HomeMy WebLinkAbout20200602 Ver 1_More Info Requested_20200611Strickland, Bev
From: Pullinger, Robert C
Sent: Thursday, June 11, 2020 8:48 AM
To: Bodnar, Gregg
Cc: Staples, Shane; Bland, Raleigh W CIV CESAW CESAD (US)
Subject: REQUEST FOR ADDITIONAL INFORMATION - Williams Landing Enterprises, LLC - 275
Landing Road, Swan Quarter NC
Attachments: DWR 2020-0602 v1 Comment Shee - CAMA Major - Williams Landing-20200610.pdf,
2020-0602 v1 275 Landing Road Williams Landing (ON HOLD) - 20200610.pdf
G regg,
Please find attached my comment sheet (and request for additional information/hold letter) for the Lee & Made
Williams/Williams Landing Enterprises, LLC project in Swan Quarter/Hyde Co. If you have any questions/need anything
else, please let me know, thanks!
Chris Pullinger
Environmental Specialist II
Division of Water Resources — Water Quality Regional Operations
North Carolina Department of Environmental Quality
943 Washington Square Mall
Washington, NC 27889
252 948 3918 office/desk phone
252-943-1036 state cell phone
chris.pullingera-ncdenr.gov
NORT I-1 CAROLING
F,nviromnew,11 Quallfj,
May 5, 2020
MEMORANDUM. -
FROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
gregq.bodnar(Lbncdenr.gov
SUBJECT: CA MA Major Permit Application Review
ROY COOPER
Governor
MICHAEL S. REGAN
secretary
BRAXTON DAVIS
Director, Division of Coastal
Management
Applicant: Lee & Madge Williams/ Williams Landing Enterprises, LLC
Project Location: 275 Landing Rd Hyde County Swan Quarter
Proposed Project: Propose to construct 1885' x 6' pier/boardwalk creating 31- slips, excavation of
700ft2 of canal bottom, excavation of 60' x 25' upland basin with 172' steel sheet
pile bulkhead, 70' by 28' concrete wash -down pad with raised apron and
collection basin, and travel lift.
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Grow Bodnar at the address above by June 30, 2020. If you have any questions
regarding the proposed project, contact Shane Staples (252)948-3950 when appropriate, in-depth comments
with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"
This agency has no comment on the proposed project.
X This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
PRINT NAME Chris Pullinger
AGENCY
SIGNATURE
DATE
Division of Water Resources - WaRO
June 10 2020
Stale of North Carolina I Euvironmenlal Quality I Coastal Management
400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
June 10, 2020
DWR # 2020-0602 v1
Hyde County
Williams Landing Enterprises, LLC
ATTN: Lee and Madge Williams
275 Landing Road
Swan Quarter, North Carolina 27885
Subject: REQUEST FOR ADDITIONAL INFORMATION
Williams Landing — CAMA Major application
Dear Mr. and Mrs. Williams:
On May 06, 2020, the Division of Water Resources (Division) received a copy of your CAMA Major
application with additional information received dated May 27, 2020, requesting a 401 Water
Quality Certification and Tar -Pamlico River Basin Riparian Buffer Authorization from the Division
for the subject project. The Division has determined that your application is incomplete and
cannot be processed. The application is on -hold until all of the following information is
received:
1. Avoidance and Minimization of Impacts to the Tar -Pamlico River Basin Buffer
a) The plans show Slips 1-4 located on the peninsula near an upland area. It is not clear if
vegetation removal is necessary for the establishment of these slips, particularly Slips 1
and 2. Consideration should be given to removal of the end slip(s) to insure impacts to
the riparian buffer do not occur initially and that encroachment does not occur into the
buffers or wetlands over time.
b) It is not clear from the application if you are requesting any sort of authorization or
variance from the Tar -Pamlico Riparian Buffer Rules for the proposed impervious
surfaces associated with the wash -down pad that would be placed in the relocated
buffer, but if so, then please provide justification for how these impacts cannot
practically be avoided or minimized, as well as a table with the proposed square
footages of impact within the buffer. These impacts may require mitigation, if
approvable. As part of the requirement for the relocation of the riparian buffer upon
creation of the upland basin, it is expected that you will re-establish Zone 1 and Zone 2
as described in 15A NCAC 02B .0259 (4), and the relocation of the riparian buffer.
D EQ�� North Carolina Department of Environmental Quality Division of Water Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
NoarH c �aouNa �
Dopanmem f Environmental Quality /� 252.946.6481
2. Wastewater Management System for Onsite Boat Wash and Maintenance Facility:
Please provide plans for the project that outline what permitted wastewater disposal
options will be utilized for boat wash wastewater management to complies with
permitting requirements of 15A NCAC 02T .1003(a)(3). In addition, a more detailed
Operation and Maintenance plans for the proposed facility will need to specifically
address how all overspray water generated during wash down will be contained (via
curtains to enclose the boats or within a building). Also, the plan will need to provide
specific details regarding the removal of excess residual of the wash down pad to ensure
stormwater discharge does not become a wastewater discharge. [15A NCAC
02H .0506(b)(3)]
Information within the permit application states that wastewater generated from the
facility would be sent to the Swan Quarter Sanitary District. The acceptance of this
waste should not be reason for Swan Quarter Sanitary District to request in the future
an expansion of their facility nor should it change or compromise their ability to stay
compliant with their permit requirements.
3. NCG190000 for Marina Plan:
Based on a review of your application, the Division will require documentation that a
NCG190000 application has been submitted to the Division of Energy, Mining, and Land
Resources [15A NCAC 02H .0506(b)(3)]. An Operations and Maintenance (O&M) Plan for the
facility may be required and should be submitted to DWR for review.
Pursuant to 15A NCAC 2H. 0506 (6)(f) and Title 15A NCAC 02H .0506 (6)(g), the applicant shall
furnish all of the above requested information for the proper consideration of the application. If
all of the requested information is not received in writing within 30 calendar days of receipt of
this letter, the Division will be unable to approve the application and it will be returned. The
return of this project will necessitate reapplication to the Division for approval, including a
complete application package and the appropriate fee.
Please respond in writing within 30 calendar days of receipt of this letter by sending three copies
of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service
Center, Raleigh, NC 27699-1617.
Please be aware that you have no authorization under the Neuse Riparian Buffer Rules for this
activity and any work done within riparian buffers or waters of the state may be a violation of
North Carolina General Statutes and Administrative Code.
Please contact Chris Pullinger at 252-948-3918 or chris.pullinger@ncdenr.gov if you have any
questions or concerns.
Sincerely,
Chris Pullinger, Environmental Specialist II
Water Quality Regional Operation Section
Division of Water Resources, NCDEQ
cc: Brian Rubino, Quible & Associates (via e-mail: brubino@quible.com)
Joseph S. Lassiter, Lassiter Consulting LLC (via e-mail: j
Lee and Madge Williams, Williams Landing Enterprises, LLC (via e-mail:
hoboseafood@hoboseafood.com)
Raleigh Bland, USACE Washington Field Office (via e-mail)
Gregg Bodnar, DCM Morehead City (via e-mail)
Shane Staples, DCM WaRO
DWR Files/Laserfiche