HomeMy WebLinkAbout20200759 Ver 1_401 Application_20200609DWR
mrlslon of Water Resources
Pre -Construction Notification (PCN) Form
April 11, 2020 Ver 3.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
C Yes r No
Change only if needed.
BIMS # Assigned
20200759
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
Reviewing Office *
Raleigh Regional Office - (919) 791-4200
Information for Initial Review
1a. Name of project:
Town of Holly Springs (Carolina Springs) Pump Station & Force Main
1a. Who is the Primary Contact?*
Deborah Shirley
1b. Primary Contact Email:*
dshirley@sandec.com
Date Submitted
6/9/2020
Nearest Body of Water
Big Branch; Little Branch
Basin
Cape Fear
Water Classification
C; C
Site Coordinates
Latitude:
Longitude:
35.6773
-78.8749
A. Processing Information
County (or Counties) where the project is located:
Wake
Is this a NCDMS Project
r Yes r No
Is this project a public transportation project?*
r Yes r No
1a. Type(s) of approval sought from the Corps:
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Version#*
1
What amout is owed?*
r $240.00
r $570.00
Select Project Reviewer*
Stephanie Goss:eads\szgoss
1c. Primary Contact Phone:*
(919)846-5900
1b. What type(s) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r Individual Permit
12 - Utility Lines
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
F- 401 Water Quality Certification - Express
F- Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
r Yes r No
B. Applicant Information
1d. Who is applying for the permit?
R Owner r Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Town of Holly Springs
2b. Deed book and page no.:
N/A
2c. Responsible party:
John Schifano
2d.Address
Street Address
PO Box 8
Address Line 2
city
Holly Springs
Postal / Zip Code
27540
2e. Telephone Number:
(919)557-2917
2g. Email Address:*
john.schifano@hollyspringsnc.us
State / Rovince / legion
NC
Country
United States
2f. Fax Number:
r- Yes r No
r Yes r No
4. Agent/Consultant (if applicable)
4a. Name:
Deborah Shirley
4b. Business Name:
Soil & Environmental Consultants, PA
4c.Address
Street Address
8412 Falls of Neuse Road, Suite 104
Address Line 2
City
Raleigh
Postal / Zip Code
27615
4d. Telephone Number:
(919)846-5900
4f. Email Address:*
dshirley@sandec.com
Agent Authorization Letter*
Agent Auth_municipal_TOHS Carolina Springs Offsite FM.docx.pdf
State / Province / F bgion
NC
Country
United States
4e. Fax Number:
413.15KB
C. Project Information and Prior Project History C^U
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality/ town:
Folly Springs
2. Project Identification
2b. Property size:
2a. Property Identification Number: ApproArnately 14.16 acres (1.53 onsite; 12.63
IWA-Linear Utility Project offsite)
2c. Project Address
Street Address
Located from Woods Creek Road to the Utley Creek Water Reclamation Facility
Address Line 2
(Sty
State / Province / Fegion
Apex
NC
Postal / Zip Cade
Country
27539
United States
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Big Branch; Little Branch
3b. Water Resources Classification of nearest receiving water:*
C; C
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
030300040102
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The wasting conditions on the site within the vicinity of the proposed pump stations consists primarily of forestry. The proposed force main path is primarily road side, previously
disturbed areas. There are four (4) perennial stream features (N, F2, G2 & K2), six (6) intermittent stream features (L, M, H2, J2, L2 & M2), and five (5) wetland features (W38 - W42)
located within or adjacent to the proposed pump station and easement locations. Within the proposed pump station and easement locations specifically, streams M & N are located
adjacent to the proposed pump station. Wetlands W38, W42, and streams F2 & G2 are located along Old Holly Springs Apex Road. Streams H2 and J2 are located on in wooded land
between Folly Springs New Mill Road and Thomas Mill Road. Wetlands W39, W40, W41 & stream K2 are all located along Irving Parkway with stream L2 just south of Green Oaks
Parkway. Streams L (adjacent to the proposed pump station) and M2 (north of the treatment plant) have been avoided. The general land use in the vicinity of the project is residential
and commercial development with forested land.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
USGS Offsite.pdf
2.61 MB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
Soil Survey Offsite.pdf 1.38MB
4f. List the total estimated acreage of all existing wetlands on the property:
ApproArnately 0.03 acres within easement
4g. List the total estimated linear feet of all existing streams on the property:
Apprommately 407 linear feet within the eastment and pump station area
4h. Explain the purpose ofthe proposed project:*
The purpose of this project is to construct and to provide wastewater service to a large portion of the Town of Holly Springs extra territorial jurisdiction. The service area will eventually
include residential and commercial development as well as two (2) Wake County Public School System schools. The force main is approArnately 19,000 feet in length and will discharge
to the Town of Holly Springs May Creek Water Reclamation Facility.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The overall project consists of the construction of a pump station and a force main. Specifically, there are nine (9) open cut construction access areas that impact streams and or
wetlands. Heavy equipment typically used for the sanitary sewer installation will be used (e.g. excavators, bulldozers, etc.).
4j. Please upload project drawings for the proposed project.
02190372.10 Impact Maps.pdf 8.61 MB
Sheets -Details -EC Details.pdf 9.39MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No O Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
AID for Pump Station & Force Main not issued to date, PJD package sent via email on June 2, 2020
Sc. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Steven Ball
Agency/Consultant Company: Soil & Environmental Consultants, PA
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are anyother NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity?
It is my understanding that there are no intended future phases beyond the easements shown. Therefore, no additional NWP, Regional General Permits, or IP are anticipated.
D. Proposed Impacts Inventory U
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
W Wetlands W Streams -tributaries r Buffers
r Open Waters r Pond Construction
2. Wetland Impacts
f��
2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W.2d. W. name 2e.Forested* 2f.Typeof 2g. Impact
Jurisdicition*(?) area*
Impact 2 Construction Access P Headwater Forest W38 Yes Both 0.010
(Permanent -no (acres)
permanent loss)
Im act 2
P
Temporary Construction
P Y
Access
T
Headwater Forest
W38
Yes
Both
0.017
(acres)
Impact 7
Temporary Construction
Access
T
Headwater Forest
W41
Yes
Both
0.003
I (acres)
2g. Total Temporary Wetland Impact
0.020
2g. Total Wetland Impact
0.030
2h. Comments:
3. Stream Impacts
2g. Total Permanent Wetland Impact
0.010
3a. Reason for impact (?)
3b.lmpact type *
3c. Type of impact*
3d. S. name *
3e. Stream Type *
3f. Type of
3h. Impact
❑
(?)
]3g.S.width*
Jurisdiction*
length*
S1
Impact 1 B-Temporary
Permanent
Other
Stream N
Perennial
Both
27
39
Construction Access
Average (feet)
(linearfeet)
(Permanent -No permanent
loss)
82
Impact 1A-Temporary
Permanent
Other
Stream M
Intermittent
Both
8
65
Construction Access
Average(feet)
(lir�rfeet)
(Permanent -no permanent
loss)
S3
Impact 3-Temporary
Permanent
Other
Stream F2/G2
Perennial
Both
11
109
Construction Access
Average (feet)
(lin�rfeet)
(Permanent -no permanent
loss)
S4
Impact 4-Construction
Permanent
Other
Stream H2
Intermittent
Both
2
77
Access (Permanent -no
Average (feet)
(lines feet)
permanent loss)
S5
Impact 5-Construction
Permanent
Other
Stream J2
Intermittent
Both
2
30
Access (Permanent -No
Average (feet)
(lirfeet)
Permanent Loss)
S6
Impact 6-Temporary
Permanent
Other
Stream K2
Perennial
Both
10
55
Construction Access
Av-age(feet)
(lir�rfeet)
(Permanent -No Permanent
Loss)
S7
Impact 8-Temporary
Permanent
Other
Stream L2
Intermittent
Both
HE-
3i.
31. Total permanent stream impacts:
412
31. Total stream and ditch impacts:
412
3j. Comments:
31. Total temporary stream impacts:
Total permanent -no permanent loss stream = 412 LF. Identified as "permanent -no permanent loss", riprap will be "keyed" into the stream bed for
stabilization, will not obstruct stream flows. Additionally, at Impacts 4 & 5 (i.e. intermittent streams), the stream banks will be sloped for future
maintenance access.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
S&EC completed a wetland and stream delineation for approximately 24,000 linear foot of proposed easement at 50' wide to identify natural resources
so that impacts could be avoided & minimized to the maximum extent practicable. This easement delineation included three (3) different routes south
of Thomas Mill Road. The proposed project entails constructing a force main from a pump station located on the proposed Carolina Springs property
to the Utley Creek Water Reclamation Facility for the treatment of wastewater for proposed and future developments. Directional drill or bore &jack
construction methods are not being proposed for this project. This is because the cost of bore and jack as well as HDD can be cost prohibitive,
particularly in areas where rock is encountered. Additionally, the Town of Holly Springs will have to maintain the 30' wide permanent maintenance
corridor that would affect the wetlands and/or streams, therefore the open cut construction method has been proposed. Impact areas 1A and 1 B are
proposed temporary construction access with "permanent -no permanent loss" stream impacts. These impacts are identified as "permanent -no
permanent loss" impacts because riprap will be "keyed" into the stream bed and banks for stability. These impacts are necessary for the construction
of the force main and to avoid any impact to the Woods Creek Road public right of way. Impact area 2 is proposed temporary and "permanent -no
permanent loss" wetland impacts for a temporary construction access as well as a permanent maintained corridor access within the wetland. Wetland
impacts were minimized by placing the force main on the east side of Old Holly Springs Apex Road vs. the wrest which would have resulted in greater
wetland impacts. Impact area 3 is proposed "permanent -no permanent loss" stream impact for a temporary construction access. This impact is
identified as a "permanent -no permanent loss" impact because riprap will be "keyed" into the stream bed and banks for stability. The NCDOT has
plans to realign this road and replace the bridge at this location. The proposed impact was designed on the east side of Old Holly Springs Apex Road
vs. the west side to avoid the force main being approximately 80 ft. from the outside travel lane which would make the utility and easement more
difficult to access for future maintenance activities. Impact areas 4 & 5 are both proposed "permanent -no permanent loss" stream impacts for
permanent construction access. These impacts are identified as "permanent -no permanent loss" impacts because riprap will be "keyed" into the
stream bed and banks for stability, in addition the stream banks at these locations will be sloped for future maintenance access. These impact
locations were designed in these locations because of property owners and their concerns regarding force main locations on their properties. Impact
area 6 is proposed "permanent -no permanent loss" stream impact for a temporary construction access. This impact is identified as a "permanent -no
permanent loss" impact because riprap will be "keyed" into the stream bed and banks for stability. This crossing location was chosen because this
area has been previously disturbed from another sanitary sewer easement, and because this easement route #3 impacted less wetlands and streams
than routes 1 & 2. Impact area 7 is proposed temporary wetland impact for a temporary construction access. The force main has been designed on
the east of Irving Parkway because there are many obstacles on the west side of the road such as storm drainage, a potable water line, sewage force
main. These existing easements and utility lines would make installation on the west side of Irving Parkway impractical. Impact area 8 is proposed
"permanent -no permanent loss" stream impact for a temporary construction access. This impact is identified as a "permanent -no permanent loss"
impact because riprap will be "keyed" into the stream bed and banks for stability. This location was chosen because of an existing easement to access
the Utley Creek Water Reclamation Facility. Note that stream impacts to feature "L" (onsite) was avoided by relocating the pump station, and "M2" by
connecting to an existing force main on the west side of the Utley Creek Water Reclamation Facility. Temporary wetland impacts will be brought back
to pre -construction contours and allowed to revegetate with existing wetland seed source.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
A stream bypass with cofferdam and a pump around will be used as well as silt fence, silt fence outlets and check dams (see detail sheet #25).
