Loading...
HomeMy WebLinkAbout20200737 Ver 1_Shoreline Stabilization_20200529w_� State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [ REGEl\1FD MAY 2 9 ZJ20 Owner Information NCDEQIDWRINPDES Name: Illdmas,,_ Maf(cnc. S-.r'/we f ( Mailing Address: /00 Johnbea4 G04 Sfa4essv, l[e lVG 27677 Telephone Number: 4203 314- g3S:Z Fax Number: E-mail Address: Sh7we 90 crul. corn 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: ) must be attached if the Agent has signed this application form. Name: 1JI rJ /11 A S wc-It Company Affiliation: Mailing Address .• sr,4Tes%ti t` pie .2-8'677 Telephone Number: V03. 316. $35Z E-mail Address: Go Fax Number: Person to receive the Certification Approval: —_V%.MA3 STi lwc I1 II. Project Information [ 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: ,lrede-11 eo. NC Nearest Town: G4awbA , MC Subdivision name or site address (include phase/lot number): Ri ye Oa ks 4--A#U0;&1q.S Lo4 # 5/ Directions to site - please include road names and numbers, landmarks, etc.: ?alke- C e-x4 13% &V6rd sc%col Rd o-W T` yD Go 5P149 6n � hard cake y3 SAocl RJ .�r 2ra�des +o U S-10. 7al,.e a ICP�4 headed ea:r 52 nQss �a-�aw bA Ri'yer i9r_t,dQP -Ten look -'or aa4c ror% At le(4c��r /ate' Latitude (in decimal degrees) 3'S. 12/6 Longitude (decimal degrees) — a�- Oho �D 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): r-e!;iden 6. Property size (acres): . 62 Gcr'e s 7. Lake/ river/ ocean adjacent to property: lal« A/&Y-A4 / 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 4 dd Xo ra a _�o h e/a j2re ren 4 era si©n 9. Will work be conducted from land? D� From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: / X I Da I 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: V, _.X _l o o p 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): J O S_� na4ur41 g ra S5e5 and one- AcIl l buS A dhe"6.0 S�T 5 / 13/2. eza Owner/Agent's Signature* [ Date Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 �Fu�ll Pond/ Normal Water Level Shoreline Lake (At Full Pond/ Norm, al,Waterievel) RiPtap 10,0 �-srep 77 L o4- S/ Fxisi;A5 `Dock 144+ x 12 -�� t3 J�} x lob-cr be.100 -n u II Qo� j� V4 JC IE6-C�- p%ve I Acc,- sc. 166 s•4. Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 eR�y'IOt�2jl/R+ S/uh;/.r•,l' /i.,., ,_t-t. � NC 2Q�77 own", �®��C&Q�OC/A�1��1 �I._r__►_�o Land sca►ae .znC ___` ���'�/� d HGWOn is A VlolAdm ® Bier luj� � you teedon, � Mama ift IN NCAC 02H ,®d®o aad i SA NCAC 02B .0243(l)] � a l a work should be provided to the RPpl(eW®H, [15A ` are M allowed to be rmmvod e 1 of l3 fie ,AIMA � *M M soly �l ��1 � elev l , aNNN lull1 1e�late lw can be wed: f13m 3 pail In the bufr !I M allowed: EXeeeel� d18�rbaaea of �®�1d ®@ii�` q A NCAC (�q ��qqqq (6)� , D 5A !!CAC 028 r0243 it l" 1", lol l walkwp", , . :8W Ja iW � a � # ®�lv#al®, 'a@ v lltnita lon on 9lz@ ibr docks' [1SA NCAC 42 _0243(4) an Work to be conductedfrom land MW indicatean Me" and �� worl� corridor should described, g#hall "e1 that are to be rwo The =WW must be outside the ba , P SA NCAC 02H <,®502 1 dA NCAC 028,0243€aalog, spoil, construction (4)1(6), (a)) 8tOrmwaWr cannot be pig or channeled ibr direct diagharge to tht' labsbe I' dWmr*, All eongt ice` ' Allot#wl @»art gjN@jpfttt 1I t, s S�,'/fie// �iorteue S+:lwe\\ Npariao;air l aait: d I have b Jaformed of CaUwtm € conducted in 1ha �, not" lff"lly 9ta in the aPP1104tloo and approved b e �l ion of � M � Is a *iol on and aabJect Udm such that the construction will be built wW #ubw- . to OkOMM pit, will l �4 �1 Sipature 5 /3�2020 6/13/2020 @h®F@Gn@ ibhilin ien/huff@f From: To; 9tllwol��o®I:�f , subjoot,, Nhordino OtobilimtW/DOw Sato; fiuo, Apr 14, 2020 3 97 pm Attachments: IMf3_7980.jpg (50K), IMG_7928.jpg (46K), IMG_7900.jpg (43K) Sett from sty Whom 3 Att9ghh9d lm@g@§ EDGE OF LANE NORMAN [AIwK t[Y•R w afOO°•I�Y � Y YIAYIY fin' t-M x RYrO'E MI�' N IrtlVtY I NI' L-!I A la'•ITt W' i-Myipp9lY �; • t['frltYrE L-y A WIfb . r«'.r. Aa• i v N Imo[ CA°T, [AWYY it�r' It Y rliY�fY �• i W i Y•ieYiY e4!' NVNON. y0 ioelst I i1T .°west ilir' iii i fw'ct'•siYY ifAri' [T• i� ri •E�f °Y r n : ausrYfY [ l � E[GENO JOHNBOAT COURT Q • so, R/'A' - PIUVATE Aln O [Iw • b • AF OO 0 100 OO Imo-- i00 ]Oo r Pr. GRAPHIC 5CAIF iF( llr. ygrv•I IN 1• 100 ✓AMES E. d' N/NA HOLLAR e � V cau.rr a Irueull Iti 9Q$ aw .__10-1.s7 _._.-____ I xrcwm M+P (No —L) CURVE DATA TA9[E _ _ _ tune +w+le ulenl ¢clo auErwa _ M I • PIER ORIVF A7'R/M' 'A' IDIM' I Za' f twxm � ilm' iG l' +eCll'•o'. rt _ i laf�ORixY� n .w• •-� �_e+ am, &:Z Isw iaw'rEsriei fi[ Iialm iAty, R R 4D' vAMExT [_°y' 1 � viri f•.c[..n ia.� � N rex°I'E [ I uwN+ r� E +MINx[mmxnN+xa: c� aNp°°°s isf°mAo', iaar C11 PIER DRIVE ROAD CONNECTION 'c i ISlO IIA' .14 w tAAN x u»I'Iftf f7 tflV fIM' Wa';@0'a'tlN7 - O� ok DATA Taki � wa �-n Yr•. w n,a• �°iN r i>tT A°u•�e a 1 xus f, 91417 _ _ _ t_a :WI'WY iW' a t M,�.„.f `p i_aai n rs' �" IAI•Ad ml IOI•.aY 0; 411' �IpI'It"R i0°�w`f°eo' I:Ar wpO+iN' iwe1°a> ti _• �i+ i°°a�l90cE'IrE �' i aimm'i C-q �-jj NNE T' IYM xTAa'rrE imOp' �i•peI' IaW +erfrl°'[ O O$ IE MATCH UNIE T iNEET a OF 4 17 ACRE' 0.515 ACRE jyI „ i +V'[�q' [ r.�.f n+..Iw ..+Nti•+ P•1•r E. Fl•ming, Prof•salon¢I land Surveyor Reg. No. L-4240 AI wnx clnN Axw XIIA•o MC ANI (Rt)RI-0ti) la••• c°uR+ ! NIPAII KxrMI�°X ado rto "�E 'RI VER OAKS AKS LANDINGS 91a¢I —PHASE I °+r[ E[D SNAVEr C°wM1[r[0'l.Tl•d![-�Ei MNXO I[iEVM.f�i•ioi. a. A.°1. 9i 11.0T [.