Loading...
HomeMy WebLinkAboutNCC202402_ESC Approval Submitted_20200610ROY COOPER Governor MICHAEL . S. REGAN secretary BRIPN WRENN Acting Director NORTH CAROLINA Environmental Quality June 3, 2020 LETTER OF APPROVAL H & H Constructors, Inc. Brian Walker, Division Manager & Agent 2919 Breezewood Avenue, Suite 400 Fayetteville, NC 28303 RE: Project Name: Oakmont, Phase Two, Sec 1-B - Lot 170 Acres Approved: 0.46 Project ID: HARNE-2020-135 County: Harnett City: Barbecue Address: Executive Drive River Basin: Cape Fear Stream Classification: Other Submitted by: Dennis Gilbert Date Received by LQS: May 5, 2020 Plan Type: Residential Dear Mr. Walker: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. the NOI ' form toy Annette, Lucas at Annetteducas@ncdenngoy or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources EQr..� Fayetteville Regional Office 1 225 Green Street, Suite '7141 Fayetteville, North Caroil6a 28301 r�c;ana�r ll� 910.433:3300 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan, including the use of equipment and technology owned and operated by the Department, (e.g., survey equipment, vehicles, unmanned aerial vehicles; etc.). Unless this office bears otherwise from you, this correspondence serves as your authorization for DEMLR to utilize equipment and/or technology on your property for inspection purposes. Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan: North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. in addition; local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval, Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, C� 3 Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Dennis Gilbert, Moorman, Kizer & Retzel, Inc. - electronic copy Landon Chandler, Harnett County Planning & Inspections Office — electronic copy Fayetteville Regional Office