Loading...
HomeMy WebLinkAboutNCG110105_Inspection Report_20200610ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Town of Rutherfordton Attn: Phillip Reynolds 129 North Main Street Rutherfordton, North Carolina 28139 NORTH CAROLINA Environmental Quality June 10, 2020 Subject: NOTICE OF DEFICIENCY (NOD-2019-PC-0180) NPDES Stormwater General Permit NCG110000 Certificate of Coverage NCG110105 Town of Rutherfordton Rutherford County Dear Mr. Reynolds: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on June 2, 2020. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Reed, CPSWQ, CEPSC , MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D ��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 4;Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rvomNnwourvn oepa,unemmum�on,eommmiq 828.296.4500 Compliance Inspection Report Permit: NCG110105 Effective: 06/01/18 Expiration: 05/31/23 Owner: Town of Rutherfordton SOC: Effective: Expiration: Facility: Rutherfordton WWTP County: Rutherford NC Hwy 221 Region: Asheville Rutherfordton NC 28139 Contact Person: Doug Barrick Title: Town Manager Phone: 828-287-3520 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/02/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 02:45PM Exit Time: 04:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Municipal WWTP> 1MGD, Stormwater Discharge, COC Facility Status: 0 Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG110105 Owner- Facility: Town of Rutherfordton Inspection Date: 06/02/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On June 2, 2020 this facility was inspected for compliance and to determine if adequate progress has been made response to the previously issued Notice of Deficiency. I met with Jenny Faulkner on site. It was determined during the inspection that adequate progress has been made and that the notice of deficiency is now resolved. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NCG110105 Owner - Facility: Town of Rutherfordton Inspection Date: 06/02/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? E ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #.Does the Plan include a BMP summary? N ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3