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
There are no proposed permanent loss stream impacts for the project, all "permanent -no permanent loss" impacts will have riprap "keyed" in to the stream bed and will not obstruct
stream flows, "permanent -no permanent loss" wetland impacts are less than 0.10 acre. Impacts have been avoided to the maximum extent practicable. Therefore compensatory
mitigation in the form of mitigation payment has not been proposed.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) u
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
If no, explain why:
No diffuse flow required, no proposed imperviousness or concentrated flows.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)?
r Yes r No
Comments:
Per Question 3a, this project does not require Stormwater Management Plan or Antidegradation Calculations. There is no proposed new impervious area for the Force Main.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPAUSEPA)?*
r Yes r No
Comments:*
The project will be built and paid for by a developer and will receive a reimbursement. SEPA/NEPA not required per the project engineer.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
We have reviewed the "Draft Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetlands Programs' document
prepared by the NC Division of Water Quality on April 10, 2004, version 2.1. The draft states that other publically funded projects may or may not
result in cumulative impacts. The Town of Folly Springs (Carolina Springs) Pump Station & Force Main project is a privately funded (with partial public
reimbursement) within a partially developed watershed. Please note that this project is located within the Town of Holly Springs, therefore the adjacent
properties that have potential for development will have the following regulations to protect downstream waters: 1) The Cape Fear River Basin
Riparian Area Protection Rules, these regulations require limited development within the riparian buffer area, in addition diffuse flow of runoff is
required and/or Best Management Practices may be needed if diffuse flow cannot be achieved; 2) the Phase II NPDES Stormwater Permit Program,
this program includes permitting requirements for Municipal Separate Storm Sewer Systems (MS4s) in addition to post -construction stormwater
management requirements. We anticipate that the DWR will advise us if any additional information is needed.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r Nor N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated
at a treatment plant, list the capacity available at that plant.
Non -discharge wastewater will be treated at the Utley Creek Water Reclamation Facility with a capacity of 6.0 Million Gallons Per Day.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5d. Is another Federal agency involved?*
r Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property.
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
The NC Natural Heritage Programs Data Explorer Map was used to search for elemental occurrences of federally protected species listed within and
within 1-mile of the project boundaries. It was determined based on the search that there are no elemental occurrences that are listed as federally
Threatened/Endangered within or within 1-mile of the project boundaries. References: NC Natural Heritage Program. 2020. Geographic Information
System (GIS) data. NCDNCR, Raleigh, NC. Available at http://www.nenhp.org/. (Accessed: May 14, 2020).
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
The NOAA Habitat Conservation/Habitat Protection: National Marine Fish Service; Essential Fish Habitat Mapper website was referenced. No Essential
Fish Habitat was identified near the project.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
The NC State Historic Preservation Office HPOWEB GIS Service interactive map was referenced on May 13, 2020, one "surveyed only" listing was
identified adjacent to the proposed Force Main route. This listing is the Holland Cemetery (WA7475), a 1880-1998 cemetery feature listed as
"surveyed only'. It is located on the east side of Old Holly Springs Apex Road and north of Cypress Hill Lane. The proposed Force Main easement was
shifted to the west side of Old Holly Springs Apex Road at the intersection of Old Holly Springs Apex Road and Ivy Arbor Way, to the north of this
cemetery.
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-yearfloodplain?*
r Yes r No
8b. If yes, explain how project meets FEMA requirements:
There will be no above ground structures installed within the 100-year flood plains.
8c. What source(s) did you use to make the floodplain determination?*
NC Flood Risk Information System Floodplain Mapping Program and confirmation from the project engineer.
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
SKETCH MAP Carolina Springs Forcemain - PJD Request 2020 (PRINTED).pdf 2.25MB
Signature
W By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Deborah E. Shirley
Signature
he 011-
Date
6/9/2020
J
MUNICIPAL OFFICIAL / AGENT AUTHORIZATION
Project Name/Description: Town of Holly Springs – Carolina Springs Offsite Force Main
S&EC Project # 13152
Date: 04/09/2020
The Department of the Army
U.S. Army Corps of Engineers, Wilmington District
69 Darlington Avenue
Wilmington, NC 28403
Attn: James Lastinger Field Office: Regulatory Field Office
This document authorizes Soil & Environmental Consultants, PA (S&EC) (as my agent) to act on my
behalf and take all actions necessary for the processing, issuance and acceptance of a permit or
certification and any and all associated standard and special conditions. This notification supersedes any
previous correspondence concerning the agent for this project.
NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government
officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site
meeting prior to visiting the site.
PARCEL INFORMATION:
Parcel Index Number(s) (PIN): multiple
Site Address:
City, County, State:
MUNICIPAL OFFICIAL INFORMATION:
Name:
Address: PO Box 8, Holly Springs, NC 27540
Phone No.: Fax No.: Mobile No.:
Email:
_________________________________________ ________________________
Municipal Official (please print) Date
Municipal Official’s Signature
We hereby certify the above information submitted in this application is true and accurate to
the best of our knowledge.
DocuSign Envelope ID: AE449437-C319-4995-B1BF-354C97C900CB
4/15/2020
John Schifano
Town of Holly Springs
919-557-2917
Town Attorney
919-708-8082
john.schifano@hollyspringsnc.us
Project Number:
DS
Project Manager:
1" = 2000'Scale:
05/21/2020Date:
Map Title:
Source:
Figure 1- USGS Map
Town of Holly Springs-
Carolina Springs Force Main
2019 USGS New Hill
& Apex Quad
¯0 2,000 4,000
Feet
13152.W19
Project Number:
SBProject Manager:
1" = 1500'Scale:
05/21/2020Date:
Map Title:
Source:
Figure 2 - Soil Survey
Town of Holly Springs-
Carolina Springs Force Main
Wake County Soil Survey
Sheet 90, 83, 82 & 89
¯0 1,500 3,000
Feet
13152.W15
S
SSS
S
SWCC
E
E ED DDEFOBS
SSS SSSSECHH
FOB
FOB
FOB
FOB
FOB FOB
W
X X X
XXXC
C
CC
DDD
DDEEEE EE
E
SPGSSS
S SSSSSSSS
SSSSD
D
TE
ECHHCHH
CHH
CHH
CHH
FOB
FOB FOB
FOBFOB FOB
FOBFOB
FOB
FOB
FOB
FOB
FOB
FOBFOBWW
W
WWEFOFOFOFO EFMDDDSS EWETLANDAREAW23S09 STOPDWRSTARTFEATURE LBUFFERDWR STOPFEATURE LBUFFERWETLANDAREAW21WETLANDAREAW21WF04WF05WF06WF07WF03WF02WF01WF09WF08WF10WF11WF12WF13WF16WF15WF14WETLAN
D
A
R
E
A1
WETLAN
D
A
R
E
A
2
BLDGBLDGBLDGSIGNSIGNSIGNSIGNALPO
L
ELPLPSIGNALPOLESIGNALPOLESIGNALPOLESIGNALPOLESIGNALPOLELPLPLPLPLPLPLPSIGNN 10°56'
5
2
"
W
274.33'N 04°22'27" E188.54'N 55°56'14" E51.35'N 17°21'2
2
"
W
9.31'POND
60' ACCESS EASEMENTper BM 1990, PG 106BM 1985, PG 1712 and 171620' PUBLIC SANITARY SEWER EASEMENTSTORMWATER MAINTENANCEEASEMENT15' PRIVAT
E
R
E
U
S
E
L
I
N
E
E
A
S
E
M
E
N
T PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPDM01STARTFLAGSB03 STOPFLAGSB04STARTFLAGWWWS
SSS
S
SWCC
E
E ED DDEFOBS
SSS SSSSECHH
FOB
FOB
FOB
FOB
FOB FOB
W
X X X
XXXC
C
CC
DDD
DDEEEE EE
E
SPGSSS
S SSSSSSSS
SSSSD
D
TE
ECHHCHH
CHH
CHH
CHH
FOB
FOB FOB
FOBFOB FOB
FOBFOB
FOB
FOB
FOB
FOB
FOB
FOBFOBWW
W
WWEFOFOFOFO EFMDDDSS EWETLANDAREAW23S09 STOPDWRSTARTFEATURE LBUFFERDWR STOPFEATURE LBUFFERWETLANDAREAW21WETLANDAREAW21WF04WF05WF06WF07WF03WF02WF01WF09WF08WF10WF11WF12WF13WF16WF15WF14WETLAN
D
A
R
E
A1
WETLAN
D
A
R
E
A
2
BLDGBLDGBLDGSIGNSIGNSIGNSIGNALPO
L
ELPLPSIGNALPOLESIGNALPOLESIGNALPOLESIGNALPOLESIGNALPOLELPLPLPLPLPLPLPSIGNN 10°56'
5
2
"
W
274.33'N 04°22'27" E188.54'N 55°56'14" E51.35'N 17°21'2
2
"
W
9.31'POND
60' ACCESS EASEMENTper BM 1990, PG 106BM 1985, PG 1712 and 171620' PUBLIC SANITARY SEWER EASEMENTSTORMWATER MAINTENANCEEASEMENT15' PRIVAT
E
R
E
U
S
E
L
I
N
E
E
A
S
E
M
E
N
T PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPDM01STARTFLAGSB03 STOPFLAGSB04STARTFLAGWWW30"x48"H2030"x48"H2072"x42"H2072"x42"H2060"x36"H20
24"x30"H20
30"x42"H20 $
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN EXISTING CONDITIONS MAP A
1 inch = 1000 ft.
