Loading...
HomeMy WebLinkAboutSW5200601_2020-04-30 Hydrograph Charter_202006051 2 3 4 5 1 Watershed Model Schematic Hydraflow Hydrographs by Intelisolve v9.2 Project: Charter Furniture Model.gpw Thursday, Apr 30, 2020 Hyd. Origin Description Legend 1 SCS Runoff Pre Development Site 2 SCS Runoff Post Development - BMP 3 SCS Runoff Post Development - Bypass 4 Reservoir Dry Pond 5 Combine Post-Development Total Site Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- 51.34 ------- ------- ------- 120.81 ------- ------- 201.10 Pre Development Site 2 SCS Runoff ------- 10.71 ------- ------- ------- 23.61 ------- ------- 38.19 Post Development - BMP 3 SCS Runoff ------- 48.20 ------- ------- ------- 106.29 ------- ------- 171.89 Post Development - Bypass 4 Reservoir 2 0.132 ------- ------- ------- 3.691 ------- ------- 26.09 Dry Pond 5 Combine 3, 4 48.30 ------- ------- ------- 106.42 ------- ------- 193.79 Post-Development Total Site Proj. file: Charter Furniture Model.gpw Thursday, Apr 30, 2020 Hydraflow Hydrographs by Intelisolve v9.2 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 51.34 2 718 103,447 ---- ------ ------ Pre Development Site 2 SCS Runoff 10.71 2 716 21,667 ---- ------ ------ Post Development - BMP 3 SCS Runoff 48.20 2 716 97,528 ---- ------ ------ Post Development - Bypass 4 Reservoir 0.132 2 1180 21,651 2 631.03 16,002 Dry Pond 5 Combine 48.30 2 716 119,178 3, 4 ------ ------ Post-Development Total Site Charter Furniture Model.gpw Return Period: 1 Year Thursday, Apr 30, 2020 Hydraflow Hydrographs by Intelisolve v9.2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 1 Pre Development Site Hydrograph type = SCS Runoff Peak discharge = 51.34 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 103,447 cuft Drainage area = 22.170 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(13.680 x 98) + (8.490 x 55)] / 22.170 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) Pre Development Site Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 2 Post Development - BMP Hydrograph type = SCS Runoff Peak discharge = 10.71 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 21,667 cuft Drainage area = 4.030 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.850 x 98) + (1.180 x 55)] / 4.030 5 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Post Development - BMP Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 3 Post Development - Bypass Hydrograph type = SCS Runoff Peak discharge = 48.20 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 97,528 cuft Drainage area = 18.140 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 2.99 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(12.500 x 98) + (5.640 x 55)] / 18.140 6 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Post Development - Bypass Hyd. No. 3 -- 1 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 4 Dry Pond Hydrograph type = Reservoir Peak discharge = 0.132 cfs Storm frequency = 1 yrs Time to peak = 19.67 hrs Time interval = 2 min Hyd. volume = 21,651 cuft Inflow hyd. No. = 2 - Post Development - BMP Max. Elevation = 631.03 ft Reservoir name = Dry Pond Max. Storage = 16,002 cuft Storage Indication method used. 7 0 8 16 24 32 40 48 56 64 72 80 88 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Dry Pond Hyd. No. 4 -- 1 Year Hyd No. 4 Hyd No. 2 Total storage used = 16,002 cuft Pond Report 8 Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Pond No. 1 - Dry Pond Pond Data Contours - User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 626.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 626.00 1,536 0 0 1.00 627.00 2,100 1,818 1,818 2.00 628.00 2,736 2,418 4,236 3.00 629.00 3,444 3,090 7,326 4.00 630.00 4,224 3,834 11,160 5.00 631.00 5,076 4,650 15,810 6.00 632.00 6,000 5,538 21,348 7.00 633.00 6,988 6,494 27,842 8.00 634.00 7,503 7,246 35,088 9.00 635.00 8,973 8,238 43,326 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 18.00 1.50 0.00 0.00 Span (in)= 18.00 1.50 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft)= 625.50 626.00 0.00 0.00 Length (ft)= 60.00 0.00 0.00 0.00 Slope (%)= 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a No No No Crest Len (ft)= 9.42 10.00 0.00 0.00 Crest El. (ft)= 632.50 633.50 0.00 0.00 Weir Coeff.= 3.33 3.00 3.33 3.33 Weir Type = Riser Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 626.