Loading...
HomeMy WebLinkAboutNCG030616_Inspection Report_20200610ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Morganton Pressure Vessels LLC Attention: Heather Splawn 1 Alfred Baglioni Drive Marion, North Carolina 28752 NORTH CAROLINA Environmental Quality June 10, 2020 Subject: Compliance Evaluation Inspection Permit: NCG030000 Certificate of Coverage: NCG030 McDowell County, North Carolina Dear Ms. Splawn: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on June 2, 2020. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincere , Isaiah Reed, CPSW , CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rvomn caFour�n oeearimmmi�nmm�manumuvin 828.296.4500 Compliance Inspection Report Permit: NCG030616 Effective: 11/01/18 Expiration: 05/31/21 Owner: Morganton Pressure Vessels LLC SOC: Effective: Expiration: Facility: Morganton Pressure Vessels LLC County: McDowell 1 Cobia Dr Region: Asheville Marion NC 28752 Contact Person: Heather Splawn Title: Phone: 828-652-3704 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/02/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 12:30PM Exit Time: 02:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCGO30616 Owner - Facility: Morganton Pressure Vessels LLC Inspection Date: 06/02/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: On June 2, 2020 this facility was inspected for compliance. I met with Heather Splawn on site. No major issues were noted during the inspection. However, the following permit compliance issues were identified. 1) A spill log has not been maintained in accordance with the NCG030000 General Permit. The permittee is directed to immediately begin maintaining a spill log as outlined in the permit. 2) Employee training as required in the NCG030000 General Permit has not been documented. The permittee is directed to immediately begin documenting and implementing all training provided by the permit. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG030616 Owner -Facility: Morganton Pressure Vessels LLC Inspection Date: 06/02/2020 Inspection Type; Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (t1SGS) map? M ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? M ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? M ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment Page 3 of 3