1000
GRAPHIC SCALE
0 500 1000 2000
IR
V
I
N
G
P
K
W
Y
THOMAS MILL RDNEW HILL RD
OLD HO
L
L
Y
S
P
RI
N
G
S
A
P
E
X
R
D
WOODS CREEK RDO
L
D
H
O
L
L
Y
S
P
R
I
N
G
S
A
P
E
X
R
D
GREEN OAKS PKWYTOHS
WWTP
VICINITY MAP
1"=10000'
PROJECT LOCATION
SSS
SSSW
C CE
E ED DDE
FOB
S
S
S
S
S
SSSE
CHH
FOB FOB
FOB
FOB
FOB
FOB
W
X X X
XXXC
C
C
CDDD
DDEEEE
E
E
E
SPGSS
S
SSSS
S
SSSS
SSSSD
D
T
E
ECHH
CHH
CHH
CHH
CHH
FOB
FOB FOB
FOBFOB FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
W
W
W
W
WT
T
FOFOFOFO
T
FM
D
DD
S
SEWETLANDAREAW23S09 STOPDWRSTARTFEATURE LBUFFERDWR STOPFEATURE LBUFFERWETLANDAREAW21WETLANDAREAW21EOI WF04WF05WF06WF07WF03WF02WF01WF09WF08WF10WF11WF12WF13WF16WF15WF14WETLA
N
D
A
R
E
A1
WETLA
N
D
A
R
E
A
2
BLDGBLDGBLDGSIGNSIGNSIGNSIGNN 10°56'52"
W
274.33'N 04°22'27" E188.54'N 55°56'14" E51.35'N 17°21'22"
W
9.31'
POND
60' ACCESS EASEMENTper BM 1990, PG 106BM 1985, PG 1712 and 171620' PUBLIC SANITARY SEWER
EASEMENT
15' PRIVATE
R
E
U
S
E
L
I
N
E
E
A
S
E
M
E
N
T
DM01STARTFLAGSB03 STOPFLAGSB04STARTFLAG430'
430'
425'425'
425'
425'
425'425'425'425'425'425'
420'
420'420'420'420'420'420'
420'
420'420'420'415'415'415'415'
415'
415'
415'
415'
415'
415'
415'410'410'410'410'
410'410'410'
410'410'410'410'410'410'
410'410'410'410'405'405'405'405'405'405'
405'405'405'405'405'405'405'400'400'400'400'400'400'400'
400'
400'
400'
400'400'395'395'395'395'
395'
395'
395'395'390'390'390'390'
390'
390'390'390'
390'
385'385'385'
385'
385'385'385'
380'
380'380'380'380'
380'380'380'
380'
380'
380'
375'
375'375'375'
375'375'
375'
375'370'370'370'365'365'365'365'365'
365'365'365'365'365'365'365'360'360'360'360'360'360'355'355'
355'
355'
355'355'355'
355'
355'355'355'355'355'355'350'
350'350'350'350'350'345'345'345'345'
340'
340'
340'
340'340'340'340'340'335'335'335'335'335'335'
335'335'
335'335'335'335'330'330'
330'
330'
330'
330'
330'330'330'330'325'
325'
325'
325'
325'
325'325'320'320'320'320'320'
320'320'320'320'320'320'320'320'315'315'315'315'315'315'315'315'315'315'315'315'310'310'310'310'310'310'310'310'310'310'
305'305'305'
305'
305'
300'
300'
300'
300'
300'
295'
295'
295'295'290'
290'
290'285'285'285'285'280'280'280'275'275'
275'
275'
275'275'270'270'270'270'
270'270'265'
265'
265'265'265'265'265'265'265'265'265'
265'
265'
265'265'265'265'265'265'265'265'265'265'265'265'265'260'260'260'260'260'260'260'260'
260'
255'
255'255'255'255'
255'255'255'255'255'
255'
255'255'255'250'250'250'250'180' CP&L EASEMENTDB 2942, PG 378DB 2949, PG 505BM 1991, PG 429180' CP&L EASEMENTDB 2942, PG 378DB 2949, PG 505BM 1991, PG 42950' CARDINAL EXTENSION COMPANY, LLCGAS LINE EASEMENTper BM 2015, PG 12550' CARDINAL PI
P
E
L
I
N
E
C
O
M
P
A
N
Y
,
L
L
C
and CARDINAL EX
T
E
N
S
I
O
N
C
O
M
P
A
N
Y
,
L
L
C
RIGHT OF WAYDB 14033, PG 12
6
2
50' CARDINAL PI
P
E
L
I
N
E
C
O
M
P
A
N
Y
,
L
L
C
and CARDINAL EX
T
E
N
S
I
O
N
C
O
M
P
A
N
Y
,
L
L
C
RIGHT OF WAYDB 14033, PG 1262
50' CARDINAL EXTENSION COMPANY, LL
C
GAS LINE EASEMENTper DB 8166, PG 1195
50' CARDINAL EXTENSION COMPANY, LLC
GAS LINE EASEMENT
per DB 8166, PG 1195
30' SAN
IT
AR
Y
SEWEREASEMEN
T
p
e
r
BM
1990
,
PG
1
6
0 PERMANENT UTILITY EASEMENTper BM 2007,
P
G
6
0
0
20' U
TILIT
Y EASE
ME
NT
per BM 1990, P
G
10
6
10' UTIL
I
T
Y
E
A
S
E
M
E
N
T
p
er
B
M
2
0
0
6
,
P
G
1874
W
W
W
SSS
SSSW
C CE
E ED DDE
FOB
S
S
S
S
S
SSSE
CHH
FOB FOB
FOB
FOB
FOB
FOB
W
X X X
XXXC
C
C
CDDD
DDEEEE
E
E
E
SPGSS
S
SSSS
S
SSSS
SSSSD
D
T
E
ECHH
CHH
CHH
CHH
CHH
FOB
FOB FOB
FOBFOB FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
FOB
W
W
W
W
WT
T
FOFOFOFO
T
FM
D
DD
S
SEWETLANDAREAW23S09 STOPDWRSTARTFEATURE LBUFFERDWR STOPFEATURE LBUFFERWETLANDAREAW21WETLANDAREAW21EOI WF04WF05WF06WF07WF03WF02WF01WF09WF08WF10WF11WF12WF13WF16WF15WF14WETLA
N
D
A
R
E
A1
WETLA
N
D
A
R
E
A
2
BLDGBLDGBLDGSIGNSIGNSIGNSIGNN 10°56'52"
W
274.33'N 04°22'27" E188.54'N 55°56'14" E51.35'N 17°21'22"
W
9.31'
POND
60' ACCESS EASEMENTper BM 1990, PG 106BM 1985, PG 1712 and 171620' PUBLIC SANITARY SEWER
EASEMENT
15' PRIVATE
R
E
U
S
E
L
I
N
E
E
A
S
E
M
E
N
T
DM01STARTFLAGSB03 STOPFLAGSB04STARTFLAG430'
430'
425'425'
425'
425'
425'425'425'425'425'425'
420'
420'420'420'420'420'420'
420'
420'420'420'415'415'415'415'
415'
415'
415'
415'
415'
415'
415'410'410'410'410'
410'410'410'
410'410'410'410'410'410'
410'410'410'410'405'405'405'405'405'405'
405'405'405'405'405'405'405'400'400'400'400'400'400'400'
400'
400'
400'
400'400'395'395'395'395'
395'
395'
395'395'390'390'390'390'
390'
390'390'390'
390'
385'385'385'
385'
385'385'385'
380'
380'380'380'380'
380'380'380'
380'
380'
380'
375'
375'375'375'
375'375'
375'
375'370'370'370'365'365'365'365'365'
365'365'365'365'365'365'365'360'360'360'360'360'360'355'355'
355'
355'
355'355'355'
355'
355'355'355'355'355'355'350'
350'350'350'350'350'345'345'345'345'
340'
340'
340'
340'340'340'340'340'335'335'335'335'335'335'
335'335'
335'335'335'335'330'330'
330'
330'
330'
330'
330'330'330'330'325'
325'
325'
325'
325'
325'325'320'320'320'320'320'
320'320'320'320'320'320'320'320'315'315'315'315'315'315'315'315'315'315'315'315'310'310'310'310'310'310'310'310'310'310'
305'305'305'
305'
305'
300'
300'
300'
300'
300'
295'
295'
295'295'290'
290'
290'285'285'285'285'280'280'280'275'275'
275'
275'
275'275'270'270'270'270'
270'270'265'
265'
265'265'265'265'265'265'265'265'265'
265'
265'
265'265'265'265'265'265'265'265'265'265'265'265'265'260'260'260'260'260'260'260'260'
260'
255'
255'255'255'255'
255'255'255'255'255'
255'
255'255'255'250'250'250'250'180' CP&L EASEMENTDB 2942, PG 378DB 2949, PG 505BM 1991, PG 429180' CP&L EASEMENTDB 2942, PG 378DB 2949, PG 505BM 1991, PG 42950' CARDINAL EXTENSION COMPANY, LLCGAS LINE EASEMENTper BM 2015, PG 12550' CARDINAL PI
P
E
L
I
N
E
C
O
M
P
A
N
Y
,
L
L
C
and CARDINAL EX
T
E
N
S
I
O
N
C
O
M
P
A
N
Y
,
L
L
C
RIGHT OF WAYDB 14033, PG 12
6
2
50' CARDINAL PI
P
E
L
I
N
E
C
O
M
P
A
N
Y
,
L
L
C
and CARDINAL EX
T
E
N
S
I
O
N
C
O
M
P
A
N
Y
,
L
L
C
RIGHT OF WAYDB 14033, PG 1262
50' CARDINAL EXTENSION COMPANY, LL
C
GAS LINE EASEMENTper DB 8166, PG 1195
50' CARDINAL EXTENSION COMPANY, LLC
GAS LINE EASEMENT
per DB 8166, PG 1195
30' SAN
IT
AR
Y
SEWEREASEMEN
T
p
e
r
BM
1990
,
PG
1
6
0 PERMANENT UTILITY EASEMENTper BM 2007,
P
G
6
0
0
20' U
TILIT
Y EASE
ME
NT
per BM 1990, P
G
10
6
10' UTIL
I
T
Y
E
A
S
E
M
E
N
T
p
er
B
M
2
0
0
6
,
P
G
1874
W
W
W
30"x48"H2030"x48"H2072"x42"H2072"x42"H2060"x36"H20
24"x30"H20
30"x42"H20 $
1 inch = 1000 ft.
1000
GRAPHIC SCALE
0 500 1000 2000
VICINITY MAP
1"=10000'
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN OVERALL WETLAND AND STREAM IMPACT MAP B
PROPOSED
FORCEMAIN
ALIGNMENT
IR
V
I
N
G
P
K
W
Y
THOMAS MILL RDNEW HILL RD
OLD HO
L
L
Y
S
P
RI
N
G
S
A
P
E
X
R
D
WOODS CREEK RDO
L
D
H
O
L
L
Y
S
P
R
I
N
G
S
A
P
E
X
R
D
GREEN OAKS PKWYTOHS
WWTP
PROPOSED
PUMP STATION
IMPACT AREA 2
PROJECT LOCATION
IMPACT AREA 1
IMPACT AREA 3
IMPACT AREA 4
IMPACT AREA 5
IMPACT AREA 6
IMPACT AREA 8
IMPACT AREA 7
24" RCP
WETLAND A
R
E
A
W
2
0
(LINEAR WE
T
L
A
N
D
)
INV:
255.52'
INV:
256.68'
WOODS C
R
E
E
K
R
O
A
D
60' PUBLI
C
R
I
G
H
T
O
F
WAY
26
5
'
260'
260'260'260'260'
25
5
'
255'
255'255'250'250'250'
250'
DUKE ENERGY PROGRESS
INC
DB 15289 PG 2437
PIN 0730712692
24" RCP
WETLAND A
R
E
A
W
2
0
(LINEAR WE
T
L
A
N
D
)
INV:
255.52'
INV:
256.68'
WOODS C
R
E
E
K
R
O
A
D
60' PUBLI
C
R
I
G
H
T
O
F
WAY
26
5
'
260'
260'260'260'260'
25
5
'
255'
255'255'250'250'250'
250'
DUKE ENERGY PROGRESS
INC
DB 15289 PG 2437
PIN 0730712692XXCH
E
M
I
C
A
L
S
Y
S
T
E
M
I
S
D
E
S
I
G
N
E
D
T
O
C
O
N
T
R
O
L
T
H
E
G
E
N
E
R
A
T
I
O
N
O
F
H
Y
D
R
O
G
E
N
S
U
L
F
I
D
E
W
I
T
H
I
N
T
H
E
F
O
R
C
E
M
A
I
N
.
TH
E
C
H
E
M
I
C
A
L
S
H
A
L
L
B
E
A
N
A
Q
U
E
O
U
S
S
O
L
U
T
I
O
N
O
F
C
A
L
C
I
U
M
N
I
T
R
A
T
E
.
CO
N
T
R
A
C
T
O
R
T
O
F
U
R
N
I
S
H
C
O
N
C
R
E
T
E
C
O
N
T
A
I
N
M
E
N
T
S
T
R
U
C
T
U
R
E
W
I
T
H
A
L
L
I
N
-
S
L
A
B
P
I
P
I
N
G
A
N
D
C
O
N
D
U
I
T
.
CO
N
T
A
I
N
M
E
N
T
W
A
L
L
T
O
H
A
V
E
I
N
S
I
D
E
D
I
M
E
N
S
I
O
N
S
O
F
1
5
'
x
1
5
'
x
2
'
W
I
T
H
T
H
E
A
B
I
L
I
T
Y
T
O
C
O
N
T
A
I
N
A
P
P
R
O
X
I
M
A
T
E
L
Y
2
,
5
0
0
-
G
A
L
L
O
N
S
O
F
C
H
E
M
I
C
A
L
.
UTI
L
I
Z
E
S
W
E
E
P
S
O
N
L
Y
(
N
O
E
L
B
O
W
S
)
F
O
R
C
O
N
D
U
I
T
D
I
R
E
C
T
I
O
N
A
L
C
H
A
N
G
E
S
.
C
O
N
T
R
A
C
T
O
R
T
O
F
U
R
N
I
S
H
A
N
D
I
N
S
T
A
L
L
A
L
L
N
E
C
E
S
S
A
R
Y
S
L
A
B
O
P
E
N
I
N
G
S
,
S
L
E
E
V
E
S
,
A
N
D
S
E
A
L
A
N
T
.
CO
N
T
R
A
C
T
O
R
T
O
F
U
R
N
I
S
H
A
N
D
I
N
S
T
A
L
L
A
L
L
N
E
C
E
S
S
A
R
Y
H
A
N
G
E
R
S
,
S
U
P
P
O
R
T
S
,
A
N
D
B
L
O
C
K
I
N
G
F
O
R
P
I
P
I
N
G
.
AL
L
H
A
R
D
W
A
R
E
R
E
Q
U
I
R
E
D
F
O
R
I
N
S
T
A
L
L
A
T
I
O
N
S
H
A
L
L
B
E
3
1
6
S
T
A
I
N
L
E
S
S
S
T
E
E
L
.
2"
P
V
C
D
R
A
I
N
W
I
T
H
P
L
A
S
T
I
C
B
A
L
L
V
A
L
V
E
A
N
D
S
P
L
A
S
H
P
A
D
F
M
FM
FM
FM
FM
FM
FM
FM
FM
SF
SFSF
SF
SF
13
+
0
0
14+
0
0
15+0
0
16+00
17+00
18+00
PROPOSED 14" FORCEMAIN
LIMITS OF DISTURBANCE
IMPACT AREA 1A
PERMANENT (NO PERMANENT LOSS)
STREAM IMPACT
TEMPORARY CONSTRUCTION ACCESS
65 LF (511 SF)
IMPACT AREA 1B
PERMANENT (NO PERMANENT LOSS)
STREAM IMPACT
TEMPORARY CONSTRUCTION ACCESS
39 LF (1,065 SF)
40 LF OF 26"Ø STEEL CASING
INSTALLED BY OPEN-CUT
50 LF OF 26"Ø STEEL CASING
INSTALLED BY OPEN-CUT
STREAM L
STREAM N
EX TOP OF BANK, TYP.
EX. 100 YR
FLOODLINE
EX. FLOODWAY
STREAM M
14+00 14+50 15+00 15+50 16+00 16+50
50 LF OF 26" STEEL CASING
0.25" THK
40 L
F
O
F
2
6
"
S
T
E
E
L
C
A
S
I
N
G
0.25
"
T
H
K STREAM H (CS)STREAM B (CS)4.5' MIN. COVER
PROPOSED 14" FORCEMAIN
EX. GRADE
"KEYED-IN" RIPRAP "KEYED-IN" RIPRAP
240
245
250
255
260
265
240
245
250
255
260
265
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN STREAM IMPACT AREA 1 MAP C
1 inch = 50 ft.
50
GRAPHIC SCALE
0 25 50 100
PROPOSED 10' TEMP.
CONSTRUCTION EASEMENT
PROPOSED 30'
PERMANENT UTILITY
EASEMENT
IMPACT LEGEND
PERMANENT WETLANDS (PERMANENT - NO PERMANENT LOSS)
TEMPORARY WETLANDS
PERMANENT STREAM (PERMANENT - NO PERMANENT LOSS)
PERMANENT STREAM
TEMPORARY STREAM
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
XXX
XX X
XXX
XG
G
G
G
G
G
G
G
G
G
G
G
G
W
W
W
WWWWWW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
R
R
R
R
R
R RR
R
T
T
T
T
T
T
T
T
T
T
T
T
R
R
R
R
R
R
R
R
R
R
R
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
OHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEWF04WF05WF06WF07WF03WF02WF01WF09WF08WF10WF11WF12WF13WF16WF15WF14WETLAND ARE
A
1
WETLAND ARE
A
2
CURB INLET
TOP: 309.71'
DROP INLET
TOP: 312.35'
INV OUT: 307
.
1
0
'
CURB INLET
TOP: 305.72'
INV IN: 299.1
2
'
INV OUT: 298
.
9
4
'
15" R
C
P
15"
RCP
15" RCP 15" RCP24" RCP15" RCP
18" RCP 15" RCP24" RCPSIGNCURB INLET
TOP: 302.24'
INV IN: 297.0
6
'
(
N
W
)
INV IN: 296.9
9
'
(
N
E
)
INV OUT: 296
.
9
1
'
(
S
E
)
DROP INLET
TOP: 302.74'
INV OUT: 297
.
4
4
'
CURB INLET
TOP: 299.55'
INV IN: 293.8
9
'
(
N
W
)
INV IN: 294.5
7
'
(
N
E
)
INV OUT: 293
.
8
4
'
(
S
E
)
24" RCP
INV: 296.65'
DROP INLET
TOP: 301.34'
INV OUT: 296
.
4
5
'
24" RCP
INV: 293.13'
20' PUBLIC DR
A
I
N
A
G
E
E
A
S
E
M
E
N
T
per BM 2018,
P
G
2
0
0
3
30' STREETYA
R
D
B
U
F
F
E
R
COS 3TWELVE OAKS PHASE 9SECTION 1BBM 2018, PG 2003DB 16829, PG 573PIN 0740013687MUL
LER
OAK
DR
IVE
5
1
'
PUB
L
IC
R
IGHT
OF
WAYPPPPPPPPPP310'310'305'
305'
300'
300'300'
295'
30' DUKE ENE
R
G
Y
PROGRESS
EASEMENT
per BM 2018,
P
G
2
0
0
3
TRACT A
WAKE COUNTY
PROPERTY
BM 1988, PG 782
DB 4803, PG 67
PIN 0740026492
XXX
XX X
XXX
XG
G
G
G
G
G
G
G
G
G
G
G
G
W
W
W
WWWWWW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
R
R
R
R
R
R RR
R
T
T
T
T
T
T
T
T
T
T
T
T
R
R
R
R
R
R
R
R
R
R
R
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
OHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEWF04WF05WF06WF07WF03WF02WF01WF09WF08WF10WF11WF12WF13WF16WF15WF14WETLAND ARE
A
1
WETLAND ARE
A
2
CURB INLET
TOP: 309.71'
DROP INLET
TOP: 312.35'
INV OUT: 307
.
1
0
'
CURB INLET
TOP: 305.72'
INV IN: 299.1
2
'
INV OUT: 298
.
9
4
'
15" R
C
P
15"
RCP
15" RCP 15" RCP24" RCP15" RCP
18" RCP 15" RCP24" RCPSIGNCURB INLET
TOP: 302.24'
INV IN: 297.0
6
'
(
N
W
)
INV IN: 296.9
9
'
(
N
E
)
INV OUT: 296
.
9
1
'
(
S
E
)
DROP INLET
TOP: 302.74'
INV OUT: 297
.
4
4
'
CURB INLET
TOP: 299.55'
INV IN: 293.8
9
'
(
N
W
)
INV IN: 294.5
7
'
(
N
E
)
INV OUT: 293
.
8
4
'
(
S
E
)
24" RCP
INV: 296.65'
DROP INLET
TOP: 301.34'
INV OUT: 296
.
4
5
'
24" RCP
INV: 293.13'
20' PUBLIC DR
A
I
N
A
G
E
E
A
S
E
M
E
N
T
per BM 2018,
P
G
2
0
0
3
30' STREETYA
R
D
B
U
F
F
E
R
COS 3TWELVE OAKS PHASE 9SECTION 1BBM 2018, PG 2003DB 16829, PG 573PIN 0740013687MUL
LER
OAK
DR
IVE
5
1
'
PUB
L
IC
R
IGHT
OF
WAYPPPPPPPPPP310'310'305'
305'
300'
300'300'
295'
30' DUKE ENE
R
G
Y
PROGRESS
EASEMENT
per BM 2018,
P
G
2
0
0
3
TRACT A
WAKE COUNTY
PROPERTY
BM 1988, PG 782
DB 4803, PG 67
PIN 0740026492
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
PROPOSED VAR. WIDTH
PERMANENT UTILITY EASEMENT
PROPOSED 14" FORCEMAIN
LIMITS OF DISTURBANCE
IMPACT AREA 2
TEMPORARY WETLAND IMPACT
TEMPORARY CONSTRUCTION ACCESS
744 SF
IMPACT AREA 2
PERMANENT WETLAND IMPACT
10' MAINTAINED CORRIDOR ACCESS
444 SF
10' MAINTAINED CORRIDOR
WETLAND W39
WETLAND W42
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN WETLAND IMPACT AREA 2 MAP D
1 inch = 50 ft.
50
GRAPHIC SCALE
0 25 50 100
IMPACT LEGEND
PERMANENT WETLANDS (PERMANENT - NO PERMANENT LOSS)
TEMPORARY WETLANDS
PERMANENT STREAM (PERMANENT - NO PERMANENT LOSS)
PERMANENT STREAM
TEMPORARY STREAM
G
GGGGGGGGWWWWW
W
W
W
W
W W W W W W
W
R
R R R R
R
R R R
R
RRRWWWWWOHEOHEOHEOHEOHEOHEOHE
OHEABANDONED
30' TOWN OF
H
O
L
L
Y
S
P
R
I
N
G
S
B
U
F
F
E
R
(30' FROM T
O
P
B
A
N
K
)
per FIRM MA
P
N
U
M
B
E
R
3
7
2
0
0
7
4
0
0
0
J
,
D
A
T
E
D
5
/
2
/
2
0
0
6
AND MAP NU
M
B
E
R
3
7
2
0
0
6
4
9
0
0
J
,
D
A
T
E
D
5
/
2
/
2
0
0
6
PP265'265'265'265'
265'
265'265'265'265'265'265'265'260'260'260'
MOSELY FAMILY VENTURES II,
DB 8398, PG 1536
BM 1999, PG 1759
PIN 0649096118
MOSELY FAMILY VENTURES II,
LLC
DB 8398, PG 1536
BM 1999, PG 1759
PIN 0649096118
DUKE PROGRESS ENERGY
RESIDUAL AREA
"MAE OMIE H. MOSELY
and CAROLINA POWER AND LIGHT
COMPANY"
BM 1999, PG 1759
DB 15289, PG 2437
PIN 0649298326
MOSELY FAMILY VENTURES II,
LLC
DB 8458, PG 2302
BM 1999, PG 1759
PIN 0730907566
OLD HOLLY SPRING
S
A
P
E
X
R
O
A
D
60' PUBLIC RIGHT O
F
W
A
Y
G
GGGGGGGGWWWWW
W
W
W
W
W W W W W W
W
R
R R R R
R
R R R
R
RRRWWWWWOHEOHEOHEOHEOHEOHEOHE
OHEABANDONED
30' TOWN OF
H
O
L
L
Y
S
P
R
I
N
G
S
B
U
F
F
E
R
(30' FROM T
O
P
B
A
N
K
)
per FIRM MA
P
N
U
M
B
E
R
3
7
2
0
0
7
4
0
0
0
J
,
D
A
T
E
D
5
/
2
/
2
0
0
6
AND MAP NU
M
B
E
R
3
7
2
0
0
6
4
9
0
0
J
,
D
A
T
E
D
5
/
2
/
2
0
0
6
PP265'265'265'265'
265'
265'265'265'265'265'265'265'260'260'260'
MOSELY FAMILY VENTURES II,
DB 8398, PG 1536
BM 1999, PG 1759
PIN 0649096118
MOSELY FAMILY VENTURES II,
LLC
DB 8398, PG 1536
BM 1999, PG 1759
PIN 0649096118
DUKE PROGRESS ENERGY
RESIDUAL AREA
"MAE OMIE H. MOSELY
and CAROLINA POWER AND LIGHT
COMPANY"
BM 1999, PG 1759
DB 15289, PG 2437
PIN 0649298326
MOSELY FAMILY VENTURES II,
LLC
DB 8458, PG 2302
BM 1999, PG 1759
PIN 0730907566
OLD HOLLY SPRING
S
A
P
E
X
R
O
A
D
60' PUBLIC RIGHT O
F
W
A
YFMFM FMFMFMFMFMFMFMSFSFSFSFSFSFSF71+00
72+00
73+00
74+00
75+00
PROPOSED 10' TEMP.
CONSTRUCTION EASEMENT
PROPOSED 30' PERMANENT
UTILITY EASEMENT
PROPOSED 14" FORCEMAIN
LIMITS OF DISTURBANCE
IMPACT AREA 3
PERMANENT (NO PERMANENT LOSS)
STREAM IMPACT
TEMPORARY CONSTRUCTION ACCESS
109 LF (1,220 SF)
100 LF OF 26° STEEL CASING
INSTALLED BY OPEN-CUT
EX. TOP OF BANK, TYP.
STREAM G2
STREAM F2
72+00 72+50 73+00 73+50 74+00 74+50
100 LF OF 26" STEEL CASING
0.25" THKSTREAM DSTREAM C4.5' MIN. COVER
PROPOSED 14" FORCEMAIN
EX. GRADE
"KEYED-IN" RIPRAP
240
245
250
255
260
265
270
240
245
250
255
260
265
270
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN STREAM IMPACT AREA 3 MAP E
1 inch = 50 ft.
