Loading...
HomeMy WebLinkAboutWQ0038305_Regional Office Historical File 2016 to 2018PAT MCCR.ORY i [ I L Governor DONALD R. VAN DER VAART secv erav S. JAY ZIMMERMAN Director February 29, 2016 Steve Hooper, Mayor Town of Robbinsville PO Box 126 Robbinsville, NC, 28771 Subject: Permit No. WQ0038305 Town of Robbinsville Tallulah Creek and Circle Street Areas Sewer System Wastewater Collection System Extension Permit Graham County Dear Mr. Hooper: In accordance with your application received February 16, 2016, we are forwarding herewith Permit No. WQ0038305 dated February 29, 2016, to the Town of Robbinsville (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to, the Permittee. It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may.result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. _This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State of North Carolina / Environmental Quality / Water Resources 2090 U.S. Hwy. 70, Swannanoa, N.C. 28778 828-2964500 Town of Robbinsville Permit No. WQ0038305 If you need additional information concerning this matter, please contact Tim Heim a' via e-mail at tim.heim@ncdenr.gov. Sincerely, r G. Landon Davidson, P.G., Regional Sup rv'sor Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ cc:. Michael J Waresak, P.E. — McGill Associates (electronic copy) twiIfO O Fic9e ,i Water Resources Central Files PERCS (electronic copy) G:\WR\WQ\Graham\Collection Systems\Robbinsville Coll Sys WQC500158\WQ0038305 Tallulah Creek & Circle.docx 0 Page 2 of 8 .r; Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws; Rules, and Regulations, permission is hereby granted to the Town of Robbihsville Graham County for the construction and operation of approximately 50 linear feet of 6-inch gravity sewer, 8,505 linear feet of 8-inch gravity, and 50 linear feet of 10-inch gravity sewer to serve as repair and replacement to the existing gravity sewer lines as part of. the Tallulah Creek and Circle Street Areas Sewer System project, and the discharge of zero additional gallons per day of collected domestic wastewater into the Town of Robbinsville's existing sewerage system, pursuant to the application received February 16, 2016 and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by_the Department of Environmental Quality and considered a part of this permit. This permit shall .be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. G. Landon Davidson, P.G., Regional Supervisor - Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0038305 Permit Issued: February 29, 2016 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Town of Robbinsville is hereby authorized to: construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Town of Robbinsville Wastewater Treatment Facility in accordance with Permit Number NC0025879. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed . project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance, with the Standard Conditions identified below. . II. STANDARD CONDITIONS 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)], 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01101 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T :0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters; and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. Page 4 of 8 n and maintenance plan including pump station inspection frequency, preventative e schedule, spare parts inventory and overflow response has been developed and d. . ins that are not connected to a telemetry system shall be inspected every day (i.e. --- . _Y_ 1.,. r year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 213.0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall.include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. . 3. Grease education materials shall be distributed.more often than required in Parts (1) and (2) of this Subparagraph if.necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be- maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Asheville Regional Office, telephone number (828) 296-4500, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable 'of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills. occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) Page 5 of 8 733-3300. Persons reporting any of the above occurrences shall file a spill report by completin submitting Part I of Form CS-SSO (or the most current Division approved form) within five day following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is'one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to.completion of this Engineer's Certification shall be considered a violation of the permit and shall subject ,the Permittee to appropriate enforcement actions. If the permit is issued to a private entity.with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested Page 6 of 8 fications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. - After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. , A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum .Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June. 1, 2000 as applicable; and other supporting materials may subject_ the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances. that may be imposed by the' Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government -agencies. [G.S. 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: TOWN OF ROBBINSVILLE PERMIT #: WQ0038305 PROJECT: TALLULAH CREEK AND CIRCLE STREET AREAS SEWER SYSTEM ISSUE DATE: February 29, 2016 This project shall not be considered complete nor allowed to operate in accordance wiL11 %-U11u1L1V11 . this permit until the Division' has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the Tallulah Creek and Circle Street Areas Sewer System and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 11 2090 US Hwy 70 Swannanoa, NC 28778 Asheville Regional Office Phone: (828)-296-4500 FAX: (828)-299-7043 Division of Meter Quality FBst Track Application (FTA 1212) for Sewer Systems— RevieW. Checklist rojecfNames�l�l ulA11 eRlt. d CO -aft c preiiminaryReview Date: . ab 1 / (P Project Number i �:�003�3®� �� lirmal Review Dated (7/ C(„ Reviewer;, � � rr : >� 3 f-3 5 Appiicafilon Pre Review j FlNo Project is located in a County currently covered b the regional office y es . Application and supporting documentation submitted: in duplicate? es ®No One Original and One Copy: wle Correct application tee submitted? G.S. 143-215.3D es Li No Ensure that a check for $480 is submitted and made out Application package is complete ' es _ [jNo Current application version (FTA 12-12) . Cl [jlNo Briefproject narrative (per Section A of FTA Certification of Public ConvenienceandNeces ovided oyes • DNo (if applicable). Operational Agreements, signed an dated Yes QNo (if applicable) . . Flow Tracking / Acceptance Form 3), signed es QNo Flow Tracking / Acceptance Plannin °s . Addendum Yes QNo . (if applicable) Site Map and Street Le el Map (per Se F of 2) es ONo ;.. Stream Glass>fica "'"' SCAS 03- i ed,= d date 1'� . ` 046 . , PE Certificat<o placation ed, seal ed by QNo Applicant Ce ' is sYgae dated (or` on letter as provaded) Wes QNo PermitInfo' - Does the requite a pe the a kes . QNo i_. See 'tting by'Regul` 15A 02T0303)for projects deemed permitted Is the project ehgi .. the Fast T " ogram? a. ; . Wes QNo Project not petmatt the fast' program Requires an Ea ental sanent per, 15A NCAC 01C .0408 Is an`alternat ve s sure'sewers; STEP systems, vacuum systems, etc.) Is fianded tl>rough th cture Finance Section If tile applicant is a private entity (private utility) ' Dyes 090 . Applicant has;beek designated as a public utility by the NC Utilities Commission Hnsubmitted'a Certificate of Public Convenience and Necessity (CPM or Letter from the Public Staff of the NC Utilities Commission, (contact Central Office If the applicant is a private entity (Developer) ElYes BRO Has submitted an executed Operational Agreement (DEV 06-13) If the apphcaiit as a Homeowner's or Property Owner's Associataon: ,, ayes � o Has submitted an executed Operational Agreement (HOA 601-13) and, Copy`of the Articles of Incorporation, Declarations and. By-laws l Wastewater Flow Information , Has the wastewater flow -volume been calculated correctly (section B.9 of FTA 12-12)? [JYes UNo Flow -is calculated per 15A NCAC 02T.0114 or If daily design flow is not based on regulations ensure that the applicant has an approved flow reduction of . daily design flow rate on file with the. Division. or If other than 2T.0114, values must be supported with flow data per 15A NCAC 02T.0114(f) (Contact Central Office) Has submitted Flow Tracking/Acceptance Form (FTSE 06-13) es []NoProper certification per 15A NCAC :0106 (bl []NoForm is dated within one year of receipt of application package es ❑LNG Is FTSE Planning Assessment Addendum Required? ❑Yes o Required only for projects where available pump station capacity is < 0. Contact .CentralOffice i.f needed Additional forms (FTSE 06-13) required? ❑Yes. o Required only if the owner of downstream sewer different then owner of W WTF Design Information Has Stream.Classification form been submitted'(WSCAS 03 12) Qies []No Required if any portion of project is v� i l00 feet ofanysurface>mater; or wetlands If no, verify separation on submitted USGS Topographic Map Note, 15A-NCAC02T :0305 (f) contains minimum separations required for sewer A variance is required if minimum separations cannot be avoided Has been signed, "sealed, and dated by anN.C. PE s ❑No Is Project design is in accordance with (see section B. 13 ofFTA 12-12) CO []No 15A NCAC 02T Gravity Sewer Minimum Design Criteria (latest version) Minimum Desio Criteria for Permittingof f Pump Stations and -Force Mains (latest version) If no, a variance approval is required per the requirements of BA NCAC 02T.0105M Applicant must submit TWO copies of the plans, specifications; and calculations , - Contact the Central Office to discuss the variance request to determine a course of action. Variance approvals are issued from the central office. _ If approved, ,the`variance should be mcorporated into the final permit ,Project contains high priority lines (15A NCAC 0H.0402. ❑Yes o Contact the Central Office Application Certification Has a N.C. PE stamped, signed, and dated the application?. [ es ❑No PE with active license in North Carolina? Yes ❑No Check the.NCBELS to ensure Engineer is currently registered to practice NCBELS License Lookup Applicant (Owner/Permittee) signature meets requirement of 15A NCAC .0106(b)? Yes e00 If not, is a delegation letter provided, delegating authority? ❑YesIf the owner is a corporation, is the corporation registered in N C.?' ❑Yes N.C. Secretary of State (Corporation Seam 1� `R 2 Februa 11. 2016 REC IVE Division of Water. Resources Landon. Davidson, Water Quality Supervisor North Carolina Department of Environmental Quality$ �16 Water:Quality Regional Operations Section Asheville. Regional Office Water ouality Regional Operations 2090 US Highway 70 Asheville Regional Otfice Swannanoa, North Carolina 28778 RE: Fast Track Application Tallulah Creek and Circle Street Areas Sewer System -Improvements Town of Robbinsville, North Carolina Dear Mr. Davidson: On behalf of the Town of Robbinsville, please find attached a Fast Track Application for the above gravity sewer system project. The project generally consists of approximately 8,462 linear feet (LF) of 8-inch ductile iron pipe (DIP) gravity sewer line, 120. LF of steel encasement pipe complete with carrier pipe: installed by bore and jack, 50 LF of 6-inchDIP gravity sewer line; -50 LF 0--f-10-inch DIP gravity sewer line, 76 manholes, and related app rtenances. The purpose of this project is to reduce Sanitary sewer overflows and I&I by replacing old, broken, and sagging 6- and 8-inch vitrified clay pipe with new lines. This project improves service to existing customers of the system but does . not add additional: customers. This project is being funded entirely by a Community Development Block Grant. Most of these pipes will be installed along existing alignments for which encroachments. and easements have already been acquired An Erosion and. Sedimentation Control Plan will be filed with the North Carolina. Department of Environmental Quality Land Section. The following documents are enclosed: - One. (1) original and one (1) copy o�, the Fast Track Application Form (FTA 10-1.4) One (1) original check for the $480 application fee One (1) original and one (1) copy off the Downstream Sewer, WWTP Capacity and Flow Tracking/Acceptance form (FTSE 08-13) Two (2) copies of the site topographic map. -Two, (2) copies of the street level project map. - - One (1) original and one (1) cop of the Watershed Classification -Attachment form (WSCAS 01-.15) 55 Broad Street P.O.: Box 2259 ph: 828.252.0575 ,Asheville, North Carolina 28801 Aslieville, Nortli Car lira 28802 f: 828.252:2518 www.mcgillengineers.com 2 C H 4 C LL Z LL a 7 Application Number: E THE TAB KEY TO MOVE FROM FIELD TO FIELD ,Q0038305 (to be completed by DWR) Owner/Permittee: ----- ---- �36Is-- - i1 a. Town of Robbinsville -- -- - -- - -- - -- - --- . _ .. -- - - . _- -- j Full Legal Name (company, municipality, HOA, utility, etc.) 11 b. Steve Hooper, Mayor - I Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials) Ac. The legal entity who will own this system is: i El Individual Individual ❑ Federal_ ® Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): I -- --_ '1 d. PO Box 126 1 e. Robbinsville - Mailing Address City 1 f. NC 1 g. 28771 - ---'--��-- — State Zip Code j1 h. 828-479-3250 1 i. 828-479-9272 - -- Ili. townofrobbinsville@hotmall.com - j Telephone — -- Facsimile j E-mail J --- -- -- — - - - '2. Project (Facility) Information: j _ _ __-..------ - - --- --- - . _ _ - ,- - - -- - - --- --- - - - --- - ----R-E-C-LEWED. 2a. Tallulah Creek and Circle Street Areas Sewer System 12b. Graham Division of Water , I Improvements County Where Prc ject is Located 3. Contact Person '3a. Vann Waters, McGill Associates-'�-�-� Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 828-252-0575 - - 13c. vann.waters m illy' rSR8Pt'b6f'lona► Operations Phone Number I I E-mail 11. Project is ® New ❑ Modification (of an existing permit) If Modification, Permit No.: i 12. Owner is ® Public (skip to Item B(3)) ❑ Private (go to Item 2(a)) I 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one) ❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Public Utility (Instruction D) i ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) El Homeowner Assoc./Developer (Instruction E) 3. Town of Robbinsville Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 14a. Town of Robbinsville WWTP 14b. NC 0025879 Name of WWTF WWTF Permit No. I 5a. Town of Robbinsville 5b. 8-inch ® Gravity 5c. unknown Owner of Downstream Sewer Permit # of Downstream Sewer (Instruction F) Receiving Sewer Size ❑ Force Main _ _ _ - -- ---- - The origin of this wastewater is (check all that apply): - ® Residential Subdivision ® Retail (Stores, shopping centers) 100% Domestic/Commercial ® Apartments/Condominiums ® Institution % Industrial j ® Mobile Home Park ❑ Hospital j ❑ School ❑ Church (Attach Description) ® Restaurant ❑ Nursing Home %Other ® Office E] Other (specify): I. -_ _____..__ - _. ._.- _ _.._ - ..-_ .--_ _._._ - - _(Attach_Descrintion) . _ 7. Volume of wastewater to be allocated or permitted for this particular project: 0 gallons per day *Do not include future flows or previously permitted allocations 8. If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Noj ® Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) --- -- - --- FTA 10-14 APPLICATION Page 4 of 6 W Z P O V O LL Z F- UJ IL W ovide the wastewater flow calculations used in V determining the permitted flow in accordance with 15A NCAC 2T .0114 for e value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use. data in accordance with 15A NCAC 2T .0114 (f). " No additional customers will be added to the wastewater collection system by this project. Design flow for the nearest pump station is stated in the attached form FTSE 08-13. 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size ) ( Length gth (feet) New Gravity or Additional Force Main ��--6— 8,505—eal,l(�� /(��C�---�--- - ___—gravity 50 gravity � 10 I r--- 50 gravity I 111. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) 'Pump Station Location ID: n/a (self chosen - as shown on plans/map for reference) Longitude: LI titude: Design Flow Operational Point Power Reliability Option _ �— — (MGD) I GPM @TDH 1 - Permanent 2 - generator w/ATS; portable generator w/MTS i Force Main Size Force Main Length Pump Station Location ID: (self chosen - as shown on plans/map for reference) 1 Longitude: Latitude: Design Flow (MGD) Operational Point 1 permanent ower Reliability Option - GPM @TDH 2 - generator w/ATS; Force Main Size Force Main Length portable generator w/MTS — 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ❑ Yes ® No If Yes, permit number of 21nd treatment facility (RO — if "yes" to 13,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? 0 Yes ❑ No If No, complete and submit the Variance/Alternative Design Request (VADC 10-14) application and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. FTA 10-14 APPLICATION . . I Page 5 of 6 ve the following permits/certifications been sul Wetland/Stream Crossings - General Permit or 4 Sedimentation and Erosion Control Plan? Trout Buffer Waiver? Stormwater? 5. Does this project include any high priority lines WE manholes)? These lines will be considered higt :heck if Yes: ❑ and provide details: emitted forapproval for the system or project to be served? H Certification? ❑ Yes ❑ No ® N/A ❑ Yes ® No ❑ N/A ❑ Yes ❑ No ® N/A ❑ Yes ❑ No ® N/A involve aerial lines, siphons, or interference I !1. Owner/Permittee's Certification: (Signature of Signing � Official and Project Name) /, Steve Hooper, attest that this application for the Town of Robbinsville has been reviewed by me and is accurate and j complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments r are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 1a. 6&CC - Signing Official Signature - Date r----- i ENGINEERING DESIGN DOCUMENTS APPLICATION. MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY Z f TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T .0305 Q12. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) /, Michael J Waresak ,attest that this application for the Town of Robbinsville has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation I— to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in LU accordance with.the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February ( 12, 1996, and the Minimum Design Criteria for the' Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division Although V guidance. other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that i l have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B. any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as j well as civil penalties up to $25,000 per violation. 2a. Michael J Waresak 1 E 19 61/g//� �0p9 CAR Professional Engineer Name 2b. McGill Associates Engineering Firm o m 12d. 2c. 55 Broad Street I9 s, o ® u Mailing Address Asheville �2e. NC f: 28804 State 4 a i �City — Zip I17 -- --—� �OG4d9���� 2�. 828-252-0575 j2h. 828-252-2518 2i. mike.waresak@mcgillengineer Telephone Facsimile NC Pe Seal, Signature &Date FTA 10-14 APPLICATION Page 6 of 6 . �e,' ter Eesources State of North Carolina Department of Environment and Natural Resources Division of Water. Resources Flow Traeking/Acceptance for Sewer Extension Applications (FTSE 08-13). Project Applicant Name: Town of Robbinsville Project Name for which flow is being requested: Tallulah Creek and Circle Street.Areas More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed -wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Robbinsville b. WWTP Facility Permit M NC 0025879. All flows are in MGD c. WWTP facility's permitted flow 0.630 d. Estimated obligated flow not yet tributary to the WWTP 0.000 e. WWTP facility's actual avg. flow 0.238 f. Total flow for this specific request 0.000 g. Total actual and obligated flows to the facility . 0.238 h. Percent of permitted flow used 38% II Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: i Pump Station (Name or Number) (A) 03) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Average Daily Approx. Not Yet Total Current Firm Flow** Current Avg. Tributary Flow Plus Capacity,* (Firm / p fl; Daily Flow, Daily Flow, Obligated Available MGD MGD MGD MGD Flow Capacity*** 2.17 0.630 0.238 0.000 0.238 0.392 RECEIVED Division of Water Resourrag Wator. Quality RaggiQna! Operattens As�ieviiie Regional Mire * :The Firm Capacity of any pump station is defined as the: maximum pumped flow that . can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addend�m shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. age 1 of 6 . FTSE 08-13 III. Certification Statement: I Steve Hooper certify to the best of my knowledge that the addition of the volume'of wastewater to be permitted in this. project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature Date State of North Carolina Department of Environment and Natural Resources Division of Water. Resources Division of Water Resources Watershed Classification Attachment (WSCAS 01-15). Along with this form, submits color copy of a USGS Topographic Map to identify the project area and waterbodies. Each map or maps must show the location of the sewer system and include location identifiers where the system traverses over or near, waterbodies. The map should have location ID's for each different ,waterbody and corresponding classifications should be recorded. Include the completed form and map portions with the permit application for submittal to the appropriate review agency. A list of the Division's regional offices, their county coverage, and contact information can be obtained from: http://portal.ncdenr.org/web/wq/home/ro Location ID Name of Waterbodyl River Basin Waterbody Index No. Waterbody Classification sewer line . Tulula Creek Little Tennessee 2-190.-2-(14) WS-III; Tr, CA If unnamed, indicate "unnamed tributary to X"; where X is the named waterbody to which the unnamed tributary joins. Division of Water Resources FEB 16 24' Water Cluality Regional Operations Asheville Regional Office a Registered Professional Engineer in the State of at l have diligently followed the Division's instructions . for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief. PE Seal, Signature and. Date ��``allBtt//s CA ? a .-A o_ o d�9950 o �lrFD PLAN 2000 0 1000 2000 4000 GRAPHIC SCALE 1 INCH = 2000 FEET �- -��(J /"\ A �- � rk+i'� ,�f r_�t �i 1 (.�Y� • � ,�. E f/ l �'� ✓�` '\�`Y ��.e, t.. J �' s, J ' E k \ a 7�{��'/F%tom=J-J/^S � ��L:-y`Jc . � j ly/�✓�{^�`,�.,-�11r ^ � • `f �� ^./�,���� 4 1 Y u. n�"'�1Y.a !Lr ! �� � �Nf ���� �R� JI.IV.'`! ' ���� ~i�l �• L� TOWN OF ROBBINSVILLE WWTP # NC25879 / 'ILA 1r� PROJECT LOCATIONS AMJJ ...+.r==�. < ,- f 1 ��. h� • / a owl �(%�l 1��./ I PUMP STATION 1 1�` l i ��r _�_; (���`�� ;� , `' -.��_, ♦ t°A `� � 'r�y� �`. O `t: J� �+�/JJJ n� y %\ y r >_• •� PAL ` 143 t t ( -'_ J t il_ PC ��S `Jt ,'.---.J �;._l p •, s_' i%'-,.,.,.J Mil �'; k�% % •f � D'�y ° ¢� � ,� `L `'. what � � :� �'�" � �' �^ � � � r %�� eek„ t jr ..�•.��.• 0221127 � flor11� 1�f `���Cc' l� • -�'h` 1 , M eN L i ' .._l� ._.— \,11 �,Nc� � �% I jl � c�1. } lt, r � ��:' 1�'`• �=r� �� �� (( ' � � � o `'�`�r. _t� `.._%!�-, i, // ��:� 1 (^ 4 '..};'`. r Lit o !-`i.l .-.fJ..®`'S �l.. it j '� • r `o 'f �. �{(r�� /�( �� � ��\ �5�''`� •�'~,14t � II ��SI"�'���• i r S "„c._� ✓'sly-'' .�l �f �``,->� v 1�,/�. � � � � 1 . ��� c �y • TALLULAH CREEK AND Jos ND:: 13.00369 ,'Mc / �� CIRCLE STREET AREAS DATE Y: MJ 2 SHEET (v ��JT DESIGNED BY: MJW SEWER SYSTEM IMPROVEMENTS CADD BY: MJW2 TOWN OF ROBBINSVILLE .DESIGN .N.T.REVIEw: TOPOGRAPHIC MAP A S S C' C I A T E S FILE NAME: REVIEW:_ i ENGINEERING• PLANNING -FINANCE ToLoMa dM SI BROMSIREEi ,�—R,.E—.1 ��.ca�,sz �s F9L\IL'CFA'SEM COl59 GRAHAM COUNTY, NORTH CAROLINA ° - V& t PROPOSED: REPLACE EXISTING 8" VCP PIPE WITH NEW 8" DIP SEWER LINE AND MANHOLES MOOSE ANIJOLE2�61�-�'- EXISTING- MANHOLE ABANDON EXISTING I- 8" VCP -SEWER LINE mm-111A, Nft'o 17 5, l4p T, 14 OMcGffl A S S O C I A T E S June 14, 2018 Landon Davidson, Water Quality Supervisor North Carolina Department of Environmental Quality Water Quality Regional Operations Section Asheville Regional Office 2090 US Highway 70 Swannanoa, North Carolina 28778 Dear Mr. Davidson: 00wo Ivicowu�q�wwav suolIw9d0 AjpDAVM 810? s Nnr i �M to uolstn?�g �, RE: Engineering Certification Tallulah Creek Sewer Improvements Permit #WQ0038305 Town of Robbinsville, North Carolina On behalf of the Town of Robbinsville, please find enclosed a completed Engineering Certification and one copy of digital record drawings for the referenced sanitary sewer system improvements project. The digital files reflect the as -built condition of the recently completed sewer improvements. On behalf of the Town thank you for your continued assistance with this project. Should you have any questions or require additional information please feel free to contact me at your earliest convenience. Sincerely, McGILL ASSOC TES, P.A. J. ELISKI, PE Project Manager Enclosure Cc: Mayor Steve Hooper, Town of Robbinsville P:\17.00363\letters\ld 14junl8.doc 55 Broad Street P.O. Box 2254 ph: 828.252.0575 Asheville, North Carolina 28801 Asheville, North Carolina 28802. f: 828.252.2518 www.megillengineers.com bays �olpaa allinaysy suppualbad 41Lnt) ;aleM FAST TRACK SEWER ENGINEERING CERTIFICATION . t 017 PERMITTEE: TOWN OF ROBBINSVILLE _.. PERMIT: WQ0098305' V PROJECT: TALLULAH CREEK AND CIRCLE STREET AREAS SEWER SYSTEM 6Mn099d.1e1rM io urnsiAI GIA ISSUE DATE; February 29, 2016 This project shali.not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and.all required supporting documentation. It should be submitted in. a manner that. documents the ' Division's receipt. Send the required documentation to the Regional Supervisor,.Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The. Permittee is responsible for tracking all partial certifications up until a finatcertification Is received. A Final'Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMIT ITeS CERTIFICATION I, the undersigned agent for the Permittee; hereby state -that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate'&maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature_0 Date.' ENGINEER'S CERTIFICATION as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe. ([] periodically,,ffweekly, LJ full time) the construction of the Tallulah Creek 'and Circle Street Areas Sewer System and location as referenced above for the above Permittee hereby state that, to'the'best of my abilities,*due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit, 1SA NCAC 02T; the Division *of Water Resources' (Division) Gravity Sewer. Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: m Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section', 2090 US Hwy 70 Swannanoa, NC 28778 Asheville Regional Office Phone: (828} 29'6-4500 FAX: (828)-299 7043