HomeMy WebLinkAboutWQ0038305_Regional Office Historical File 2016 to 2018PAT MCCR.ORY
i [ I L Governor
DONALD R. VAN DER VAART
secv erav
S. JAY ZIMMERMAN
Director
February 29, 2016
Steve Hooper, Mayor
Town of Robbinsville
PO Box 126
Robbinsville, NC, 28771
Subject: Permit No. WQ0038305
Town of Robbinsville
Tallulah Creek and Circle Street Areas Sewer System
Wastewater Collection System Extension Permit
Graham County
Dear Mr. Hooper:
In accordance with your application received February 16, 2016, we are forwarding herewith Permit No.
WQ0038305 dated February 29, 2016, to the Town of Robbinsville (Permittee) for the construction and
operation upon certification of the subject wastewater collection system extension. This permit shall be
effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations
as specified therein. This cover letter shall be considered a part of this permit and is therefore
incorporated therein by reference.
Please pay particular attention to the following conditions contained within this permit:
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system
permit issued to, the Permittee.
It shall be responsibility of the Permittee to ensure that the as -constructed project meets the
appropriate design criteria and rules. Failure to comply may.result in penalties in accordance with North
Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right
to request an adjudicatory hearing upon written request within 30 days following receipt of this permit.
_This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina
General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
NC 27699-6714. Unless such demands are made, this permit shall be final and binding.
State of North Carolina / Environmental Quality / Water Resources
2090 U.S. Hwy. 70, Swannanoa, N.C. 28778
828-2964500
Town of Robbinsville
Permit No. WQ0038305
If you need additional information concerning this matter, please contact Tim Heim a'
via e-mail at tim.heim@ncdenr.gov.
Sincerely,
r
G. Landon Davidson, P.G., Regional Sup rv'sor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
cc:. Michael J Waresak, P.E. — McGill Associates (electronic copy)
twiIfO O Fic9e ,i
Water Resources Central Files
PERCS (electronic copy)
G:\WR\WQ\Graham\Collection Systems\Robbinsville Coll Sys WQC500158\WQ0038305 Tallulah Creek & Circle.docx
0
Page 2 of 8
.r;
Environmental
Quality
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws; Rules, and Regulations, permission is hereby granted to the
Town of Robbihsville
Graham County
for the construction and operation of approximately 50 linear feet of 6-inch gravity sewer, 8,505 linear
feet of 8-inch gravity, and 50 linear feet of 10-inch gravity sewer to serve as repair and replacement to
the existing gravity sewer lines as part of. the Tallulah Creek and Circle Street Areas Sewer System
project, and the discharge of zero additional gallons per day of collected domestic wastewater into the
Town of Robbinsville's existing sewerage system, pursuant to the application received February 16, 2016
and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted
February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of
Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data
subsequently filed and approved by_the Department of Environmental Quality and considered a part of
this permit.
This permit shall .be effective from the date of issuance until rescinded and shall be subject to the
specified conditions and limitations contained therein.
G. Landon Davidson, P.G., Regional Supervisor -
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
Permit Number: WQ0038305
Permit Issued: February 29, 2016
Page 3 of 8
SUPPLEMENT TO PERMIT COVER SHEET
Town of Robbinsville is hereby authorized to:
construct, and then operate upon certification the aforementioned wastewater collection extension.
The sewage and wastewater collected by this system shall be treated in the Town of Robbinsville
Wastewater Treatment Facility in accordance with Permit Number NC0025879.
Permitting of this project does not constitute an acceptance of any part of the project that does not
meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as
applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations
and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division
approval is based on acceptance of the certification provided by a North Carolina -licensed Professional
Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed .
project meets the appropriate design criteria and rules.
Construction and operation is contingent upon compliance, with the Standard Conditions identified
below.
. II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)],
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01101
3. This permit shall be effective only with respect to the nature and volume of wastes described in the
application and other supporting data. [15A NCAC 02T .0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following performance criteria shall be met: [15A NCAC 02T :0108(b)]:
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters; and to prevent any contravention of groundwater standards or
surface water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
Page 4 of 8
n and maintenance plan including pump station inspection frequency, preventative
e schedule, spare parts inventory and overflow response has been developed and
d. .
ins that are not connected to a telemetry system shall be inspected every day (i.e.