50
GRAPHIC SCALE
0 25 50 100
IMPACT LEGEND
PERMANENT WETLANDS (PERMANENT - NO PERMANENT LOSS)
TEMPORARY WETLANDS
PERMANENT STREAM (PERMANENT - NO PERMANENT LOSS)
PERMANENT STREAM
TEMPORARY STREAM
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
420'420'420'415'415'410'410'405'405'400'400'395'390'390'UPPERMAN, SHIRLEY A
STEPHENS, LILLE G
DB 03-E, PG 2832
PIN 0649353198
NANCY GARCIA
DB 16715, PG 1389
PIN 064934079
NIGEL AND SANDRA CRENSHAW
DB 8498, PG 744
PIN 0649344892
HOWARD LESLIE
DB 2294, PG 51
PIN 0649345789
30' TOWN
OF
H
OLLY
SPRINGS BUFFE
R
(30' FROM T
OP BANK)420'420'420'415'415'410'410'405'405'400'400'395'390'390'UPPERMAN, SHIRLEY A
STEPHENS, LILLE G
DB 03-E, PG 2832
PIN 0649353198
NANCY GARCIA
DB 16715, PG 1389
PIN 064934079
NIGEL AND SANDRA CRENSHAW
DB 8498, PG 744
PIN 0649344892
HOWARD LESLIE
DB 2294, PG 51
PIN 0649345789
30' TOWN
OF
H
OLLY
SPRINGS BUFFE
R
(30' FROM T
OP BANK)FMFMFMFMFMFMFMFMFMFMFMFMFMSFSFSFSFSFSF SFSFSFSF138+00 139+00 140+00 141+00
142+00143+00144+00145+00PROPOSED 30' PERMANENT
UTILITY EASEMENT
PROPOSED 14" FORCEMAIN
LIMITS OF DISTURBANCE
IMPACT AREA 4
PERMANENT (NO PERMANENT LOSS)
STREAM IMPACT
PERMANENT ACCESS
77 LF (156 SF)
STREAM H2 STREAM J4.5' MIN. COVER
PROPOSED 14" FORCEMAIN
EX. GRADE
"KEYED-IN" RIPRAP
380
385
390
395
400
405
140+00 140+50 141+00 141+50 142+00
380
385
390
395
400
405
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN STREAM IMPACT AREA 4 MAP F
1 inch = 50 ft.
50
GRAPHIC SCALE
0 25 50 100
IMPACT LEGEND
PERMANENT WETLANDS (PERMANENT - NO PERMANENT LOSS)
TEMPORARY WETLANDS
PERMANENT STREAM (PERMANENT - NO PERMANENT LOSS)
PERMANENT STREAM
TEMPORARY STREAM
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
SSSSANIT
A
R
Y
S
E
W
E
R
MANHO
L
E
TOP:
4
2
1.
9
3'INV OU
T:
4
1
6.
9
3'420'420'415'415'410'410'405'405'400'400'395'BAKER BUILDERS, INC
DB 16953, PG 2586
PIN 0649348067
30' TOWN
OF
H
OLLY
SPRINGS BUFFE
R
(30' FROM T
OP BA
NK)SSSSANIT
A
R
Y
S
E
W
E
R
MANHO
L
E
TOP:
4
2
1.
9
3'INV OU
T:
4
1
6.
9
3'420'420'415'415'410'410'405'405'400'400'395'BAKER BUILDERS, INC
DB 16953, PG 2586
PIN 0649348067
30' TOWN
OF
H
OLLY
SPRINGS BUFFE
R
(30' FROM T
OP BA
NK)FMFMFMFMFMFMFMFMFMSFSF
SF
SF SFSF
SF
SF
SF
SF
149+00
150+00
151+00
152+00
153+00
PROPOSED 30' PERMANENT
UTILITY EASEMENT
PROPOSED 14" FORCEMAIN
LIMITS OF DISTURBANCE
IMPACT AREA 5
PERMANENT (NO PERMANENT LOSS)
STREAM IMPACT
PERMANENT ACCESS
30 LF (61 SF)
STREAM J2 STREAM K4.5' MIN. COVER
PROPOSED 14" FORCEMAIN
EX. GRADE
"KEYED-IN" RIPRAP
385
390
395
400
405
410
150+00 150+50 151+00 151+50 152+00
385
390
395
400
405
410
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN STREAM IMPACT AREA 5 MAP G
1 inch = 50 ft.
50
GRAPHIC SCALE
0 25 50 100
IMPACT LEGEND
PERMANENT WETLANDS (PERMANENT - NO PERMANENT LOSS)
TEMPORARY WETLANDS
PERMANENT STREAM (PERMANENT - NO PERMANENT LOSS)
PERMANENT STREAM
TEMPORARY STREAM
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
XXX
XXXXXXXXXX
X
XXXXXXXXCE
S
SS
S
S
D
FOB
FOB
FOFOFOFOTTTTTTTTTTT
CCCCCCCFOFOFOFO G
G
C
EESSSSSS
SSSSSSSSSSSS
SS
SSSSSSSSSSUUUUCCCCCCCG
G
FO C
WWWWWWWWWWWWWWWFM
EEEEEECCCWE
T
L
A
N
D
A
R
E
A
4
WE
T
L
A
N
D
A
R
E
A
5
3
0
'
TOW
N
O
F
HO
L
L
Y
S
P
R
I
NG
S
B
U
F
F
E
R
(
3
0
'
F
ROM
TO
P
B
A
N
K
)
15" CPP
1
8
"
C
P
P
15" CPP
S
T
O
R
M
M
A
N
H
O
L
E
T
O
P
:
4
1
0
.
8
9
'
IN
V
I
N
:
4
0
4
.
6
7
'
(
W
E
S
T
)
IN
V
I
N
:
4
0
4
.
2
5
'
(
E
A
S
T
)
IN
V
O
U
T
:
4
0
2
.
5
9
'
(S
O
U
T
H
)
F
E
S
I
N
V
:
3
9
0
.
0
5
'
42"
RCP
24" RCP24" RCP
INV:
397.18'
A
IT
O
P
:
3
9
8
.
7
7
'
IN
V
:
3
9
6
.
0
4
'
2
4
"
R
C
P
IN
V
:
3
9
6
.
1
6
'
1
8
"
R
C
P
IN
V
:
3
9
4
.
0
0
'
15" RCP 15" RCP15" RCP18" RCPC
U
R
B
I
N
L
E
T
T
O
P
:
4
0
1
.
7
1
'
IN
V
O
U
T
:
3
9
7
.
5
5
'
C
U
R
B
I
N
L
E
T
T
O
P
:
4
0
2
.
0
0
'
IN
V
I
N
:
3
9
5
.
7
4
'
(
W
E
S
T
)
IN
V
I
N
:
3
9
4
.
7
5
'
(
S
O
U
T
H
)
IN
V
O
U
T
:
3
9
4
.
7
0
'
(
N
O
R
T
H
)
C
U
R
B
I
N
L
E
T
T
O
P
:
4
0
3
.
0
1
'
IN
V
I
N
:
3
9
7
.
1
8
'
IN
V
O
U
T
:
3
9
6
.
8
9
'
A
I
T
O
P
:
4
0
1
.
5
9
'
IN
V
:
3
9
8
.
0
8
'
C
U
R
B
I
N
L
E
T
T
O
P
:
4
0
0
.
8
0
'
IN
V
O
U
T
:
3
9
4
.
4
1
'
1
5
"
R
C
P
IN
V
:
3
9
3
.
0
6
'
A
I
T
O
P
:
4
1
1
.
0
0
'
IN
V
O
U
T
:
4
0
5
.
5
1
'
1
5
"
R
C
P
IN
V
:
4
0
0
.
4
1
'15" CPPA
IT
O
P
:
4
0
6
.
2
1
'
IN
V
O
U
T
:
3
9
7
.
3
1
'
1
8
"
R
C
P
IN
V
:
3
9
6
.
0
6
'
2
0
'
T
O
W
N
O
F
H
O
L
L
Y
S
P
R
I
N
G
S
P
R
I
V
A
T
E
D
R
A
I
N
A
G
E
E
A
S
E
M
E
N
T
p
e
r
B
M
2
0
1
2
,
P
G
1
1
1
8
NEWSPAP
E
R
W
A
Y
60' PUBL
I
C
R
I
G
H
T
O
F
W
A
Y
IRVING PARKWAY100' PUBLIC RIGHT OF WAY20' DRAIN
A
G
E
E
A
S
E
M
E
N
T
CENTERE
D
O
N
P
I
P
E
p
e
r
B
M
2
0
0
9
,
PG 545
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
RIP
RAP
415'
415'
410'410'410'4
0
5
'
405'405'405'400'400'
4
0
0
'395'395'395'390'390'
385'385'30' SANITARY SEWEREASEMENT per BM 1990, PG 160TRACT 1
HOLLAND INDUSTRIAL PARK
BM 2009, PG 545
BM 2017, PG 2538
DB 9041, PG 1711
PIN 0649430496
ABCZ DEVELOPMENT CO, LLC
LOT 2
HOLLAND COMPANY INC
BM 2005, PG 1101
DB 13825, PG 736
PIN 0649338038
POE PROPERTIES, LLC
LOT 3
BM 2012, PG 1118
DB 13339, PG 1052
PIN 0649433281
WARP TECHNOLOGIES, INC
LOT 53
BM 1988, PG 1461
DB 4578, PG 707
PIN 0649425785XXX
XXXXXXXXXX
X
XXXXXXXXCE
S
SS
S
S
D
FOB
FOB
FOFOFOFOTTTTTTTTTTT
CCCCCCCFOFOFOFO G
G
C
EESSSSSS
SSSSSSSSSSSS
SS
SSSSSSSSSSUUUUCCCCCCCG
G
FO C
WWWWWWWWWWWWWWWFM
EEEEEECCCWE
T
L
A
N
D
A
R
E
A
4
WE
T
L
A
N
D
A
R
E
A
5
3
0
'
TOW
N
O
F
HO
L
L
Y
S
P
R
I
NG
S
B
U
F
F
E
R
(
3
0
'
F
ROM
TO
P
B
A
N
K
)
15" CPP
1
8
"
C
P
P
15" CPP
S
T
O
R
M
M
A
N
H
O
L
E
T
O
P
:
4
1
0
.
8
9
'
IN
V
I
N
:
4
0
4
.
6
7
'
(
W
E
S
T
)
IN
V
I
N
:
4
0
4
.
2
5
'
(
E
A
S
T
)
IN
V
O
U
T
:
4
0
2
.
5
9
'
(S
O
U
T
H
)
F
E
S
I
N
V
:
3
9
0
.
