Loading...
HomeMy WebLinkAbout20100038 Ver 1_401 Application_20100110ms consultants, inc. engineers, architects, planners 500 Jackson Street Roanoke Rapids, NC 27870-2602 Phone: (252) 519-2135 Fax: (252) 519-2137 www.msconsultants.com January 11, 2010 20 100038 w nn ?InIn?? ?Nxk NCDENR-DWQ Wetlands and Stormwater Branch 401 Oversight/Express Permitting Unit 1650 Mail Service Center JAN 1 3 mo Raleigh, North Carolina 27699-1650 DENR • WATER 00i Y VVLANDSANDSTONIVATE WAI CN Reference: Albemarle Electric Membership Corporation: PCN for wetlands impacts Town of Winfall, Perquimans County, North Carolina To Whom It May Concern:: The Albemarle Electric Membership Corporation project is a proposed 61,391 square foot office and warehouse building located at the intersection of Highway 17 Bypass and Creek Drive in the town of Winfall, Perquimans County, North Carolina. The project consists of construction of an access roadway, which will require placement of fill material within existing wetlands on site. Please find attached five (5) copies of the following submittal documents for the proposed wetland impacts: • PCN Form • $240 Application Fee • Full Sized Construction Drawings (2 copies) - under separate cover • 11"x17" Construction Drawings (3 copies) - under separate cover • Stormwater Management Plan (3 copies) • Wetlands Supplemental Drawings • USGS Map • Soils Map • USACE Notice of Jurisdictional Determination If after review you have any questions, or if you require any additional information, please contact me at your earliest convenience. Sincerely, ms consultants, inc. Nicholas S. Rightmyer, E. . Project Engineer Cc: Mr. Fred Yates, Town of Winfall Mayor Offices in: Ohio, Pennsylvania, Indiana, West Virginia, North Carolina, and Florida ms consultants, inc. engineers, architects, planners 500 Jackson Street Roanoke Rapids, NC 27870-2602 Phone: (252) 519-2135 Fax: (252) 519-2137 www.msconsultants.com January 11, 2010 NC DENR - DWQ Wetlands and Stormwater Branch 401 Oversight/Express Permitting Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Reference: Albemarle Electric Membership Corporation: PCN for wetlands impacts Town of Winfall, Perquimans County, North Carolina To Whom It May Concern:: The Albemarle Electric Membership Corporation project is a proposed 61,391 square foot office and warehouse building located at the intersection of Highway 17 Bypass and Creek Drive in the town of Winfall, Perquimans County, North Carolina. The project consists of construction of an access roadway, which will require placement of fill material within existing wetlands on site. Please find attached five (5) copies of the following submittal documents for the proposed wetland impacts: • PCN Form • $240 Application Fee • Full Sized Construction Drawings (2 copies) - under separate cover • 11"x17" Construction Drawings (3 copies) - under separate cover • Stormwater Management Plan (3 copies) • Wetlands Supplemental Drawings • USGS Map • Soils Map • USACE Notice of Jurisdictional Determination If after review you have any questions, or if you require any additional information, please contact me at your earliest convenience. Sincerely, ms consultants, inc. Nicholas S. Rightmyer, E. . Project Engineer Cc: Mr. Fred Yates, Town of Winfall Mayor 1 dib r Db,? JA N 1 3 2010 IUNDSMD OW ATER NCH Offices in: Ohio, Pennsylvania, Indiana, West Virginia, North Carolina, and Florida 2 0 1 0 0 0 3 6 o??F WAWAT?c9QG oNii? < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Albemarle Electric Membership Corporation 2b. County: Perquimans 2c. Nearest municipality / town: Winfall 2d. Subdivision name: n/a an 17 2e. NCDOT only, T.I.P. or state project no: L5 U W, 3. Owner Information 3 2wf 3a. Name(s) on Recorded Deed: Albemarle Electric Membership Corporation p 3b. Deed Book and Page No. DB 359, P 802 10"MTFjt 3c. Responsible Party (for LLC if applicable): 3d. Street address: 159 Creek Drive 3e. City, state, zip: Hertford, NC 27944 3f. Telephone no.: 252-426-5735 3g. Fax no.: 252-426-8270 3h. Email address: info@albemarle.ncemcs.com UCH Page f of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: William W. Dreitzler, P.E. 5b. Business name (if applicable): ms consultants, inc 5c. Street address: 500 Jackson Street 5d. City, state, zip: Roanoke Rapids, NC 27870 5e. Telephone no.: 252-519-2135 5f. Fax no.: 252-519-2137 5g. Email address: bdreitzler@msconsultants.com Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 7950-11-8841 1b. Site coordinates (in decimal degrees): Latitude: 36.2009 Longitude: - 76.4508 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 36.54 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Perquimans River proposed project: 2b. Water Quality Classification of nearest receiving water: SC 2c. River basin: Pasquotank 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently wooded and surrounded by light residential development and farmland 3b. List the total estimated acreage of all existing wetlands on the property: 0.73 Acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: n/a 3d. Explain the purpose of the proposed project: Construction of a new office, warehouse, and yard area for AEMC operations 3e. Describe the overall project in detail, including the type of equipment to be used: The impacts will be the result of construction of the proposed roadway, which will be constructed using typical methods and equipment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained "T [ -] Yes ? No ® Unknown this project (including all prior phases) in the past? - 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ® Yes ? No 6b. If yes, explain. The remaining acreage may be used for future developments. No additional impacts are expected. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ®P ? T Fill ® Yes ? No ? Corps ? DWQ W2 ®P ? T Fill ® Yes ? Corps ? No ? DWQ W3 ? PEI T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number PER or 404, 1 - 0 (Corps stream r Permanent O P or intermittent DWQ - non- 404 , (linea Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 61 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Impacts were minimized by locating the crossings as far upstream and parallel to the channel as practical 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Typical roadway construction techniques will be utilized, including temporary erosion control during construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWO) 1. Diffuse Flow Plan Ia. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. El Yes [:3 No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 22% 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The plan will utilize one large wet detention pond, and one bioretention basin designed to NCDENR requirements. ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ® No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWO Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWO Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWO Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The possible future development for this site is not expected to result in additional impacts 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewer lines will be connected to the existing Winfall sewer system. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? www.saw.usace.army.miVwetlands/esa (Hertford Quad map returned 4 elements, none with a federal status) 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? l Yes ® No E F 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? hftp://ocean.floridamarine.org/efh-coraVims/viewer.htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? www.hpo.dcr.state.nc.us 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: No construction proposed in floodplains 8c. What source(s) did you use to make the floodplain determination? Perquimans County FIRM - Map # 3720795000J Bradley V. Furr Executive V.P. & General Manager _ i Applicant/Agent's Printed Name Applicant/ gent's Signature (Agent's signature is valid only if an authorization letter from the applicant Date is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version 11/16/09 MON 12:32 FAX. 9197792308 ms consultants Garner 11/6/2009 11:32 ALBEMARLE-EMC 91919 '792309PP7993 U.S. ARMY CORPS OF ENGMERS , WIL1bI:(NOTON DISTRICT Action 1d. SAW-2009-00.102 County: Per(uimans U.S.G.S. Quad. Winfall NOTIFICATION OF MUSDICTIONAL DETFRSUNAUON Property Owner/rQgent; Catherine Nixon Address: 142 Nixon Straet Hertford, NC 27944 tg?UUI NO. 992 Pol 20 100034 Property description: Size (acres) 38.5 Nearest Town IMP,,., rt. ford Nearest Waterway Mill Cr River Basin, Albemarle Sound lJSGS RUC 030102Q5 Coordinates 3 .201 W -76.45!386 Lotaaon description 1Prarer is located on tile snutlr?vestertn corner of $1Riitrhway 17 and Creep Drive. I'flat no 1111 ,of Hertford County. PerauimnAS Coynty North Cnrclinit, -?-- - Indicate Which of the Follawint= A>paJv; A. Freliminary Detertaination - Pued on preliminary informatlon, there maybe wot'ands on the above described property, We strongly suggest you have this property inspected to determine the extent vfDepartamw of the Anny (DA) jurisdiction. To be considered final, a jurisdictional determination trust be verified by the Corps. This prvWninary determination is not an appealable action larder the Regulatory Program Administrative Appee.l Process ( Reference 33 CM-Fact 331). B. Approved Determination There are Navigable Waters of the United States wltldn the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is 8 change in the 11tw or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are wetlands on the above described nro army subject to the permit rear!, ements of Section d04 ofthe Clean Water Act rCWA)(33 USC 8 13441_ TTnimx thON,,,n n .? ...., I- ,L_ - We strongly suggest you have tho wetlands on your property delineated, Due to the size of your property and/or our present workload., the Corps may not be able to accompli::h this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. - The wetland on your prop" have been dcliMted and the delineation has Eieen verified by the Corps, We strongly suggest you have this delineation surveyed. Upon cuTbOt-1110n, this survey should be reviewed and verified by the Corps, Once verified, this survey will provide an accw ate delrieGon of" areas Subject to CWAiUrisdiction on your property which, provided there is no change in the low or ourpablish,ed regulations, may be retied upon for a period not to exceed five years. X hucrc n cnan a ?n the law or our UbliBhi reetrlations, this dater min may be relied aeon for a period not to exceed n-.ears f" rem the date of this p2gi__ c_atlon. There are no waters of the U.S., to include wetlands, proscnt on Cho above described property which are subject to the pmt requirements of Seellon 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regtlations, this determination may be relied upon for a period not to exceed five years from the date of this notification, X Page 3 of 2 11/16/09 MON 12:32 FAX 9197792308 ms consultants Garner Z002 11/15/2009 11,32 ALBEMARLE-EMC 4 9191.9?792308PP7993 N0.892 U02 Action Id, 09-00102 Placement of dredged or fill materiM within waters of the YJ8 and/or wetlands without a Department of the Army permit may conStltute u violation of Section 301 oi'the Clean Wat`Fr Act (33 USC § 1311), If you have any questions regarding this determination and/or the Corps regulatory program, phase contact .Fosh?_ Pelletier at 2S2-97S-1616 ext. 34, C. Basis For Determination sta-I . D. Remarks E, Appeals Information (This Informatton applits only to approved jurisdietional determinations as indicated in & above) This core: espon,dence cOnsdtutes an approved jurisdittianal determination for the above described site. If you object to this determination, You nosy request an administrative appeid under Corps regulations at 33 CFR part 331. Enclosed you will find, a Notification of' Appeal Process (NAP) tact sheet ttnd reclUest for appeal (PFA) form. If you request to appeal this determination you must submit a completed RFA form to d-Le following address; District Bngiueer, 'W'ilmington Regulatory DivisiGrl Attn:Tosh Pelletier, Project Manager, Washington Regulatory Field Office Post Office Box 1000 'Washington, North Carolina 27889 In order for an RFA to be accepted by the Corps, the Corps most determine that .it is complete, that it meets the criteria for appeal tinder 33 CFR part 331.5, and that it has been received by the District O$tce within 60 days of the date of the NAP. Should you decide to submit an R1~A farm, it must be recelvcd at the above address by March. 15, 2009. * *It is not necessary to submit an kFA form to the District Office if you do not object to the determination in t1liS correspondence.** Corps R,eguIatory Official: Date: Tsnuarv 1S, 2009 Expiration Date Junuar 15, 2014 T%e Wilmington District is committed to providing the hlghest level of suppart to the public. To help us ensure we cominue to do so, please complete the Customer Satisfaction Survey ;acatod at our website at h complete the survey online. l;ulatorv.u.sr _ rrveaom? ( to copy furnished: Jennifer Archambatilt JR. Caner III & Associates, Inn. Page 2 of 3 11/16/09 MON 12:33 FAX 9197792308 ms consultants Garner 10 003 11i1b/2009 11:32 ALBEMARLE=-EMC 4 91919779230ePP^993 Nd.a92 903 afherine Nixon xrisclictional De%rrnination PROFFERED PEFWT (81 PROFFERED PERMIT PS 11T DENTAL APPROM JMSDI( PMLZ11NA-RY EMS e Number: 2009-00102 Permit or Letter of Permit or Leiter of ICTIONAL TION You may e.ccept or objeet to the permit. A B C ACCEPT: If you received a Standard Permit. you MY sign thb permit document and return it to the district engineer for final autkorizahDn, If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized, Your signature on the Standard Permit or acceptance of the LOP rmeatis that you accept the permit in its en'drety, end waive all rights to appeal the permit, including it's terms and conditions, ez:d approved itmrlsdicti¢ral determinations associated with the permit. OBJECT: Ifyou obiact to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the pertnir be ,.Modified accordingly. Yoti trust Complete Se-,tion IY of this form and return the form to the district engineer. Your objections must be received by the distract engineer within fsb days of the date of this notice, or you will forfeit your right to appeal the permit in the firture. Upon receipt ofyour letter, the district ettgiucer,will evalbate your objections and may_ (a) modify the permit to address all ofyour concerns, (b) modify the pt:rmit to address some of your oirjccrlons, of (c) not modify the perzrtit having determined that the permit should be ismed, as previausly written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, x; iodinated in Section $ below. B: PROFFERED PERMIT: You may accept or a)t;peal the ACCEPT; If youreecived a Standard Pmnit, you may sign the permit document and return ittn the district engineer for final authorization., If you received a Letter of Permission (LOP), you may accept the LOP and your,Aork is suth4rized. Your, signatwe on the Standard Permit or acceptance of the LOP tneans th.ot YOU accept the permit in its entirety, and waive all rights to appeal the permit, irtcluftg its terms and conditions, and approved,jurisdictiooal deterrninatioris associated witb•the permit. APME,AL: Ifyou choose to decline the proffered p(tmat (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit undet the Corps of Engineers Administrative Appeal Process by completing Section Il of this forth and sending the forth, to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. Date: January 15, See Section below C. PERMIT DENIAL: You may appeal the denial of a pounit under the Cotes of Engineers Administrative Appeal process by completing Section 11 of this form and sending the form to th+: division engineer, This farm must be received by the division engineer within 60 days of the date of this notice, 11/16/09 MON 12:34 FAX 9197792308 ms consultants Garner 11/16/2009 11:32 ALBEMARLE-EMC 4 91919 ?92300PP7993 D: APPROVEI) JURmL provide new information. TI4N: You rmtly accept or appeal 10004...-- NO. B92 004 approved YD or ACCEPT: You do not tired to notify the Corps to accept an approved Ill, Failure to notify the Corps within ft} days of [he date of this notice, means that you accept the approved JD in its andrery, and waive alt rights to appeal the approved m. ¦ APPEAL: If you disagree with the approved ID, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section Il of this farm and sending the form to the district engineer, This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY .IURISDICTIONAL DETER:14D4ATION: You do not deed to respond to the Carps regarding the preliminary ID, The Preliminary TD is trot appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Colps district for further instruction. Also you may provide new information for further consideration, by the Corps do reevaluate the 71). 'I W REASONS FOIL APPEAL OR OBJECTIONS: (Describe your reasons for app ealin the decision or your objections to an initial proffered permit in clear concise statement, g You may atattach ache information to this form to clat ify where your reasons or objectiow are addressed in ou may Slxative record.) the adtWni ADDITIONAL NFORMATIONr: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is alread in ,-. y the ad>'runistrative record. If you. have questions regarding this decisic andlor the appeal process you may contact: Josh Pelletier U.S. Army Corps of Engineers Post Office Box 1400 Washington, North Carolina 27889 (252) 975-1616 ex 34 If YOU only have questions regarding the appeal process you may also contact: Mr. Mike Bell, .Administrative Appeal Review Officer C2-ET-C0-R U.S- Amly Corps of Eugineers, South Atlantic Division 6C liorsyth Street, Room 9M15 Atlanta, Georgia 30303-8801 xICiHT OF ENTRY; 'Your signature below grytnts & right of entry to Corps of Engineers , and any government consultants, to conduct investig personnel ations of the project site during the course of the appeal process, you investigations, beprovided a 15 day notice of any site investigation, and will have the opporttmity to participate In all site Signature of appellant or a:_ent. Date: Telephone nu=ben For appeals on Itlifiial Proffered Permits abd approved Jurisdictional Determinations send this farm to., 11/16/09 MON 12:35 FAX 9197792308 ms consultants Garner Lo 005 11/15f2009 11:32 ALBEMRPLE-EMC 4 919197792309PP7993 NO.e92 U05 District Engineer, Wilmington k,egulatory :Division, Attn;Josh Pelletier, Project Manager, Washington Regulatory Field Office, Post Office Box 1000, Washington, North Czar. olina 27889 For NrWit denials and Proffered Permits send this form to: Division Engineer, Commander, U.& Army Engineer Division, South Atlantic, Attn: Mr. Mike Bell, Ad ministra,tive Appeal Officer, CESAD-ET-C()-R, 60 Forsyth Street, Room 9M15; Atlanta, Georgia 30303-8901 e n N ip r 36° 12'39" 36° 11'27" Soil Map-Perquimans County, North Carolina (AEMC) N N r M Map Scale: 1:10,600 if printed on A size (8.5" x 11") sheet. N N Meters 0 100 200 400 600 Feet A 0 400 800 1,600 2,400 USDA Natural Resources Web Soil Survey aM Conservation Service National Cooperative Soil Survey 36° 12'40" 36° 11'27" io N 8/31/2009 Page 1 of 3 m C O m U r 0 z T C oU U2 c Q m E Q a CL m 2 O O m 6 01 N U p ' L co 3 a) L m U > m a) 0 a O m C CO 0 a) p c_ C E N _ a) m CO N 7 C 2 O O - Y N Z CL m O N m U m U Q o co E -0 N O x LO E a? e C', 00 U w L 0 O O °o Y r 0? O N y Z 0 Z 1 r-- .6 L N 0 CD N O E z U N z 0 c cN (u La 3 N C li Q a U (U ar° U) D O m C) p m Q 'm0 O CO T Q) j 3 C w N O CL CO T O_ a) LL ? N o a) ai pN E o ° m C E C -0 E-0 can) c a r ° a) °' m 0 (n - a a o U N S ?a°i a`?i, 3 aLE Q - °o io .0 m z? % N CD d N m s i c oY o w °? = m a) N m m m `p 'm y c N O c N a m j % N N-o N m Qca p T 7 O"O a) :3 W f U) O M a9 0 co 0 U N N O m 'a Z Q m -0 7 N O.. Cc on a) N N m m w a) v 0 7 L p a) a> N (n (D - o 'a o m 0 E m E 2 -r F a E 0 cn?U F- :E U) U) 0 H° o N N m m C T co a 0 t m U r o T O O ` N O :% C y = O N O ~ ? O 'O O CL m cn L T r m c E v) m 'o 2' of D? Z, y I d L L O 0 N m O m U > _ W 7 w O c (9 C/) O U U O _ cn c m ? 5 U) m O J d LL m is 10 R CL • d LL r O c LU W '0 m m CL 3 F- LU J Q Q m a o N a m 3 v N Z' N d " N . . N C ` ` O m m 7 co 3: O. O O O d C d m d 4 (n a N m 'Fu U O O a fn O u> Uj T N a d Q. Q O 2 IL O 30 N m 0 - "O LL t N O N L) C Y a) C - O L O U) U Q __ U) T y O m O ` m > C U C cc > a) 0 C C 0 d Q U) co co U U CD tD J J d d' f4 O (n f4 fn (n L fn N d a C ? O N Q N O) Cl) O w O O N (V M a) W d T a) Z U) 'o i> U) =, m U m O cn a N o U m C O m z d u N •? d 3 N O C N o ? m 3 N m c ?0 O z u D `?L Soil Map-Perquimans County, North Carolina AEMC Map Unit Legend Perquimans County, North Carolina (NC143) Map Unit Symbol Map Unit Name Acres in A01 Percent of A01 AaA Altavista fine sandy loam, 0 to 2 percent slopes 25.0 5.3% At Augusta fine sandy loam 155.3 32.8% CO Chowan silt loam 13.9 2.9% CtB Conetoe loamy sand, 0 to 5 percent slopes 55.2 11.7% DO Dorovan muck 78.8 16.6% Se Seabrook fine sand 23.4 5.0% StA State loamy fine sand, 0 to 2 percent slopes 39.6 8.4% To Tomotley fine sandy loam 43.7 9.2% W Water 38.5 8.1% Totals for Area of Interest 473.4 100.0% UNUA Natural Resources Web Soil Survey 8/31/2009 Conservation Service National Cooperative Soil Survey Page 3 of 3 it FE IF • 1� �����_;i j�1Ce 1 . • J �. i��II fp _• / ��j .. -- III i" I �I II I.�._ /�� a �.. Cb if Chi ` ♦ ti Cr Cb I / If 41 1, ) � t �� O C � i S . v � rte... r' �• A ." / •��T�, awl '3.i �� � .,_� � � A � m j F a \ )T y j O x s a l \ it o• � i •mo 311 J�z I -- \ ' J i ms consultants, inc. .. engineers, architects, planners 500JeL;•m USGS MAP ALBEMARLE ELECTRIC " �" . ® Renck a•wa•, Norm c•m .2 am gOfRI1 CAFIFK OLNA RM1one. (252) 5 11 24= ��E OR-CE/ WARB-IOII Fes. (mom) 51621370.2137 mwtl•�.conPFKXE= * 804Q%W NN a ?LL Z U) a?Q woo N O O sr r:e.. 0 ?UC) U O a U) 0 U C c v? a +r N 0 co U 5 U U O? U a?i cn 'rn m E C L C? G U C L 2 CA D Z g w 3: 0 0 T W J a U) 0 09@90WRI Stormwater Management Narrative JAN 1 3 m o Albemarle Electric Membership Corporation in Winfall, NC D AND sR BAANW The proposed development consists of a new 0.41-mile access roadway, 22,620 square foot office, 38,771 square foot warehouse, 3.92 acre fenced gravel yard, and associated parking. The 38.5-acre site is located at the intersection of US Highway 17 bypass and Creek Drive in the town of Winfall, Perquimans County, North Carolina. The site is currently wooded and there are no existing structures. There is a 0.8-acre wetland area that has been delineated by JH Carter and Associates, and was accepted by USACE on January 15, 2009 (Action ID: SAW-2009-00102). The topography of the site is relatively flat, with a few areas of steeper slopes near the wetlands and the southwestern property boundary. A portion of the southwestern boundary is within the flood zone, however no development is proposed in this area. The developed site will consist of two main drainage areas. The stormwater runoff will be managed by installation of two permanent BMP structures. Runoff will be conveyed to the ponds through gently sloped grassed ditches. The stormwater management measures have been designed to meet the new 2008 coastal stormwater requirements, which includes 85% TSS removal, control and treatment of the first 1.5" of rain, discharge at less than or equal to predevelopment rates for the one year storm, and a 2-5 day drawdown time of the storage volume. The first pond is a 32,500 square foot wet detention basin with a drainage area of 12.2 acres (55% impervious). The pond collects a majority of the runoff from the gravel yard area and the roof drainage. The wet detention pond incorporates two forebays, a vegetated shelf, baffles to increase flow length, and an outlet structure to release treated water at the 1-year, 24-hour predevelopment rate. Because the site does not allow for an emergency overflow, the outlet structure is designed to pass the 100-year storm event. The pool elevation of this pond is roughly 4.5 feet lower than the seasonally high water table. There are two existing drainage ways less than 200 feet from the pond with bottom elevations more than 2 feet lower than the pool elevation, therefore no adverse impacts are expected from the low pool elevation. The second pond is a 4,500 square foot stormwater wetlands basin with a drainage area of 0.6 Acres (58.3% impervious). Most of the runoff draining to this pond is from the front asphalt parking lot. The pond incorporates two forebays, a deep pool by the outlet, shallow land and shallow water areas, wetland plantings, temporary storage volume, and an overflow outlet structure. The overflow structure discharges into the proposed roadside ditch. r ,. ?? ?' ? . , i, Permit No. (to be provided by DWQ) ?pF W AT F9p o ? o NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. T The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name Albemarle Electric Membership Corporation r Contact person William W. Dreitzler, P.E. Phone number 1-252-519-2135 Date 13-Oct-09 Drainage area number 1 Site Characteristics Drainage area 521,132 ft' Impervious area, post-development 296,257 ftz % impervious 56.85 % Design rainfall depth 1.5 in Storage Volume: Non-SA Waters Minimum volume required 36,586 ft3 OK Volume provided 79,512 fts OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5• runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? Y (Y or N) ```,NXX% 1 / 1-yr, 24-hr rainfall depth 3.1 in `?\ \' kA CAR0 /i Rational C, pre-development 0.30 (unitless) N 0, •?FESS/d..i Rational C, post-development 0.70 (unitless) •QQ` ??. G Rainfall intensity: 1-yr, 24-hr storm 0.13 in/hr OK SEAL 27 r` Pre-development 1-yr, 24-hr peak flow 0.46 ft3/sec r : 18079 W Post development 1-yr, 24-hr peak flow 1.08 ft3/sec ?y Z. Pre/Post 1-yr, 24-hr peak flow control 0.62 ft3/sec i?'l1NGl Elevations Temporary pool elevation 5.60 fmsl 11 I 1? Permanent pool elevation 3.50 fmsl /1 D9 SHWT elevation (approx. at the perm. pool elevation) 3.50 fmsl Top of 1 Off vegetated shelf elevation 4.00 fmsl r Bottom of 1 Oft vegetated shelf elevation 3.00 fmsl Sediment cleanout, top elevation (bottom of pond) -1.00 fmsl Sediment cleanout, bottom elevation -2.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool? N (Y or N) Elevation of the top of the additional volume 5.6 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) r. p ri*, Surface Areas Area, temporary pool Area REQUIRED, permanent pool SA/DA ratio Area PROVIDED, permanent pool, A?r,_,?, Area, bottom of 1 Oft vegetated shelf, Awt Shat Area, sediment cleanout, top elevation (bottom of pond), Awa ond Volumes Volume, temporary pool Volume, permanent pool, V?,,,., Volume, forebay (sum of forebays if more than one forebay) Forebay %of permanent pool volume SAIDA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vp._p., Area provided, permanent pool, Ap._p., Average depth calculated Average depth used in SA/DA, d,,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap „_p., Area, bottom of 1 Oft vegetated shelf, Abo, sherc Area, sediment cleanout, top elevation (bottom of pond), knot-o„d 41,335 ft2 29,705 ft 5.70 (unitless) 32,442 ft2 OK 27,790 ft2 13,153 ft2 79,512 ft3 OK 100,658 ft3 19,001 ft3 18.9% % OK 90 % Y (Y or N) N (Y or N) 5.70 (unitless) N (Y or N) 100,658 ft' 32,442 ft2 It Need 3 ft min. It Y (Y or N) 32,442 ft 27,790 ft2 13,153 ft2 "Depth" (distance blw bottom of 1 Oft shelf and top of sediment) 4.00 ft Average depth calculated 3.41 It Average depth used in SA/DA, d.„ (Round to nearest 0.5ft) 3.5 It Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (CW) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Forth SW401-Wet Detention Basin-Rev.8-9117/09 Y (Y or N) 7.7(x2)in in2 0.60 (unitless) 0.67 It N (Y or N) (unitless) (unitless) ft ft 0.46 ft3/sec 1.08 ft3/sec 0.26 ft3/sec 3.50 days 3 :1 10 :1 10.0 it 3 :1 1.5 :1 OK OK OK, draws down in 2-5 days. OK OK OK OK OK Y (Y or N) OK 1.0 It OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pump out Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) ilt C 1??1 iF v fJ,"2 a<< d w"?'7" T,' tit 8 k?4 r r 2 ! t V ..r I irl y \L l lr ?? N?,i??aIS'ip4M?,...?`? Please indicate the page or plan sheet numbers where the supporting documentation can be found.An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. N s R ?' t 1, Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. N S R C ?' 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. Qp NSF C WO 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. Q C,' S 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. A ? ` ?v aR G A C. S 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, C I`5 to verify volume provided. 6 . A construction sequence that shows how the wet detention basin will be protected from sediment until the A ATT entire drainage area is stabilized. . 7. The supporting calculations. Av s A TT. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. A TT. 9. A copy of the deed restrictions (if required). N-59%, A TT 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 O?ot W ATF9OG y r *A > -i NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. Project name Albemarle Electric Membership Corporation Contact name William (Bill) W. Dreitzler Phone number 252-519-2135 Date January 8, 2010 Drainage area number 2 Site Characteristics Drainage area 26,926.00 ft Impervious area 15,685.00 ftz Percent impervious 58.3%% Design rainfall depth 1.50 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.12 in 1-yr, 24-hr intensity 0.13 in/hr Pre-development 1-yr, 24-hr runoff 0.02 ft3/sec Post-development 1-yr, 24-hr runoff 0.05 ft3/sec Pre/Post 1-yr, 24-hr peak control 0.03 ft3/sec Storage Volume: Non-SA Waters Minimum required volume 3,670.00 ft3 Volume provided (temporary pool volume) 3,781.00 ft3 OK Storage Volume: SA Waters Parameters 1.5' runoff volume 1933.00 ft3 Pre-development 1-yr, 24-hr runoff volume 350.00 ft3 Post-development 1-yr, 24-hr runoff volume 4,020.00 fts Minimum volume required 3670.00 ft3 Volume provided 3,781.00 -ft' OK Outlet Design Depth of temporary pool/ponding depth (DPia,t) 12.00 in OK Drawdown time 3.00 days OK Diameter of orifice 1.50 in OK Coefficient of discharge (CD) used in orifice diameter calculation 0.60 (unitless) Driving head (Ho) used in the orifice diameter calculation 0.33 ft OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 1 of 3 Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The forebay surface area percentage is: Non-forebay portion of deep pool The non-forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) Shallow Water bottom Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Top of PPE is within 6" of SHWT, If yes: SHWT (Seasonally High Water Table) This design meets Option #2, Wetland has liner with permeability < 0.01 in/hr, If yes: Depth of topsoil above impermeable liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants recommended in Shallow Water Area: Herbaceous (4+ cubic-inch container) Number of Plants recommended in Shallow Land Area: Herbaceous (4+ cubic-inch container), OR Shrubs (1 gallon or larger), OR Trees (3 gallon or larger) and Herbaceous (4+ cubic-inch) Number of Plants provided in Shallow Water Area: Herbaceous (4+ cubic-inch container) Number of Plants provided in Shallow Land Area: Herbaceous (4+ cubic-inch container) Shrubs (1 gallon or larger) Trees (3 gallon or larger) and Grass-like Herbaceous (4+ cubic-inch) 3,781.00 ft2 OK 1,506.00 ft2 OK 40%% 1,475.20 ft2 OK 39%% 455.30 ft2 OK 12%% 344.50 ft2 OK 9%% 3,781.00 ft2 OK 0.00 ft2 11.00 ft amsl 10.00 ft amsl 9.70 ft amsl 7.00 ft amsl 7.00 ft amsl y (Y or N) 10.50 ft amsl OK (Y or N) in 12.00 in OK 3,60 in OK 36.00 in OK 36.00 in OK n (Y or N) OK 400 400 64 8 and 320 400 OK 320 More required if not planting shrubs or trees. 