HomeMy WebLinkAboutNC0003425_Other_20180101 (5)NOTE
1. LOCATION AND BOUNDARY OF COAL PILE STRUCTURAL FILL
IS CURRENTLY UNKNOWN.
2. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO
ON JULY 7, 2017. AERIAL DATED JUNE 13, 2016.
L a=-- Ly i E U. I
EIC&1[1&-LC
f
LEGEND
ACTIVE ASH BASIN WASTE BOUNDARY
ACTIVE ASH BASIN COMPLIANCE BOUNDARY
LANDFILL WASTE BOUNDARY
LANDFILL COMPLIANCE BOUNDARY
STORAGE AREAAND STRUCTURAL FILL BOUNDARY
1 . J DUKE ENERGY PROPERTY BOUNDARY
EAST ASH BASIN
'-(EAB)
.'r
3,
600 300 0 600 1,200 FIGURE 1-1
G GRAPHIC SCALE IN FELT WASTE AND COMPLIANCE BOUNDARIES
148 RIVER STREET, SUITE 220 (FUTURE CONDITIONS)
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999 ROXBORO STEAM ELECTRIC PLANT
��r DR- nterracor.com DUKE ENERGY PROGRESS, LLC
synPROECT NA MANAGER: C.EADY DATE:06/19/2018 SEMORA, NORTH CAROLINA
CHECKED BY: C. EADY
P:\Duke Energy Pro mss.1026\500.Client Attorney Privile e\00,ALL SITES\GI S\Roxboro\Roxboro Modified—d
Attachment B