HomeMy WebLinkAboutR-2905Channel Mitigation Monitoring Sheets I, II, III, AND IV
Monitoring Data Record
Project Title: R-2905 (NC 55 / US 1) COE Action ID: 200221216
Stream Name: DWQ Number:
City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County
Date Construction Completed: Monitoring Year: (1) of 5
Ecoregion: 8 digit HUC unit
USGS Quad Name and Coordinates:
Rosgen Classification:
Length of Project: _ Urban or Rural: Urban Watershed Size:
Monitoring DATA collected by: K. Smith, M. Green Date: 3/4/04
Applicant Information:
Name: NCDOT Roadside Environmental Unit
Address: 1 South Wilmington St. Raleigh, NC 27611
Telephone Number: (919) 733-2920 Email address:
Consultant Information:
Name:
Address:
Telephone Number:
Email address:
Project Status: Complete
Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level .1 2 3
Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3
Section 1. PHOTO REFERENCE SITES
(Monitoring at all levels must complete this section)
Attach site map showing the location and angle of all reference photos with a site
designation (name,
number, letter, etc.) assigned to each reference photo location. Photos should be provided for all
structures and cross section locations, should show both banks and include an upstream and
downstream view. Photos taken to document physical stability should be taken in winter. Photos
taken to document vegetation should be taken in summer (at representative locations). Attach
photos and a description of each reference photo or location. We recommend the use of a photo
identification board in each photo to identify location.
Total number of reference photo locations at this site: 3
Dates reference photos have been taken at this site: 3/4/04
Individual from whom additional photos can be obtained (name, address, phone):
Other Information relative to site photo reference:
If required to complete Level 3 monitoring only stop here; otherwise, complete section 2.
1
Section 2. PLANT SURVIVAL
Attach plan sheet indicating reference photos.
Identify specific problem areas (missing, stressed, damaged or dead plantings):
None at time of monitoring, plants dormant.
Estimated causes, and proposed/required remedial action:
N/A
ADDITIONAL COMMENTS: ls` Quarter Monitoring
At planting: 102 Black Willow
102 Silky Dogwood
9 Sweetgum
8 Black Cherry
If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3.
Section 3. CHANNEL STABILITY
Visual Inspection: The entire stream project as well as each in-stream structure and bank
stabilization/revetment structure must be evaluated and problems addressed.
Report on the visual inspection of channel stability. Physical measurements of channel
stabili /morphology will not be required. Include a discussion of any deviations from as-built
and an evaluation of the significance of these deviations and whether they are indicative of a
stabilizing or destabilizing situation.
No problems or concerns. Site appears to be doing very well at the time of 151 Quarter monitoring.
Date Station Station Station Station Station
Inspected Number Number Number Number Number
Structure
Type
Is water
piping
through or
around
structure?
Head cut or
down cut
resent?
Bank or scour
erosion
resent?
Other
problems
noted?
NOTE: Attach separate narrative sheets to each monitoring report describing/discussing
the overall monitoring results. Include the identification of specific problem
areas/channel failures, estimated cause and proposed/required remedial action. This
should include a brief discussion of any parameter that has changed significantly from as-
built.
US 1 On Ramp
} :t rti
Photo 1
fig
1 1
Photo 3
1" Quarter 2004
h? L?? 1 ..r f ;.J s{!
4
Photo 2
Channel Mitigation Monitoring Sheets I, II, III, AND IV
Monitoring Data Record
Project Title: R-2905 (NC 55 / US 1) COE Action ID: 199920326
Stream Name: DWQ Number:
City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County
Date Construction Completed: May 2004 Monitoring Year: (1) of 1
Ecoregion: 8 digit HUC unit
USGS Quad Name and Coordinates:
Rosgen Classification:
Length of Project: _ Urban or Rural: Urban Watershed Size:
Monitoring DATA collected by: K. Smith, M. Green Date: 6/8/04
Applicant Information:
Name: NCDOT Roadside Environmental Unit
Address: 1425 Rock Quarry Road, Raleigh NC 27610
Telephone Number: (919) 861-3779 Email address: jelliott(a,dot.state.nc.us
Consultant Information:
Name: N/A
Address:
Telephone Number: Email address:
Project Status: Complete
Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 2 -3
Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3
Section 1. PHOTO REFERENCE SITES
(Monitoring at all levels must complete this section)
Attach site map showing the location and angle of all reference photos with a site
designation (name,
number, letter, etc.) assigned to each reference photo location. Photos should be provided for all
structures and cross section locations, should show both banks and include an upstream and
downstream view. Photos taken to document physical stability should be taken in winter. Photos
taken to document vegetation should be taken in summer (at representative locations). Attach
photos and a description of each reference photo or location. We recommend the use of a photo
identification board in each photo to identify location.
Total number of reference photo locations at this site: 3
Dates reference photos have been taken at this site: 3/4/04, 6/8/04
Individual from whom additional photos can be obtained (name, address, phone):
Jason Elliott (919)861-3779
Other Information relative to site photo reference:
If required to complete Level 3 monitoring only stop here; otherwise, complete section 2.
Section 2. PLANT SURVIVAL
Attach plan sheet indicating reference photos.
Identify specific problem areas (missing, stressed, damaged or dead plantings):
No problems at this time.
Estimated causes, and proposed/required remedial action:
N/A
ADDITIONAL COMMENTS: 2nd Quarter Monitorine. Trees are doing well at this time. Trees are 2-
3 feet in height. NCDOT recommends to continue monitoring at this time.
If required to complete Level I and Level 2 monitoring only stop here; otherwise, complete section 3.
Section 3. CHANNEL STABILITY
Visual Inspection: The entire stream project as well as each in-stream structure and bank
stabilization/revetment structure must be evaluated and problems addressed.
Report on the visual inspection of channel stability. Physical measurements of channel
stabili /morphology will not be required. Include a discussion of any deviations from as-built
and an evaluation of the significance of these deviations and whether they are indicative of a
stabilizing or destabilizing situation.
No problems or concerns. Site appears to be doing vea well at the time of 2"d Quarter monitoring.
Date Station Station Station Station Station
Inspected Number Number Number Number Number
Structure
Type
Is water
piping
through or
around
structure?
Head cut or
down cut
resent?
Bank or scour
erosion
resent?
Other
problems
noted?
NOTE: Attach separate narrative sheets to each monitoring report describing/discussing
the overall monitoring results. Include the identification of specific problem
areas/channel failures, estimated cause and proposed/required remedial action. This
should include a brief discussion of any parameter that has changed significantly from as-
built.
US 1 On Ramp
2"a Quarter 2004
Photo 1
Photo 3
Photo 2
4
Channel Mitigation Monitoring Sheets I, II, III, AND IV
Monitoring Data Record
Project Title: R-2905 (NC 55 / US 1) COE Action ID: 199920326
Stream Name: DWQ Number:
City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County
Date Construction Completed: ME 2004 Monitoring Year: (1) of 1
Ecoregion: 8 digit HUC unit
USGS Quad Name and Coordinates: _
Rosgen Classification:
Length of Project: _ Urban or Rural:
Monitoring DATA collected by: M. Gri
Applicant Information:
Urban Watershed Size:
en, J.Wait Date: 10/20/04
Name: NCDOT Roadside Environmental Unit
Address: 1425 Rock Quarry Road, Raleigxh NC 27610
Telephone Number: (919) 861-3772 Email address: ml rg een(a-)dot.state.nc.us
Consultant Information:
Name: N/A
Address:
Telephone Number: Email address:
Project Status: Complete
Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 -2 -3
Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3
Section 1. PHOTO REFERENCE SITES
(Monitoring at all levels must complete this section)
Attach site map showing the location and angle of all reference photos with a site
designation (name,
number, letter, etc.) assigned to each reference photo location. Photos should be provided for all
structures and cross section locations, should show both banks and include an upstream and
downstream view. Photos taken to document physical stability should be taken in winter. Photos
taken to document vegetation should be taken in summer (at representative locations). Attach
photos and a description of each reference photo or location. We recommend the use of a photo
identification board in each photo to identify location.
Total number of reference photo locations at this site: 3
Dates reference photos have been taken at this site: 3/4/04, 6/8/04, 10/20/04
Individual from whom additional photos can be obtained (name, address, phone):
Matthew Green (919) 861-3772
Other Information relative to site photo reference:
If required to complete Level 3 monitoring only stop here; otherwise, complete section 2.
Section 2. PLANT SURVIVAL
Attach plan sheet indicating reference photos.
Identify specific problem areas (missing, stressed, damaged or dead plantings):
No problems at this time.
Estimated causes, and proposed/required remedial action:
N/A
ADDITIONAL COMMENTS: Continue monitoring.
If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3.
Section 3. CHANNEL STABILITY
Visual Inspection: The entire stream project as well as each in-stream structure and bank
stabilization/revetment structure must be evaluated and problems addressed.
Report on the visual inspection of channel stability. Physical measurements of channel
stabili . /morphology will not be required. Include a discussion of any deviations from as-built
and an evaluation of the significance of these deviations and whether they are indicative of a
stabilizing or destabilizing situation.
No problems or concems. Site appears to be doing very well at the time of 3rd Quarter monitoring.
Streambank highly vegetated with black willow, iuncus sp., fennel. Wax myrtle, lespedeza, and dogwood.
Date Station Station Station Station Station
Inspected Number Number Number Number Number
Structure
Type
Is water
piping
through or
around
structure?
Head cut or
down cut
resent?
Bank or scour
erosion
resent?
Other
problems
noted?
NOTE: Attach separate narrative sheets to each monitoring report describing/discussing
the overall monitoring results. Include the identification of specific problem
areas/channel failures, estimated cause and proposed/required remedial action. This
should include a brief discussion of any parameter that has changed significantly from as-
built.
US 1 On Ramp
3`d Quarter 2004
Photo 1
Photo 3
Photo 2
Channel Mitigation Monitoring Sheets I, II, III, AND IV
Monitoring Data Record
Project Title: R-2905 (NC 55 / US 1) COE Action ID: 199920326
Stream Name: DWQ Number:
City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County
Date Construction Completed: May 2004 Monitoring Year: ( 1 ) of 1
Ecoregion: 8 digit HUC unit
USGS Quad Name and Coordinates:
Rosgen Classification:
Length of Project: Urban or Rural: Urban Watershed Size:
Monitoring DATA collected by: M. Green, D. Jenkins Date: 1/21/05
Applicant Information:
Name: NCDOT Roadside Environmental Unit
Address: 1425 Rock Quarry Rd. Raleigh, NC 27610
Telephone Number: (919) 861-3772 Email address: migreen(a)dot.statemc.us
Consultant Information:
Name: N/A
Telephone Number: Email address:
Project Status: Complete
Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 0 -2 -3
Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3
Section 1. PHOTO REFERENCE SITES
(Monitoring at all levels must complete this section)
Attach site map showing the location and angle of all reference photos with a site
designation (name,
number, letter, etc.) assigned to each reference photo location. Photos should be provided for all
structures and cross section locations, should show both banks and include an upstream and
downstream view. Photos taken to document physical stability should be taken in winter. Photos
taken to document vegetation should be taken in summer (at representative locations). Attach
photos and a description of each reference photo or location. We recommend the use of a photo
identification board in each photo to identify location.
Total number of reference photo locations at this site: 3
Dates reference photos have been taken at this site: 3/4/04, 6/8/04, 10/20/04, 1/21/05
Individual from whom additional photos can be obtained (name, address, phone):
Other Information relative to site photo reference:
If required to complete Level 3 monitoring only stop here; otherwise, complete section 2.
Section 2. PLANT SURVIVAL
Attach plan sheet indicating reference photos.
Identify specific problem areas (missing, stressed, damaged or dead plantings):
Streambank vegetation is dormant at this time.
Estimated causes, and proposed/required remedial action:
ADDITIONAL COMMENTS: NCDOT has completed one year of quarterly monitoring and is requesting to
close out visual inspection of vegetation at this site.
If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3.
Section 3. CHANNEL STABILITY
Visual Inspection: The entire stream project as well as each in-stream structure and bank
stabilization/revetment structure must be evaluated and problems addressed.
Report on the visual inspection of channel stability. Physical measurements of channel
stability/morphology will not be required. Include a discussion of any deviations from as-built
and an evaluation of the significance of these deviations and whether they are indicative of a
stabilizing or destabilizing situation.
Bankfull event has occurred. NCDOT has completed one year of quarterly monitoring and is requesting to close out
visual inspection of channel stability at this site.
Date Station Station Station Station Station
Inspected Number Number Number Number Number
Structure
Type
Is water
piping
through or
around
structure?
Head cut or
down cut
resent?
Bank or scour
erosion
present?
Other
problems
noted?
NOTE: Attach separate narrative sheets to each monitoring report describing/discussing the
overall monitoring results. Include the identification of specific problem areas/channel failures,
estimated cause and proposed/required remedial action. This should include a brief discussion of
any parameter that has changed significantly from as-built.
R-2905
4 th Quarter
Photo 1
Photo 3
Photo 2
N. C. DEPARTMENT" OF TRANSPORTATION
DATE
TRANSMITTAL SLIP
OM, BLDG.
? NOTE AND FIL
? NOTE AND RETURN TO. ME ? PER YOUR REQUEST
? RETURN WITH MORE DETAILS -.? FORf YOUR APPROVAL
? NOTE AND SEE ME ABOUT THIS ? FOR YOUR INFORMATION
? PLEASE ANSWER ? FOR YOUR COMMENTS
? PREPARE REPLY FOR My .S GNATURE ? SIGNATURE
? TAKE APPROPRIATE ACT N ? INVESTIGATE AND REPORT
COMMENTS-
RECEIVED
PEAR 0 21995
ENVIRONMENTAL SCIENCES
DRAFT
Channel Mitigation Monitoring Sheets I, II, III, AND IV
Monitoring Data Record
Project Title: R-2905 (NC 55 / US 1) COE Action ID: 200221216
Stream Name: DWQ Number:
City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County
Date Construction Completed: Monitoring Year: (1) of 5
Ecoregion: 8 digit HUC unit
USGS Quad Name and Coordinates:
Rosgen Classification:
Length of Project: Urban or Rural: Urban Watershed Size:
Monitoring DATA collected by: K. Smith, M. Green Date: 3/4/04
Applicant Information:
Name: NCDOT Roadside Environmental Unit
Address: 1 South Wilmington St. Raleigh, NC 27611
Telephone Number: (919) 733-2920 Email address:
Consultant Information:
Name: _
Address:
Telephone Number: Email address:
Project Status: Complete
Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 -2 3
Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3
Section 1. PHOTO REFERENCE SITES
(Monitoring at all levels must complete this section)
Attach site map showing the location and angle of all reference photos with a site
designation (name,
number, letter, etc.) assigned to each reference photo location. Photos should be provided for all
structures and cross section locations, should show both banks and include an upstream and
downstream view. Photos taken to document physical stability should be taken in winter. Photos
taken to document vegetation should be taken in summer (at representative locations). Attach
photos and a description of each reference photo or location. We recommend the use of a photo
identification board in each photo to identify location.