--- . _Y_ 1.,. r year). Pump stations that are connected to a telemetry system shall be inspected
at least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections
are documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in
accordance with 15A NCAC 213.0506(a), and public notice shall be provided as required by North
Carolina General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall.include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative. .
3. Grease education materials shall be distributed.more often than required in Parts (1) and (2)
of this Subparagraph if.necessary to prevent grease -related sanitary sewer overflows.
i. Right-of-ways and easements shall be- maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of
three years with exception of the map, which shall be maintained for the life of the system.
5. The Permittee shall report by telephone to a water resources staff member at the Asheville Regional
Office, telephone number (828) 296-4500, as soon as possible, but in no case more than 24 hours,
following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility
incapable 'of adequate wastewater transport, such as mechanical or electrical failures of
pumps, line blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the
initial verbal report. Overflows and spills. occurring outside normal business hours may also be
reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919)
Page 5 of 8
733-3300. Persons reporting any of the above occurrences shall file a spill report by completin
submitting Part I of Form CS-SSO (or the most current Division approved form) within five day
following first knowledge of the occurrence. This report must outline the actions taken or proposed
to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current
Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-
215.1C(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
7. Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form attached to this permit shall be submitted with the required
supporting documents to the address provided on the form. A complete certification is'one where
the form is fully executed and the supporting documents are provided as applicable. Any
wastewater flow made tributary to the wastewater collection system extension prior to.completion
of this Engineer's Certification shall be considered a violation of the permit and shall subject ,the
Permittee to appropriate enforcement actions.
If the permit is issued to a private entity.with an Operational Agreement, then a copy of the
Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been
appropriately filed with the applicable County's Register of Deeds office shall be submitted with
the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines &
force mains) of the wastewater collection system extension. Final record drawings should be
clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings
that are marked up or annotated with after construction information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing,
velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage,
surge protection, detention time in the wet well, and force main, ability to flush low points in
force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power
source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, include travel
timeframes, shall be provided.
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting
in non-compliance with this permit (including pipe length increases of 10% or greater, increased
flow, pump station design capacity design increases of 5% or greater, and increases in the
number/type of connections), regulations, or the Minimum Design Criteria. Requested
Page 6 of 8
fications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis
and each on its own merit. Please note that variances to the Minimum Design Criteria should be
requested and approved during the permitting process prior to construction. - After -construction
requests are discouraged by the Division and may not be approved, thus requiring replacement or
repair prior to certification & activation. [15A NCAC 02T .0116]
8. Gravity sewers installed greater than ten percent below the minimum required slope per the
Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified
until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident prior to completing and
submitting the construction certification. [ 15A NCAC 02T.0105(n)]
9. , A copy of the construction record drawings shall be maintained on file by the Permittee for the life
of the wastewater collection facilities. [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the
Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum .Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted
June. 1, 2000 as applicable; and other supporting materials may subject_ the Permittee to an
enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A
through §143-215.6C, construction of additional or replacement wastewater collection facilities,
and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A
NCAC 02T .0104; 15A NCAC 02T .0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including
those as may be required by this Division, such as the construction of additional or replacement
facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances. that may be imposed by the' Division any other Federal, State, or
Local government agencies which have jurisdiction or obtaining other permits which maybe required
by the Division or any other Federal, State, of Local government -agencies. [G.S. 143-215.1(b)]
Page 7 of 8
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE: TOWN OF ROBBINSVILLE
PERMIT #: WQ0038305
PROJECT: TALLULAH CREEK AND CIRCLE STREET AREAS SEWER SYSTEM
ISSUE DATE: February 29, 2016
This project shall not be considered complete nor allowed to operate in accordance wiL11 %-U11u1L1V11 .
this permit until the Division' has received this Certification and all required supporting documentation.
It should be submitted in a manner that documents the Division's receipt. Send the required
documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address at
the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name, Title Signature Date
ENGINEERS CERTIFICATION
I, , as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the
Tallulah Creek and Circle Street Areas Sewer System and location as referenced above for the above
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer
Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design
Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date:
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
NC DWR — Water Quality Regional Operations Section 11 2090 US Hwy 70 Swannanoa, NC 28778
Asheville Regional Office Phone: (828)-296-4500 FAX: (828)-299-7043
Division of Meter Quality
FBst Track Application (FTA 1212) for Sewer Systems— RevieW. Checklist
rojecfNames�l�l ulA11 eRlt. d CO -aft c preiiminaryReview Date: .
ab 1 / (P
Project Number i �:�003�3®� �� lirmal Review Dated (7/ C(„
Reviewer;, � � rr : >� 3 f-3 5
Appiicafilon Pre Review
j
FlNo
Project is located in a County currently covered b the regional office
y
es .
Application and supporting documentation submitted: in duplicate?
es ®No
One Original and One Copy:
wle
Correct application tee submitted? G.S. 143-215.3D
es Li No
Ensure that a check for $480 is submitted and made out
Application package is complete
'
es _ [jNo
Current application version (FTA 12-12) . Cl
[jlNo
Briefproject narrative (per Section A of FTA
Certification of Public ConvenienceandNeces ovided
oyes • DNo
(if applicable).
Operational Agreements, signed an dated
Yes QNo
(if applicable) . .
Flow Tracking / Acceptance Form 3), signed
es QNo
Flow Tracking / Acceptance Plannin °s . Addendum
Yes QNo .
(if applicable) Site Map and Street Le el Map (per Se F of 2)
es ONo
;..
Stream Glass>fica "'"' SCAS 03- i ed,= d date
1'�
. ` 046
. ,
PE Certificat<o placation ed, seal ed by
QNo
Applicant Ce ' is sYgae dated (or` on letter as provaded)
Wes QNo
PermitInfo' -
Does the requite a pe the a
kes . QNo
i_.
See 'tting by'Regul` 15A 02T0303)for projects deemed permitted
Is the project ehgi .. the Fast T " ogram? a. ; .
Wes QNo
Project not petmatt the fast' program
Requires an Ea ental sanent per, 15A NCAC 01C .0408
Is an`alternat ve s sure'sewers; STEP systems, vacuum systems, etc.)
Is fianded tl>rough th cture Finance Section
If tile applicant is a private entity (private utility) '
Dyes 090 .
Applicant has;beek designated as a public utility by the NC Utilities Commission
Hnsubmitted'a Certificate of Public Convenience and Necessity (CPM
or Letter from the Public Staff of the NC Utilities Commission, (contact Central Office
If the applicant is a private entity (Developer)
ElYes BRO
Has submitted an executed Operational Agreement (DEV 06-13)
If the apphcaiit as a Homeowner's or Property Owner's Associataon: ,,
ayes � o
Has submitted an executed Operational Agreement (HOA 601-13)
and, Copy`of the Articles of Incorporation, Declarations and. By-laws
l
Wastewater Flow Information ,
Has the wastewater flow -volume been calculated correctly (section B.9 of FTA 12-12)? [JYes UNo
Flow -is calculated per 15A NCAC 02T.0114
or
If daily design flow is not based on regulations ensure that the applicant has an approved flow reduction of .
daily design flow rate on file with the. Division.
or
If other than 2T.0114, values must be supported with flow data per 15A NCAC 02T.0114(f)
(Contact Central Office)
Has submitted Flow Tracking/Acceptance Form (FTSE 06-13) es []NoProper certification per 15A NCAC :0106 (bl []NoForm is dated within one year of receipt of application package es ❑LNG
Is FTSE Planning Assessment Addendum Required? ❑Yes o
Required only for projects where available pump station capacity is < 0.
Contact .CentralOffice i.f needed
Additional forms (FTSE 06-13) required? ❑Yes. o
Required only if the owner of downstream sewer different then owner of W WTF
Design Information
Has Stream.Classification form been submitted'(WSCAS 03 12) Qies []No
Required if any portion of project is v� i l00 feet ofanysurface>mater; or wetlands
If no, verify separation on submitted USGS Topographic Map
Note, 15A-NCAC02T :0305 (f) contains minimum separations required for sewer
A variance is required if minimum separations cannot be avoided
Has been signed, "sealed, and dated by anN.C. PE s ❑No
Is Project design is in accordance with (see section B. 13 ofFTA 12-12) CO []No
15A NCAC 02T
Gravity Sewer Minimum Design Criteria (latest version)
Minimum Desio Criteria for Permittingof f Pump Stations and -Force Mains (latest version)
If no, a variance approval is required per the requirements of BA NCAC 02T.0105M
Applicant must submit TWO copies of the plans, specifications; and calculations , -
Contact the Central Office to discuss the variance request to determine a course of action. Variance approvals
are issued from the central office. _ If approved, ,the`variance should be mcorporated into the final permit
,Project contains high priority lines (15A NCAC 0H.0402. ❑Yes o
Contact the Central Office
Application Certification
Has a N.C. PE stamped, signed, and dated the application?. [ es ❑No
PE with active license in North Carolina? Yes ❑No
Check the.NCBELS to ensure Engineer is currently registered to practice
NCBELS License Lookup
Applicant (Owner/Permittee) signature meets requirement of 15A NCAC .0106(b)? Yes e00
If not, is a delegation letter provided, delegating authority? ❑YesIf the owner is a corporation, is the corporation registered in N C.?' ❑Yes
N.C. Secretary of State (Corporation Seam 1� `R
2
Februa 11. 2016 REC IVE
Division of Water. Resources
Landon. Davidson, Water Quality Supervisor
North Carolina Department of Environmental Quality$ �16
Water:Quality Regional Operations Section
Asheville. Regional Office Water ouality Regional Operations
2090 US Highway 70
Asheville Regional Otfice
Swannanoa, North Carolina 28778
RE: Fast Track Application
Tallulah Creek and Circle Street Areas
Sewer System -Improvements
Town of Robbinsville, North Carolina
Dear Mr. Davidson:
On behalf of the Town of Robbinsville, please find attached a Fast Track Application for
the above gravity sewer system project.
The project generally consists of approximately 8,462 linear feet (LF) of 8-inch ductile
iron pipe (DIP) gravity sewer line, 120. LF of steel encasement pipe complete with carrier pipe:
installed by bore and jack, 50 LF of 6-inchDIP gravity sewer line; -50 LF 0--f-10-inch DIP gravity
sewer line, 76 manholes, and related app rtenances. The purpose of this project is to reduce
Sanitary sewer overflows and I&I by replacing old, broken, and sagging 6- and 8-inch vitrified
clay pipe with new lines. This project improves service to existing customers of the system but
does . not add additional: customers. This project is being funded entirely by a Community
Development Block Grant.
Most of these pipes will be installed along existing alignments for which encroachments.
and easements have already been acquired An Erosion and. Sedimentation Control Plan will be
filed with the North Carolina. Department of Environmental Quality Land Section.
The following documents are enclosed:
- One. (1) original and one (1) copy o�, the Fast Track Application Form (FTA 10-1.4)
One (1) original check for the $480 application fee
One (1) original and one (1) copy off the Downstream Sewer, WWTP Capacity and Flow
Tracking/Acceptance form (FTSE 08-13)
Two (2) copies of the site topographic map.
-Two, (2) copies of the street level project map.
- - One (1) original and one (1) cop of the Watershed Classification -Attachment form
(WSCAS 01-.15)
55 Broad Street P.O.: Box 2259 ph: 828.252.0575
,Asheville, North Carolina 28801 Aslieville, Nortli Car lira 28802 f: 828.252:2518 www.mcgillengineers.com
2
C
H
4
C
LL
Z
LL
a
7
Application Number:
E THE TAB KEY TO MOVE FROM FIELD TO FIELD ,Q0038305
(to be completed by DWR)
Owner/Permittee:
----- ----
�36Is--
-
i1 a. Town of Robbinsville
-- -- - -- - -- - -- - --- . _ ..
-- - - . _- --
j Full Legal Name (company, municipality, HOA, utility,
etc.)
11 b. Steve Hooper, Mayor
- I Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials)
Ac. The legal entity who will own this system is:
i El Individual Individual ❑ Federal_ ® Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify):
I -- --_
'1 d. PO Box 126 1 e. Robbinsville
- Mailing Address City
1 f. NC
1 g. 28771 - ---'--��-- —
State
Zip Code
j1 h. 828-479-3250 1 i. 828-479-9272 - -- Ili. townofrobbinsville@hotmall.com -
j Telephone — -- Facsimile j E-mail
J
--- -- -- — - - -
'2. Project (Facility) Information:
j
_
_ __-..------ - - --- --- - . _ _ - ,- - - -- - - --- --- - - - --- - ----R-E-C-LEWED.