0
5
'
42"
RCP
24" RCP24" RCP
INV:
397.18'
A
IT
O
P
:
3
9
8
.
7
7
'
IN
V
:
3
9
6
.
0
4
'
2
4
"
R
C
P
IN
V
:
3
9
6
.
1
6
'
1
8
"
R
C
P
IN
V
:
3
9
4
.
0
0
'
15" RCP 15" RCP15" RCP18" RCPC
U
R
B
I
N
L
E
T
T
O
P
:
4
0
1
.
7
1
'
IN
V
O
U
T
:
3
9
7
.
5
5
'
C
U
R
B
I
N
L
E
T
T
O
P
:
4
0
2
.
0
0
'
IN
V
I
N
:
3
9
5
.
7
4
'
(
W
E
S
T
)
IN
V
I
N
:
3
9
4
.
7
5
'
(
S
O
U
T
H
)
IN
V
O
U
T
:
3
9
4
.
7
0
'
(
N
O
R
T
H
)
C
U
R
B
I
N
L
E
T
T
O
P
:
4
0
3
.
0
1
'
IN
V
I
N
:
3
9
7
.
1
8
'
IN
V
O
U
T
:
3
9
6
.
8
9
'
A
I
T
O
P
:
4
0
1
.
5
9
'
IN
V
:
3
9
8
.
0
8
'
C
U
R
B
I
N
L
E
T
T
O
P
:
4
0
0
.
8
0
'
IN
V
O
U
T
:
3
9
4
.
4
1
'
1
5
"
R
C
P
IN
V
:
3
9
3
.
0
6
'
A
I
T
O
P
:
4
1
1
.
0
0
'
IN
V
O
U
T
:
4
0
5
.
5
1
'
1
5
"
R
C
P
IN
V
:
4
0
0
.
4
1
'15" CPPA
IT
O
P
:
4
0
6
.
2
1
'
IN
V
O
U
T
:
3
9
7
.
3
1
'
1
8
"
R
C
P
IN
V
:
3
9
6
.
0
6
'
2
0
'
T
O
W
N
O
F
H
O
L
L
Y
S
P
R
I
N
G
S
P
R
I
V
A
T
E
D
R
A
I
N
A
G
E
E
A
S
E
M
E
N
T
p
e
r
B
M
2
0
1
2
,
P
G
1
1
1
8
NEWSPAP
E
R
W
A
Y
60' PUBL
I
C
R
I
G
H
T
O
F
W
A
Y
IRVING PARKWAY100' PUBLIC RIGHT OF WAY20' DRAIN
A
G
E
E
A
S
E
M
E
N
T
CENTERE
D
O
N
P
I
P
E
p
e
r
B
M
2
0
0
9
,
PG 545
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
RIP
RAP
415'
415'
410'410'410'4
0
5
'
405'405'405'400'400'
4
0
0
'395'395'395'390'390'
385'385'30' SANITARY SEWEREASEMENT per BM 1990, PG 160TRACT 1
HOLLAND INDUSTRIAL PARK
BM 2009, PG 545
BM 2017, PG 2538
DB 9041, PG 1711
PIN 0649430496
ABCZ DEVELOPMENT CO, LLC
LOT 2
HOLLAND COMPANY INC
BM 2005, PG 1101
DB 13825, PG 736
PIN 0649338038
POE PROPERTIES, LLC
LOT 3
BM 2012, PG 1118
DB 13339, PG 1052
PIN 0649433281
WARP TECHNOLOGIES, INC
LOT 53
BM 1988, PG 1461
DB 4578, PG 707
PIN 0649425785
FM
FMFM
FM FM
FMFMSF SFSFSF
SF SF
162+00
163+00164+
0
0
165+00
166+00167+00168+00PROPOSED 30' PERMANENT
UTILITY EASEMENT
PROPOSED 14" FORCEMAIN
LIMITS OF DISTURBANCE
IMPACT AREA 6
PERMANENT (NO PERMANENT LOSS)
STREAM IMPACT
TEMPORARY CONSTRUCTION ACCESS
55 LF (598 SF)
STREAM K2
EX. TOP OF BANK, TYP.
8" SEWER
8" SEWER
16" FORCE MAIN
GAS
TEL
12" WATER
GAS
FIBER OPTIC
CATV
ELEC
FIBER OPTIC
GAS
ELEC
24" RCP STORM DRAIN
100 LF OF 26"
ST
E
EL
C
A
SI
N
G
0.25" THKSTREAM E4.5' MIN. COVER
PROPOSED 14" FORCEMAIN
EX. GRADE
"KEYED-IN" RIPRAP
375
380
385
390
395
400
164+00 164+50 165+00 165+50 166+00
375
380
385
390
395
400
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN STREAM IMPACT AREA 6 MAP H
1 inch = 50 ft.
50
GRAPHIC SCALE
0 25 50 100
IMPACT LEGEND
PERMANENT WETLANDS (PERMANENT - NO PERMANENT LOSS)
TEMPORARY WETLANDS
PERMANENT STREAM (PERMANENT - NO PERMANENT LOSS)
PERMANENT STREAM
TEMPORARY STREAM
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
X XXX X X X X X X XXCCEEECHHFOBFOBWE
E
E
E
E
E
E
E
E
E
ECTCC
FO
FO
FO
FO
FO
FO
FO
FO
FO FO
FOFOFOFO TT
T
T
T
E
E
E
E
FOT
T
T
T
TT
T
T
T
T
T
CC
TT
TW
W
W
W
W
W W
W
W
W
W
W
W W
W
W W W W
E
E
E
E
E
E EWETLAND AREA 6
18" RCP
INV:
407.82'
INV:
407.82'
3
0
"
RCP
INV: 385.43'
CURB INLET
TOP: 394.32'
FULL OF MUD
AI
TOP: 391.00'
FULL OF MUD
CURB INLET
TOP: 385.65'
INV OUT: 378.56'
CURB INLET
TOP: 385.41'
INV IN: 378.13'
INV OUT: 378.09'
STORM MAN HOLE
TOP: 388.10'
INV IN: 376.99'
INV OUT: 376.95'
20' DRAINAGE EASEMENT
per BM 1998, PG 1031
POND
20' WATERLINE EASEMENT
per BM 1998, PG 1031
IRVING P
A
R
K
W
A
Y
100' PUBL
I
C
R
I
G
H
T
O
F
W
A
Y
415'410'410'410'405'400'400'395'395'390'390'JJKL INVESTMENTS LLC 1
600 IRVING PARKWAY, LLC
LOT 3B
STATE EMPLOYEES CREDIT UNION
LOT 3
BM 2004, PG 1906
DB 11666, PG 1405
PIN 0649427230
WARP TECHNOLOGIES, INC
LOT 53
BM 1988, PG 1461
DB 4578, PG 707
PIN 0649425785
X XXX X X X X X X XXCCEEECHHFOBFOBWE
E
E
E
E
E
E
E
E
E
ECTCC
FO
FO
FO
FO
FO
FO
FO
FO
FO FO
FOFOFOFO TT
T
T
T
E
E
E
E
FOT
T
T
T
TT
T
T
T
T
T
CC
TT
TW
W
W
W
W
W W
W
W
W
W
W
W W
W
W W W W
E
E
E
E
E
E EWETLAND AREA 6
18" RCP
INV:
407.82'
INV:
407.82'
3
0
"
RCP
INV: 385.43'
CURB INLET
TOP: 394.32'
FULL OF MUD
AI
TOP: 391.00'
FULL OF MUD
CURB INLET
TOP: 385.65'
INV OUT: 378.56'
CURB INLET
TOP: 385.41'
INV IN: 378.13'
INV OUT: 378.09'
STORM MAN HOLE
TOP: 388.10'
INV IN: 376.99'
INV OUT: 376.95'
20' DRAINAGE EASEMENT
per BM 1998, PG 1031
POND
20' WATERLINE EASEMENT
per BM 1998, PG 1031
IRVING P
A
R
K
W
A
Y
100' PUBL
I
C
R
I
G
H
T
O
F
W
A
Y
415'410'410'410'405'400'400'395'395'390'390'JJKL INVESTMENTS LLC 1
600 IRVING PARKWAY, LLC
LOT 3B
STATE EMPLOYEES CREDIT UNION
LOT 3
BM 2004, PG 1906
DB 11666, PG 1405
PIN 0649427230
WARP TECHNOLOGIES, INC
LOT 53
BM 1988, PG 1461
DB 4578, PG 707
PIN 0649425785
FM FM
FM
FM
FM
FM
FM
FM
FM
EX. 100' PUBLIC R/WPROPOSED 14" FORCEMAIN
LIMITS OF DISTURBANCE
IMPACT AREA 7
TEMPORARY WETLAND IMPACT
TEMPORARY CONSTRUCTION ACCESS
120 SF
10' MAINTAINED CORRIDOR
WETLAND W41
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN WETLAND IMPACT AREA 7 MAP I
1 inch = 50 ft.
50
GRAPHIC SCALE
0 25 50 100
IMPACT LEGEND
PERMANENT WETLANDS (PERMANENT - NO PERMANENT LOSS)
TEMPORARY WETLANDS
PERMANENT STREAM (PERMANENT - NO PERMANENT LOSS)
PERMANENT STREAM
TEMPORARY STREAM
FOFOFO
FOFOFOFOFOFO FOFOFOFOFOFOFOFOFOFMFMFMFMFMFMFMFMFMR R R R R R R R R R R R R R R R
W W W W W W W W W W W W W W W W
30' TOWN OF HOLLY SPRINGS BUFFER
(30' FROM TOP BANK)
20' WATERLINE EASEMENT
per BM 1998, PG 1031
PERMANENT DRAINAGE EASEMENT
per BM 2006, PG 2122
IRVING PARKWAY EXTENSION
50' PUBLIC RIGHT OF WAY
per BM 2005, PG 85 RIP RAP380'375'370'365'365'360'360'355'355'350'KWANG S WOO and
IN JA WOO
BM 2008, PG 600
DB 17351, PG 1876
PIN 0649319322
GARRETT CARTER and
CARTER-GARNER SPRINGS, LLC
BM 2008, PG 1640
DB 11165, PG 705
PIN 0649418561
10' PERMANENT UTILITY EASEMENT
per BM 2007, PG 600FOFO FO
FOFOFOFOFOFO FOFOFOFOFOFOFOFOFOFMFMFMFMFMFMFMFMFMR R R R R R R R R R R R R R R R
W W W W W W W W W W W W W W W W
30' TOWN OF HOLLY SPRINGS BUFFER
(30' FROM TOP BANK)
20' WATERLINE EASEMENT
per BM 1998, PG 1031
PERMANENT DRAINAGE EASEMENT
per BM 2006, PG 2122
IRVING PARKWAY EXTENSION
50' PUBLIC RIGHT OF WAY
per BM 2005, PG 85 RIP RAP380'375'370'365'365'360'360'355'355'350'KWANG S WOO and
IN JA WOO
BM 2008, PG 600
DB 17351, PG 1876
PIN 0649319322
GARRETT CARTER and
CARTER-GARNER SPRINGS, LLC
BM 2008, PG 1640
DB 11165, PG 705
PIN 0649418561
10' PERMANENT UTILITY EASEMENT
per BM 2007, PG 600FMFM FMFMFMFMFMFMFMSF SF SF
S
F
SFSFSFSFSFSF SF SF SF
180+00 181+00 182+00 183+00 184+00 185+00
EX. 50' PUBLIC R/W
PROPOSED 14" FORCEMAIN
LIMITS OF DISTURBANCE
IMPACT AREA 8
PERMANENT (NO PERMANENT LOSS)
STREAM IMPACT
TEMPORARY CONSTRUCTION ACCESS
37 LF (277 SF)
STREAM L2
EX. TOP OF BANK, TYP.STREAM O4.5' MIN. COVER
PROPOSED 14" FORCEMAIN
EX. GRADE
"KEYED-IN" RIPRAP
345
350
355
360
365
182+00 182+50 183+00 183+50 184+00
345
350
355
360
365
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ Planners [ STrveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
06.03.2020
AS NOTED
HOLLY SPRINGS NORTH CAROLINADAM
PAP
WR TOWN OF HOLLY SPRINGS (CAROLINA SPRINGS)
SEWAGE PS #1 AND FORCE MAIN STREAM IMPACT AREA 8 MAP J
1 inch = 50 ft.
50
GRAPHIC SCALE
0 25 50 100
IMPACT LEGEND
PERMANENT WETLANDS (PERMANENT - NO PERMANENT LOSS)
TEMPORARY WETLANDS
PERMANENT STREAM (PERMANENT - NO PERMANENT LOSS)
PERMANENT STREAM
TEMPORARY STREAM
SCALE:
1" = 50' HORIZ.
1" = 5' VERT.
PRELIMINARY
NOT APPROVED FOR
CONSTRUCTION
K:\19\19-0370\190372.10-Lennar- Carolina Springs Master Plan\CAD\Drawing Sets\Construction\PS and Offiste sewer\Sheets-Details.dwg- Tuesday, June 2, 2020 4:02:10 PM - MCCLURE, DAVIDNo.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.WithersRavenel
$ngineers [ /lanners [ Surveyors
115 MacKenan Drive | Cary, NC 27511 | t: 919.469.3340 | license #: C-0832 | www.withersravenel.com02190372.10
04.27.2020
As Noted
Holly Springs Wake County North Carolina
DAM
PAP
JWW
CAROLINA SPRINGS
SEWAGE PUMP STATION #1 AND FORCE MAIN EROSION CONTROL DETAILS 25
TEMPORARY STREAM CROSSING BYPASS
NOT TO SCALE
PUMP
PROPOSED EARTH BERM, TYP
CLASS "I" RIP-RAP
TEMPORARY CONSTRUCTION STREAM CROSSING
PROPOSED EARTH BERM, TYP
SEDIMENT BAGCROSSING PIPE
CLASS "I" RIP-RAP
POLYETHYLENE FABRIC ON
FACE (8 MIL THICK)PROPOSED EARTH BERM (TYP)
TOP OF BANK
POLYETHYLENE FABRIC ON FACE
(8 MIL THICK)
TEMPORARY STONE DAM
CROSSING PIPE
EX STREAM BOTTOM
POLYETHYLENE FABRIC ON
FACE (8 MIL THICK)
TEMPORARY CMP
12' MIN
CONSTRUCTION EASEMENT
(SEE NOTE 4)
12' MIN
18" MIN
NOTES:
1.EROSION STONE TO BE "CLASS I" RIP-RAP UNLESS DESIGNATED
DIFFERENTLY ON CONSTRUCTION PLAN.
2.TEMPORARY CMP PIPE SIZE AND AMOUNT NEEDED AS SHOWN
ON PLANS.
3.PUMP AND LINE SIZE TO BE DETERMINED BY THE CONTRACTOR.
4.WIDTH OF CONSTRUCTION EASEMENT SHALL BE MINIMIZED
BASED UPON FIELD CONDITIONS. ANY DISTRUBANCE(S)
EXCEEDING WHAT IS SHOWN ON PLANS MAY REQUIRE
ADDITIONAL WATER QUALITY PERMITTING.
CONSTRUCTION SEQUENCE
1.INSTALL PUMPS UPSTREAM OF TEMPORARY STREAM CROSSING
AND PUMP TO AREA DOWNSTREAM OF CONSTRUCTION AREA.
BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING
WITHIN THE STREAM.
2.INSTALL UPSTREAM DAM AND DOWNSTREAM DAM WITH
POLYETHYLENE FACING.
3.INSTALL EARTH BERMS ALONG TOP OF BANK ON EACH SIDE OF
STREAM IN THE CONSTRUCTION AREA.
4.INSTALL SEDIMENT FILTER BAG AT TOP OF BANK. DEWATER
CONSTRUCTION AREA BETWEEN STONE DAM USING THE FILTER
BAG.
5.INSTALL THE NEW PIPELINE.
6.UPON CONSTRUCTION COMPLETION, REMOVE TEMPORARY DAMS,
POLYETHYLENE, AND TEMPORARY CMP, DEPRESS TEMPORARY
DAM BOTTOMS INTO STREAM BED UNTIL TOP OF RIP RAP IS LEVEL
WITH STREAM BOTTOM.
7.REMOVE TEMPORARY EARTH BERM AND SEDIMENT BAGS AND
STABILIZE AREAS AS INDICATED ON DRAWINGS.
MAINTENANCE NOTES:
1.INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT THAT
PRODUCES 1
2 INCH OR MORE OF RAIN.
2.REMOVE SEDIMENT AND WOODY DEBRIS PROMPTLY.
3.REMOVE COLLECTED SEDIMENT FROM STONE/RIPRAP
AREAS AS NECESSARY. TOPDRESS WITH 2", WASHED STONE
AS NECESSARY.
FROM PUMPFLOW ÞFLOW Þ
PIPE FLOW ÞTO PUMP
PLAN
SECTION A-A
STREAM FLOW Þ
A A
*INSTALL SANDBAGS IN PIPE INVERT & FABRIC WHILE PUMPING AROUND
DURING CONSTRUCTION IN STREAM.
**REMOVE SANDBAGS & FABRIC TO ALLOW FLOW THROUGH PIPE WHEN NOT
PUMPING AROUND.
5' MIN
*
**
STREAM FLOW Þ
TEMPORARY CMP PUMP
FLOW Þ
NC OneMap
Wake County GIS1" = 500'
Scale:
Deborah Shirley
Project Mgr.:
.ðð
ððððððððððPond
Pond
Pond
*
*
1
0
0
/
W
Pond
rip rap
Wetlands offsite (not flagged)
Roadside ditch
Drainage area. Soils are red and not believed to be hydric
Wetlands flagged previously
ððRoadside ditch
Existing Sewer Manholes
ð:
:
:
HOLLY SPRINGS NEW HILL RD
GREEN OAKS PKWY
GB AL
F
ORD HWYANCIENT OAKS DRSOUR MASH CT
KING OAK ST
C
E
D
A
R
W
R
E
N LN
C L I M B IN G TR E E T R L
MINT JULEP WAY
U T LE Y B LU FFS D R
T
RI
NI
T
Y CREEK DRDUCK BRANCH DRB E R M AN E D G E RD HARTSHORN CTEDGEGROVE LNSCARLET TANAGER CIRSTABLE RIDGE DRCHICKASAW PLUM DRMAGNOLIA MEADOW WAY NCCGIA
0 1,000 2,000500
Feet
Project No.
13152.W19
12/12/2019 Prepared by: CB
Legend
Proposed offsite sewer line
Proposed Offsite Sewer Line
Carolina Springs Property Boundary
Offsite Sewer Line Option 3
Potentially Jurisdictional Perennial Stream
Potentially Jurisdictional Intermittent Stream
Potentially Jurisdictional Ditch/Gully
Potentially Jurisdictional Ephemeral Stream
Potentially Jurisdictional Linear Wetland
Potentially Jurisdictional Pond
Potentially Jurisdictional Wetland
Potential 30' Town of Holly Springs Buffer
Wetland Sketch Map
Town of Holly Springs-Carolina
SpringsOffsite Force Main
Detailed Delineation of Waters of the US
Suitable for Preliminary Planning Only
S&EC reserves the right to modify this map based on more fieldwork,
and any other additional information. Approximations were mapped using
topographic maps, air photos and ground truthing. If the site is going
to be disturbed, S&EC’s detailed delineation should be approved and
permitted by the U.S. Army Corps of Engineers as required. If the user of
this work desires an accurate map of the regulated features flagged by
S&EC, they should retain a NC Registered Professional Land Surveyor to
locate S&EC’s flagging.
&
(
)
W
*)
+
-
/
.
0
DP1A
DP2A