Loading...
HomeMy WebLinkAboutSW6200303_O&M EZ - Boykin_20200605Operation & Maintenance Agreement Project Name: Project Location: Boykin PV1 Solar Electric Power Plant Wade, Cumberland County, North Carolina Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Level Spreader/VFS Permeable Pavement Proprietary System Rainwater Harvesting Sand Filter Stormwater Wetland Wet Detention Basin Disconnected Impervious Area User Defined BMP Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Present: Present: 0 0 0 0 0 0 0 0 0 0 0 0 0 ng O&M tables wil Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): De aciclecl auto Entire Site I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: County of personally appeared before me this Fresh Air Energy XXXVIII, LLC 101 Second Street Ste. 1250 San Francisco, CA 94105 415-626-1802 ErikS@ecoplexus.com , a Notary Public for the State of , do hearby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, Date: and STO,RZ Version 1.4 My commission expires 6/5/2020 Page 1 of 3 STORM-EZ 6/5/2020 Version 1.4 O&M Manual Page 2 of 3 User Defined BMP Maintenance Requirements Section 1 Important operation and maintenance procedures: The entire vegetated area within the Solar Power Plant will be carefully managed to reduce the sediment load leaving the site. After the first-time fertilization to establish the permanent ground cover on the vegetated areas of the Solar Power Plant, Minimize use of Herbicides and Fertilizers per NCDEQ Stormwater Design Manual E-6 Avoid Compaction of Subsoil per NCDEQ Stormwater Design Manual E-6 Recommendation 1 Avoid Concentration of Stormwater per NCDEQ Stormwater Design Manual E-6 Recommendation 3 The system will be visually inspected by the owner/operator at leastquarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Section 2 Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: Entire Vegetated Area Areas of bare soil/ Gullies Regrade necessary to remove the gully, replant disturbed area. Entire Vegetated Area Vegetation Maintain vegetation at a heaight of approximately 12 inches. Receiving Water Body Erosion or signs of damage Contact the NC Division of Water Quality 401 Oversight Unit. STORM-EZ 6/5/2020 Version 1.4 O&M Manual Page 3 of 3