Loading...
HomeMy WebLinkAbout310050_Plan of Action_20200604PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 3'1-050 County= Buplin Facility Name= BJB Farm #'1 Certfied Operator Name= Biuell Bavis Operator Number � _ Current liquid levels) i cM1es a red From tM1e c nt liquid level in tM1e lagoon to tM1e lowest point on tM1e top of tM1e dam For lagoons witM1out spillways; and From tM1e current liquid level m tM1e lagoon to tM1e bottom of tM1e spillway For lagoons witM1 spillways_ Lagoon Name/1 �= Spillway(V or N)_ Level(inc M1es)_ Lagoon � Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 BJ B'1-'1 BJ B'1-2 BJB '1-3 '17 '16 25 2 CM1ecK all applicable items Liquid level i witM1in tM1e designed structural Freeboard elevations of o structures_ Rve and 30 day Plans of Action are attac M1ed_ Hydraulic and agmnom c balances are witM1in ac ePtable ranges X Liquid level i witM1in tM1e 25 year 24 M1our storm elevations For o structures_ A 30 day Plan of Action is attac M1ed_ Agronomic balance is witM1in ac eptable range_ Waste is to be pumped and M1auled to oK site locations_ Volume and PAN c ntent of waste to be pumped and M1auled i reflected i action 111 tables Included witM1in tM1is plan i a list of tM1e proposed sites witM1 elated Facility n tubers, n mbar of a nd r ng c op nFormation_ Contact ands approval From tM1e OWO prior to tmnsFer of waste to a site not covered in tM1e Facility's CAWMP_ Operation will be partially or Fully depopulated_ �AttacM1 a mplete sc M1edule witM1 c sponding a al uNts and dates For depopulation �iF a als a e to be m ed to a otM1ereperm fitted Facility, provide Facility number, lagoon Freeboard levels and M1erd population For tM1e recery rig Facility 3 Earliest possible date to begin land application of waste= 1 M1ereby certiTy iM1ai 1 M1ave r wed iM1e inTormaiion listed above and i cluded wiiM1in iM1e attac M1ed Plan oT Action, and io iM1e best oT my Knowledge and ability, iM1e inTormaiion is accn rate aria co��ect. Bizzeu oa.as PM1oneo gto-zsa-oo�s Facility OwnedManager (pant) B.mdd'Oaw Oate= 6/4/2020 Facility OwnedManager (signature) 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANU/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY � _ Structure IU= BJOt-� line m — 666 4 Ib PAN 2 Structure IU= BJU �-2 line m — 866.8 Ib PAN 3 Structure IU= line m — Ib PAN 4_ Structure IU= line m — Ib PAN S Structure IU= line m — Ib PAN 6_ Structure IU= line m — Ib PAN n. lines '1 � 2 � 3 � 4 � 5 � 6 � 5332 Ib PAN 111. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 UAY DRAW DOWN 'State c nt c op ending apphcabon date o ext crop apphcabon begmnmg date Tor ava Jable recery rig c ops during 30 day dmw down period_ v. Total PAN a ails ble for all Tields (sum oT column i) _ � � 734.8 Ib. PAN IV. FACILITY'S POA OVERALL PAN BALANCE w. Total PAN io be land applied (line n from section 11) _ � 5332 Ib. PAN POA (30 Uay) 2/2t/00 Cro p"s r rig PAN balance (line v Trom section 111) _ � � 734.8 Ib. PAN y. Overall PAN,bala rice (w - z) _-'10202 Ib. PAN Line y m st sM1ow a a deFcit IF line y does not sM1ow a a deFcit, list c of action M1ere i eluding pump and M1aul, depopulation, M1erd reduction, etc_ For pump 8. M1aul and M1erd reduction options, r alculate n w PAN based nForm anon_ IF n w Felds a e to be i eluded a option For lowering lagoon level, add tM1ese Felds to tM1e PANobalance table and r alculate tM1e o mll PAN balance_ IF a al waste is to be M1auled to a otM1er permitted Tacility, provide inForm anon regarding tM1e M1erd population and lagoon Freeboard levels at tM1e recery rig Tacility_ NARRATI V E Irrigation to begin as conditions permit Waste Samples Dated 3-� 9-20 BJO � � � _98 BJO t2 222 BJO t32t7 Lagoons wM1ere sampled again on 6-3-2020 For Fu rtM1er questions call_ Pond CreeK Precision Agriculture Inc Doug AtKins 9 � 0-27 � -0363 NC CertiFied TecM1nical Specialist POA (30 Day) 2/2'I /00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 UAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE t_Structure Name/Identifier QUp BJOt-� 2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard a_ current liquid level according to marKer � 7.O cM1es b_ designed 25 yr /24 M1r_ storm 8. structural Freeboard 20.0 cM1es c_ line b - line a (inc M1es in red zo e) = 3.O inc M1es d_ top of diKe surtace area according to design (a ea at below structural Freeboard elevation) 84000 its e_ line c/t 2 x line d x 7 48 gallons/R 3 � 57080 gallons 3 Projected volume of waste liquid produced during draw down period F_ temporary storage period according to structural design t801days g_ volume of waste produced according to structural design 94978 R3 M1_ current M1erd # 2880 certified M1erd # 2880 actual waste produced = cur nt M1erd # line g = 94978 R3 certified M1erd # �_ volume of wasM1 water according to structural design ORa j_ excess ramFall over a aporation according to design 49000 R3 K_ Qines M1 + � + j) x 7 48 x 30 days/line F= � 79493 gallons 4_ Total PAN to be land applied during draw down period L current waste analysis dated 3/t 9/2020 � _98 Ibs/� 000 gaL m_ (Qines e + K)/� 000) x line I = 666.4 Ibs_ PAN REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (CIicK on iM1e nazi Sirudure iab sM1own below) POA (30 Uay) 2/2t/00 Esx�..,axea Esx�..,axea Esx�..,axea POA (30 oay� vziioo PLAN OF ACTION (POA) FOR HIGH FREEBOARB AT ANIMAL FACILITIES 30 UAY URAW DOWN PERIOB 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE �_ Structure Name/Identifier pU)_ BJOt-2 2 Current liquid volume in 25 yr /24 M1r_ storm storage 8. structural Freeboard a_ current liquid level according to marKer � 6.O i cM1es b_ designed 25 Yr /24 M1r_ storm 8. structural Freeboard 20.0 i cM1es c_ line b - line a (inc M1es in red zo e) = 4.O i cM1es d_ top of diKe surtace area according to design (a ea at below structural Freeboard elevation) 84600 its Estimated e_ line c/t 2 x line d x 7 48 gallons/i[ 2t 0936 gallons 3 Projected volume of waste liquid produced during draw down period F_ temporary storage period according to structural design t801daYs g_ volume of waste produced according to structural design 94978 it' Estimated M1_ current M1erd # 2880 certified M1erd # 2880 Estimated actual waste produced = r- t M1errf # x line g = 94978 it' certified M1erd # �_ volume of wasM1 water according to structural design 00 it' j_ excess ramFall over a aporation according to design 49000 iT'' Estimated K_ Qines M1 + � + j) x 7 48 x 30 days/line F= � 79493 gallons 4_ Total PAN to be land applied during draw down period L current waste analysis dated 7/4/20t8 222 Ibs/t 000 gaL m_ (Qines e + K)/� 000) x line I = 866.8 Ibs_ PAN REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (CIicK on iM1e nazi Sirudure iab sM1own below) POA (30 Uay) 2/2t/00