Total number of reference photo locations at this site: 3
Dates reference photos have been taken at this site: 3/4/04
Individual from whom additional photos can be obtained (name, address, phone):
Other Information relative to site photo reference:
If required to complete Level 3 monitoring only stop here; otherwise, complete section 2.
DRAFT
DRAFT
Section 2. PLANT SURVIVAL
Attach plan sheet indicating reference photos.
Identify specific problem areas (missing, stressed, damaged or dead plantings):
None at time of monitoring, plants dormant.
Estimated causes, and proposed/required remedial action:
N/A
ADDITIONAL COMMENTS: ls` Quarter Monitoring
At planting: 102 Black Willow
102 Silky Dogwood
8 Black Cherry
If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3.
DRAFT
DRAFT
Section 3. CHANNEL STABILITY
Visual Inspection: The entire stream project as well as each in-stream structure and bank
stabilization/revetment structure must be evaluated and problems addressed.
Report on the visual inspection of channel stability. Physical measurements of channel
stability/morphology will not be required. Include a discussion of any deviations from as-built
and an evaluation of the significance of these deviations and whether they are indicative of a
stabilizing or destabilizing situation.
No problems or concerns. Site appears to be doing very well at the time of 1" Quarter monitoring,.
Date Station Station Station Station Station
Inspected Number Number Number Number Number
Structure
Type
Is water
piping
through or
around
structure?
Head cut or
down cut
resent?
Bank or scour
erosion
resent?
Other
problems
noted?
NOTE: Attach separate narrative sheets to each monitoring report describing/discussing
the overall monitoring results. Include the identification of specific problem
areas/channel failures, estimated cause and proposed/required remedial action. This
should include a brief discussion of any parameter that has changed significantly from as-
built.
DRAFT
US 1 On Ramp
Photo 1
Photo 3
Photo 2
2004
v.a
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT, JR. DIVISION OF HIGHWAYS R. SAMUEL HUNT III
GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 SECRETARY
February 27, 1995
MEMORANDUM TO: Mr. Eric Galamb
DEM - DEHNR, 6th Floor
FROM: H. Franklin Vick, P. E., Manager
Planning and Environmental Branch 524? & a2,
SUBJECT: Review of Scoping Sheets for NC 55, From Proposed Holly
Springs Bypass to North of US 1, Wake County, Federal
Aid Project No. MA-55(4), State Project No. 8.1403301,
TIP No. R-2905
Attached for your review and comments are the scoping sheets for the
subject project (See attached map for project location). The purpose of
these sheets and the related review procedure is to have an early "meeting
of the minds" as to the scope of work that should be performed and thereby b 7
enable us to better implement the project. A scoping meeting for this
project is scheduled for Thursday, March 30, 1995 at 10:00 A. M. in the
Planning and Environmental Branch Conference Room (Room 434). You may
provide us with your comments at the meeting or mail them to us prior to
that date. fi,
Thank you for your assistance in this part of our planning process. 1 64 `S
If there are any questions about the meeting or the scoping sheets, please
call Missy Dickens, Project 0P nving Engineer, at 733-7842.
MAD/plr riVe 1 3 (" /J'S
Z? 3-I
Attachment M I t ck ti S LJ Z- 3 t C ?,
q
RE
PROJECT SLOPING SHEET
Date 2-21-95
Revision Date
Project Development Stage
Programming
Planning x
Design
TIP R-2905
State Project # 8.1403301
F.A. Project # MA-55(4)
Division 5
County Wake
Route(s) NC 55
Functional Classification Urban Minor Arterial
Length 2.6 km (1.6 miles)
Purpose of Project To improve capacity and safety along existing facility.
Description of Project (including specific limits) and major elements of work: NC 55.
Wake County. from proposed Holly Sprinas bypass to North of US 1. Widen to 5-lane
facility and widen or possibly replace Bridge No. 71 over. US 1.
Type of environmental document to be prepared: EA
Environmental Study Schedule: EA - End April, 1996
FONSI - Begin July 1996, End November 1996
Will there be special funding participation by municipality, developers, or other8
• -.Yes No X
If yes, by whom and amount: ($) , or (%)
How and when will this be paidq
PROJECT SCOPING SHEET
Type of Access Control: Fuli Partial None X
Number of Interchanges 1 Grade Separations
Stream Crossings None
Typical Section: Existing (1) 2-lane, 6.6 m (22-ft.) pavement including 0 to 0.6-m (0 to
2-ft.) paved shoulders and 1.8 to 2.4 m (6 to 8-ft.) grassed
shoulders.
(2) At US 1 interchange: 3-lane, 11.3 m (37-ft.) pavement
including 1.2 to 1.5-m (4 to 5-ft.) paved shoulders.
(3) Bridge: 28-ft. clear roadway width.
Proposed (1) 5-lane shoulder section; 18-m (60-ft.) travelway
Traffic (ADT): Current 14.500* Design Year 26,100* %TTST %Duals
* More accurate traffic data to be provided at scoping meeting.
Design Standards Applicable: AASHTO X 3R
Design Speed: 80-90 km/h (50-60 mgh)
Current Cost Estimate:
Construction Cost (including engineering and contingencies ....... $
Right of Way (including relocation, utilities, and acquisition) ........ $
Force Account Items ........................................................................... $
Preliminary Engineering ...................................................................... $
TOTAL PLANNING COST ESTIMATE ..................................................... $
TIP Cost Estimate:
Construction ...................................................................... $ 3,250,000
-
Right of Way ........................................................................................ $ 740,000
TOTAL TIP COST ESTIMATE ........................................................ $ 3,990,000
PROJECT SCOPING SHEET
List any special features, such as railroad involvement, which could affect cost or
schedule of project:
ITEMS REQUIRED (X) COMMENTS COST
Estimated Costs of Improvements:
Pavement
Surface ............................................................................... $
-Base .................................................................................... $
Milling & Recycling ........................................................... $
Tumouts .............................................................................. $
Shoulders
?Paved ................................................................................. $
_-Earthen ...............................................................................
Earthwork .....................................................................................
Subsurface Items ......................................................................... $
-Subgrade and Stabilization ........................................................ $
--Drainage (list any special items) ............................................... $
Sub-Drainage ...............................................................................
Structures
Bridge Rehab ..................................................................... $
New Bridge ........................................................................ $
Remove Bridge ................................................................. $.
New Culvert ....................................................................... $-
Culvert Extension ............................................................... $.
_ Retaining Walls .................................................................. $
Ki^ise Walls .........................................................................
Other MIX ......................................................................... $
Concrete Curb & Gutter ........................................................... $---
Concrete Sidewalk ..................................................................... ?-
-Guardrail ..................................................................................... $
Fencing
W.W .................................................................................... $
C.L ......................................................................................
Erosion Control ............................................................................
Landscaping ............................................................................... $
-Lighting ........................................................................................
Traffic Control ............................................................................. $
- -Signing.
New .............................. ..................................................... $
Upgraded ......................................................................
Traffic Signals
New .............. .................................................................
-Revised ..............................................................................
RR Signals
New ................................................................................... $
Revised .............................................................................
-With/without Arms ...........................................................
PROJECT SCOPING SHEET
ITEMS REQUIRED N COMMENTS COST
_if 3R
_ Drainage Safety Enhancement ..................................................... $
-Roadside Safety Enhancement ..................................................... $
-Realignment for Safety Upgrade ..................................................
_-Pavement Markings
-Paint .................................................................................................
- Thermoplastic ................................................................................. $
-Raised Pavement Markers ............................................................ ?i
_.?elineators ................................................................................................
Other (clearing, grubbing, misc., and mob.) ....................................... $
CONTRACT COST Subtotal .............................................. $
Engineering & Contingencies ........................................................................... $
PE Costs ...............................................................................................................
Force Account ....................................................:............. ......................:...
Subtotal ............................................... ?.
Right-of-Way
Will contain within existing R/W? Yes No
Existing Width
New R/W needed Estimated Cost ..........................
Easements: Type Width
Estimated Cost ..........................
Utilities ........................................................................................................
Right-of-Way Subtotal ..................................................................... S
Total Estimated Cost .......................... $
Prepared by: Date
The above scoping has been reviewed and approved by:
Init. Date
Highway Design
Roadway
Structure
Design Services
Geotechnical
Hydraulics
Loc. & Surveys
Photogrommetry
Prel. Est. Engr.
Ping & Environ.
inj Date
B.O.T. Member,
Mgr Program & Policy
Chief Engineer- Precon
Chief Engineer- Op
Sec Roads Officer
Construction Branch
Roadside Environ. ---
Maintenance Branch
Bridge Maintenance
Statewide Planning
}
Ini Date 10 Date
Right of Way Division Engineer
R/W Utilities Biciycle Coordinator
Traffic Engr. Program Development
Project Management FHWA
County Manager Dept. of Cult. Res.
City/ Municipality DEHNR
(Scoping Sheet for local officials will be sent to Division Engineering.)
*If you are not in agreement with proposed project or scoping, note your proposed
revisions or comments here:
-a.0ma .Nm ¦s
• shill
.., y Kr
Ro
Lake_ Z Garne
AuDwr?
e / Jf _
iillowsafings
? V?
c,. uT- fi?
~
-0
DIVISION OF HIGHWAYS
PLANNING AND ENVIRONMENTAL
a?n+ BRANCH
NC 55
FROM PROPOSED HOLLY SPRINGS BYPASS
TO NORTH OF US 1
WAKE COUNTY
T. I. H. PROJECT NO. R - 2905
?° w n ?
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. DIVISION OF HIGHWAYS
GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201
R. SAMUEL HUNT III
SECRETARY
May 12, 1995
MEMORANDUM TO: Mr. Eric Galamb
DEM - DEHNR, 6th Floor
FROM: H. Franklin Vick, P. E., Manager J7-,?,???
Planning and Environmental Branch
SUBJECT: NC 55, From Proposed Holly Springs Bypass to North of
US 1, Wake County, Federal-Aid Project No. MA-55(4),
State Project No. 8.1403301, TIP Project No. R-2905
The Planning and Environmental Branch of the Division of Highways has
begun studying the proposed improvements to NC 55, from proposed Holly
Springs Bypass to north of US 1 in Wake County. The project is included in
the 1995-2001 North Carolina Transportation Improvement Program and is
scheduled for right of way in fiscal year 1999 and construction in fiscal
year 2000.
