Loading...
HomeMy WebLinkAboutNCG140448_Renewal COC_20170801STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140448 STORMWATER AND WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Macleod Construction Inc is hereby authorized to operate approved wastewater treatment system(s) and discharge stormwater and/or wastewater, as approved in the original permit/application or subsequent permit modification, from a facility located at: North Pointe Business Park Concrete Batch Plant 4304 Northpointe Industrial Blvd Charlotte Mecklenburg County to receiving waters designated as Stewart Creek, class C waters in the Catawba River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, and V of General Permit No. NCG140000 as attached. This Certificate of Coverage (COC) shall become effective August 1, 2017. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 1, 2017. for Tracy E. Davis, P.E., CPM Director, Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission