Loading...
HomeMy WebLinkAboutNCC202183_ESC Approval Submitted_20200610ROY COOPER Governor MICHAEL S. REGAN Sccrriur y BRIAN WRENN Ac tin'? ❑lrc." tar NORTH CAL COLINA Environmental Quality May 5, 2020 LETTER OF APPROVAL WITH MODIFICATIONS The University of North Carolina at Chapel Hill ATTN: George Battle, Vice Chancellor for Institutional Integrity and Risk Management Campus Box 1000 Chapel Hill, NC 27599-1000 RE: Project Name: Horace Williams Airport Property Solar and Storage Power Plant Acres Approved: 6.0 Project ID: ORANG-2020-014 County: ORANGE, City: Chapel Hill, Address: Estes Drive Extension River Basin: Cape Fear, Stream Classification: Jordan Reservoir Watershed Submitted By: Ballentine Associates, P.A. Date Received by LQS: May 4, 2020 Plan Type: Revised Dear Mr. Battle: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval witfT Modifications. The Modifications Required for Approval are listed on (lie attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. As of April 1, 2019, all new construction adtivities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI farm maybe accessed at de .ne. ,ov/NCG0L Please direct questions about the eNOI form to Annette Lucas at Annette. Lucas namcdenr.gov or Paul Clark at Paul.0lark (i_t�,ncdenr._gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for ITis.+her own COC. Title I 5A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: I. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. �:,V Mir Ili Carnhna bcpxtmeni of iw,rownem.il Quilitye��D_E Ui�is:nn+�r [ncryy. r lincr�I paid ��nd Rr,aur:cs ��jy IZ,0v;gh Pgliar+al Of fir a I4,1.8 hla I S. r it (-Ccr 3800 MurrlI Rri%v Valcigh Nor titC.arnlino 77604 Letter of Approval with Modifications The University of North Carolina at Chapel Hill May 5, 2020 Page 2 of 3 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally Castle, EI Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval cc: Ashton R. Smith, PE (AshtonS a ba a.en =. ro) Electronic Copy Janet Clarke (jlclarke a ehs.unc.edu) Electronic Copy Regional Office file Letter of Approval with Modifications The University of North Carolina at Chapel Hill May 5, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Horace William Airport Property Solar and Storage Power Plant Project ID: ORANG-2020-014 County: ORANGE 1. This plan approval excludes earthworks and grading. A revised plan is needed if clearing and grading will be necessary to complete this project. Ref G.S. I I3A-54.1 through G.S. I I3A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities