tpti Public Works Department CITY OF SANFORD P. O. BOX 3729 TELEPI[ONE 919-777-1118 FAX 919-774-8179 North Carolina 27331-3729 or 919-777-1122 Paul M. Weeks, Jr., P.E. City Engineer June 1, 2020 Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ 3800 Barrett Drive Raleigh, NC 27609 RE: Notice of Violation NOV-2020-DV-0198 Permit No. WQCS00047 City of Sanford Collection System Lee County Dear Mr. Vinson: We are in receipt of the above referenced Notice of Violation, dated May 4, 2020, which involved three incidents; 305 E Rose (202000342), Sycamore and Second (202000344), and Market and Hickory (202000348). Below is a discussion of the history as well as the current and future actions being taken to address these occurrences. Attached is an overview map showing the locations of the overflows and the projects that are discussed in this letter. The Event On February 6, 2020, overflows were reported at the three locations, which are all located in Little Buffalo basin. The cause was attributed to a severe natural occurrence. Please find attached rain gauge data from the Big Buffalo Water Reclamation Facility. The spill site in question is more than 4 miles from the rain gauge location however the data shows a large amount of rain on February 6th. RAEngineering FiiesIMEMOSIFY 19 - 20'.0068 pw - Response to NOV.doc Current and Future Actions All three locations are part of the same outfall where we have had previous overflows. To help address this situation, we have completed one recent project and two others are underway: Skunk Creek Rehabilitation project This year, the City finished a cured in place lining project, part of which took place in the Little Buffalo basin. We cleaned 2,735 feet of 8-inch sewer in Little Buffalo basin, of which we lined 1,175 feet. Investigations last year identified those sections of line as sources of inflow and infiltration. This work took place prior to the February event and may have lessened the impact. In the Spring of 2021, we will flow monitor that area to determine the impact of our work. East Sanford CDBG On February 21, 2020, the City received a $2 million CDBG-I grant to rehabilitate sections of sewer line in East Sanford that was originally installed prior to 1930. Please see the attached map. The sections identified for rehabilitation are shown in red. Sections shown in green are additional segments we may line based on funds available. This area discharges to the Little Buffalo outfall, therefore any decrease in inflow from this project will positively impact Little Buffalo. The City is currently acquiring the services of a grant administrator and engineer for this project. We expect to be able to start the repair work in the Spring of 2021. Little Buffalo Rehabilitation — Upper Reach In January of 2020, design work started to increase the size of a portion of Little Buffalo outfall. Previously, studies were undertaken to determine our options for addressing the overflows in the Little Buffalo basin. We expect design to be complete by December of 2020. Concurrently, we are applying for SRF and ASADRA to assist in funding the construction effort. Should you have any questions regarding the above information, please feel free to contact me at any time. Sincerely, Paul M. Weeks Jr., F.E. City Engineer cc: Vic Czar, Public Works Director Gerald Cox, Distribution/Collection Administrator R:''.Engineering