Loading...
HomeMy WebLinkAboutR-2905Channel Mitigation Monitoring Sheets I, II, III, AND IV Monitoring Data Record Project Title: R-2905 (NC 55 / US 1) COE Action ID: 200221216 Stream Name: DWQ Number: City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County Date Construction Completed: Monitoring Year: (1) of 5 Ecoregion: 8 digit HUC unit USGS Quad Name and Coordinates: Rosgen Classification: Length of Project: _ Urban or Rural: Urban Watershed Size: Monitoring DATA collected by: K. Smith, M. Green Date: 3/4/04 Applicant Information: Name: NCDOT Roadside Environmental Unit Address: 1 South Wilmington St. Raleigh, NC 27611 Telephone Number: (919) 733-2920 Email address: Consultant Information: Name: Address: Telephone Number: Email address: Project Status: Complete Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level .1 2 3 Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3 Section 1. PHOTO REFERENCE SITES (Monitoring at all levels must complete this section) Attach site map showing the location and angle of all reference photos with a site designation (name, number, letter, etc.) assigned to each reference photo location. Photos should be provided for all structures and cross section locations, should show both banks and include an upstream and downstream view. Photos taken to document physical stability should be taken in winter. Photos taken to document vegetation should be taken in summer (at representative locations). Attach photos and a description of each reference photo or location. We recommend the use of a photo identification board in each photo to identify location. Total number of reference photo locations at this site: 3 Dates reference photos have been taken at this site: 3/4/04 Individual from whom additional photos can be obtained (name, address, phone): Other Information relative to site photo reference: If required to complete Level 3 monitoring only stop here; otherwise, complete section 2. 1 Section 2. PLANT SURVIVAL Attach plan sheet indicating reference photos. Identify specific problem areas (missing, stressed, damaged or dead plantings): None at time of monitoring, plants dormant. Estimated causes, and proposed/required remedial action: N/A ADDITIONAL COMMENTS: ls` Quarter Monitoring At planting: 102 Black Willow 102 Silky Dogwood 9 Sweetgum 8 Black Cherry If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3. Section 3. CHANNEL STABILITY Visual Inspection: The entire stream project as well as each in-stream structure and bank stabilization/revetment structure must be evaluated and problems addressed. Report on the visual inspection of channel stability. Physical measurements of channel stabili /morphology will not be required. Include a discussion of any deviations from as-built and an evaluation of the significance of these deviations and whether they are indicative of a stabilizing or destabilizing situation. No problems or concerns. Site appears to be doing very well at the time of 151 Quarter monitoring. Date Station Station Station Station Station Inspected Number Number Number Number Number Structure Type Is water piping through or around structure? Head cut or down cut resent? Bank or scour erosion resent? Other problems noted? NOTE: Attach separate narrative sheets to each monitoring report describing/discussing the overall monitoring results. Include the identification of specific problem areas/channel failures, estimated cause and proposed/required remedial action. This should include a brief discussion of any parameter that has changed significantly from as- built. US 1 On Ramp } :t rti Photo 1 fig 1 1 Photo 3 1" Quarter 2004 h? L?? 1 ..r f ;.J s{! 4 Photo 2 Channel Mitigation Monitoring Sheets I, II, III, AND IV Monitoring Data Record Project Title: R-2905 (NC 55 / US 1) COE Action ID: 199920326 Stream Name: DWQ Number: City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County Date Construction Completed: May 2004 Monitoring Year: (1) of 1 Ecoregion: 8 digit HUC unit USGS Quad Name and Coordinates: Rosgen Classification: Length of Project: _ Urban or Rural: Urban Watershed Size: Monitoring DATA collected by: K. Smith, M. Green Date: 6/8/04 Applicant Information: Name: NCDOT Roadside Environmental Unit Address: 1425 Rock Quarry Road, Raleigh NC 27610 Telephone Number: (919) 861-3779 Email address: jelliott(a,dot.state.nc.us Consultant Information: Name: N/A Address: Telephone Number: Email address: Project Status: Complete Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 2 -3 Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3 Section 1. PHOTO REFERENCE SITES (Monitoring at all levels must complete this section) Attach site map showing the location and angle of all reference photos with a site designation (name, number, letter, etc.) assigned to each reference photo location. Photos should be provided for all structures and cross section locations, should show both banks and include an upstream and downstream view. Photos taken to document physical stability should be taken in winter. Photos taken to document vegetation should be taken in summer (at representative locations). Attach photos and a description of each reference photo or location. We recommend the use of a photo identification board in each photo to identify location. Total number of reference photo locations at this site: 3 Dates reference photos have been taken at this site: 3/4/04, 6/8/04 Individual from whom additional photos can be obtained (name, address, phone): Jason Elliott (919)861-3779 Other Information relative to site photo reference: If required to complete Level 3 monitoring only stop here; otherwise, complete section 2. Section 2. PLANT SURVIVAL Attach plan sheet indicating reference photos. Identify specific problem areas (missing, stressed, damaged or dead plantings): No problems at this time. Estimated causes, and proposed/required remedial action: N/A ADDITIONAL COMMENTS: 2nd Quarter Monitorine. Trees are doing well at this time. Trees are 2- 3 feet in height. NCDOT recommends to continue monitoring at this time. If required to complete Level I and Level 2 monitoring only stop here; otherwise, complete section 3. Section 3. CHANNEL STABILITY Visual Inspection: The entire stream project as well as each in-stream structure and bank stabilization/revetment structure must be evaluated and problems addressed. Report on the visual inspection of channel stability. Physical measurements of channel stabili /morphology will not be required. Include a discussion of any deviations from as-built and an evaluation of the significance of these deviations and whether they are indicative of a stabilizing or destabilizing situation. No problems or concerns. Site appears to be doing vea well at the time of 2"d Quarter monitoring. Date Station Station Station Station Station Inspected Number Number Number Number Number Structure Type Is water piping through or around structure? Head cut or down cut resent? Bank or scour erosion resent? Other problems noted? NOTE: Attach separate narrative sheets to each monitoring report describing/discussing the overall monitoring results. Include the identification of specific problem areas/channel failures, estimated cause and proposed/required remedial action. This should include a brief discussion of any parameter that has changed significantly from as- built. US 1 On Ramp 2"a Quarter 2004 Photo 1 Photo 3 Photo 2 4 Channel Mitigation Monitoring Sheets I, II, III, AND IV Monitoring Data Record Project Title: R-2905 (NC 55 / US 1) COE Action ID: 199920326 Stream Name: DWQ Number: City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County Date Construction Completed: ME 2004 Monitoring Year: (1) of 1 Ecoregion: 8 digit HUC unit USGS Quad Name and Coordinates: _ Rosgen Classification: Length of Project: _ Urban or Rural: Monitoring DATA collected by: M. Gri Applicant Information: Urban Watershed Size: en, J.Wait Date: 10/20/04 Name: NCDOT Roadside Environmental Unit Address: 1425 Rock Quarry Road, Raleigxh NC 27610 Telephone Number: (919) 861-3772 Email address: ml rg een(a-)dot.state.nc.us Consultant Information: Name: N/A Address: Telephone Number: Email address: Project Status: Complete Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 -2 -3 Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3 Section 1. PHOTO REFERENCE SITES (Monitoring at all levels must complete this section) Attach site map showing the location and angle of all reference photos with a site designation (name, number, letter, etc.) assigned to each reference photo location. Photos should be provided for all structures and cross section locations, should show both banks and include an upstream and downstream view. Photos taken to document physical stability should be taken in winter. Photos taken to document vegetation should be taken in summer (at representative locations). Attach photos and a description of each reference photo or location. We recommend the use of a photo identification board in each photo to identify location. Total number of reference photo locations at this site: 3 Dates reference photos have been taken at this site: 3/4/04, 6/8/04, 10/20/04 Individual from whom additional photos can be obtained (name, address, phone): Matthew Green (919) 861-3772 Other Information relative to site photo reference: If required to complete Level 3 monitoring only stop here; otherwise, complete section 2. Section 2. PLANT SURVIVAL Attach plan sheet indicating reference photos. Identify specific problem areas (missing, stressed, damaged or dead plantings): No problems at this time. Estimated causes, and proposed/required remedial action: N/A ADDITIONAL COMMENTS: Continue monitoring. If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3. Section 3. CHANNEL STABILITY Visual Inspection: The entire stream project as well as each in-stream structure and bank stabilization/revetment structure must be evaluated and problems addressed. Report on the visual inspection of channel stability. Physical measurements of channel stabili . /morphology will not be required. Include a discussion of any deviations from as-built and an evaluation of the significance of these deviations and whether they are indicative of a stabilizing or destabilizing situation. No problems or concems. Site appears to be doing very well at the time of 3rd Quarter monitoring. Streambank highly vegetated with black willow, iuncus sp., fennel. Wax myrtle, lespedeza, and dogwood. Date Station Station Station Station Station Inspected Number Number Number Number Number Structure Type Is water piping through or around structure? Head cut or down cut resent? Bank or scour erosion resent? Other problems noted? NOTE: Attach separate narrative sheets to each monitoring report describing/discussing the overall monitoring results. Include the identification of specific problem areas/channel failures, estimated cause and proposed/required remedial action. This should include a brief discussion of any parameter that has changed significantly from as- built. US 1 On Ramp 3`d Quarter 2004 Photo 1 Photo 3 Photo 2 Channel Mitigation Monitoring Sheets I, II, III, AND IV Monitoring Data Record Project Title: R-2905 (NC 55 / US 1) COE Action ID: 199920326 Stream Name: DWQ Number: City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County