HomeMy WebLinkAbout20100043 Ver 1_401 Application_20100110
THE
WOOTEN
COMPANY
ENGINEERING
P L A N N I N G
ARCHITECTURE
January 14, 2010
Ms. Amy Chapman
Division of Water Quality
401/Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
Re: Pre-Construction Notification Application
Town of Ahoskie - 2009 Annexation
Water and Sewer Extensions
Ahoskie, North Carolina
TWC No. 2277-IW
Dear Ms. Chapman:
Copy
On behalf of the Town of Ahoskie, please find enclosed for your review the following
items regarding the above referenced project.
• Pre-Construction Notification Application
• Applicable construction drawings (2 reduced scale sets)
• USGS map showing location of project
• SCS Soils map showing location of project
120 North Boylan Avenue
Raleigh NC 27603-1423
I trust this information is sufficient for your review; however, if you should have any
questions or require additional information, please do not hesitate to contact us. We will
get you any information or clarification needed immediately.
Sincerely,
THE WOOTE ANY
D. Lee Campbell, Jr., P.E.
JAN 1 49 20110
MW - WATER QUALITY
WETI M NO STATER BRANCH
Enclosures: As stated.
cc: Tony Hammond, Town of Ahoskie
20100043
919.828.0531
fax 919.834.3589
2 0 1 0 0 0 4 3
pF W ATF9
o? qG Office Use Only:
Corps action ID no.
o DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PC Form
A. Applicant Information
1. Processing CO URTESY
1a. Type(s) of approval sought from the
Corps:
®Section 404 Permit ? Section 10 Permit ?0Py
1 b. Specify Nationwide Permit (NWP) number: NW 12 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? N Yes ? No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
N Yes ? No For the record only for Corps Permit:
? Yes N No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below. N Yes ? No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ? No
2. Project Information
2a. Name of project: Town of Ahoskie Annexation 2009
2b. County: Hertford County
2c. Nearest municipality / town: Ahoskie p
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state
project no: N/A JAN 1 9 2010
3. Owner Information DENR-WERDUALrrY
ANDS AND STOMMIM BRANCH
3a. Name(s) on Recorded Deed: N/A
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if
applicable): Town of Ahoskie
3d. Street address: 201 W. Main Street
3e. City, state, zip: Ahoskie, NC 27910
3f. Telephone no.: (252)-332-5146
3g. Fax no.: (252)-332-1643
3h. Email address: tonyhammond@ahoskie.org
Page I of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name: N/A
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: D. Lee Campbell, PE
5b. Business name
(if applicable): The Wooten Company
5c. Street address: 120 North Boylan Avenue
5d. City, state, zip: Raleigh, NC 27603
5e. Telephone no.: (919)-828-0531
5f. Fax no.: (919)-834-3589
5g. Email address: Iampbell@thewootencompany.com
Page 2 of 10
PCN Form -Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1 a. Property identification no. (tax PIN or parcel ID): N/A (Linear project in NCDOT RAN and Town of Ahoskie
Easements)
1 b. Site coordinates (in decimal degrees): Latitude: 36.25N Longitude: - 77.OOW
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: N/A acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Ahoskie Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C NSW
2c. River basin: Chowan River Basin
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing residential and commercial establishments
3b. List the total estimated acreage of all existing wetlands on the property:
0.19 Acres
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
40
3d. Explain the purpose of the proposed project:
To provide water and sewer service to the annexed area.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project will involve the installation of approximately XX linear feet of waterline, approximately XX linear feet of sewer
mains, approximately XX linear feet of sanitary force mains and 3 sanitary sewer pump stations. The equipment used will
be trackhoe, rubber tire backhoe and trucks
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? Y
? es ®No ? Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
f d
? Preliminary ? Final
o
etermination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A
Name (if known): N/A Other: N/A
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
N/A
S. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes ®No ? Unknown
5b. If yes, explain in detail according to "help file" instructions.
N/A
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
N/A
Page 3 of 10
PCN Form -Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ®P ? T Sewer line
g
crossing
unknown ® Yes
? No ® Corps
? DWQ
0.162
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0.16
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ®P ? T sewer crosing UT of Ahoskie
Creek ? PER
® INT ® Corps
? DWQ 15 20
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ?DWQ
3h. Total stream and tributary impacts 20
3i. Comments:
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T =
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments: N/A
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
Pi N/A
P2
5f. Total
5g. Comments: N/A
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres): N/A
5j. Size of pond watershed (acres): N/A
5k. Method of construction: N/A
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ? Tar-Pamlico ® Other: Chowan
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number- Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
B1 ?P?T ?Yes
? No
B2 ?P?T ?Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c.
If yes, which mitigation option will be used for this
project? ? Mitigation bank
El Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: N/A
3b. Credits Purchased (attach receipt and letter) Type N/A Quantity N/A
3c. Comments: N/A
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: N/A linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): N/A square feet
4e. Riparian wetland mitigation requested: N/A acres
4f. Non-riparian wetland mitigation requested: N/A acres
4g. Coastal (tidal) wetland mitigation requested: N/A acres
4h. Comments: N/A
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
N/A
Page 6 of 10
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ® No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 N/A 3 (2 for Catawba)
Zone 2 N/A 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
N/A
6h. Comments: N/A
Page 7 of 10
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ? No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments: N/A
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? <2 %
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Percent Impervious is below 24%
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
N/A
® Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? Town of Ahoskie
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
® USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No
attached?
4. DWQ Stormwater Program Review
® Coastal counties
4a. Which of the following state-implemented stormwater management programs apply ? HQW
? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ® No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 8 of 10
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ? Yes ? No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ? No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ? No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
N/A
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Flow to Ahoskie WWTP, which has capacity of 1.6 MGD
Page 9 of 10
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
? Yes No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
®
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Project is to be located in DOT right-of-way, 5 feet off the edge of pavement. Impacting federally protected species is
highly unlikely and difficult to quantify since the habitats of the species in concern are not delineated.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Research was conducted using the USFWS and various other sources. No substantial evidence could be found to
assume the unnamed tributaries of Ahoskie Creek could be considered Essential Fish Habitat.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NC State Office of Archeology, National Register of Historic Places
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ®Yes ? No
8b. If yes, explain how project meets FEMA requirements: Water tight manholes have been specified; located 2' above 100
year flood level
8c. What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Information System
Linda L. Blackburn
Applicant/Agent's Printed Name Applicant/Ag nt's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is rovided.
Page 10 of 10
PCN Form - Version 1.3 December 10, 2008 Version
IIr-> > 4ur11 cuaall
bALr1'61t 41 .-nh,g6H
,cri-F ¢1_c?N 1al N JI -C O ?biG2(n!aM Ql'
38r I IH'tl "1 r'1,N k' rd `J N I H 33111'9 N3
ANV&NOO NROOM JHl
SNOISIA3H
NOIlof1N1SNO
a
S3a NJI °¢ z
mZ'w
a
?Q
U w
r Z
o
W - >
?
iu'Ud
O
Q N
W O
_ w d
VI w O O°' Nmw
z N°
"
o N° 50
www
Z.- -
a Q
? 0
-
!
-
- --- L7VO-b`- A VnHS31,fVHS yJ
I
r x ,.. ,_.rJ.l),,
I
I
?
-- ----1_____ ______
rar,
F
r' e
I c
? =
r-u
r C
C
a
a
z
m
I a
?
N V \
I.
1
? I
1
I ? ? d
o ,
I c^ r =
Q
w
'
C)
a Y
•\ Z Q
~
wn 1
( -?"?- a
Q i f
n V ..CFA
9
'
T I
< U
;? O
z
? Y
o'
ao
a
(
o`t?
r; w °y w o ?
;1 ? r
W ?
wi
9? a N 3 __ /
3w I
?
`
M
BEMARL--E DRIt
-AL -
- - RI
o:
ci o
w
?Ja
i
o
3N?z
? Z Y
Z w U
' W Q
O
? J W Z Q
Hmw?o
Q
a
r
Z p oa
Z 'O
m
L
m n 4
'
?
3 ?
.
Q '
3 '
• µ
V I V
\ v p
w
Z I
-
V
l L
M?
Z M
_
W Q Z O
O '.
w MO
O
z a O
x drn ms ?\ _
z
z
rn
Z m°
N
l w
F w
wN ?
?
x
x
E)
1+90'LE+4Z 'd1S Ol 00'00+0[ 'tl1S
3AIHO 1S3HOH
83M3S lHt/lINVS ,.8 M311
;-°;a::.....a °•.,
g a
m m o 3 g
w co
SNOISN31X3 H3M3S ONtl d31tlM
N0IlVX3NNtl 6001 3ZsW y_ Q ro
r =O? ._- '? `
• m
m s ml
VNllOHV3 KiHON )dNn00 U04183H
31)iSOHV 30 NMOl °?•,'? D. ???' - 3
X. V38V
' ono
O -
II
II-__- ? z I?. ` I .L L
2 ? ?L t
az_
I UQw
to
y p Ow>
I M_ 311
I w oln w??d'
QO QN Z.. 1/1
\ Z I ¢ F!
-I I?rn?
cll
i
I I I -- -
z n
Z N
/ w no r
/ JO n a \-
Z O
Q ?
/
3 oaw I
It ? m I
z jam
z
ovmio I
?zw4
4\ NZUZ "..-
4 ? Z Q I
oW p _.
,. >UJw I
O KIm
I
K O H O
- Y 0-W V!m I
Ilt ?4?.'"?°?, II
w
O
Z
(7 N O ?I
I O J I
O V7 I
O
I \ mUZ I
0 4 Mw„w,
Xmm
wl I
` I
4 I I `r II
L
O Np n. I
r Z O
1
? ? Oe 1
1 '
1 ?
F-wM
1 Q
3Jw
.l`.cwi v=i
? 3¢w
zwN
m
O
I? to
(O O
(D Ln
Ln O
N Lo
d O Ln
M O
L7 in
N
z)-9g o W
SO"
L 31 , -
ZL 3 0
a
,
Z'
0'
4-
b-
(H
1
b
0'
N I"
AI
N
J
w 9
L
• 0
Z
tV W
SI
L mz
?9
J
_
--
N
au
a
a
?
ill
N 3
0
W
698
n
NI
F
?
w
a
4
=
•
1
w
O
W m
w
O H
z
w
'er 7
w
4 6
I < w ?, J
tO N
2
(?)I
I I m
_ o
p f
,
I I i
I »
ao
a
w
w
N
II i
' I I I I
LL £?
O -
I£d I d
,` 1 H
1 IN
bz
4 - N
11 'A
1
j
Tv
a
I
b
I
T
I
CO
w
4 S - d 1 H
0 1
l
H
L
b-
n
U
°
O
m 3
8Z'
SI-
d
1
H o
w In
r
1 l H NY 9 "S n NI
I X
?
I
0_
I
W m
w ?
3 I
L
'
N
A
O
W _ Z
0 - NI
1
0 _I
A
1 J m
i ;p r
o ? X I
I
I I i
I
o
£" 8S S S , L. 4 :
(1
(1
3
'
M )
NI
Nl
A
'A
idl
1
Z6 Z - 1 0 ' 1
?
I
I I 1
I
I
I
_
r
_u' W
a
_
• do
HK
-
?
-
a
a
m w l ?'b ?9? Nl V1S q 'Z ?l _
n ' N
W
J Q
U a
U
1 I
- 4 O
I
I
I
- zw
-m
- ,
I 1
I W
r?
i
ro w II
Z p
I
9
8
.L
ro I -
I
4 3 0
i L 'L I n N
I 1 -
I ? o w
W
I I
I I
- >
I a
eo m I
I r Iw = >
a
OL S Z b I A
I w °D
'Q N 3? 0 WI Z 'O b n N °m p W
£
'b
l
O
L
b
K
J a
c J
o J
i o
N 3 ON Nt+ W L
' O' "
'A
Q 6
6Q n
I' NI
NI o
!
£
tl ' 0
0 a 0
l
H 1 0 '9
0
O 0
OL _
v K
s S 'Z N
1 l M 1 M
O
h Ln
(O O
(O Ln
Ln O
In Ln
d O
M O
N) In
N
O
N
O
O
M
o
0
c
c
17
c
a
c
n
c
O
0
0
a
o
n
0
N
0
0
0
0
6 1HS
I
?u
Qi ?I t
N N ??
u6p q-oa?y-1HS\S133HS\OOVO\MI \LLZZ-af?soyy\ sloa(o?d\ ?1
nv 9b-Lt:OI 600111111111l
NI / IJ 00000.9
4Id'71 N-b'OS09S3X
uosujouia
SNOISIA38
NOI1onNISNOO 2103
3Sf110N 00
NJIS30 u
°z
? o
s
STJO J :,equ.nN asuso!7
6 Rgc K, 016 lei 1£50 27? 616
e?Ai-e04(d JN AajQ oPUaAY UOIAJ9 !IVON 0Zi
3 Hn13?11 HD dV JN IN N V 1 1 9H 1'333 P, 19 N3
ANddN OON3100M IHl
I
a N e 9
l I `4 I
3I
y I
i?. rd h
U` N
J ' 1 I
133HS SIH1 33S
9z' Z' 'V1S All HO1VW
C?
09+bZ,V1S Ol 00+01 'V1S
Zh WH ON / Z4 AMH ON 3J0
314I1 H31HM .9 / H3M3S kHViINVS X
SNOISN31X3 H3M3S (INV HRVM
NOIlVX3NNV 6002
H1HON UNOOO GHOd1H3H
31NSOHV 30 NMOl
A. V3HV
\ b?S ,'/yS
bb
i
W
o}
wm
w
a
na x
_,z
Y
E
a
wa -o a
d c5
UZ
}W UO
ZOO - =
M?V.u w Oo
W Z
QFO > ea Z
UNO o o
na O? Zo
Q r0 I
r
/1 Vlm KNS - ? N
Q
?
Q
UI V \ J
f? -
(Miz'I`--'1
06ON-OBH- -? -
• r r,y%
n ?> I 1 F
?m I
L zz
I
?JO
Nwz I
o3
.z
aio Z°J
K 1
I Q
<
o5< 3
o
li-
141
I
'
I u
I
1 I
I I
.
u
? ?I1
J o I
O O
o
I ?
? Fo
I
NoM 1
w UO? 1
m o'c} 1 .
Q
33
A a iv
a 3 ? x I ?.•'
o o N
xow o a?a I ^
00 Y Q?
3 w x r_- p:
z.- U a< - 171
U oO N
w o mab °o n
o f z n I r\
m J_ w o
aU O
3u r-z_ 112Z
zf WY I Q NnI
O-F U
w U Z°Z w
J W ? a
N ? w _J
4lQW? I ? I
o I
>rQ-v~im -? I
?zd= }
a rn `Om
` I
w
U
w I
w
H I
w.
z F
L
GTZ-A?17
G
I° 1 wa
I ?w I I
w
I ww U
° ??`
3m ? r3 0
Q
I
- x `Ox 3 ? n
moo ao ro4 r,
I wa
zQ 3 3o
w wN
z z
I
I
}
?
ZZ F
Q W ZZQ
m w
I rcN
m?
I aw
N } 33
Z 1/1
3
I wF
z?
0
O r-
z l0O
o o
w n-
O
Z Qrn
f N V
o m U 3 MI
w O
U
o CO
co
O
t In
r-) O
M In
CV O
N Lo 0
1f)
O
U
a
0 h
o ?
I -
0
w 3
w
N
I
I
? I
I
? ?
d ? I
S 'S
Z '6 0
Z V In
S
_
.
`Im
b'
-4
9
Z-
I'
N
0 -
I
? m I
o w
N l-
I
4 £ • Z? 1
Z
-
NI
0 "O -19 ?9 Z• - 1 O "A I
I
I
w
M
O
N
I
S £ ?i0 W I i? I
9 N 10 W- ' Z - 1f1 0 AI !
I I - ? ?
1 0
T
- I
r°o
°d ,
I ? m I
jLl t£I -
11;0 d
?8l 1 H
1
Z'Z
N
I' N
a
O I
I I
o
a I
-
I I £ ' ?(j£ Id I
J c
c
0 l 6 z n)
j r
I
?I
V
>I
J
JI
u6pp-oa?y-1HS\S133NS\0 V32JV\Opd.7\M!\LLZZ-ab?soyy\sl?alo?d\?1
wv 60 £'S Ol 60011/1 e/611
NI / 71 0000'0.9
71d'7121-b'OS09S3X
uosujowa
_- l
J _.
:? LfQt ' ` o ?• f
i
J \ I
105
Qo N.,
J' ?' i103 41Jernlgan
t - Airport
'Cem
.?' -4-.,f.,._ ? r. y!1 ?i'?l i? ref ?,.t ? ?'?, .__??.. .???•,• w. •-t+++.rs• t?_
J •. t`?? lL 1 i_; -. _- ;?, cttf -Corned Tra lgr
'' Jr Jl?l 1iC0) _ %7. a• RPA 3 7 %
o t ` % I JerNgarl 42
"`? ? ?/ ? }\ \ _ , - 3101 -.._-h ? a • ) ?E ?, -' ??._ ? ??. \ J.
Cr
G
t
.yM
1333 000