2a. Tallulah Creek and Circle Street Areas Sewer System 12b. Graham Division of Water ,
I Improvements County Where Prc ject is Located
3. Contact Person
'3a. Vann Waters, McGill Associates-'�-�-�
Name and Affiliation of Someone Who Can Answer Questions About this Application
3b. 828-252-0575 - - 13c. vann.waters m
illy' rSR8Pt'b6f'lona► Operations
Phone Number I I E-mail
11. Project is ® New ❑ Modification (of an existing permit) If Modification, Permit No.:
i
12. Owner is ® Public (skip to Item B(3)) ❑ Private (go to Item 2(a))
I
2a. If private, applicant will be:
2b. If sold, facilities owned by a (must choose one)
❑ Retaining Ownership (i.e. store, church, single office, etc.) or
❑Leasing units (lots, townhomes, etc. - skip to Item B(3))
❑ Public Utility (Instruction D)
i ❑ Selling units (lots, townhomes, etc. - go to Item B(2b))
El Homeowner Assoc./Developer (Instruction E)
3. Town of Robbinsville
Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project
14a.
Town of Robbinsville WWTP
14b. NC 0025879
Name of WWTF
WWTF Permit No.
I
5a. Town of Robbinsville
5b. 8-inch
® Gravity
5c. unknown
Owner of Downstream Sewer
Permit # of Downstream Sewer (Instruction F)
Receiving Sewer Size
❑ Force Main
_ _ _ - -- ---- -
The origin of this wastewater is (check all that apply):
-
® Residential Subdivision ® Retail (Stores, shopping centers) 100% Domestic/Commercial
® Apartments/Condominiums ® Institution
% Industrial
j
® Mobile Home Park ❑ Hospital
j
❑ School ❑ Church (Attach Description)
® Restaurant ❑ Nursing Home %Other
® Office E] Other (specify):
I. -_ _____..__ - _. ._.- _ _.._ - ..-_ .--_ _._._ - - _(Attach_Descrintion) . _
7. Volume of wastewater to be allocated or permitted for this particular project: 0 gallons per day
*Do not include future flows or previously permitted allocations
8. If the permitted flow is zero, indicate why:
❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Noj
® Rehabilitation or replacement of existing sewer with no new flow expected
(see 15A NCAC 02T .0303 to determine if a permit is required) --- -- - ---
FTA 10-14 APPLICATION Page 4 of 6
W
Z
P
O
V
O
LL
Z
F-
UJ
IL
W
ovide the wastewater flow calculations used in
V
determining the permitted flow in accordance with 15A NCAC 2T .0114 for
e value in Item B(7) AND/OR the design flow for
line or pump station sizing if a reduced or zero flow is being requested in
Item B(7). Values other than that in 15A NCAC 2T
.0114 (b) and (c) must be supported with actual water or wastewater use.
data in accordance with 15A NCAC 2T .0114 (f).
"
No additional customers will be added to the wastewater
collection system by this project. Design flow for the nearest pump
station is stated in the attached form FTSE 08-13.
10. Summary of Sewer Lines to be Permitted (attach
additional sheets if necessary)
Size )
(
Length gth (feet)
New Gravity or Additional
Force Main
��--6—
8,505—eal,l(�� /(��C�---�---
- ___—gravity
50
gravity
� 10
I
r---
50
gravity
I
111. Summary of Pump Stations w/ associated Force
Mains to be Permitted (attach additional sheets as necessary)
'Pump Station Location ID: n/a (self chosen - as shown
on plans/map for reference)
Longitude: LI
titude:
Design Flow
Operational Point
Power
Reliability Option
_ �—
—
(MGD)
I GPM @TDH
1 - Permanent
2 -
generator w/ATS;
portable generator w/MTS
i Force Main Size
Force Main Length
Pump Station Location ID:
(self chosen - as shown on plans/map for reference)
1
Longitude: Latitude:
Design Flow
(MGD) Operational Point 1
permanent
ower Reliability Option
-
GPM @TDH 2 -
generator w/ATS; Force Main Size Force Main Length
portable generator w/MTS
—
12. Will the wastewater flow in the proposed sewer lines
or pump stations be able to be directed to another treatment facility?