FilesMEMOS'TY 19 - 20'-.0068 pw - Response to NOV.doc MONTHLY CLIMATOLOGICAL SUMMARY for FEB. 2020 NAME: BigBuffalo WWTP CITY. STATE: ELEV: 261 ft LAT: 35" 18' 00" N LONG: 79" 06' 00" W TEMPERATURE ("F), RAIN (in), WIND SPEED (mph) MEAN DAY TEMP HIGH TIME 1 40.6 46.0 3:30p 2 48.3 63.6 3:30p 3 59.7 76.8 2:30p 4 63.8 70.3 1:30p 5 62.0 64.1 1:00p 6 61.9 71.8 1:00p 7 49.9 61.3 5:00a 8 37.3 44.1 12:30p 9 43.3 56.2 3:30p 10 52.7 66.99 2:OOp 11 66.7 73.3 4:OOp 12 56.6 62.2 12:30a 13 61.9 71.9 10:30a 14 44.5 52.8 2:00p 15 36.0 47.2 3:30p 16 43.2 56.0 2:00p 17 48.4 61.6 2:30p 18 51.7 62.4 3:30p 19 48.8 57.1 2:00a 20 37.8 44.8 11:OOa 21 31.3 37.1 4:30p 22 36.0 55.1 4:OOp 23 45.3 63.1 2:30p 24 46.6 50.9 10:30a 25 55.9 63.9 3:00p 26 57.9 64.0 2:30p 27 42.8 50.8 2:30p 28 40.5 53.3 2:00p 29 37.9 48.6 3:30p 48.6 76.8 3 HEAT COOL AVG DEG DEG WIND DOM LOW TIME DAYS DAYS RAIN SPEED HIGH TIME DIR --------------------------------------------------- --------- 33.1 12:OOm 24.4 0.0 0.02 0.3 10.0 4:00p S 30.5 5:30a 16.7 0.0 0.01 2.5 22.0 1:30p NE 39.9 7:00a 7.5 2.2 0.00 1.1 12.0 1:30p N 58.7 7:O0a 2.1 0.8 0.00 1.8 13.0 2:30p N 59.8 8:30p 3-0 0.0 0.30 1.5 14.0 3:00a NNE 59.0 11:30g 3.5 0.4• 3.52 2.2 23.0 1:00p NNW 36.6 11:00p 15.1 0.0 0.06 5.0 31.0 7:30a NE 27.9 7:00a 27.7 0.0 0.00 0.9 10.0 1:30p ESE 31.5 7:OOa 21.7 0.0 0.00 0.6 11.0 11:30p NNW 33.3 6:30a 12.5 0.1 0.00 0.9 15.0 1:00p N 62.2 12:00m 0.8 2.5 0.15 3.0 23.0 12:30p N 53.2 7:OOa 8.4 0.0 0.01 1.4 13.0 1:30a S 48.3 12:00m 4.1 0.9 0.57 3.6 22.0 9:30a NNE 34.2 12:00m 20.5 0.0 0.00 2.7 17.0 2:OOp SSE 28.7 6:00a 29.0 0.0 0.00 1.1 11.0 8:OOa S 29.1 6:OOa 21.8 0.0 0.06 0.3 10.0 12:30p WNW 40.4 12:OOm 16.6 0.0 0.00 1.0 12.0 11:30a S 37.9 4:00a 13.3 0.0 0.11 0.3 7.0 12:30p S 39.7 12:00m 16.2 0.0 0.13 1.5 15.0 4:30a S 32.8 5:30p 27.2 0.0 0.13 0.9 14.0 11:OOa S 25.3 12:00m 33.7 0.0 0.33 3.5 19.0 9:00a S 22.2 5:30a 29.0 0.0 0.06 0.4 9.0 12:00p SW 25.8 6:30a 19.7 0.0 0.00 0.0 13.0 3:OOp NE 42.7 S:OOa 18.4 0.0 0.33 0.1 8.0 8:30a N 47.9 12:30a 9.1 0.0 0.10 0.6 13.0 5:30a NNW 49.0 12:OOm 7.1 0.0 0.00 1.5 23.0 10:00p NNW 30.0 12:OOm 22.2 0.0 0.00 3.3 22.0 7:30a E 25.7 6:00a 24.5 0.0 0.02 2.0 19.0 2:30p ENE 28.2 11:30p 27.1 0.0 0.01 2.3 22.0 11:30a E 22.2 22 482.9 6.9 5.92 1.6 31.0 7 S Max >= 90.0: 0 Max <- 32.0: 0 Min <= 32.0: 11 Min <= 0.0. 0 Max Rain: 3.52 ON 02/06/20 Days of Rain: 15 (>.01 in) 9 (>.1 in) 1 (>1 in) Heat Base: 65.0 Cool Base: 65.0 Method: Integration n41. Im F� 44 Cf T' µid%k}r5 TMi _:• i. {#r', . # 0 dp jr r A _61 1 �•� ��� - i r� r�' 4 ,S�LBk=r!SS.� x � � •1 AZ,' qr ,o tr ii+ r51 41 • ll .•1 0- is �l � y 55Y Ir 1/./—� NF�'SHS3.^• 4_ 5I - n 'r',ry ram.*^�'� •yy gF0UR4 j L � UR Y` 5 �■ •rya, r N v � `' � 1 • _ � a .fir;' ... it f,•. a �. t O L .^. 5 •r ��i.�HTHIRAST ^t ter. -• a iAj• w 5 ��ty9S a'��i•~ 4, ro omill, i 4 ��`i r.. 1 }'4 �!' _ 5 �5T �' • SE Ry1J5 ` ti ' � � 3, s��P � g� ` , ' T M3 •_�__ � ' Y •'� � 1 ��`' ���� ems) ran°. i s a' ..,�SItO�REST.. __._ ...— wi�Sa�sT��..�:r • t �'�.x� •' •" Lam' ', d Y : � .�' • 4p l 1 � ��tti' •� � r4 � A{�� i r S'' 'pro �•J orb .t S i Little Buffalo Rehabilitation - Upper `Reach 4 [I I I �- .Us � i i. 115 Chatham St Buggy Factory Legend - Sewer Main a �... Upper LBC (current project) Lower LBC (to Amos Bridges Rd.) -_f-- H-4 . Little Buffalo Creek (LBC) Outfall � W WithersRavenel o�5 Engineers I Manners I 5uly� yors ar( 0 500 1.000 Feet ract 01 14 Wundl Map tsf'l n