0 More required if not planting herb. and/or trees. 8 OK 320 OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Does project drain to SA waters? If yes, What is the length of the vegetated filter? Are calculations for supporting the design volume provided in the application? Is BMP sized to handle all runoff from ultimate build-out? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is: Approximate wetland length Approximate wetland width Approximate surface area using length and width provided Will the wetland be stabilized within 14 days of construction? y (Y or N) n (Y or N) ft y (Y or N) y (Y or N) y (Y or N) 2.44:1 66.00 ft 27.00 ft 1,782.00 ft2 y (Y or N) OK Excess volume must pass through filter. OK OK OK OK This approx. surface area is within this number of square feet of the entire wetland surface area reported above: OK Form SW401-Wetland-Fiev.6-11/16/09 Parts I and II. Project Design Summary, Page 3 of 3 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found, An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 1 1 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Wetland dimensions (and length to width ratio), - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. N SR ???0 2. Plan details (1" = 50' or larger) for the wetland showing: - Wetland dimensions (and length to width ratio) - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build-out, - Off-site drainage (if applicable), - Overflow device, and - Boundaries of drainage easement. N? C m 3. Section view of the wetland (1" = 20' or larger) showing: Side slopes, 3:1 or lower - Wetland layers All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth Option 2, clay liner: Depth of topsoil on top of liner, liner specifications C t? to 4. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: A variety of several suitable species (not including cattails), - Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. c ?, 5 NSCZ. ATT_ ?T ! I . .AZ 9 4rr SW401-Wetland-Rev.6-11 /16/09 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations (including drawdown calculations). 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). 9. A soils report that is based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. Part III, page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does ® does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe, otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 Of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 3.5 Sediment Removal . -1 Pe manen`( ----------------- Volume\ Bottom Elevatio -2 -ft Min. Sediment Storage FOREBAY Sediment Removal Elevation -1------------- } Volum -------------------------- ---- Bottom Elevation -2 21-ft M Pool MAIN POND Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Albemarle Electric Membership Corporation BMP drainage area number: Print name: Bradley V. Furr Title: Executive Vice President and General Manager Address: 159 Creek Drive, Hertford, NC 27944 P. S Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. n oe '-? j\gt2-? , a Notary Public for the State of W-? i c\c,- , County of 1.C)C I!Lh? do hereby certify that (\aA personally appeared before me this day of C e C L-:?O?R , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, Z'? ?b-01? SEAL My commission expires Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Date: Permit Number: (to be provided by DWQ) Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). - No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. - Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BWelement: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is resent. Remove the trash/ debris. Perimeter of wetland Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment swale offsite. The pipe is cracked or otherwise Replace the pipe. damaged if applicable). Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Wetland O&M-Rev.4 Page 1 of 3 Permit Number: (to be provided by DWQ) HiwlP. ekmr ent: Potential problem: How I will remediate the roblenu - Forebay Sediment has accumulated in the Search for the source of the sediment and forebay to a depth that inhibits the remedy the problem if possible. Remove forebay from functioning well. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Deep pool, shallow water Algal growth covers over 50% of the Consult a professional to remove and and shallow land areas deep pool and shallow water areas. control the algal growth. Cattails, phragmites or other invasive Remove invasives by physical removal or plants cover 50% of the deep pool and by wiping them with pesticide (do not shallow water areas. spray) - consult a professional. Shallow land remains flooded more Unclog the outlet device immediately. than 5 days after a storm event. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Best professional practices show that Prune according to best professional pruning is needed to maintain optimal practices. plant health. Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth of the deep the sediment and dispose of it in a location pools. where it will not cause impacts to streams or the BMP. Embankment A tree has started to grow on the Consult a dam safety specialist to remove embankment. the tree. An annual inspection by appropriate Make all needed repairs. professional shows that the embankment needs repair. Evidence of muskrat or beaver activity Consult a professional to remove muskrats is resent. or beavers. Micropool Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage have Contact the NC Division of Water Quality occurred at the outlet. 401 Oversight Unit at 919-733-1786. Form SW401-Wetland O&M-Rev.4 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Albemarle Electric Membership Corporation BMP drainage area number: 02 Print name: Bradley V. Furr Title: Executive Vice President and General Manager Address: 159 Creek Drive, Hertford, NC 27944 Phone: 252-426-5735 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401-Wetland O&M-Rev.4 Page 3 of 3 Deed Restrictions & Protective Convenances I, Bradley V. Furr acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot within the project known as Albemarle Electric Membership Corporation 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number , as issued by the Division of Water Quality under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. A stormwater management system must be designed and permitted through DWQ before construction of any future development. 7. The owner of each lot, whose ownership is not retained by the permittee, is required to submit a separate stormwater permit application to the Division of Water Quality and receive a permit prior to construction. 8. The project and each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. Signature: Date: a /?g9 1, a Notary Public in the State of L , County of w o?_?-\t L\ A do hereby certify that c act \ ?? r t personally appeared before me this the 1 day of 20 GL?_, and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, SEAL Signat re My Commission expires Page 1 of 1 Stormwater Management Calculations for: ALBEMARLE ELECTRIC NC Hwy. 17 Bypass & Creek Drive Winfall, NC Project #: 64-12790-00 December 2009 Prepared by: ?; ?i R ,A%r O• . ??`'?4?FESS?• O 9 Es.- SEAL ?: s • 1 ., 8A7g : w; ? NEE E++0 W? ms consultants, Inc. engineers, architects, planners 336 B Carthage Street Sanford, NC 27330 (919) 774-7303 FAX: (919) 774-6109 www.msconsultants.com ms consultants, inc. engineers, architects, planners 336 B Carthage Street Sanford, NC 27330 (919) 774-7303 FAX: (919) 774-6109 www.msconsultants.com DITCH CALCULATIONS i = 8.0 Project Name : AEMC Project Number : 64-12790 Project Location : Winfall, NC Designed by : NSR Date : 7-Oct-09 Inlet/ditch s% n C A (Ac) D cfs Qtotal M BW D(rft) V (fps) SHEAR 102+50 - 103+50 (L) 0.50 0.022 0.60 0.06 0.29 0.29 3.0 0.0 0.28 1.2 0.09 104+75 - 114+00 (R) 0.50 0.022 0.55 5.10 22.44 22.44 3.0 0.0 1.43 3.7 0.44 104+75 - 114+00 (L) 0.50 0.022 0.60 0.69 3.31 3.31 3.0 0.0 0.70 2.3 0.22 114+00 - 116+75 (L) 0.50 0.022 0.60 0.33 1.58 1.58 3.0 0.0 0.53 1.9 0.16 116+75 - 118+50 (R) 0.50 0.022 0.60 0.05 0.24 0.24 3.0 0.0 0.26 1.2 0.08 118+50 - 119+00 (R) 8.00 0.022 0.60 0.04 0.19 0.19 3.0 0.0 0.14 3.2 0.71 117+25 - 118+00 (L) 0.50 0.022 0.60 0.10 0.48 0.48 3.0 0.0 0.34 1.4 0.11 118+00 - 118+50 (L) 10.00 0.022 0.60 0.03 0.14 0.14 3.0 0.0 0.12 3.2 0.76 Culvert 0.60 4.00 19.20 20.40 118+50 - 119+25 (L) 8.00 0.022 0.60 0.03 0.14 1.01 3.0 0.0 0.26 4.8 1.32 119+25 - end (L) 0.50 0.022 0.60 0.18 0.86 0.86 3.0 0.0 0.42 1.6 0.13 119+00 - 119+50 (R) 8.00 0.022 0.60 0.03 0.14 1.01 3.0 0.0 0.26 4.8 1.32 119+50 - end (R) 0.50 0.022 0.60 0.18 0.86 0.86 3.0 0.0 0.42 1.6 0.13 Southern Ditch 0.50 0.022 0.70 4.38 24.53 25.39 3.0 0.0 1.49 3.8 0.47 summary of calculations s% = slope of ditch n = roughness coefficient C = runoff coefficient i = average intensity of rainfall in inches per hour based on a ten year storm A(sf) = drainage area in square feet A(Ac) = drainage area in acres Q(cfs) = flow in the channel (from channel section runoff only) in cubic feet per second Qtotal = flow in the channel (from channel section runoff and upstream channel sections) in cubic feet per second M = horizontal component of sideslope BW= bottom width of a trapezoidal channel (triangular if BW = 0) D(ft) = normal flow depth in feet V (fps) = average velocity in the channel in feet per second SHEAR = Shear stress at normal depth in pounds per square foot n = per table 8.05b of the design manual c = weighted average from table 8.03a of the design manual A(Ac) = A(sf) / 43560 Q(cfs) = C * i * A(Ac) Qtotal = Q(cfs) + Q(cfs) of all upstream sections Depth = (( Q(cfs) * ((2 * sgrt(1 + (M^2)))^(2/3)) 1.49 * sqrt(s) * (M^(5/3))))^(3/8) V(fps) = Qtotal / (( DEPTH * ( DEPTH * M)) + ( DEPTH * BW ) SHEAR = 62.4 * DEPTH * s% .values for depth in trapezoidal channels (BW > 0) are determined using the trapezoidal channel calculator (AutoCad 2006) ms consultants, Inc. engineers, architects, planners 336 B Carthage Street Sanford, NC 27330 (919) 774-7303 FAX: (919) 774-6109 www.msconsultants.com PIPE CALCULATIONS n = 0.013 Project Name : AEMC Project Number: 64-12790 Project Location : Winfall, NC Designed by : NSR Date : 7-Oct-09 Upstream S C 1 A a 0 total Rea. Pro. Size BMP Pond 0.4 0.75 10.75 11.5 92.72 92.72 48.32 dual 36 106+00 ( R) 0.5 0.55 8.0 4.5 19.80 19.80 25.97 24 110+50 ( R) 0.5 0.55 8.0 2.3 10.12 10.12 20.19 24 Bioretention 1 0.6 10.8 0.8 5.18 5.18 13.80 15 118+75 1.2 From Ditch C alcs => 20.40 20.40 22.29 24 summary of calculations s = slope n = roughness coefficient Q = flowrate - from ditch calculations or Q=CiA Req. Size =16`(((0*n)/(sgrt(s/100)))^(3/8)) ms consultants, Inc. engineers, architects, planners 336 B Carthage Street Sanford, NC 27330 (919) 774-7303 FAX: (919) 774-6109 www.msconsultants.com SEDIMENT TRAP CALCULATIONS i -10 = 8.0 Project Name : AEMC Project Number : 64-12790 Project Location : Winfall, NC Designed by : NSR Date : 7-Oct-09 # g A (sf) A(ac) 000) SA rea L W SA Pro V reg D V aro WL 1 0.5 19602 0.45 1.80 784 40 20 800 1620 3.0 1914 4 Summary of calculations C = runoff coefficient i(10) = average intensity of rainfall in inches per hour based on a ten year storm A(sf) = drainage area in square feet A(ac) = drainage area in acres Q(10) = flow into the trap in cubic feet per second based on a ten year storm SA req = surface area required at design flow in square feet L = proposed length of trap in feet W = proposed width of trap in feet SA pro = surface area provided in square feet V req = volume required in cubic feet D = Depth of the sediment trap from bottom of trap to top of weir in feet v pro = proposed volume of the trap in cubic feet WL = Length of weir in feet c = weighted average from table 8.03a of the design manual A(ac) = A(sf) / 43560 Q(10) = C - i(10) - A(Ac) SA req = 0.01 * Q(10) SA pro=L'W V req = 3600 ' A(ac) V pro = (((L'W)+((L-2D)`(W-2D)))/2)'D WL = per table 6.60a of the design manual BOTTOM EL. 5 A his, ms consultants, Inc. engineers, architects, planners 336 B Carthage Street Sanford, NC 27330 (919) 774-7303 FAX: (919) 774-6109 www.msconsultants.com Project Name : AEMC Project Number: 64-12790 Project Location : Winfall, NC Designed by : NSR Date : 7-Oct-09 WET DETENTION POND CALCULATIONS Runoff Volume using Simple Method (Section 3.3) Rainfall Depth Drainage Area = 521132 SF Drainage Area = 11.96 Ac Impervious Area = 296257 SF Impervious Fraction (IA) = 0.57 Runoff Coefficient (Rv) = 0.56 Rainfall Depth to control = 1.5 .1 Volume = 36585.99 cf = Drainage Area / Impervious Area = 0.05 + (0.9 * IA) = 3630 * Depth * Rv * Area Pre/Post Development Differece 1yr 24 hr Rainfall Depth = 3.12 " Predev Drainage Area = 521132 sf Predev Impervious Area = 0 Impervious Fraction = 0 Predev Rv = 0.05 Volume = 69324.14 cf = Drainage Area / Impervious Area = 0.05 + (0.9 * IA) = 3630 * Depth * ( Rv post - Rv pre) * Area Surface Area (Section 10.3.4) Pond Depth = 4 ft Area @ bottom of shelf = 27788 sf Area @ permanent pool = 32443 sf Area @ pond bottom = 13152 sf Average Depth = 3.41 ft SA/DA from Table 10-4 = 5.7 SA required = 29704.52 sf Outlet Structure Release Rate Predevelopment C = 3 1 yr 24 hr Intensity = 0.13 "/hr Predevelopment Flowrate = 4.67 cfs Option 2 equation =D17*(SA/DA /100) = C * I * A Drawdown Time Storage Volume Provided = 79512 cf Target drawdown time = 3.5 days Flowrate = 0.26 cfs Circular Orifice Target Flowrate Q = 0.26 cfs Discharge Coeff. Cd = 0.6 Storage Depth = 2.1 ft Orifice X-sect. Area = 0.065 sf # of orifices = 2 Orifice Diameter = 7.68 in. = Volume / Time = ( Q / ( Cd * ( SQRT (2 * 32.2 * ( Depth / 3 ))))) =2*SQRT((Area /#oforifices) *Pi)) ms consultants, Inc. engineers, architects, planners 336 B Carthage Street Sanford, NC 27330 (919) 774-7303 FAX: (919) 774-6109 www.msconsultants.com STORMWATER WETLANDS CALCULATIONS Runoff Volume using Simple Method (Section 3.3) Rainfall Depth Drainage Area = 26926 SF Drainage Area = 0.62 Ac Impervious Area = 15685 SF Impervious Fraction (IA) = 0.58 Runoff Coefficient (Rv) = 0.57 Rainfall Depth to control = 1.5 " Volume = 1933 cf Pre/Post Development Differece 1yr 24 hr Rainfall Depth = 3.12 " Predev Drainage Area = 26926 sf Predev Impervious Area = 0 Impervious Fraction = 0 Predev Rv = 0.05 Predev Volume = 350 Postdev Volume = 4020 Volume = 3670 cf REQUIRED VOLUME = 3670 cf Surface Area (Section 10.3.4) Pond Depth = 1 ft SA required = 3670 sf Project Name : AEMC Project Number: 64-12790 Project Location : Winfall, NC Designed by : NSR Date : 7-Jan-10 = Drainage Area / Impervious Area = 0.05 + ( 0.9 * IA) = 3630 * Depth * Rv * Area = Drainage Area / Impervious Area = 0.05 + (0.9 * IA) = 3630 * Depth * ( Rv post - Rv pre) * Area = Volume / Depth U o Z o W c Q CO Z 2. 0 c > N E Q g -0 co ca E 0 p Z z v c U Z J .? N 2 N p CL I a a ¦ Cn C ? C 0 (D M i m 0 O M (D v C sUCmr- c 0 U) 'tf z Co M A- c U? rn ? 0 cn • m o r- M d C Mfn_LL ,?:te3f'E 07 O CO CO E ^ co M N N Lo 'o O O 2V O CO N It N r Lo N M N H H ;?„? I- T Lo Lo CA l- CO a) O LL M CD N O CO Lo O O Cn Lo T M ^ O M CO O 00 M r 06.2t) O O M M M M Lo M CO 00 CO 0 CO N M Lf T 0 M rn CO * F-F-; r M Lo M 0 T - r L r l CO T . T N . r+ C N d^ E U. M CO M M ?t Ln ct 00 In M M CD r M CO r T N M O M M W C) O N O N 00 00 v > CO r M r N N O N Lo r ti T M M cF N CO r m ?' C m (p E^ M m Lo r m 00 m 00 m m w O zV I ° - *- W N 00 io N N * M ? M 't 't ? ? LL >; I M M M M r.+ m C d E ^ co Lo N CO co lC ?V O 0) CQ O CIO N ? 0 0 0 0 0 ; v ILL B r r N N r C m d ?+CVC U .q o oM Lo ? . 'O 7QN M ? O ? N c O 0 Im M LL (n C 7 Q tU ^ A N rt 0 'r M M M M M M O U. ?- ? CO N M It T N O M 0 M 0 M 0 M 0 M 0 M , LL Q C d 0 E^ N N T m m CC d 7U - O ? N r ? ? 0 0 0 0 0 LL &_ 0 6 V r r CV N T C Q d _ m U. N CMO M ? N U) NQN M m M T N cO Ot LL O O E^ m O CO CO f- 0 00 00 C O M N N a 0 0 O N CD O CO T CO N T Ln CO M CO N T ? (L OV It T" M G) O I? T pO 00 CA M CDD I- N r r r N r.. c (D E^ C E M N r f? CD T O T r M M (? CD T M CO r T N CO 0 0) 3V O CO CO M M Ln N O N m m c" CL It W M 0 r N m It CO m ^ > T T T N T T M N r ?' L w W a (? tO? Co Ln r- "t Lo M r T Ln m 0 C L'd yu, Ln O M (A N O) (A ?t M T i V OTC in a Qv M ? N N CTO t CqtO N T N oMO N r r r r- N N M M ?t ?F ?t C O _ 0 0 0 0 0 10 O O CO 0 0 LL O r N 0 0 qt Ln Lo CO I? W t m v In ? Ln M Ln N Ln *- Ln 0 0 Ln Ln r Uf Lo N O T N N M 16?, QG. Og ?G6, ??9 O? ,pD 00 4Y q04 P QG" ?.F-?GQG \1,y??'? fig, QG• •,?. e ?`S ISM / \1 Ok,R eG? ?' 1 41 P?" F'?Ft I1? 5 lv? o*GQG ?1 O QG ? GOeO?PPO $h? 5p, Ste. 09 "0 ?•: W z = , % / / ? ! ?Pp aQ G?? j/ ` III V l j (D L) ZNF p \ o a x ..? u \ t iz Q J Q Z O m H Z) O N w. Q z Q F- z W 2 12- 0 W W 0 u.1 CL ?U win wm O¢u 0., .z w d oao u ? w z Q J z O m 2 h O V) 165, QG. 00 5?6. ?y9 00 ,po \ 00 pf. QOM $95 P QG b16. z 0 00 ? / 1 C? 5 / FO 0 5? O QG U?Q Z> ° a N LL „ PLO A56 ? ? w az oz Ua O, U W O U U aob p z (.D O a z r, ro m J o (31 W Q z a cr 0 z W CL O w W 0 F- U) O a- w z Q J z D O m S O m C? U Q m m II W LL 0 0. o. z '3 a aoa wx? z 1: wz- U =5m w2 O NWQ oao u I Hydraf low Table of Contents W #-a- Stormwater Routing.gpw Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Watershed Model Schematic ...................................................................................... 1 Hydrograph Return Period Recap .............................................................................. 2 1 - Year Summary Report ....................................................................................................................... 3 Hydrograph Reports ................................................................................................................. 4 Hydrograph No. 1, SCS Runoff, Predevelopment @ Point F ................................................. 4 Hydrograph No. 2, SCS Runoff, Postdevelopment into Pond ................................................ 5 Hydrograph No. 3, Reservoir, Wet Detention Routing ........................................................... 6 Pond Report - Wet Detention Pond ................................................................................... 7 Hydrograph No. 4, SCS Runoff, Postdevelopment bypassing Pond ...................................... 8 Hydrograph No. 5, Combine, Postdevelopment @ Point F .................................................... 9 10 - Year Summary Report ..................................................................................................................... 10 Hydrograph Reports ............................................................................................................... 11 Hydrograph No. 1, SCS Runoff, Predevelopment @ Point F ............................................... 11 Hydrograph No. 2, SCS Runoff, Postdevelopment into Pond .............................................. 12 Hydrograph No. 3, Reservoir, Wet Detention Routing ......................................................... 13 Hydrograph No. 4, SCS Runoff, Postdevelopment bypassing Pond .................................... 14 Hydrograph No. 5, Combine, Postdevelopment @ Point F .................................................. 15 100 - Year Summary Report ..................................................................................................................... 