Loading...
HomeMy WebLinkAbout310189_Plan of Action_20200601PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-189 County: Duplin Facility Name: Eugene Whaley Farm Certified Operator Name: Eugene Whaley Operator Number: 17331 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name11D: Spillway(Y or N): Level(nches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 2 N N 19 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWO prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Eugene Whaley Phone: Facility Owner/Manager (print) G v` Date: Facility er/Manager (signature) t1-u.r 910-290-1005 6/1 /2020 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 474.0 lb PAN 2. Structure ID: Lagoon 2 line m = 268.3 lb PAN 3. Structure ID: Lagoon 3 line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 742.3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RE APPI i n nl IRINrZ TNI-qIn nev PIP -PI n o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Iblacre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application windows P1 Bermuda 23.00 205.00 4715.0 March - Sept State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4715.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 742.3 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section ill) = 4715.0 lb. PAN y. Overall PAN balance (w - x) _ -3973 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is availab for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD L TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 1 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker L 19.Q inches b. designed 25 yr.124 hr. storm & structural freeboard 19.5 inches c_ line b - line a (inches in red zone) = 0.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 92125 ftz e. line c112 x fine d x 7.48 gallonslft3 28712 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116329 ft3 h. current herd # 2900 certified herd #1 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k_ (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 5/27/2019 m_ ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 68904 ft' W 53739.E ft3 152896 gallons 2.61 Ibs11000 gal. 474.0 lbs. PAN PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): I Lagoon 2 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker 17.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 31250 ft' e. line c/12 x line d x 7.48 gallons/ft3 38958 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 29011.8 ft3 h. current herd # 1 -00-0-1 certified herd # 880 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 5/27/2019 m. ((lines e + k)I1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 32968 ft3 t�JW l 18229.21ft3 63826 gallons 2.61 ibs/1000 gal. 268.3 lbs. PAN PoA (30 Day) 2/21100