❑ Yes ® No If Yes, permit number of 21nd treatment
facility
(RO — if "yes" to 13,12 please contact the Central Office
PERCS Unit)
13. Does the sewer system comply with the Minimum
Design Criteria for the Permitting of Pump Stations and Force Mains
(latest version), the Gravity Sewer Minimum Design
Criteria (latest version) and 15A NCAC Chapter 2T as applicable?
0 Yes ❑ No
If No, complete and submit the Variance/Alternative
Design Request (VADC 10-14) application and supporting
documents for review. Approval of the request
is required prior to submittal of the Fast Track Application and
supporting documents.
FTA 10-14 APPLICATION . . I Page 5 of 6
ve the following permits/certifications been sul
Wetland/Stream Crossings - General Permit or 4
Sedimentation and Erosion Control Plan?
Trout Buffer Waiver?
Stormwater?
5. Does this project include any high priority lines WE
manholes)? These lines will be considered higt
:heck if Yes: ❑ and provide details:
emitted forapproval for the system or project to be served?
H Certification? ❑ Yes
❑ No
® N/A
❑ Yes
® No
❑ N/A
❑ Yes
❑ No
® N/A
❑ Yes
❑ No
® N/A
involve aerial lines, siphons, or interference
I
!1. Owner/Permittee's Certification: (Signature of Signing
�
Official and Project Name)
/, Steve Hooper, attest that this application for the
Town of Robbinsville has been reviewed by me and is accurate and
j complete to the best of my knowledge. I understand
that if all required parts of this application are not completed and that
if all required supporting documentation and attachments
r are not included, this application package is subject to being
returned as incomplete. Note: In accordance
with North Carolina General Statutes 143-215.6A and 143-215.6B, any
person who knowingly makes any false statement,
representation, or certification in any application shall be guilty of a Class
2 misdemeanor, which may include a fine not to exceed
$10,000 as well as civil penalties up to $25,000 per violation.
1a. 6&CC
-
Signing Official Signature
-
Date
r-----
i
ENGINEERING DESIGN DOCUMENTS
APPLICATION.
MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS
THESE DOCUMENTS MUST INCLUDE
PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY
Z
f TO OTHER UTILITIES, DESIGN CALCULATIONS,
ETC. REFER TO 15A NCAC 02T .0305
Q12.
Professional Engineer's Certification: (Signature of Design Engineer and Project Name)
/, Michael J Waresak ,attest that this application for the Town of Robbinsville has been reviewed by me and is accurate,
complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation
I—
to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in
LU
accordance with.the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February
( 12, 1996, and the Minimum Design Criteria for the' Fast -Track Permitting of Pump Stations and Force Mains adopted June
1, 2000 and the watershed classification in accordance with Division Although
V
guidance. other professionals may have
developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that
i
l have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC
General Statutes 143-215.6A and 143-215.6B. any person who knowingly makes any false statement, representation, or
certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as
j
well as civil penalties up to $25,000 per violation.
2a. Michael J Waresak
1
E 19 61/g//�
�0p9
CAR
Professional Engineer Name
2b. McGill Associates
Engineering Firm
o
m
12d.
2c. 55 Broad Street
I9
s, o
® u
Mailing Address
Asheville �2e.
NC f: 28804
State
4 a
i
�City
—
Zip I17
-- --—�
�OG4d9����
2�. 828-252-0575 j2h. 828-252-2518 2i.
mike.waresak@mcgillengineer
Telephone Facsimile
NC Pe Seal, Signature &Date
FTA 10-14 APPLICATION Page 6 of 6 .
�e,'
ter Eesources
State of North Carolina
Department of Environment and Natural Resources
Division of Water. Resources
Flow Traeking/Acceptance for Sewer Extension Applications
(FTSE 08-13).
Project Applicant Name: Town of Robbinsville
Project Name for which flow is being requested: Tallulah Creek and Circle Street.Areas
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed -wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Town of Robbinsville
b. WWTP Facility Permit M NC 0025879.
All flows are in MGD
c. WWTP facility's permitted flow 0.630
d. Estimated obligated flow not yet tributary to the WWTP 0.000
e. WWTP facility's actual avg. flow 0.238
f. Total flow for this specific request 0.000
g. Total actual and obligated flows to the facility . 0.238
h. Percent of permitted flow used 38%
II Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
i
Pump
Station
(Name or
Number)
(A)
03)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Average Daily
Approx.
Not Yet
Total Current
Firm
Flow**
Current Avg.
Tributary
Flow Plus
Capacity,*
(Firm / p fl;
Daily Flow,
Daily Flow,
Obligated
Available
MGD
MGD
MGD
MGD
Flow
Capacity***
2.17
0.630
0.238
0.000
0.238
0.392
RECEIVED
Division of Water Resourrag
Wator. Quality RaggiQna! Operattens
As�ieviiie Regional Mire
* :The Firm Capacity of any pump station is defined as the: maximum pumped flow that .
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addend�m shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
age 1 of 6
. FTSE 08-13
III. Certification Statement:
I Steve Hooper certify to the best of my knowledge that the addition of
the volume'of wastewater to be permitted in this. project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
Signing Official Signature Date
State of North Carolina
Department of Environment and Natural Resources
Division of Water. Resources
Division of Water Resources Watershed Classification Attachment (WSCAS 01-15).
Along with this form, submits color copy of a USGS Topographic Map to identify the project area and waterbodies.
Each map or maps must show the location of the sewer system and include location identifiers where the system
traverses over or near, waterbodies. The map should have location ID's for each different ,waterbody and
corresponding classifications should be recorded.
Include the completed form and map portions with the permit application for submittal to the appropriate review
agency. A list of the Division's regional offices, their county coverage, and contact information can be obtained from:
http://portal.ncdenr.org/web/wq/home/ro
Location ID
Name of Waterbodyl
River
Basin
Waterbody
Index No.
Waterbody
Classification
sewer line .
Tulula Creek
Little
Tennessee
2-190.-2-(14)
WS-III; Tr, CA
If unnamed, indicate "unnamed tributary to X"; where X is the named waterbody to which the unnamed tributary joins.
Division of Water Resources
FEB 16 24'
Water Cluality Regional Operations
Asheville Regional Office
a Registered Professional Engineer in the State of
at l have diligently followed the Division's instructions .
for classifying waterbodies and that the above classifications are
inclusive of the stated project, complete and correct to the best of my
knowledge and belief.
PE Seal, Signature and. Date
��``allBtt//s
CA ?
a
.-A o_
o d�9950 o
�lrFD
PLAN
2000 0 1000 2000 4000
GRAPHIC SCALE 1 INCH = 2000 FEET
�- -��(J /"\ A �- � rk+i'� ,�f r_�t �i 1 (.�Y� • � ,�. E f/ l �'� ✓�` '\�`Y ��.e, t..
J �' s, J ' E k \ a 7�{��'/F%tom=J-J/^S � ��L:-y`Jc . � j ly/�✓�{^�`,�.,-�11r ^ � • `f
�� ^./�,���� 4 1 Y u. n�"'�1Y.a !Lr ! �� � �Nf ���� �R� JI.IV.'`! ' ���� ~i�l �•
L�
TOWN OF ROBBINSVILLE WWTP
# NC25879 /
'ILA
1r� PROJECT LOCATIONS
AMJJ ...+.r==�. < ,- f 1 ��. h� • / a owl �(%�l 1��./ I
PUMP STATION 1
1�` l i ��r _�_; (���`�� ;� , `' -.��_, ♦ t°A `� � 'r�y� �`. O `t: J� �+�/JJJ n� y
%\ y r >_• •� PAL ` 143 t t ( -'_ J t il_ PC
��S `Jt ,'.---.J �;._l p •, s_' i%'-,.,.,.J Mil �'; k�% % •f � D'�y ° ¢� � ,�
`L `'. what � � :� �'�" � �' �^ � � � r %�� eek„ t
jr
..�•.��.• 0221127
� flor11�
1�f
`���Cc'
l� • -�'h` 1 , M eN
L
i
' .._l� ._.— \,11 �,Nc� � �% I jl � c�1. } lt, r � ��:' 1�'`• �=r� �� �� (( ' � � � o `'�`�r. _t�
`.._%!�-, i, // ��:� 1 (^ 4 '..};'`. r Lit o !-`i.l .-.fJ..®`'S �l.. it j '� • r `o 'f �.
�{(r�� /�( �� � ��\ �5�''`� •�'~,14t � II
��SI"�'���• i
r S
"„c._� ✓'sly-'' .�l �f �``,->� v 1�,/�. � � � � 1 . ��� c
�y • TALLULAH CREEK AND Jos ND:: 13.00369
,'Mc
/ �� CIRCLE STREET AREAS DATE Y: MJ 2 SHEET
(v ��JT DESIGNED BY: MJW
SEWER SYSTEM IMPROVEMENTS CADD BY: MJW2
TOWN OF ROBBINSVILLE .DESIGN .N.T.REVIEw: TOPOGRAPHIC MAP
A S S C' C I A T E S FILE NAME:
REVIEW:_
i ENGINEERING• PLANNING -FINANCE ToLoMa dM
SI BROMSIREEi ,�—R,.E—.1 ��.ca�,sz �s F9L\IL'CFA'SEM COl59 GRAHAM COUNTY, NORTH CAROLINA ° -
V&
t
PROPOSED:
REPLACE EXISTING 8" VCP PIPE WITH
NEW 8" DIP SEWER LINE AND MANHOLES
MOOSE
ANIJOLE2�61�-�'-
EXISTING-
MANHOLE
ABANDON EXISTING I-
8" VCP -SEWER LINE
mm-111A, Nft'o
17
5,
l4p
T,
14
OMcGffl
A S S O C I A T E S
June 14, 2018
Landon Davidson, Water Quality Supervisor
North Carolina Department of Environmental Quality
Water Quality Regional Operations Section
Asheville Regional Office
2090 US Highway 70
Swannanoa, North Carolina 28778
Dear Mr. Davidson:
00wo Ivicowu�q�wwav
suolIw9d0 AjpDAVM
810? s Nnr
i �M to uolstn?�g �,
RE: Engineering Certification
Tallulah Creek Sewer Improvements
Permit #WQ0038305
Town of Robbinsville, North Carolina
On behalf of the Town of Robbinsville, please find enclosed a completed Engineering
Certification and one copy of digital record drawings for the referenced sanitary sewer system
improvements project. The digital files reflect the as -built condition of the recently completed
sewer improvements.
On behalf of the Town thank you for your continued assistance with this project. Should
you have any questions or require additional information please feel free to contact me at your
earliest convenience.
Sincerely,
McGILL ASSOC TES, P.A.
J. ELISKI, PE
Project Manager
Enclosure
Cc: Mayor Steve Hooper, Town of Robbinsville
P:\17.00363\letters\ld 14junl8.doc
55 Broad Street P.O. Box 2254 ph: 828.252.0575
Asheville, North Carolina 28801 Asheville, North Carolina 28802. f: 828.252.2518 www.megillengineers.com
bays �olpaa allinaysy
suppualbad 41Lnt) ;aleM
FAST TRACK SEWER ENGINEERING CERTIFICATION
.
t
017
PERMITTEE:
TOWN OF ROBBINSVILLE
_..
PERMIT:
WQ0098305'
V
PROJECT:
TALLULAH CREEK AND CIRCLE STREET AREAS SEWER SYSTEM
6Mn099d.1e1rM io urnsiAI
GIA
ISSUE DATE;
February 29, 2016
This project shali.not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and.all required supporting documentation.
It should be submitted in. a manner that. documents the ' Division's receipt. Send the required
documentation to the Regional Supervisor,.Water Quality Regional Operations Section at the address at
the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The. Permittee is responsible for tracking all partial certifications up
until a finatcertification Is received. A Final'Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMIT ITeS CERTIFICATION
I, the undersigned agent for the Permittee; hereby state -that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate'&maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name, Title Signature_0 Date.'
ENGINEER'S CERTIFICATION
as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe. ([] periodically,,ffweekly, LJ full time) the construction of the
Tallulah Creek 'and Circle Street Areas Sewer System and location as referenced above for the above
Permittee hereby state that, to'the'best of my abilities,*due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance of this permit, 1SA NCAC 02T; the Division *of Water Resources' (Division) Gravity Sewer.
Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design
Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as
applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date:
m Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach if necessary):
NC DWR — Water Quality Regional Operations Section', 2090 US Hwy 70 Swannanoa, NC 28778
Asheville Regional Office Phone: (828} 29'6-4500 FAX: (828)-299 7043