HomeMy WebLinkAbout310050_Plan of Action_20200604PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number 3'1-050 County= Buplin
Facility Name= BJB Farm #'1
Certfied Operator Name= Biuell Bavis Operator Number
� _ Current liquid levels) i cM1es a red From tM1e c nt liquid level in tM1e lagoon to tM1e
lowest point on tM1e top of tM1e dam For lagoons witM1out spillways; and From tM1e current liquid level
m tM1e lagoon to tM1e bottom of tM1e spillway For lagoons witM1 spillways_
Lagoon Name/1 �=
Spillway(V or N)_
Level(inc M1es)_
Lagoon � Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
BJ B'1-'1 BJ B'1-2 BJB '1-3
'17 '16 25
2 CM1ecK all applicable items
Liquid level i witM1in tM1e designed structural Freeboard elevations of o structures_
Rve and 30 day Plans of Action are attac M1ed_ Hydraulic and agmnom c balances are
witM1in ac ePtable ranges
X Liquid level i witM1in tM1e 25 year 24 M1our storm elevations For o structures_ A
30 day Plan of Action is attac M1ed_ Agronomic balance is witM1in ac eptable range_
Waste is to be pumped and M1auled to oK site locations_ Volume and PAN c ntent of waste
to be pumped and M1auled i reflected i action 111 tables Included witM1in tM1is plan i a list
of tM1e proposed sites witM1 elated Facility n tubers, n mbar of a nd r ng c op
nFormation_ Contact ands approval From tM1e OWO prior to tmnsFer of waste to a site
not covered in tM1e Facility's CAWMP_
Operation will be partially or Fully depopulated_
�AttacM1 a mplete sc M1edule witM1 c sponding a al uNts and dates For depopulation
�iF a als a e to be m ed to a otM1ereperm fitted Facility, provide Facility number, lagoon
Freeboard levels and M1erd population For tM1e recery rig Facility
3 Earliest possible date to begin land application of waste=
1 M1ereby certiTy iM1ai 1 M1ave r wed iM1e inTormaiion listed above and i cluded wiiM1in iM1e
attac M1ed Plan oT Action, and io iM1e best oT my Knowledge and ability, iM1e inTormaiion is
accn rate aria co��ect.
Bizzeu oa.as PM1oneo gto-zsa-oo�s
Facility OwnedManager (pant)
B.mdd'Oaw Oate= 6/4/2020
Facility OwnedManager (signature)
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANU/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
� _
Structure IU= BJOt-�
line m —
666 4 Ib PAN
2
Structure IU= BJU �-2
line m —
866.8 Ib PAN
3
Structure IU=
line m —
Ib PAN
4_
Structure IU=
line m —
Ib PAN
S
Structure IU=
line m —
Ib PAN
6_
Structure IU=
line m —
Ib PAN
n. lines '1 � 2 � 3 � 4 � 5 � 6 � 5332 Ib PAN
111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 UAY DRAW DOWN
'State c nt c op ending apphcabon date o ext crop apphcabon begmnmg date Tor ava Jable
recery rig c ops during 30 day dmw down period_
v. Total PAN a ails ble for all Tields (sum oT column i) _ � � 734.8 Ib. PAN
IV. FACILITY'S POA OVERALL PAN BALANCE
w. Total PAN io be land applied (line n from section 11) _ � 5332 Ib. PAN
POA (30 Uay) 2/2t/00
Cro p"s r rig PAN balance (line v Trom section 111) _ � � 734.8 Ib. PAN
y. Overall PAN,bala rice (w - z) _-'10202 Ib. PAN
Line y m st sM1ow a a deFcit IF line y does not sM1ow a a deFcit, list c of action M1ere i eluding pump and
M1aul, depopulation, M1erd reduction, etc_ For pump 8. M1aul and M1erd reduction options, r alculate n w PAN based
nForm anon_ IF n w Felds a e to be i eluded a option For lowering lagoon level, add tM1ese Felds to tM1e
PANobalance table and r alculate tM1e o mll PAN balance_ IF a al waste is to be M1auled to a otM1er permitted
Tacility, provide inForm anon regarding tM1e M1erd population and lagoon Freeboard levels at tM1e recery rig Tacility_
NARRATI V E
Irrigation to begin as conditions permit
Waste Samples Dated 3-� 9-20 BJO � � � _98
BJO t2 222
BJO t32t7
Lagoons wM1ere sampled again on 6-3-2020
For Fu rtM1er questions call_
Pond CreeK Precision Agriculture Inc
Doug AtKins
9 � 0-27 � -0363
NC CertiFied TecM1nical Specialist
POA (30 Day) 2/2'I /00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 UAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
t_Structure Name/Identifier QUp BJOt-�
2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard
a_ current liquid level according to marKer � 7.O cM1es
b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard 20.0 cM1es
c_ line b - line a (inc M1es in red zo e) = 3.O inc M1es
d_ top of diKe surtace area according to design
(a ea at below structural Freeboard elevation) 84000 its
e_ line c/t 2 x line d x 7 48 gallons/R 3 � 57080 gallons
3 Projected volume of waste liquid produced during draw down period
F_ temporary storage period according to structural design
t801days
g_ volume of waste produced according to structural design
94978
R3
M1_ current M1erd # 2880 certified M1erd # 2880
actual waste produced = cur nt M1erd # line g =
94978 R3
certified M1erd #
�_ volume of wasM1 water according to structural design
ORa
j_ excess ramFall over a aporation according to design
49000 R3
K_ Qines M1 + � + j) x 7 48 x 30 days/line F=
� 79493 gallons
4_ Total PAN to be land applied during draw down period
L current waste analysis dated 3/t 9/2020
� _98 Ibs/� 000 gaL
m_ (Qines e + K)/� 000) x line I =
666.4 Ibs_ PAN
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(CIicK on iM1e nazi Sirudure iab sM1own below)
POA (30 Uay) 2/2t/00
Esx�..,axea
Esx�..,axea
Esx�..,axea
POA (30 oay� vziioo
PLAN OF ACTION (POA) FOR HIGH FREEBOARB AT ANIMAL FACILITIES
30 UAY URAW DOWN PERIOB
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
�_ Structure Name/Identifier pU)_ BJOt-2
2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard
a_ current liquid level according to marKer � 6.O i cM1es
b_ designed 25 Yr /24 M1r_ storm 8. structural Freeboard 20.0 i cM1es
c_ line b - line a (inc M1es in red zo e) = 4.O i cM1es
d_ top of diKe surtace area according to design
(a ea at below structural Freeboard elevation) 84600 its Estimated
e_ line c/t 2 x line d x 7 48 gallons/i[ 2t 0936 gallons
3 Projected volume of waste liquid produced during draw down period
F_ temporary storage period according to structural design
t801daYs
g_ volume of waste produced according to structural design
94978
it' Estimated
M1_ current M1erd # 2880 certified M1erd # 2880
Estimated
actual waste produced = r- t M1errf # x line g =
94978 it'
certified M1erd #
�_ volume of wasM1 water according to structural design
00
it'
j_ excess ramFall over a aporation according to design
49000
iT'' Estimated
K_ Qines M1 + � + j) x 7 48 x 30 days/line F=
� 79493 gallons
4_ Total PAN to be land applied during draw down period
L current waste analysis dated 7/4/20t8
222 Ibs/t 000 gaL
m_ (Qines e + K)/� 000) x line I =
866.8 Ibs_ PAN
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(CIicK on iM1e nazi Sirudure iab sM1own below)
POA (30 Uay) 2/2t/00