Date Construction Completed: May 2004 Monitoring Year: ( 1 ) of 1 Ecoregion: 8 digit HUC unit USGS Quad Name and Coordinates: Rosgen Classification: Length of Project: Urban or Rural: Urban Watershed Size: Monitoring DATA collected by: M. Green, D. Jenkins Date: 1/21/05 Applicant Information: Name: NCDOT Roadside Environmental Unit Address: 1425 Rock Quarry Rd. Raleigh, NC 27610 Telephone Number: (919) 861-3772 Email address: migreen(a)dot.statemc.us Consultant Information: Name: N/A Telephone Number: Email address: Project Status: Complete Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 0 -2 -3 Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3 Section 1. PHOTO REFERENCE SITES (Monitoring at all levels must complete this section) Attach site map showing the location and angle of all reference photos with a site designation (name, number, letter, etc.) assigned to each reference photo location. Photos should be provided for all structures and cross section locations, should show both banks and include an upstream and downstream view. Photos taken to document physical stability should be taken in winter. Photos taken to document vegetation should be taken in summer (at representative locations). Attach photos and a description of each reference photo or location. We recommend the use of a photo identification board in each photo to identify location. Total number of reference photo locations at this site: 3 Dates reference photos have been taken at this site: 3/4/04, 6/8/04, 10/20/04, 1/21/05 Individual from whom additional photos can be obtained (name, address, phone): Other Information relative to site photo reference: If required to complete Level 3 monitoring only stop here; otherwise, complete section 2. Section 2. PLANT SURVIVAL Attach plan sheet indicating reference photos. Identify specific problem areas (missing, stressed, damaged or dead plantings): Streambank vegetation is dormant at this time. Estimated causes, and proposed/required remedial action: ADDITIONAL COMMENTS: NCDOT has completed one year of quarterly monitoring and is requesting to close out visual inspection of vegetation at this site. If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3. Section 3. CHANNEL STABILITY Visual Inspection: The entire stream project as well as each in-stream structure and bank stabilization/revetment structure must be evaluated and problems addressed. Report on the visual inspection of channel stability. Physical measurements of channel stability/morphology will not be required. Include a discussion of any deviations from as-built and an evaluation of the significance of these deviations and whether they are indicative of a stabilizing or destabilizing situation. Bankfull event has occurred. NCDOT has completed one year of quarterly monitoring and is requesting to close out visual inspection of channel stability at this site. Date Station Station Station Station Station Inspected Number Number Number Number Number Structure Type Is water piping through or around structure? Head cut or down cut resent? Bank or scour erosion present? Other problems noted? NOTE: Attach separate narrative sheets to each monitoring report describing/discussing the overall monitoring results. Include the identification of specific problem areas/channel failures, estimated cause and proposed/required remedial action. This should include a brief discussion of any parameter that has changed significantly from as-built. R-2905 4 th Quarter Photo 1 Photo 3 Photo 2 N. C. DEPARTMENT" OF TRANSPORTATION DATE TRANSMITTAL SLIP OM, BLDG. ? NOTE AND FIL ? NOTE AND RETURN TO. ME ? PER YOUR REQUEST ? RETURN WITH MORE DETAILS -.? FORf YOUR APPROVAL ? NOTE AND SEE ME ABOUT THIS ? FOR YOUR INFORMATION ? PLEASE ANSWER ? FOR YOUR COMMENTS ? PREPARE REPLY FOR My .S GNATURE ? SIGNATURE ? TAKE APPROPRIATE ACT N ? INVESTIGATE AND REPORT COMMENTS- RECEIVED PEAR 0 21995 ENVIRONMENTAL SCIENCES DRAFT Channel Mitigation Monitoring Sheets I, II, III, AND IV Monitoring Data Record Project Title: R-2905 (NC 55 / US 1) COE Action ID: 200221216 Stream Name: DWQ Number: City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake County Date Construction Completed: Monitoring Year: (1) of 5 Ecoregion: 8 digit HUC unit USGS Quad Name and Coordinates: Rosgen Classification: Length of Project: Urban or Rural: Urban Watershed Size: Monitoring DATA collected by: K. Smith, M. Green Date: 3/4/04 Applicant Information: Name: NCDOT Roadside Environmental Unit Address: 1 South Wilmington St. Raleigh, NC 27611 Telephone Number: (919) 733-2920 Email address: Consultant Information: Name: _ Address: Telephone Number: Email address: Project Status: Complete Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 -2 3 Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3 Section 1. PHOTO REFERENCE SITES (Monitoring at all levels must complete this section) Attach site map showing the location and angle of all reference photos with a site designation (name, number, letter, etc.) assigned to each reference photo location. Photos should be provided for all structures and cross section locations, should show both banks and include an upstream and downstream view. Photos taken to document physical stability should be taken in winter. Photos taken to document vegetation should be taken in summer (at representative locations). Attach photos and a description of each reference photo or location. We recommend the use of a photo identification board in each photo to identify location. Total number of reference photo locations at this site: 3 Dates reference photos have been taken at this site: 3/4/04 Individual from whom additional photos can be obtained (name, address, phone): Other Information relative to site photo reference: If required to complete Level 3 monitoring only stop here; otherwise, complete section 2. DRAFT DRAFT Section 2. PLANT SURVIVAL Attach plan sheet indicating reference photos. Identify specific problem areas (missing, stressed, damaged or dead plantings): None at time of monitoring, plants dormant. Estimated causes, and proposed/required remedial action: N/A ADDITIONAL COMMENTS: ls` Quarter Monitoring At planting: 102 Black Willow 102 Silky Dogwood 8 Black Cherry If required to complete Level 1 and Level 2 monitoring only stop here; otherwise, complete section 3. DRAFT DRAFT Section 3. CHANNEL STABILITY Visual Inspection: The entire stream project as well as each in-stream structure and bank stabilization/revetment structure must be evaluated and problems addressed. Report on the visual inspection of channel stability. Physical measurements of channel stability/morphology will not be required. Include a discussion of any deviations from as-built and an evaluation of the significance of these deviations and whether they are indicative of a stabilizing or destabilizing situation. No problems or concerns. Site appears to be doing very well at the time of 1" Quarter monitoring,. Date Station Station Station Station Station Inspected Number Number Number Number Number Structure Type Is water piping through or around structure? Head cut or down cut resent? Bank or scour erosion resent? Other problems noted? NOTE: Attach separate narrative sheets to each monitoring report describing/discussing the overall monitoring results. Include the identification of specific problem areas/channel failures, estimated cause and proposed/required remedial action. This should include a brief discussion of any parameter that has changed significantly from as- built. DRAFT US 1 On Ramp Photo 1 Photo 3 Photo 2 2004 v.a STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT, JR. DIVISION OF HIGHWAYS R. SAMUEL HUNT III GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 SECRETARY February 27, 1995 MEMORANDUM TO: Mr. Eric Galamb DEM - DEHNR, 6th Floor FROM: H. Franklin Vick, P. E., Manager Planning and Environmental Branch 524? & a2, SUBJECT: Review of Scoping Sheets for NC 55, From Proposed Holly Springs Bypass to North of US 1, Wake County, Federal Aid Project No. MA-55(4), State Project No. 8.1403301, TIP No. R-2905 Attached for your review and comments are the scoping sheets for the subject project (See attached map for project location). The purpose of these sheets and the related review procedure is to have an early "meeting of the minds" as to the scope of work that should be performed and thereby b 7 enable us to better implement the project. A scoping meeting for this project is scheduled for Thursday, March 30, 1995 at 10:00 A. M. in the Planning and Environmental Branch Conference Room (Room 434). You may provide us with your comments at the meeting or mail them to us prior to that date. fi, Thank you for your assistance in this part of our planning process. 1 64 `S If there are any questions about the meeting or the scoping sheets, please call Missy Dickens, Project 0P nving Engineer, at 733-7842. MAD/plr riVe 1 3 (" /J'S Z? 3-I Attachment M I t ck ti S LJ Z- 3 t C ?, q RE PROJECT SLOPING SHEET Date 2-21-95 Revision Date Project Development Stage Programming Planning x Design TIP R-2905 State Project # 8.1403301 F.A. Project # MA-55(4) Division 5 County Wake Route(s) NC 55 Functional Classification Urban Minor Arterial Length 2.6 km (1.6 miles) Purpose of Project To improve capacity and safety along existing facility. Description of Project (including specific limits) and major elements of work: NC 55. Wake County. from proposed Holly Sprinas bypass to North of US 1. Widen to 5-lane facility and widen or possibly replace Bridge No. 71 over. US 1. Type of environmental document to be prepared: EA Environmental Study Schedule: EA - End April, 1996 FONSI - Begin July 1996, End November 1996 Will there be special funding participation by municipality, developers, or other8 • -.Yes No X If yes, by whom and amount: ($) , or (%) How and when will this be paidq PROJECT SCOPING SHEET Type of Access Control: Fuli Partial None X Number of Interchanges 1 Grade Separations Stream Crossings None Typical Section: Existing (1) 2-lane, 6.6 m (22-ft.) pavement including 0 to 0.6-m (0 to 2-ft.) paved shoulders and 1.8 to 2.4 m (6 to 8-ft.) grassed shoulders. (2) At US 1 interchange: 3-lane, 11.3 m (37-ft.) pavement including 1.2 to 1.5-m (4 to 5-ft.) paved shoulders. (3) Bridge: 28-ft. clear roadway width. Proposed (1) 5-lane shoulder section; 18-m (60-ft.) travelway Traffic (ADT): Current 14.500* Design Year 26,100* %TTST %Duals * More accurate traffic data to be provided at scoping meeting. Design Standards Applicable: AASHTO X 3R Design Speed: 80-90 km/h (50-60 mgh) Current Cost Estimate: Construction Cost (including engineering and contingencies ....... $ Right of Way (including relocation, utilities, and acquisition) ........ $ Force Account Items ........................................................................... $ Preliminary Engineering ...................................................................... $ TOTAL PLANNING COST ESTIMATE ..................................................... $ TIP Cost Estimate: Construction ...................................................................... $ 3,250,000 - Right of Way ........................................................................................ $ 740,000 TOTAL TIP COST ESTIMATE ........................................................ $ 3,990,000 PROJECT SCOPING SHEET List any special features, such as railroad involvement, which could affect cost or schedule of project: ITEMS REQUIRED (X) COMMENTS COST Estimated Costs of Improvements: Pavement Surface ............................................................................... $ -Base .................................................................................... $ Milling & Recycling ........................................................... $ Tumouts .............................................................................. $ Shoulders ?Paved ................................................................................. $ _-Earthen ............................................................................... Earthwork ..................................................................................... Subsurface Items ......................................................................... $ -Subgrade and Stabilization ........................................................ $ --Drainage (list any special items) ............................................... $ Sub-Drainage ............................................................................... Structures Bridge Rehab ..................................................................... $ New Bridge ........................................................................ $ Remove Bridge ................................................................. $. New Culvert ....................................................................... $- Culvert Extension ............................................................... $. _ Retaining Walls .................................................................. $ Ki^ise Walls ......................................................................... Other MIX ......................................................................... $ Concrete Curb & Gutter ........................................................... $--- Concrete Sidewalk ..................................................................... ?- -Guardrail ..................................................................................... $ Fencing W.W .................................................................................... $ C.L ...................................................................................... Erosion Control ............................................................................ Landscaping ............................................................................... $ -Lighting ........................................................................................ Traffic Control ............................................................................. $ - -Signing. New .............................. ..................................................... $ Upgraded ...................................................................... Traffic Signals New .............. ................................................................. -Revised .............................................................................. RR Signals New ................................................................................... $ Revised ............................................................................. -With/without Arms ........................................................... PROJECT SCOPING SHEET ITEMS REQUIRED N COMMENTS COST _if 3R _ Drainage Safety Enhancement ..................................................... $ -Roadside Safety Enhancement ..................................................... $ -Realignment for Safety Upgrade .................................................. _-Pavement Markings -Paint ................................................................................................. - Thermoplastic ................................................................................. $ -Raised Pavement Markers ............................................................ ?i _.?elineators ................................................................................................ Other (clearing, grubbing, misc., and mob.) ....................................... $ CONTRACT COST Subtotal .............................................. $ Engineering & Contingencies ........................................................................... $ PE Costs ............................................................................................................... Force Account ....................................................:............. ......................:... Subtotal ............................................... ?. Right-of-Way Will contain within existing R/W? Yes No Existing Width New R/W needed Estimated Cost .......................... Easements: Type Width Estimated Cost .......................... Utilities ........................................................................................................ Right-of-Way Subtotal ..................................................................... S Total Estimated Cost .......................... $ Prepared by: Date The above scoping has been reviewed and approved by: Init. Date Highway Design Roadway Structure Design Services Geotechnical Hydraulics Loc. & Surveys Photogrommetry Prel. Est. Engr. Ping & Environ. inj Date B.O.T. Member, Mgr Program & Policy Chief Engineer- Precon Chief Engineer- Op Sec Roads Officer Construction Branch Roadside Environ. --- Maintenance Branch Bridge Maintenance Statewide Planning } Ini Date 10 Date Right of Way Division Engineer R/W Utilities Biciycle Coordinator Traffic Engr. Program Development Project Management FHWA County Manager Dept. of Cult. Res. City/ Municipality DEHNR (Scoping Sheet for local officials will be sent to Division Engineering.) *If you are not in agreement with proposed project or scoping, note your proposed revisions or comments here: -a.0ma .Nm ¦s • shill .., y Kr Ro Lake_ Z Garne AuDwr? e / Jf _ iillowsafings ? V? c,. uT- fi? ~ -0 DIVISION OF HIGHWAYS PLANNING AND ENVIRONMENTAL a?n+ BRANCH NC 55 FROM PROPOSED HOLLY SPRINGS BYPASS TO NORTH OF US 1 WAKE COUNTY T. I. H. PROJECT NO. R - 2905 ?° w n ? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JAMES B. HUNT JR. DIVISION OF HIGHWAYS GOVERNOR P.O. BOX 25201, RALEIGH, N.C. 27611-5201 R. SAMUEL HUNT III SECRETARY May 12, 1995 MEMORANDUM TO: Mr. Eric Galamb DEM - DEHNR, 6th Floor FROM: H. Franklin Vick, P. E., Manager J7-,?,??? Planning and Environmental Branch SUBJECT: NC 55, From Proposed Holly Springs Bypass to North of US 1, Wake County, Federal-Aid Project No. MA-55(4), State Project No. 8.1403301, TIP Project No. R-2905 The Planning and Environmental Branch of the Division of Highways has begun studying the proposed improvements to NC 55, from proposed Holly Springs Bypass to north of US 1 in Wake County. The project is included in the 1995-2001 North Carolina Transportation Improvement Program and is scheduled for right of way in fiscal year 1999 and construction in fiscal year 2000. At the present time it is anticipated that the proposed improvements will consist of widening the existing two-lane roadway to a five-lane undivided facility within the existing 100 feet of right of way. The proposed project also includes widening and rehabilitation or replacement of Bridge No. 71 over US 1. We would appreciate any information you might have that would be helpful in evaluating potential environmental impacts of the project. If applicable, please identify any permits or approvals which may be required by your agency. Your comments will be used in the preparation of a federally funded Environmental Assessment. This document will be prepared in accordance with the National Environmental Policy Act. It is desirable that your agency respond by July 3, 1995 so that your comments can be used in the preparation of this document. If you have any questions concerning the project, please contact Jim Buck, P. E., Project Planning Engineer, of this Branch at (919) 733-7842. HFV/plr Attachment Ezr;l TRANSPORTATION DIVISION OF HIGHWAYS PLANNING AND ENVIRONMENTAL 1.0p BRANCH NC 55 FROM PROPOSED HOLLY SPRINGS BYPASS TO NORTH OF US 1 WAKE COUNTY T. I. N. PROJECT NO. R - 2905 State of North Carolina Department of Environment, Health and Natural Resources AT& Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary E ?--? A. Preston Howard, Jr., P.E., Director June 27, 1995 MEMORANDUM' TO: Melba McGee, Legislative & Intergovernmental Affairs FROM: Monica`Swihart, 'Water Quality Planning SUBJECT: Project Review #95-0847; Scoping Comments - NC DOT Proposed Improvements to NC 55, Wake County TIP No. R-2905 The Water Quality Section of the Division of Environmental Management requests that the following topics be discussed in the environmental documents prepared on the subject project: A. Identify the streams potentially impacted by the project. .The stream classifications should be current. B. Identify the linear feet of stream channelizations/ relocations. If the original stream banks were vegetated, it is requested that the channelized/relocated stream banks be revegetated. C. Number of.stream crossings. D. Will permanent spill catch basins be utilized? DEM requests that these catch basins be placed at all water supply stream crossings. Identify the responsible party for maintenance. E. Identify the stormwater controls (permanent and temporary) to be employed. F. Please ensure that sediment and erosion and control measures are not placed in wetlands. G. Wetland Impacts 1)- Identify the federal manual used for identifying and delineating jurisdictional wetlands. 2) Have wetlands been avoided as much as possible? 3) Have wetland impacts been minimized? 4) Discuss wetland impacts by plant communities affected. 5) Discuss the quality of wetlands impacted. 6) Summarize the total wetland impacts. 7) List the 401 General Certification numbers requested from DEM. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer W% recycled/ 10% post-consumer paper Melba McGee June 27, 1995 Page 2 H'. Will borrow locations be in wetlands? Borrow/waste areas should avoid wetlands to the maximum extent practicable. Prior to approval of any borrow/waste site in a wetland, the contractor shall obtain a 401 Certification from DEM. I. Did NCDOT utilize the existing road alignments as much as possible? Why not (if applicable)? J. To what extent can traffic congestion management techniques alleviate the traffic problems in the study area? K. Please provide a conceptual mitigation plan to help the environmental review. The mitigation plan may.state the following: 1. Compensatory mitigation will be considered only after wetland impacts have been avoided and minimized to the maximum extent possible. 2. On-site, in-kind mitigation is the preferred method of mitigation. In-kind mitigation within the same watershed is preferred over out-of-kind mitigation. 3. Mitigation should be in the following order: restoration, creation, enhancement, and lastly banking. Please note that a 401 Water Quality Certification cannot be issued until the conditions of NCAC 15A: 01C.0402 (Limitations on Actions During NCEPA Process) are met. This regulation prevents DEM from issuing the 401 Certification until a FONSI or Record of Decision (ROD) has been issued by the Department requiring the document. If the 401 Certification application is submitted for review prior to issuance of the FONSI or ROD, it is recommended that the applicant state that the 401 will not be issued until the applicant informs DEM that the FONSI or ROD has been signed by the Department. Written concurrence of 401 Water Quality Certification may be required for this project. Applications requesting coverage under our General Certification 14 or General Permit 31 will require written concurrence. -Please be aware that 401 Certification may be denied if. wetland impacts have not been avoided and minimized to the maximum extent practicable. RECEIVED 10956.mem ' cc: Eric Galamb JUN 2 8 1995 ENVIRONMENTAL SCIENCES D"3 A ""HH NCDENR JAMES B. HUNT JR. GOVERNOR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY RECEIPT OF PAYMENT May 1, 2000 Mr. Eric Alsmeyer US Army Corps of Engineers 6508 Falls of the Neuse Road, Suite 120 Raleigh, North Carolina 27615 Subject: TIP #: R-2905 ?A?F`? COE Permit #: 199920326 DWQ #: County: Wake The North Carolina Wetlands Restoration Program (NCWRP) received check number 579625 which includes $ 66,500.00 as payment for the compensatory mitigation requirements of the subject U. S. Army Corps of Engineers Section 404 permit (Action ID #199920326) and 401 Water Quality Certification (DWQ #) issued to the North Carolina Department of Transportation. The NCWRP, by acceptance of this payment, acknowledges that the NCWRP is responsible for the compensatory mitigation requirements associated with Action ID #199920326, and agrees to provide the compensatory mitigation as specified in Special Conditions (3) of this permit. As, specified in Special Conditions (3), the NCWRP will restore 532 linear feet of stream in Cataloging Unit 03020201 of the upper Neuse River Basin. If you have any questions concerning this matter, please contact Crystal Braswell at (919) 733-5208. Sincerely, Ronald E. Ferrell Program Manager REF/cvb cc: Dr. Charles Bruton John Hennessy File WETLANDS RESTORATION PROGRAM 1619 MAIL SERVICE CENTER, RALEIGH, NC 27699-1619 website: h2o.emstate.mus PHONE 919-733-5208 FAX 919-733-5321 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - SO% RECYCLED/10% POST-CONSUMER PAPER DRAFT Project Title: _ Stream Name: Channel Mitigation Monitoring Sheets I, II, III, AND IV Monitoring Data Record R-2905 (NC 55 / US 1) COE Action ID: 199920326 DWQ Number: City, County and other Location Information: On ramp to US 1 N from NC 55 in Wake Count Date Construction Completed: May 2004 Monitoring Year: (1) of 1 Ecoregion: 8 digit HUC unit USGS Quad Name and Coordinates: Rosgen Classification: Length of Project: Urban or Rural: Urban Watershed Size: Monitoring DATA collected by: M. Green, J.Wait Date: 10/20/04 Applicant Information: Name: NCDOT Roadside Environmental Unit Address: 1425 Rock Quarry Road, Raleigh NC 27610 Telephone Number: (919) 861-3772 Email address: mlgreenQPdot. state.nc.us Consultant Information: Name: N/A Address: Telephone Number: Email address: Project Status: Complete Monitoring Level required by COE and DWQ (404 permit/ 401 Cert.): Level 1 2 3 Monitoring Level 1 requires completion of Section 1, Section 2 and Section 3 Section 1. PHOTO REFERENCE SITES (Monitoring at all levels must complete this section) Attach site map showing the location and angle of all reference photos with a site designation (name, number, letter, etc.) assigned to each reference photo location Photos should be provided for all structures and cross section locations, should show both banks and include an upstream and downstream view. Photos taken to document physical stability should be taken in winter. Photos taken to document vegetation should be taken in summer (at representative locations). Attach photos and a description of each reference photo or location. We recommend the use of a photo identification board in each photo to identify location. Total number of reference photo locations at this site: 3 Dates reference photos have been taken at this site: 3/4/04, 6/8/04,10/20/04 Individual from whom additional photos can be obtained (name, address, phone): Matthew Green (919) 861-3772 Other Information relative to site photo reference: If required to complete Level 3 monitoring only stop here; otherwise, complete section 2. DRAFT DRAFT Section 2. PLANT SURVIVAL Attach plan sheet indicating reference photos. Identify specific problem areas (missing, stressed, damaged or dead plantings): No problems at this time. Estimated causes, and proposedfrequired remedial action: N/A ADDITIONAL COMMENTS: Continue monitoring. If required to complete Level I and Level, 2 monitoring only stop here; otherwise, complete section 3. 2 DRAFT DRAFT Section 3. CHANNEL STABILITY Visual Inspection: The entire stream project as well as each in-stream structure and bank stabilization/revetment structure must be evaluated and problems addressed. Report on the visual inspection of channel stability. Physical measurements of channel stability. /morphology will not be required. Include a discussion of any deviations from as-built and an evaluation of the significance of these deviations and whether they are indicative of a stabilizing or destabilizing situation. No problems or concerns. Site appears to be doing very well at the time of 3rd Quarter monitoring. Streambank highly vegetated with black willow, juncus sp., fennel, wax myrtle, lespedeza, and dogwood. Date Station Station Station Station Station Inspected Number Number Number Number Number Structure Type Is water piping through or around structure? Head cut or down cut present? Bank or scour erosion present? Other problems noted? NOTE: Attach separate narrative sheets to each monitoring report describing/discussing the overall monitoring results. Include the identification of specific problem areas/channel failures, estimated cause and proposed/required remedial action. This should include a brief discussion of any parameter that has changed significantly from as- built. DRAFT US 1 On Ramp 2004 Photo 1 Photo 3 Photo 2 Ok W ATF9 .0? QG r f? `C September 13, 2005 Wake County Mr. Philip S. Harris, III, P.E., Manager North Carolina Department of Transportation Project Development & Environmental Analysis Office of Natural Environment 1548 Mail Service Center Raleigh, North Carolina 27699-1548 RE: US 1 at NC 55 Interchange Stream Mitigation Site, Wake County, TIP No. R-2905 Dear Mr. Harris: This correspondence is in reference to your letter dated June 13, 2005, regarding the US 1 at NC 55 Interchange Stream Mitigation Site located in Wake County, North Carolina. This site is being utilized by the North Carolina Department of Transportation as compensatory mitigation for the US 1 at NC 55 interchange project. By copy of this letter, we are notifying you that no further monitoring of the site will be required since the construction and success criteria for the mitigation site has been met. Thank you for your time and cooperation. If you have any questions, please contact Christina Breen at 919-733-9604. Sincer ly, an W. Klimek, P.E. JEH/cmb cc: Mr. Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office Mr. Gary Jordan, USFWS Mr. Chris Militscher, USEPA Mr. Travis Wilson, WRC NCDWQ Raleigh Regional Office Mr. John Nance, PE, Division 5 Engineer, 2612 N. Duke Street, Durham, NC 27704 Mr. Chris Murray, Division 5 Environmental Officer, 2612 N. Duke Street, Durham, NC 27704 Central Files File Copy No- Carolina Transportation Permitting Unit Nawridly 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetlands Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper dea S('A1g a, O? STATE OF NORTH CAROLINA ?P?,?? DEPARTMENT OF TRANSPORTATION "$;e MICHAEL F. EASLEY LYNDO TIPPE" GOVERNOR SECRETARY June 13, 2005 Mr. Eric Alsmeyer Raleigh Regulatory Office ACOE 6508 Falls of Neuse Rd. Suite 120 Raleigh, NC 27615 Re: R-2905 US 1 at NC 55 Interchange Stream Mitigation Site, Wake County, State Project No. 8.1403301, TIP No. R-2905 ACOE ID No. 199920326 Mr. Eric Alsmeyer: As you are aware, the Department has monitored the US 1 at NC 55 Interchange stream mitigation site since its construction in Spring of 2004. Located in Wake County adjacent to the on-ramp to US 1 from NC 55, this site provides 190 linear feet of on-site stream mitigation for impacts associated with project R-2905. Only visual vegetative and stream bank stability monitoring were required, hydrologic monitoring was not required for this project. NCDOT proposed to monitor the R-2905 mitigation site quarterly for one year or until success criteria were met. After each quarter, monitoring reports were submitted to the appropriate regulatory agencies. After one year of quarterly vegetation and stream bank stability monitoring by visual observation, the R-2905 mitigation site shows that the planted vegetation is surviving and the stream banks remain stable. Individual quarterly monitoring data is provided in the monitoring reports submitted between March of 2004 and January of 2005. NCDOT has completed the monitoring requirements as stated in the permit for R-2905 and requests that the site is closed and that monitoring can be discontinued. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 715-1425. Sincerely, Philip S. Harris, III, P.E., Unit Head PDEA- Natural Environment Unit MAILING ADDRESS: TELEPHONE: 919-715-1500 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919-715-1501 PARKER LINCOLN BUILDING PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 2728 CAPITAL BOULEVARD 1598 MAIL SERVICE CENTER WEBSITE: WWW.NCDOT.ORG RALEIGH NC RALEIGH NC 27699-1598 cc: Ms. Christina Breen, DWQ Mr. Travis Wilson, WRC Mr. Chris Militscher, EPA Mr. Gary Jordan, USFWS Mr. David Harris, P.E., NCDOT-REU Mr. Chris Murray, NCDOT-DEO o? DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890Ti. _ pFy , 2 WILMINGTON, NORTH CAROLINA 28402-1890 q'?.? i)?•:, IN REPLY REFER TO August 9, 2005 STaR??'`rFR B ANC:. Regulatory Division/l 145b SUBJECT: Action ID 199503168; TIP R-2905 Philip S. Harris, III, P.E. Unit Head PDEA - Natural Environment Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, NC 27699-1598 Dear Mr. Harris: Reference your June 13, 2005 letter, requesting documentation that we require no further monitoring of the "US 1 at NC 55 Interchange" stream mitigation site, south of Apex, in Wake County, North Carolina, which was mitigation for TIP Project R-2905. The North Carolina Department of Transportation has completed visual vegetative and stream bank stability monitoring for one year, as documented in the mitigation monitoring reports submitted between March 2004; and January 2005. Based on the monitoring reports, we concur with your recommendation to discontinue monitoring at this site, and have determined that you have satisfied the mitigation construction and monitoring requirements of the permit authorization for TIP R-2905 (Action ID 199503168). Should you have any questions, please call me at (919) 876-8441, extension 23. Sincerely, Eric C. Alsmeyer Regulatory Project Manager 1A Copy Furnished: Mr. John Hennessy Division of Water Quality North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, NC 27699-1650