At the present time it is anticipated that the proposed improvements
will consist of widening the existing two-lane roadway to a five-lane
undivided facility within the existing 100 feet of right of way. The
proposed project also includes widening and rehabilitation or replacement of
Bridge No. 71 over US 1.
We would appreciate any information you might have that would be helpful
in evaluating potential environmental impacts of the project. If applicable,
please identify any permits or approvals which may be required by your
agency. Your comments will be used in the preparation of a federally funded
Environmental Assessment. This document will be prepared in accordance with
the National Environmental Policy Act. It is desirable that your agency
respond by July 3, 1995 so that your comments can be used in the preparation
of this document.
If you have any questions concerning the project, please contact
Jim Buck, P. E., Project Planning Engineer, of this Branch at (919) 733-7842.
HFV/plr
Attachment
Ezr;l
TRANSPORTATION
DIVISION OF HIGHWAYS
PLANNING AND ENVIRONMENTAL
1.0p BRANCH
NC 55
FROM PROPOSED HOLLY SPRINGS BYPASS
TO NORTH OF US 1
WAKE COUNTY
T. I. N. PROJECT NO. R - 2905
State of North Carolina
Department of Environment,
Health and Natural Resources AT&
Division of Environmental Management James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
E ?--?
A. Preston Howard, Jr., P.E., Director
June 27, 1995
MEMORANDUM'
TO: Melba McGee, Legislative & Intergovernmental Affairs
FROM: Monica`Swihart, 'Water Quality Planning
SUBJECT: Project Review #95-0847; Scoping Comments - NC DOT
Proposed Improvements to NC 55, Wake County
TIP No. R-2905
The Water Quality Section of the Division of Environmental
Management requests that the following topics be discussed in the
environmental documents prepared on the subject project:
A. Identify the streams potentially impacted by the project.
.The stream classifications should be current.
B. Identify the linear feet of stream channelizations/
relocations. If the original stream banks were vegetated,
it is requested that the channelized/relocated stream banks
be revegetated.
C. Number of.stream crossings.
D. Will permanent spill catch basins be utilized? DEM requests
that these catch basins be placed at all water supply stream
crossings. Identify the responsible party for maintenance.
E. Identify the stormwater controls (permanent and temporary)
to be employed.
F. Please ensure that sediment and erosion and control measures
are not placed in wetlands.
G. Wetland Impacts
1)- Identify the federal manual used for identifying and
delineating jurisdictional wetlands.
2) Have wetlands been avoided as much as possible?
3) Have wetland impacts been minimized?
4) Discuss wetland impacts by plant communities affected.
5) Discuss the quality of wetlands impacted.
6) Summarize the total wetland impacts.
7) List the 401 General Certification numbers requested
from DEM.
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496
An Equal Opportunity Affirmative Action Employer W% recycled/ 10% post-consumer paper
Melba McGee
June 27, 1995
Page 2
H'. Will borrow locations be in wetlands? Borrow/waste areas
should avoid wetlands to the maximum extent practicable.
Prior to approval of any borrow/waste site in a wetland, the
contractor shall obtain a 401 Certification from DEM.
I. Did NCDOT utilize the existing road alignments as much as
possible? Why not (if applicable)?
J. To what extent can traffic congestion management techniques
alleviate the traffic problems in the study area?
K. Please provide a conceptual mitigation plan to help the
environmental review. The mitigation plan may.state the
following:
1. Compensatory mitigation will be considered only after
wetland impacts have been avoided and minimized to the
maximum extent possible.
2. On-site, in-kind mitigation is the preferred method of
mitigation. In-kind mitigation within the same
watershed is preferred over out-of-kind mitigation.
3. Mitigation should be in the following order:
restoration, creation, enhancement, and lastly banking.
Please note that a 401 Water Quality Certification cannot be
issued until the conditions of NCAC 15A: 01C.0402 (Limitations on
Actions During NCEPA Process) are met. This regulation prevents
DEM from issuing the 401 Certification until a FONSI or Record of
Decision (ROD) has been issued by the Department requiring the
document. If the 401 Certification application is submitted for
review prior to issuance of the FONSI or ROD, it is recommended
that the applicant state that the 401 will not be issued until
the applicant informs DEM that the FONSI or ROD has been signed
by the Department.
Written concurrence of 401 Water Quality Certification may
be required for this project. Applications requesting coverage
under our General Certification 14 or General Permit 31 will
require written concurrence. -Please be aware that 401
Certification may be denied if. wetland impacts have not been
avoided and minimized to the maximum extent practicable.
RECEIVED
10956.mem '
cc: Eric Galamb JUN 2 8 1995
ENVIRONMENTAL SCIENCES
D"3 A ""HH
NCDENR
JAMES B. HUNT JR.
GOVERNOR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
RECEIPT OF PAYMENT
May 1, 2000
Mr. Eric Alsmeyer
US Army Corps of Engineers
6508 Falls of the Neuse Road, Suite 120
Raleigh, North Carolina 27615
Subject: TIP #: R-2905 ?A?F`?
COE Permit #: 199920326
DWQ #:
County: Wake
The North Carolina Wetlands Restoration Program (NCWRP) received
check number 579625 which includes $ 66,500.00 as payment for the
compensatory mitigation requirements of the subject U. S. Army Corps of
Engineers Section 404 permit (Action ID #199920326) and 401 Water Quality
Certification (DWQ #) issued to the North Carolina Department of Transportation.
The NCWRP, by acceptance of this payment, acknowledges that the
NCWRP is responsible for the compensatory mitigation requirements associated
with Action ID #199920326, and agrees to provide the compensatory mitigation as
specified in Special Conditions (3) of this permit. As, specified in Special
Conditions (3), the NCWRP will restore 532 linear feet of stream in Cataloging Unit
03020201 of the upper Neuse River Basin.
If you have any questions concerning this matter, please contact Crystal
Braswell at (919) 733-5208.
Sincerely,
Ronald E. Ferrell
Program Manager
REF/cvb
cc: Dr. Charles Bruton
John Hennessy
File
WETLANDS RESTORATION PROGRAM
1619 MAIL SERVICE CENTER, RALEIGH, NC 27699-1619
website: h2o.emstate.mus PHONE 919-733-5208 FAX 919-733-5321
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - SO% RECYCLED/10% POST-CONSUMER PAPER
DRAFT
Project Title: _
Stream Name:
Channel Mitigation Monitoring Sheets I, II, III, AND IV
Monitoring Data Record
R-2905 (NC 55 / US 1) COE Action ID: 199920326
DWQ Number:
City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake Count
Date Construction Completed: May 2004 Monitoring Year: (1) of 1
Ecoregion: 8 digit HUC unit
USGS Quad Name and Coordinates:
Rosgen Classification:
Length of Project: Urban or Rural: Urban Watershed Size:
Monitoring DATA collected by: M. Green, J.Wait Date: 10/20/04
Applicant Information:
Name: NCDOT Roadside Environmental Unit
Address: 1425 Rock Quarry Road, Raleigh NC 27610
Telephone Number: (919) 861-3772 Email address: mlgreenQPdot. state.nc.us
Consultant Information:
Name: N/A
Address:
Telephone Number: Email address:
Project Status: Complete
Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 2 3
Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3
Section 1. PHOTO REFERENCE SITES
(Monitoring at all levels must complete this section)
Attach site map showing the location and angle of all reference photos with a site
designation (name,
number, letter, etc.) assigned to each reference photo location Photos should be provided for all
structures and cross section locations, should show both banks and include an upstream and
downstream view. Photos taken to document physical stability should be taken in winter. Photos
taken to document vegetation should be taken in summer (at representative locations). Attach
photos and a description of each reference photo or location. We recommend the use of a photo
identification board in each photo to identify location.
Total number of reference photo locations at this site: 3
Dates reference photos have been taken at this site: 3/4/04, 6/8/04,10/20/04
Individual from whom additional photos can be obtained (name, address, phone):
Matthew Green (919) 861-3772
Other Information relative to site photo reference:
If required to complete Level 3 monitoring only stop here; otherwise, complete section 2.
DRAFT
DRAFT
Section 2. PLANT SURVIVAL
Attach plan sheet indicating reference photos.
Identify specific problem areas (missing, stressed, damaged or dead plantings):
No problems at this time.
Estimated causes, and proposedfrequired remedial action:
N/A
ADDITIONAL COMMENTS: Continue monitoring.
If required to complete Level I and Level, 2 monitoring only stop here; otherwise, complete section 3.
2
DRAFT
DRAFT
Section 3. CHANNEL STABILITY
Visual Inspection: The entire stream project as well as each in-stream structure and bank
stabilization/revetment structure must be evaluated and problems addressed.
Report on the visual inspection of channel stability. Physical measurements of channel
stability. /morphology will not be required. Include a discussion of any deviations from as-built
and an evaluation of the significance of these deviations and whether they are indicative of a
stabilizing or destabilizing situation.
No problems or concerns. Site appears to be doing very well at the time of 3rd Quarter monitoring.
Streambank highly vegetated with black willow, juncus sp., fennel, wax myrtle, lespedeza, and dogwood.
Date Station Station Station Station Station
Inspected Number Number Number Number Number
Structure
Type
Is water
piping
through or
around
structure?
Head cut or
down cut
present?
Bank or scour
erosion
present?
Other
problems
noted?
NOTE: Attach separate narrative sheets to each monitoring report describing/discussing
the overall monitoring results. Include the identification of specific problem
areas/channel failures, estimated cause and proposed/required remedial action. This
should include a brief discussion of any parameter that has changed significantly from as-
built.
DRAFT
US 1 On Ramp
2004
Photo 1
Photo 3
Photo 2
Ok W ATF9
.0? QG
r
f? `C
September 13, 2005
Wake County
Mr. Philip S. Harris, III, P.E., Manager
North Carolina Department of Transportation
Project Development & Environmental Analysis
Office of Natural Environment
1548 Mail Service Center
Raleigh, North Carolina 27699-1548
RE: US 1 at NC 55 Interchange Stream Mitigation Site, Wake County, TIP No. R-2905
Dear Mr. Harris:
This correspondence is in reference to your letter dated June 13, 2005, regarding the US 1 at NC 55 Interchange
Stream Mitigation Site located in Wake County, North Carolina. This site is being utilized by the North Carolina
Department of Transportation as compensatory mitigation for the US 1 at NC 55 interchange project.
By copy of this letter, we are notifying you that no further monitoring of the site will be required since the
construction and success criteria for the mitigation site has been met.
Thank you for your time and cooperation. If you have any questions, please contact Christina Breen at
919-733-9604.
Sincer ly,
an W. Klimek, P.E.
JEH/cmb
cc: Mr. Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office
Mr. Gary Jordan, USFWS
Mr. Chris Militscher, USEPA
Mr. Travis Wilson, WRC
NCDWQ Raleigh Regional Office
Mr. John Nance, PE, Division 5 Engineer, 2612 N. Duke Street, Durham, NC 27704
Mr. Chris Murray, Division 5 Environmental Officer, 2612 N. Duke Street, Durham, NC 27704
Central Files
File Copy
No- Carolina
Transportation Permitting Unit Nawridly
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetlands
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper
dea S('A1g a, O?
STATE OF NORTH CAROLINA ?P?,??
DEPARTMENT OF TRANSPORTATION "$;e
MICHAEL F. EASLEY LYNDO TIPPE"
GOVERNOR SECRETARY
June 13, 2005
Mr. Eric Alsmeyer
Raleigh Regulatory Office ACOE
6508 Falls of Neuse Rd. Suite 120
Raleigh, NC 27615
Re: R-2905 US 1 at NC 55 Interchange Stream Mitigation Site, Wake County, State Project
No. 8.1403301, TIP No. R-2905 ACOE ID No. 199920326
Mr. Eric Alsmeyer:
As you are aware, the Department has monitored the US 1 at NC 55 Interchange stream
mitigation site since its construction in Spring of 2004. Located in Wake County adjacent to the
on-ramp to US 1 from NC 55, this site provides 190 linear feet of on-site stream mitigation for
impacts associated with project R-2905. Only visual vegetative and stream bank stability
monitoring were required, hydrologic monitoring was not required for this project. NCDOT
proposed to monitor the R-2905 mitigation site quarterly for one year or until success criteria
were met. After each quarter, monitoring reports were submitted to the appropriate regulatory
agencies.
After one year of quarterly vegetation and stream bank stability monitoring by visual observation,
the R-2905 mitigation site shows that the planted vegetation is surviving and the stream banks
remain stable. Individual quarterly monitoring data is provided in the monitoring reports
submitted between March of 2004 and January of 2005.
NCDOT has completed the monitoring requirements as stated in the permit for R-2905 and
requests that the site is closed and that monitoring can be discontinued. NCDOT requests that the
appropriate resource agencies provide documentation stating that no further monitoring is
required. If you have any questions about this project, please contact Mr. Randy Griffin at (919)
715-1425.
Sincerely,
Philip S. Harris, III, P.E., Unit Head
PDEA- Natural Environment Unit
MAILING ADDRESS: TELEPHONE: 919-715-1500 LOCATION:
NC DEPARTMENT OF TRANSPORTATION FAX: 919-715-1501 PARKER LINCOLN BUILDING
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 2728 CAPITAL BOULEVARD
1598 MAIL SERVICE CENTER WEBSITE: WWW.NCDOT.ORG RALEIGH NC
RALEIGH NC 27699-1598
cc: Ms. Christina Breen, DWQ
Mr. Travis Wilson, WRC
Mr. Chris Militscher, EPA
Mr. Gary Jordan, USFWS
Mr. David Harris, P.E., NCDOT-REU
Mr. Chris Murray, NCDOT-DEO
o?
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
P.O. BOX 1890Ti. _ pFy , 2
WILMINGTON, NORTH CAROLINA 28402-1890 q'?.? i)?•:,
IN REPLY REFER TO August 9, 2005 STaR??'`rFR
B
ANC:.
Regulatory Division/l 145b
SUBJECT: Action ID 199503168; TIP R-2905
Philip S. Harris, III, P.E.
Unit Head
PDEA - Natural Environment Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, NC 27699-1598
Dear Mr. Harris:
Reference your June 13, 2005 letter, requesting documentation that we require no further
monitoring of the "US 1 at NC 55 Interchange" stream mitigation site, south of Apex, in Wake
County, North Carolina, which was mitigation for TIP Project R-2905. The North Carolina
Department of Transportation has completed visual vegetative and stream bank stability
monitoring for one year, as documented in the mitigation monitoring reports submitted between
March 2004; and January 2005.
Based on the monitoring reports, we concur with your recommendation to discontinue
monitoring at this site, and have determined that you have satisfied the mitigation construction
and monitoring requirements of the permit authorization for TIP R-2905 (Action ID 199503168).
Should you have any questions, please call me at (919) 876-8441, extension 23.
Sincerely,
Eric C. Alsmeyer
Regulatory Project Manager
1A
Copy Furnished:
Mr. John Hennessy
Division of Water Quality
North Carolina Department of
Environment and
Natural Resources
1650 Mail Service Center
Raleigh, NC 27699-1650