16 Hydrograph Reports ............................................................................................................... 17 Hydrograph No. 1, SCS Runoff, Predevelopment @ Point F ............................................... 17 Hydrograph No. 2, SCS Runoff, Postdevelopment into Pond .............................................. 18 Hydrograph No. 3, Reservoir, Wet Detention Routing ......................................................... 19 Hydrograph No. 4, SCS Runoff, Postdevelopment bypassing Pond .................................... 20 Hydrograph No. 5, Combine, Postdevelopment @ Point F .................................................. 21 OF Report ................................................................................................................... 22 Watershed Model Schematic Hydraf low Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 1 - Predevelopment @ Point F Q 3 - Wet Detention Routing Project: Stormwater Routing.gpw into Pond 4 - Postdevelooment bvoassina Pond E- Postdevelopment @ Point F Monday, Jan 11, 2010 Hydrograph Return Period Rec?a?, y low Hydrographs Extension for AUtoCAD@ Civil 3D@ 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------ 8.169 14.79 ------- ------- 39.12 ------- ------- 95.12 Predevelopment @ Point F 2 SCS Runoff ------ 32.13 42.97 ------- ------- 76.30 ------- ------- 139.32 Postdevelopment into Pond 3 Reservoir 2 0.799 0.957 ------- ------- 17.56 ------- ------- 86.26 Wet Detention Routing 4 SCS Runoff ------ 7.261 10.81 ------- ------- 22.76 ------- ------- 47.82 Postdevelopment bypassing Pond 5 Combine 3,4 7.752 11.44 ------- ------- 23.65 ------- ------- 115.28 Postdevelopment @ Point F I Proj. file: Stormwater Routing.gpw Monday, Jan 11, 2010 Hyd rog raph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 8.169 2 724 28,494 ------ ------ ------ Predevelopment @ Point F 2 SCS Runoff 32.13 2 718 73,596 ------ ------ ------ Postdevelopment into Pond 3 Reservoir 0.799 2 942 71,913 2 4.81 48,173 Wet Detention Routing 4 SCS Runoff 7.261 2 718 14,622 ------ ------ ------ Postdevelopment bypassing Pond 5 Combine 7.752 2 718 86,535 3,4 ------ ------ Postdevelopment @ Point F Stormwater Routing.gpw Return Period: 1 Year Monday, Jan 11, 2010 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 1 Predevelopment @ Point F Hydrograph type = SCS Runoff Peak discharge = 8.169 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 28,494 cuft Drainage area = 14.330 ac Curve number = 65 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 15.00 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 8.00 6.00 4.00 2.00 Predevelopment @ Point F Hyd. No. 1 -- 1 Year a (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 I I . i i i I I I i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 1 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 Postdevelopment into Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 12.000 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.12 in Storm duration = 24 hrs Monday, Jan 11, 2010 Peak discharge = 32.13 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 718 min 73,596 cuft 85 0 ft 7.00 min Type II 484 Postdevelopment into Pond Q (cfs) Hyd. No. 2 -- 1 Year a (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 2 Time (min) Hydrograph Report 6 Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 3 Wet Detention Routing Hydrograph type = Reservoir Peak discharge = 0.799 cfs Storm frequency = 1 yrs Time to peak = 942 min Time interval = 2 min Hyd. volume = 71,913 cuft Inflow hyd. No. = 2 - Postdevelopment into Pond Max. Elevation = 4.81 ft Reservoir name = Wet Detention Pond Max. Storage = 48,173 cuft Storage Indication method used. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 - Hyd No. 3 - Hyd No. 2 ® Total storage used = 48,173 cuft Time (mi Wet Detention Routing Hyd. No. 3 -- 1 Year 7 Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Pond No. 1 - Wet Detention Pond Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 3.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 3.50 32,442 0 0 0.50 4.00 36,491 17,222 17,222 1.50 5.00 39,541 38,002 55,223 2.50 6.00 42,719 41,116 96,339 3.50 7.00 48,945 45,792 142,131 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 35.99 7.70 0.00 0.00 Crest Len (ft) = 24.00 Inactive 0.00 0.00 Span (in) = 35.99 7.70 0.00 0.00 Crest El. (ft) = 5.60 5.40 0.00 0.00 No. Barrels = 2 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 2.50 3.50 0.00 0.00 Weir Type = Riser Rect --- --- Length(ft) = 125.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 0.40 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) 4 00 . 7.50 3 00 . 6.50 2 00 . 5.50 1 00 . 4.50 0 00 . 3.50 0.00 9.00 18.00 27.00 36.00 45.00 54.00 63.00 72.00 81. 00 90.00 99.00 - Total Q Discharge (cfs) I Hydrograph Report 8 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Postdevelopment bypassing Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 4.610 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.12 in Storm duration = 24 hrs Monday, Jan 11, 2010 Peak discharge = 7.261 cfs Time to peak = 718 min Hyd. volume = 14,622 cuft Curve number = 73* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 * Composite (Area/CN) = ((1.060 x 98) + (3.550 x 65)) / 4.610 Q (cfs) 8.00 6.00 4.00 2.00 Q (cfs) 8.00 6.00 4.00 2.00 0.00 ' i i / I 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 4 Time (min) Postdevelopment bypassing Pond Hyd. No. 4 -- 1 Year Hydrograph Report 9 Hydraf low Hydrographs Extension for AUtoCAD® Civil 3D@2009 by Autodesk, Inc. v6.066 Hyd. No. 5 Postdevelopment @ Point F Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 2 min Inflow hyds. = 3, 4 Q (cfs) 8.00 Monday, Jan 11, 2010 Peak discharge = 7.752 cfs Time to peak = 718 min Hyd. volume = 86,535 cuft Contrib. drain. area= 4.610 ac Postdevelopment @ Point F Hyd. No. 5 -- 1 Year 6.00 4.00 2.00 0.00 0 240 480 - Hyd No. 5 Q (cfs) 8.00 6.00 4.00 2.00 0.00 720 960 1200 1440 1680 1920 2160 2400 2640 2880 3120 Time (min) - Hyd No. 3 -Hyd No. 4 10 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCADO Civil 3136 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 39.12 2 722 112,296 ------ ------ ------ Predevelopment @ Point F 2 SCS Runoff 76.30 2 718 179,623 ------ ------ ------ Postdevelopment into Pond 3 Reservoir 17.56 2 730 177,543 2 5.95 94,140 Wet Detention Routing 4 SCS Runoff 22.76 2 716 45,994 ------ ------ ------ Postdevelopment bypassing Pond 5 Combine 23.65 2 716 223,537 3,4 ------ ------ Postdevelopment @ Point F Stormwater Routing.gpw Return Period: 10 Year Monday, Jan 11, 2010 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Predevelopment @ Point F Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 14.330 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.81 in Storm duration = 24 hrs 11 Monday, Jan 11, 2010 Peak discharge = 39.12 cfs Time to peak = 722 min Hyd. volume = 112,296 cuft Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 15.00 min Distribution = Type II Shape factor = 484 Q (cfs) 40.00 Predevelopment @ Point F Hyd. No. 1 -- 10 Year 30.00 20.00 10.00 Q (cfs) 40.00 30.00 20.00 10.00 0.00 _ , 1 1 1 i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 1 Time (min) 12 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3138 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 2 Postdevelopment into Pond Hydrograph type = SCS Runoff Peak discharge = 76.30 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 179,623 cuft Drainage area = 12.000 ac Curve number = 85 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 7.00 min Total precip. = 5.81 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Postdevelopment into Pond Q (cfs) Q (cfs) Hyd. No. 2 -- 10 Year 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) - Hyd No. 2 13 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3138 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 3 Wet Detention Routing Hydrograph type = Reservoir Peak discharge = 17.56 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 177,543 cuft Inflow hyd. No. = 2 - Postdevelopment into Pond Max. Elevation = 5.95 ft Reservoir name = Wet Detention Pond Max. Storage = 94,140 cuft Storage Indication method used. Wet Detention Routing Q (cfs) Hyd. No. 3 -- 10 Year a (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0 00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 Time (min) - Hyd No. 3 - Hyd No. 2 ® Total storage used = 94,140 cuft 14 Hydrograph Report Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Postdevelopment bypassing Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 4.610 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.81 in Storm duration = 24 hrs Monday, Jan 11, 2010 Peak discharge = 22.76 cfs Time to peak = 716 min Hyd. volume = 45,994 cuft Curve number = 73* Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 * Composite (Area/CN) = [(1.060 x 98) + (3.550 x 65)] / 4.610 Q (cfs) 24.00 Postdevelopment bypassing Pond Hyd. No. 4 -- 10 Year 20.00 16.00 12.00 8.00 4.00 0.00 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 4 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 5 Postdevelopment @ Point F Hydrograph type = Combine Peak discharge = 23.65 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 223,537 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 4.610 ac Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ' ' 0 360 - Hyd No. 5 Postdevelopment @ Point F Hyd. No. 5 -- 10 Year Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 720 1080 1440 1800 2160 2520 2880 3240 Time (min) - Hyd No. 3 -Hyd No. 4 16 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 95.12 2 722 266,634 ------ ------ ------ Predevelopment @ Point F 2 SCS Runoff 139.32 2 718 339,948 ------ ------ ------ Postdevelopment into Pond 3 Reservoir 86.26 2 724 337,818 2 6.85 135,399 Wet Detention Routing 4 SCS Runoff 47.82 2 716 98,640 ------ ------ ------ Postdevelopment bypassing Pond 5 Combine 115.28 2 720 436,458 3,4 ------ ------ Postdevelopment @ Point F I Stormwater Routing.gpw Return Period: 100 Year Monday, Jan 11, 2010 17 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3136 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 1 Predevelopment @ Point F Hydrograph type = SCS Runoff Peak discharge = 95.12 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 266,634 cuft Drainage area = 14.330 ac Curve number = 65 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 15.00 min Total precip. = 9.