HomeMy WebLinkAboutNCC202183_ESC Approval Submitted_20200610ROY COOPER
Governor
MICHAEL S. REGAN
Sccrriur y
BRIAN WRENN
Ac tin'? ❑lrc." tar
NORTH CAL COLINA
Environmental Quality
May 5, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
The University of North Carolina at Chapel Hill
ATTN: George Battle, Vice Chancellor for Institutional Integrity and Risk Management
Campus Box 1000
Chapel Hill, NC 27599-1000
RE: Project Name: Horace Williams Airport Property Solar and Storage Power Plant
Acres Approved: 6.0
Project ID: ORANG-2020-014
County: ORANGE, City: Chapel Hill, Address: Estes Drive Extension
River Basin: Cape Fear, Stream Classification: Jordan Reservoir Watershed
Submitted By: Ballentine Associates, P.A.
Date Received by LQS: May 4, 2020
Plan Type: Revised
Dear Mr. Battle:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval witfT Modifications. The
Modifications Required for Approval are listed on (lie attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction adtivities are required to complete and submit an electronic Notice
of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
General Permit. After the form is reviewed and found to be complete, you will receive a link with payment
instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via
email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI
farm maybe accessed at de .ne. ,ov/NCG0L Please direct questions about the eNOI form to Annette Lucas
at Annette. Lucas namcdenr.gov or Paul Clark at Paul.0lark (i_t�,ncdenr._gov. If the owner/operator of this
project changes in the future, the new responsible party is required to apply for ITis.+her own COC.
Title I 5A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
I. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
�:,V Mir Ili Carnhna bcpxtmeni of iw,rownem.il Quilitye��D_E Ui�is:nn+�r [ncryy. r lincr�I paid ��nd Rr,aur:cs
��jy IZ,0v;gh Pgliar+al Of fir a I4,1.8 hla I S. r it (-Ccr 3800 MurrlI Rri%v Valcigh Nor titC.arnlino 77604
Letter of Approval with Modifications
The University of North Carolina at Chapel Hill
May 5, 2020
Page 2 of 3
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
Sally Castle, EI
Regional Engineering Associate
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
cc: Ashton R. Smith, PE (AshtonS a ba a.en =. ro) Electronic Copy
Janet Clarke (jlclarke a ehs.unc.edu) Electronic Copy
Regional Office file
Letter of Approval with Modifications
The University of North Carolina at Chapel Hill
May 5, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Horace William Airport Property Solar and Storage Power Plant
Project ID: ORANG-2020-014
County: ORANGE
1. This plan approval excludes earthworks and grading. A revised plan is needed if clearing and
grading will be necessary to complete this project.
Ref G.S. I I3A-54.1 through G.S. I I3A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities