STATE OF NORTH CAROLINA
DEPARTMENT OF TP ANSPORTATION
JAMES B. HUNT, JR. DIVISION OF HIGHWAYS R. SAMUEL HUNT III
GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 SECRETARY
MEMORANDUM TO:
FROM:
SUBJECT:
March 18, 1994
Mr. Eric Galamb
DEM - DEHNR, 6th Floor
H. Franklin Vick, P. E., Manager
Planning and Environmental Branch
MAR 2 1 1994
VMTER
Cancellation of Scoping Meeting for Chatham Connector,
From US 15-501 in Chatham County to NC 54 in Durham
County, State Project No. 6.804789, TIP No. R-2924
This is to inform you that the previously scheduled April 7, 1994
Scoping meeting for the above referenced project has been cancelled. This
project is now designated as a Division Design Construction Project to be
handled by Division 8. Please make note of this change and discontinue all
work on this project, unless notified otherwise.
If you have any questions or need additional information regarding this
project or the cancellation of the previously scheduled scoping meeting,
please contact Clarence Coleman, Project Planning Engineer, at 733-7842.
CC/plr n?
vem?'Jy .
n??
lax
CHATHAM - DURHAM COUNTIES
T. I. P. NO. R - 2924
CHATHAM CONNECTOR, FROM US 15-501
IN CHATHAM CO. TO NC 54 IN DURHAM CO.
INTERSECTION AND SAFETY IMPROVEMENTS
?a.w AATF
STATE OF NORTH CAROLINA
DEPARTMENT OF TP ANSPORTATION
JAMES B. HUNT, JR. DIVISION OF HIGHWAYS
GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201
March 4, 1994
? ? 919A?
DS 0r7L;?F'
LITY SEC,;
R. SAMUEL HUNT Ill
SECRETARY
MEMORANDUM TO: Mr. Eric Galamb
DEM - DEHNR, 6th Floor
FROM: H. Franklin Vick, P. E., Manager
Planning and Environmental Branch
SUBJECT: Review of Scoping Sheet for Chatham Connector,
US 15-501 in Chatham County to NC 54 in Durham County,
State Project No. 6.804789, R-2924
Attached for your review and comments are the scoping sheets for the
subject project (See attached map for project location). The purpose of
these sheets and the related review procedure is to have an early "meeting
of the minds" as to the scope of work that should be performed and thereby
enable us to better implement the project. A scoping meeting for this
project is scheduled for April 7, 1994, at 10:00 A. M. in the Planning and
Environmental Branch Conference Room (Room 434). You may provide us with
your comments at the meeting or mail them to us prior to that date.
Thank you for your assistance in this part of our planning process.
If there are any questions about the meeting or the scoping sheets, please
call Clarence Coleman, Project Planning Engineer, at 733-7842.
CC/plr
Attachment nil G 5 G b - `f - - 2- C2?
idL ? .
6 iP ud
01*
Ir s-e---, ?5,-? l6.4,, 2 -10 -( os) close, i
tkV
16 -?
X
iurF?
Ix) 5
J16 7
NSti?
ws
V?5-,IV nosh `(o-r)
16J L 4--t-
lax
PROJECT SCOPING SHEET
Date December 8, 1993
Revision Date
Project Development Stage
Programming
Planning FY 94-95
Design FY 96
TIP # R-2924
Project # 6.804789
F.A. Project # N/A
Division 8 and 5
County Chatham and Durham
Route Chatham Connector, SR 1717, SR 1008, SR 1726, SR 1109,
and SR 1110, From US 15-501 to NC 54
Functional Classification N/A
Length 10.8 miles
Purpose of Project: To improve intersections and safety
Description of project (including specific limits) and major
elements of work: The proposed project is to improve
intersection and alignment safety along the secondary roads that
formulate the Chatham Connector between US 15-501 in Chatham
County and NC 54 in Durham County.
Type of environmental document to be prepared: This project is a
state funded project and is to be prepared as a State
Environmental Assessment (EA).
Environmental Study Schedule:
State Environmental Assessment - September 94 completion
State Finding Of No Significant Impact - February 95 completion
Type of funding:
State funded
Will there be special funding participation by municipality,
developers, or other? Yes No
If yes, by whom and amount: ($) or (%
How and when will this be paid?
Page 1
PROJECT SCOPING SHEET
Type of Facility:
Type of Access Control: Full Partial None X
Type of Roadway: Two-lane shoulder section
Interchanges Grade Separations 3 Stream Crossings 5
Typical Section of Roadway: Two-lane, 24-foot roadway with 8-
foot usable shoulers (including 2-foot paved shoulders).
Traffic: Current Design Year
a Trucks
Design Standards Applicable: AASHTO X 3R
Design Speed: 60 MPH
Preliminary Resurfacing Design:
Preliminary Pavement Design:
Current cost Estimate:
T
Construction Cost (including engineering
and contingencies). . . . . . . . . .
Right of Way Cost (including rel., util.,
and acquisition) . . . . . . . . . . . . .
Force Account Items. . . . . . . . . . . .
Preliminary Engineering. . . . . . . . . . .
Total Cost . . . . . . . . . . . . . . . .
TIP Cost Estimate:
Construction . . . . . . . . . . . . .
Right of Way . . . . . . . . . . . . . . . .
Total Cost . . . . . . . . . . . . . . . . .
$
$
$
Page 2
PROJECT SCOPING SHEET
List any special features, such as railroad involvement, which
could affect cost or schedule of project:
ITEMS REQUIRED ( X ) COMMENTS COST
Estimated Costs of Improvements:
Pavement
Surface . . . . . . . . . . . . . . . . $
Base. . . . . . . . . . . . . . . . . . $
Milling & Recycling . . . . . . . . . $
Turnouts . . . . . . .. . . . . . . . . . $
Shoulders: Paved. . . . . . . . . . . . $
Earth . . . . . . . . . . . . $
Earthwork . . . . . . . . . . . . . ... . . $
Subsurface Items: . . . . . . . . . . . . . $
Subgrade and Stabilization. . . . . . . . . $
Drainage (List any special items) . . . . . $
Sub-Drainage . . . . . . . . . . . . . . . . $
Structures: Width x Length
Bridge Rehabilitation x $
New Bridge x $
Widen Bridge x $
Remove Bridge. x $
New Culverts: Size Length $
Fill Ht.
Culvert Extension . . . . . . . . . . . . $
Retaining Walls: Type Ave. Ht. $
Skew
Noise Walls . . . . . . . . . . . . . $
Any Other Misc. Structures. . . . . .-. $
Concrete Curb & Gutter. . . . . . . . . . . $
Concrete Sidewalk . . . . . . . . . . . . . $
Guardrail . . . . . . . . . . . . . . . . . $
Fencing: W.W. and/or C.L. $
Erosion Control . . . . . . . . . . . . $
Landscape . . . . . . . . . . . . . . . . . $
Lighting. $
Traffic Control . . . . . . . . . . . . . . $
Signing: New . . . . . . . . . . . . . . $
Upgrading . . . . . . . . . . . $
Traffic Signals: New . . . . . . . . . $
Revised . . . . . . . $
RR Signals: New . $
Revised . . . . . . . . . . $
With or Without Arms. . . . $
If 3R: Drainage Safety Enhancement. . . $
Roadside Safety Enhancement. . . $
Realignment for Safety Upgrade $
Pavement Markings: Paint Thermo $
Markers
Page 3
PROJECT SCOPING SHEET
Delineators . $
Other clearing,grubbing,mobilization,misc.. $
CONTRACT COST (Subtotal): $
Contingencies & Engineering . . . . . . . . . . $
PE Costs . . . . . . . . . . . . . . . . . . . . $
Force Account . . . . . . . . . . . . . . . . $
Subtotal: $
Right of Way:
Will Contain within Exist Right of Way: Yes No
Existing Right of Way Width:
New Right of Way Needed: Width Est. Cost $
Easements: Type Width Est. Cost $
Utilities: $
Right of Way Subtotal: $
Total Estimated Cost $
(Includes R/W)
Prepared By: C. W. Coleman CLO-<--- Date: December 8, 1993
The above scoping has been reviewed and approved* by:
INIT. DATE
Highway Design
Roadway
Structure
Design Services
Geotechnical
Hydraulics
Loc. & Surveys
Photogrammetry
Prel. Est. Engr.
Planning & Environ.
Right of Way
R/W Utilities
Traffic Engineering
Project Management
County Manager
City/Municipality
others
INIT. DATE
Board of Tran. Member
Mgr. Program & Policy
Chief Engineer-Precon
Chief Engineer-Oper
Secondary Road`s off.
Construction Branch
Roadside Environmental.
Maintenance Branch
Bridge Maintenance
Statewide Planning
Division Engineer
Bicycle Coordinator
Program Development
FHWA
Dept. of Cult. Res.
Dept. of EH & NR
Scope Sheet for local officials will be sent to Division
Engineer for handling.
Comments or Remarks:
*If you are not in agreement with proposed project or scoping,
note your proposed revisions in Comments or Remarks Section and
initial and date after comments.
Page 4
i
1
' Baha a
501
t
S 16
A I
110 1
e c
Oak
O
1700
(?nerersuv'ry {j. fN.c ydyGo • a
L
- _ ake f"-1
501 Jis_Z
Crutchfield K-rds
9 ilk Hope 87 FarrinQt 25 r/(
421 Jordan lake ?..
S'
By m d 2
t 1 ll
11
1 * SI cPittsb r du
C + d .
t Vernon S 1 A Bo al
12 IS er
Boole
I?Re nes 1 501 I t6
1 Cree 0
1 - 1 i oo
Goldsto 1
Bennett Cum we
0 Gul
12 II Carb nton
383 r ^' 751
1110
FAI
'
s a t+:y ';.
? rGi::.•.:;;..;:.:i: .
a
A , Ilia
r bands PARKW
1• >5 (UN' 1
'E POP.'
s Ci$
4if
Io r 'c B. EV ETT
' o JORDAN LAKE
501 ® _ --- - -
r y
so Creal` 1Z3L . KIy
v C
\? 171! o
1711 ?
Jb ?
G ??lgQ ?? a 37 v
S
D- IMS'3 i7J4
M 1
171* r b ` ?.f s?? \
Lyslea Ch 1781 ?. 1008
Mt. ran _ ?. a New Hops
r 17.191f? ??B 9 .?? \ 751 4„sr 1730 .? ]IL
NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION
DIVISION OF HIGHWAYS
PLANNING AND ENVIRONMENTAL
BRANCH
CHATHAM CONNECTOR, FROM US 15-501
IN CHATHAM CO. TO NC 54 IN DURHAM CO.
INTERSECTION AND SAFETY IMPROVEMENTS
CHATHAM - DURHAM COUNTIES
T. I. P. NO. R - 2924
FIG. 1
NORTH CAROLINA
7.5 MINUTE SERIES (TOPOGRAPHIC) `yo
5 I NE
EL OILL) 676ICh'APE! HILL 25 ?1r\ 2'30" 677 11990000 FEET 1679 680---r 791 091 2 30..
D ? 5 ,_ _
?o DD
u ? ? / 1?-??< IJ I ?30
0
log
7 ?? 1?
? • 11 O ?`? ?. ??? ` .. 1..! 250, I, 3971
o - ,$ 1) • ®__ - 29° _l o ?? ?. ?i 770000
FEET
O \ \ l {\ I. \ / i ( ?\ ) 3970
1 5?-0 t;D.
? • _ o h Do D , f ..
13,
ttII ?lr B . tI. ?. ° 1, 3969
r x ? Q ? .?t ?>_? ? ' 1 ?? III 5•.-'
1721
c_j
13968
11 ? T I ?k _?? ??
I I I? I '
?'? lr O ?"?• O ry./?-` ?\?;?`"'S I -.266 r?-
to)
n \ \ \ /
50
- i/r -- ???%.?,-'J//? •)? ??% U i?- '? ?r, ( , c ?. \.l ` ?nl,,. ? ? ?' ?- C??' , _ P. f!'`?? J\• :.1 5 39 7
Z I../.'
? ?-??D "?,J ? N?. _7 ? ?? , • . r' I JN? it \
D o° o - ? / / 2h za °
•
TZ
66
I ( , _I D ,` _ ?, I
17,
e ;
J
•
L11 I
? -; '• ? 250 4/ - -? j ?' `so? ? • ?. ? ? ??._
/ u. b •?\ D \? •I 2h / 13 1? 3964
Pr K? 4? D 0 h >?\ \ i i C u i? 200
•D ?
0
0 5963
U
350c? L\ ?. 0
S 22- o. - 0 47'30'
I, VK
O --' ,•;?/ ,.?J;? . 2i// . ? .l ? ?_ _ ??G ,1]52.1
Il