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Predevelopment @ Point F Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 1 Hydrograph Report 18 Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 2 Postdevelopment into Pond Hydrograph type = SCS Runoff Peak discharge = 139.32 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 339,948 cuft Drainage area = 12.000 ac Curve number = 85 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 7.00 min Total precip. = 9.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 Postdevelopment into Pond Hyd. No. 2 -- 100 Year Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 - Hyd No. 2 Time (min) 19 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3138 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 3 Wet Detention Routing Hydrograph type = Reservoir Peak discharge = 86.26 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 337,818 cuft Inflow hyd. No. = 2 - Postdevelopment into Pond Max. Elevation = 6.85 ft Reservoir name = Wet Detention Pond Max. Storage = 135,399 cuft Storage Indication method used. Q (cfs) 140.00 Wet Detention Routing Hyd. No. 3 -- 100 Year 120.00 100.00 80.00 60.00 40.00 20.00 0.00 ml w-- 0 240 - Hyd No. 3 480 720 - Hyd No. 2 Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 960 1200 1440 1680 1920 Time (min) ® Total storage used = 135,399 cuft Hydrograph Report 20 Hydraf low Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 4 Postdevelopment bypassing Pond Hydrograph type = SCS Runoff Peak discharge = 47.82 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 98,640 cuft Drainage area = 4.610 ac Curve number = 73* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 9.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.060 x 98) + (3.550 x 65)) / 4.610 Q (cfs) 50.00 Postdevelopment bypassing Pond Hyd. No. 4 -- 100 Year 40.00 30.00 20.00 10.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 - Hyd No. 4 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 5 Postdevelopment @ Point F Hydrograph type = Combine Peak discharge = 115.28 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 436,458 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 4.610 ac Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 Postdevelopment @ Point F Hyd. No. 5 -- 100 Year a (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 5 -Hyd No. 3 -Hyd No. 4 Hydraflow Rainfall Report 22 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Return Period Intensity-Duration-Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 68.9198 12.8000 0.8927 -------- 2 75.2308 12.6000 0.8724 -------- 3 0.0000 0.0000 0.0000 -------- 5 75.8672 12.5000 0.8297 -------- 10 79.6372 12.4000 0.8036 -------- 25 72.0538 11.2000 0.7452 -------- 50 66.3721 10.2000 0.6990 -------- 100 62.0844 9.3000 0.6597 -------- File name: Winfall.IDF Intensity = B / (Tc + D)^E Monday, Jan 11, 2010 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.27 4.23 3.54 3.06 2.69 2.41 2.18 2.00 1.84 1.71 1.60 1.50 2 6.16 4.95 4.16 3.60 3.18 2.85 2.59 2.37 2.19 2.04 1.90 1.79 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 7.06 5.73 4.85 4.22 3.75 3.38 3.08 2.84 2.63 2.45 2.30 2.17 10 8.02 6.55 5.57 4.87 4.34 3.92 3.58 3.31 3.07 2.87 2.70 2.55 25 9.04 7.40 6.32 5.55 4.97 4.51 4.14 3.84 3.58 3.36 3.17 3.00 50 9.91 8.12 6.96 6.13 5.51 5.02 4.63 4.30 4.02 3.79 3.58 3.40 100 10.73 8.81 7.57 6.69 6.03 5.51 5.09 4.74 4.45 4.20 3.98 3.79 Tc = time in minutes. Values may exceed 60. Precin. file name: Winfnll.ncn Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.12 3.79 0.00 0.00 5.81 0.00 0.00 9.64 SCS 6-Hr 2.26 2.70 0.00 0.00 4.04 0.00 0.00 6.63 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 OCOO nas t AMA L Hydraflow Table of Contents Sw LJ P-'-\ 4 ^Js Stormwater Routing - wetlands.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Watershed Model Schematic ...................................................................................... 1 Hydrograph Return Period Recap .............................................................................. 2 1 - Year Summary Report ....................................................................................................................... 3 Hydrograph Reports ................................................................................................................. 4 Hydrograph No. 1, SCS Runoff, Predevelopment @ Point A ................................................. 4 Hydrograph No. 2, SCS Runoff, Postdevelopment into Pond ................................................ 5 Hydrograph No. 3, Reservoir, Wetlands Pond Routing ......................................................... 6 Pond Report - Wetlands Pond ........................................................................................... 7 Hydrograph No. 4, SCS Runoff, Postdevelopment bypassing Pond ...................................... 8 Hydrograph No. 5, Combine, Postdevelopment @ Point A .................................................... 9 10-Year Summary Report ..................................................................................................................... 10 Hydrograph Reports ............................................................................................................... 11 Hydrograph No. 1, SCS Runoff, Predevelopment @ Point A ............................................... 11 Hydrograph No. 2, SCS Runoff, Postdevelopment into Pond .............................................. 12 Hydrograph No. 3, Reservoir, Wetlands Pond Routing ....................................................... 13 Hydrograph No. 4, SCS Runoff, Postdevelopment bypassing Pond .................................... 14 Hydrograph No. 5, Combine, Postdevelopment @ Point A .................................................. 15 100 - Year Summary Report ..................................................................................................................... 16 Hydrograph Reports ............................................................................................................... 17 Hydrograph No. 1, SCS Runoff, Predevelopment @ Point A ............................................... 17 Hydrograph No. 2, SCS Runoff, Postdevelopment into Pond .............................................. 18 Hydrograph No. 3, Reservoir, Wetlands Pond Routing ....................................................... 19 Hydrograph No. 4, SCS Runoff, Postdevelopment bypassing Pond .................................... 20 Hydrograph No. 5, Combine, Postdevelopment @ Point A .................................................. 21 OF Report ................................................................................................................... 22 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCADO Civil 3D@) 2009 by Autodesk, Inc. v6.066 1 - Predevelopment @ Point A Q 3 - Wetlands Pond Routing Project: Stormwater Routing - wetlands.gpw into Pond ®- Postdevelopment @ Point A Monday, Jan 11, 2010 bypassing Hydrograph Return Period Reqy plowHydrographsExtension for AutoCAD®Civil 3DO2009by Autodesk,Inc. v6.066 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------ 3.426 6.202 ------- ------- 16.41 ------- ------- 39.89 Predevelopment @ Point A 2 SCS Runoff ------ 1.834 2.427 ------- ------- 4.233 ------- ------- 7.631 Postdevelopment into Pond 3 Reservoir 2 0.031 0.036 ------- ------- 1.138 ------- ------- 4.924 Wetlands Pond Routing 4 SCS Runoff ------ 3.199 5.105 ------- ------- 11.87 ------- ------- 26.43 Postdevelopment bypassing Pond 5 Combine 3,4 3.557 5.682 ------- ------- 12.89 ------- ------- 30.91 Postdevelopment @ Point A Proj. file: Stormwater Routing - wetlands.gpw Monday, Jan 11, 2010 Hyd rog ra p h Summary Report Hydraf low Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 3.426 2 724 11,950 ------ ------ ------ Predevelopment @ Point A 2 SCS Runoff 1.834 2 716 3,726 ------ ------ ------ Postdevelopment into Pond 3 Reservoir 0.031 2 1040 3,680 2 10.63 2,597 Wetlands Pond Routing 4 SCS Runoff 3.199 2 724 9,852 ------ ------ ------ Postdevelopment bypassing Pond 5 Combine 3.557 2 724 13,562 3,4 ------ ------ Postdevelopment @ Point A Stormwater Routing - wetlands.gpw Return Period: 1 Year Monday, Jan 11, 2010 Hydrograph Report 4 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Predevelopment @ Point A Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 6.010 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.12 in Storm duration = 24 hrs Monday, Jan 11, 2010 Peak discharge = 3.426 cfs Time to peak = 724 min Hyd. volume = 11,950 cuft Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 15.00 min Distribution = Type II Shape factor = 484 Q (cfs) 4.00 Predevelopment @ Point A Hyd. No. 1 -- 1 Year 3.00 2.00 1.00 Q (cfs) 4.00 3.00 2.00 1.00 0.00 ` i .11 1 1 1 I 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 1 Hydrograph Report 5 Hydraf low Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 2 Postdevelopment into Pond Hydrograph type = SCS Runoff Peak discharge = 1.834 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 3,726 cuft Drainage area = 0.620 ac Curve number = 86* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.360 x 98) + (0.260 x 70)J / 0.620 Q (cfs) 2.00 Postdevelopment into Pond Hyd. No. 2 -- 1 Year 1.00 0.00 0 120 240 - Hyd No. 2 360 480 600 720 840 960 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 Time (min) Hydrograph Report 6 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 3 Wetlands Pond Routing Hydrograph type = Reservoir Peak discharge = 0.031 cfs Storm frequency = 1 yrs Time to peak = 1040 min Time interval = 2 min Hyd. volume = 3,680 cuft Inflow hyd. No. = 2 - Postdevelopment into Pond Max. Elevation = 10.63 ft Reservoir name = Wetlands Pond Max. Storage = 2,597 cuft Storage Indication method used. Q (cfs) 2.00 Wetlands Pond Routing Hyd. No. 3 -- 1 Year 1.00 0.00 ' s 0 480 Hyd No. 3 960 1440 1920 2400 2880 3360 3840 4320 4800 - Hyd No. 2 ® Total storage used = 2,597 cuft Q (cfs) 2.00 1.00 -i- 0.00 5280 Time (min) Pond Report 7 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3138 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Pond No. 1 - Wetlands Pond Pond Data Contours - User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 10.