Loading...
HomeMy WebLinkAboutNC0089109_Fact Sheet_20200611NCDEQ/DWR FACT SHEET FOR NPDES PERMIT DEVELOPMENT MAJOR MODIFICATION American Zinc Products, LLC NCO089109 Facility Information (1.) Facility Name: .........................................................................................................................................................:................................................................................................................................................................................................................................................................................................................................................ American Zinc Products, LLC (2.) Permitted Flow (MGD): 0.98 (6.) County: Rutherford ....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... (3.) Facility Class: II (7.) Regional Office: Asheville (4.) Pretreatment Program: N/A (8.) USGS ToPoQuad: F11SW .........................................................................................................................................................:............................................................................................................................................................................................................................................................:................................................................................... (5.) Permit Status: Major Modification (9.) USGS Quad Name: Stream CharacteristicsIff (1.) Receiving Stream: .........................................................................................................................................................:............................................................................................................................................................................................................................................................:................................................................................... Broad River (7.) Drainage Area (miz): 575 (2.) Sub -basin: 03-08-02 (8.) Summer 7Q10 (cfs): 167 ....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... (3.) Stream Index Number: 9-(36.5) (9.) Winter 7Q10 (cfs): 334 (4.) Stream Classification: WS-Iy 10. 30 2 (cfs): ( ) Q ( ) 403 5. 303 d Status: listed 11 Average Flow f Not sted ve a e ow (cfs): 1 9 4 (6.) 305(b) Status:1 (12.) IWC %: 0.9 Summary This is a Major Modification for American Zinc Products, LLC. The permit is being modified to extend the Cadmium Compliance Schedule. The schedule must be changed due to the catastrophic fire that occurred at the facility on April 18, 2019. As a result of the fire the production startup of the facility has been delayed until second quarter of the 2020. Therefore, all the milestones in the compliance scheduled must be updated. All the remaining terms and conditions of the permit remain unchanged. Proposed Schedule for Permit Issuance Per 15A NCAC 2H .0109 & .0111, The Division will receive comments for a period of 30 days following the publication date of the public notice. Any request for a public hearing shall be submitted to the Director within the 30-day comment period indicating the interest of the party filing such request and the reasons why a hearing is warranted. Draft Permit to Public Notice: Permit Scheduled to Issue: State Contact Information November 25, 2019 (est.) January 15, 2020 (est.) If you have any questions on any of the above information or on the attached permit, please contact Sergei Chernikov at (919) 707-3606, or sergei.chernikov@ncdenr.gov. Changes in the Final Permit • The interim Cadmium limits were added to the permit. Page 1 of 1