HomeMy WebLinkAboutNC0003425_Other_20180101 (7)NOTE
1. LOCATION AND BOUNDARY OF COAL PILE STRUCTURAL FILL
IS CURRENTLY UNKNOWN.
2. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO
ON JULY 7, 2017. AERIAL DATED JUNE 13, 2016.
r.
La= TtEu- CL
IIE<s&-ti
LEGEND
ACTIVE ASH BASIN WASTE BOUNDARY
ACTIVE ASH BASIN COMPLIANCE BOUNDARY
LANDFILL WASTE BOUNDARY
LANDFILL COMPLIANCE BOUNDARY
L - �, STORAGE AREAAND STRUCTURAL FILL BOUNDARY
r - J DUKE ENERGY PROPERTY BOUNDARY
TOWS
D -
EAST AS H BASIN
I
`CID
LA
600 300 0 600 1,200 FIGURE 1-1
G GRAPHIC SCALE IN FEET WASTE AND COMPLIANCE BOUNDARIES
148 RIVER STREET, SUITE 220 (FUTURE CONDITIONS)
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999 ROXBORO STEAM ELECTRIC PLANT
Ter DR--:A.cor.com DUKE ENERGY PROGRESS, LLC
PROJECT MANAGERFEIG` C. EADY DATE: 06/19/2018 S E M O RA, NORTH CARO LI NA
CHECKED BY: C. EADY
P-M,,kn F-- Prnn — ln9MMn rli— Aff— v Pri,ilan M Al I RITFR\rIR\Rnvhnm\Rnvhnm M—fiorl mvrf