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 10.00 3,781 0 0 1.00 11.00 4,412 4,092 4,092 2.00 12.00 5,828 5,103 9,195 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [I3] [C] [D] Rise (in) = 15.00 1.25 0.00 0.00 Crest Len (ft) = 9.00 Inactive 0.00 0.00 Span (in) = 15.00 1.25 0.00 0.00 Crest El. (ft) = 11.00 5.40 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 10.00 10.00 0.00 0.00 Weir Type = Riser Rect --- --- Length (ft) = 58.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (o) and submergence (s) Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 Stage / Discharge Elev (ft) 12.00 11.80 11.60 11.40 11.20 11.00 10.80 10.60 10.40 10.20 10 00 0.00 1.00 Total 0 2.00 3.00 4.00 5.00 6.00 7.00 Discharge (cfs) Hydrograph Report 8 Hydraf low Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 4 Postdevelopment b ypassing Pond Hydrograph type = SCS Runoff Peak discharge = 3.199 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 9,852 cuft Drainage area = 3.560 ac Curve number = 70* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 15.00 min Total precip. = 3.12 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.060 x 98) + (3.550 x 65)] / 3.560 Q (cfs) 4.00 3.00 2.00 1.00 Postdevelopment bypassing Pond Hyd. No. 4 -- 1 Year Q (cfs) 4.00 3.00 2.00 1.00 0.00 . , i i I I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 4 Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 5 Postdevelopment @ Point A Hydrograph type = Combine Peak discharge = 3.557 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 13,562 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.560 ac Postdevelopment @ Point A Q (cfs) Q (cfs) Hyd. No. 5 -- 1 Year 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 5 - Hyd No. 3 - Hyd No. 4 Time (min) 10 Hyd rog rap h Summary Report Hydraf low Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 16.41 2 722 47,097 ------ ------ ------ Predevelopment @ Point A 2 SCS Runoff 4.233 2 716 8,923 ------ ------ ------ Postdevelopment into Pond 3 Reservoir 1.138 2 724 8,878 2 11.11 4,649 Wetlands Pond Routing 4 SCS Runoff 11.87 2 722 33,456 ------ ------ ------ Postdevelopment bypassing Pond 5 Combine 12.89 2 722 42,363 3,4 ------ ------ Postdevelopment @ Point A Stormwater Routing - wetlands.gpw Return Period: 10 Year Monday, Jan 11, 2010 Hydrograph Report 11 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Predevelopment @ Point A Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 6.010 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.81 in Storm duration = 24 hrs Q (cfs) 18.00 Monday, Jan 11, 2010 Peak discharge = 16.41 cfs Time to peak = 722 min Hyd. volume = 47,097 cuft Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 15.00 min Distribution = Type II Shape factor = 484 Predevelopment @ Point A Hyd. No. 1 -- 10 Year 15.00 12.00 9.00 6.00 3.00 Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0.00 I I i 1 1% i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 1 Time (min) Hydrograph Report 12 Hydraf low Hydrographs Extension for AutoCAD® Civil 3138 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 2 Postdevelopment into Pond Hydrograph type = SCS Runoff Peak discharge = 4.233 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 8,923 cuft Drainage area = 0.620 ac Curve number = 86* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.81 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = ((0.360 x 98) + (0.260 x 70)J / 0.620 Q (cfs) 5.00 Postdevelopment into Pond Hyd. No. 2 -- 10 Year 4.00 3.00 2.00 1.00 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) - Hyd No. 2 13 Hydrograph Report Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 3 Wetlands Pond Routing Hydrograph type = Reservoir Peak discharge = 1.138 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 8,878 cuft Inflow hyd. No. = 2 - Postdevelopment into Pond Max. Elevation = 11.11 ft Reservoir name = Wetlands Pond Max. Storage = 4,649 cuft Storage Indication method used. Q (cfs) 5.00 4.00 3.00 2.00 1.00 Wetlands Pond Routing Hyd. No. 3 -- 10 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 - H d No. 2 Time (min) Hyd No. 3 y ®Total storage used = 4,649 cuft Hydrograph Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Postdevelopment bypassing Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 3.560 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.81 in Storm duration = 24 hrs Composite (Area/CN) = [(1.060 x 98) + (3.550 x 65)] / 3.560 Q (cfs) 12.00 Monday, Jan 11, 2010 Peak discharge = 11.87 cfs Time to peak = 722 min Hyd. volume = 33,456 cuft Curve number = 70* Hydraulic length = 0 ft Time of conc. (Tc) = 15.00 min Distribution = Type II Shape factor = 484 Postdevelopment bypassing Pond Hyd. No. 4 -- 10 Year 10.00 8.00 6.00 4.00 2.00 Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0.00 ' `f I 1 I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 4 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 5 Postdevelopment @ Point A Hydrograph type = Combine Peak discharge = 12.89 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 42,363 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.560 ac Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 Postdevelopment @ Point A Hyd. No. 5 -- 10 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 5 -Hyd No. 3 -Hyd No. 4 16 Hyd rog rap h Summary Report Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 39.89 2 722 111,826 ------ ------ ------ Predevelopment @ Point A 2 SCS Runoff 7.631 2 716 16,729 ------ ------ ------ Postdevelopment into Pond 3 Reservoir 4.924 2 720 16,684 2 11.46 6,380 Wetlands Pond Routing 4 SCS Runoff 26.43 2 722 74,371 ------ ------ ------ Postdevelopment bypassing Pond 5 Combine 30.91 2 722 91,085 3,4 ------ ------ Postdevelopment @ Point A Stormwater Routing - wetlands.gpw Return Period: 100 Year Monday, Jan 11, 2010 Hydrograph Report 17 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 1 Predevelopment @ Point A Hydrograph type = SCS Runoff Peak discharge = 39.89 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 111,826 cuft Drainage area = 6.010 ac Curve number = 65 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 15.00 min Total precip. = 9.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 40.00 30.00 20.00 10.00 Q (cfs) 40.00 30.00 20.00 10.00 0.00 -6.0- 1 i i I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 1 Predevelopment @ Point A Hyd. No. 1 -- 100 Year Hydrograph Report Postdevelopment into Pond Hyd. No. 2 -- 100 Year Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 2 Postdevelopment in to Pond Hydrograph type = SCS Runoff Peak discharge = 7.631 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 16,729 cuft Drainage area = 0.620 ac Curve number = 86* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 9.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) = [(0.360 x 98) + (0.260 x 70)] / 0.620 Q (cfs) 8.00 6.00 4.00 2.00 0.00 18 Q (cfs) 8.00 6.00 4.00 2.00 0 00 0 120 240 360 480 - Hyd No. 2 600 720 840 960 1080 1200 Time (min) Hydrograph Report 19 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 3 Wetlands Pond Routing Hydrograph type = Reservoir Peak discharge = 4.924 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 16,684 cuft Inflow hyd. No. = 2 - Postdevelopment into Pond Max. Elevation = 11.46 ft Reservoir name = Wetlands Pond Max. Storage = 6,380 cuft Storage Indication method used Q (cfs) 8.00 Wetlands Pond Routing Hyd. No. 3 -- 100 Year 6.00 4.00 2.00 Q (cfs) 8.00 6.00 4.00 2.00 0.00 1 1 1 I I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) ?- -Hyd No. 2 ®Total storage used = 6,380 cuft 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 4 Postdevelopment b ypassing Pond Hydrograph type = SCS Runoff Peak discharge = 26.43 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 74,371 cuft Drainage area = 3.560 ac Curve number = 70* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 15.00 min Total precip. = 9.64 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(1.060 x 98) + (3.550 x 65)] / 3.560 Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 Postdevelopment bypassing Pond Hyd. No. 4 -- 100 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ` ' ' i I i I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) -- Hyd No. 4 Hydrograph Report 21 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Hyd. No. 5 Postdevelopment @ Point A Hydrograph type = Combine Peak discharge = 30.91 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 91,085 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 3.560 ac Postdevelopment @ Point A Q (cfs) Q (cfs) Hyd. No. 5 -- 100 Year 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 5 - Hyd No. 3 - Hyd No. 4 Time (min) Hydraflow Rainfall Report 22 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Monday, Jan 11, 2010 Return Period Intensity-Duration-Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 68.9198 12.8000 0.8927 -------- 2 75.2308 12.6000 0.8724 -------- 3 0.0000 0.0000 0.0000 -------- 5 75.8672 12.5000 0.8297 -------- 10 79.6372 12.4000 0.8036 -------- 25 72.0538 11.2000 0.7452 -------- 50 66.3721 10.2000 0.6990 -------- 100 62.0844 9.3000 0.6597 -------- Filename: Winfall.IDF Intensity = B / (Tc + D)^E Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.27 4.23 3.54 3.06 2.69 2.41 2.18 2.00 1.84 1.71 1.60 1.50 2 6.16 4.95 4.16 3.60 3.18 2.85 2.59 2.37 2.19 2.04 1.90 1.79 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 7.06 5.73 4.85 4.22 3.75 3.38 3.08 2.84 2.63 2.45 2.30 2.17 10 8.02 6.55 5.57 4.87 4.34 3.92 3.58 3.31 3.07 2.87 2.70 2.55 25 9.04 7.40 6.32 5.55 4.97 4.51 4.14 3.84 3.58 3.36 3.17 3.00 50 9.91 8.12 6.96 6.13 5.51 5.02 4.63 4.30 4.02 3.79 3.58 3.40 100 10.73 8.81 7.57 6.69 6.03 5.51 5.09 4.74 4.45 4.20 3.98 3.79 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.12 3.79 0.00 0.00 5.81 0.00 0.00 9.64 SCS 6-Hr 2.26 2.70 0.00 0.00 4.04 0.00 0.00 6.63 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00