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.00 1,818 627.00 1.27 ic 0.06 ic --- --- 0.00 0.00 --- --- --- --- 0.057 2.00 4,236 628.00 1.27 ic 0.08 ic --- --- 0.00 0.00 --- --- --- --- 0.082 3.00 7,326 629.00 1.27 ic 0.10 ic --- --- 0.00 0.00 --- --- --- --- 0.101 4.00 11,160 630.00 1.27 ic 0.12 ic --- --- 0.00 0.00 --- --- --- --- 0.117 5.00 15,810 631.00 1.27 ic 0.13 ic --- --- 0.00 0.00 --- --- --- --- 0.131 6.00 21,348 632.00 1.27 ic 0.14 ic --- --- 0.00 0.00 --- --- --- --- 0.144 7.00 27,842 633.00 11.09 oc 0.16 ic --- --- 11.09 0.00 --- --- --- --- 11.25 8.00 35,088 634.00 23.53 ic 0.17 ic --- --- 23.53 s 10.61 --- --- --- --- 34.30 9.00 43,326 635.00 25.13 ic 0.18 ic --- --- 25.13 s 55.11 --- --- --- --- 80.42 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 5 Post-Development Total Site Hydrograph type = Combine Peak discharge = 48.30 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 119,178 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 18.140 ac 9 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 Q (cfs) Time (hrs) Post-Development Total Site Hyd. No. 5 -- 1 Year Hyd No. 5 Hyd No. 3 Hyd No. 4 Hydrograph Summary Report 10 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 120.81 2 716 247,889 ---- ------ ------ Pre Development Site 2 SCS Runoff 23.61 2 716 49,115 ---- ------ ------ Post Development - BMP 3 SCS Runoff 106.29 2 716 221,079 ---- ------ ------ Post Development - Bypass 4 Reservoir 3.691 2 726 49,001 2 632.73 26,098 Dry Pond 5 Combine 106.42 2 716 270,080 3, 4 ------ ------ Post-Development Total Site Charter Furniture Model.gpw Return Period: 10 Year Thursday, Apr 30, 2020 Hydraflow Hydrographs by Intelisolve v9.2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 1 Pre Development Site Hydrograph type = SCS Runoff Peak discharge = 120.81 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 247,889 cuft Drainage area = 22.170 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.23 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(13.680 x 98) + (8.490 x 55)] / 22.170 11 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 Q (cfs) Time (hrs) Pre Development Site Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 2 Post Development - BMP Hydrograph type = SCS Runoff Peak discharge = 23.61 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 49,115 cuft Drainage area = 4.030 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.23 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.850 x 98) + (1.180 x 55)] / 4.030 12 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) Post Development - BMP Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 3 Post Development - Bypass Hydrograph type = SCS Runoff Peak discharge = 106.29 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 221,079 cuft Drainage area = 18.140 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.23 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(12.500 x 98) + (5.640 x 55)] / 18.140 13 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) Post Development - Bypass Hyd. No. 3 -- 10 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 4 Dry Pond Hydrograph type = Reservoir Peak discharge = 3.691 cfs Storm frequency = 10 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 49,001 cuft Inflow hyd. No. = 2 - Post Development - BMP Max. Elevation = 632.73 ft Reservoir name = Dry Pond Max. Storage = 26,098 cuft Storage Indication method used. 14 0 8 16 24 32 40 48 56 64 72 80 88 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) Dry Pond Hyd. No. 4 -- 10 Year Hyd No. 4 Hyd No. 2 Total storage used = 26,098 cuft Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 5 Post-Development Total Site Hydrograph type = Combine Peak discharge = 106.42 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 270,080 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 18.140 ac 15 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 Q (cfs) Time (hrs) Post-Development Total Site Hyd. No. 5 -- 10 Year Hyd No. 5 Hyd No. 3 Hyd No. 4 Hydrograph Summary Report 16 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 201.10 2 716 423,506 ---- ------ ------ Pre Development Site 2 SCS Runoff 38.19 2 716 81,775 ---- ------ ------ Post Development - BMP 3 SCS Runoff 171.89 2 716 368,090 ---- ------ ------ Post Development - Bypass 4 Reservoir 26.09 2 720 81,659 2 633.74 33,007 Dry Pond 5 Combine 193.79 2 716 449,748 3, 4 ------ ------ Post-Development Total Site Charter Furniture Model.gpw Return Period: 100 Year Thursday, Apr 30, 2020 Hydraflow Hydrographs by Intelisolve v9.2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 1 Pre Development Site Hydrograph type = SCS Runoff Peak discharge = 201.10 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 423,506 cuft Drainage area = 22.170 ac Curve number = 82* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 7.74 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(13.680 x 98) + (8.490 x 55)] / 22.170 17 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) Pre Development Site Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 2 Post Development - BMP Hydrograph type = SCS Runoff Peak discharge = 38.19 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 81,775 cuft Drainage area = 4.030 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 7.74 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.850 x 98) + (1.180 x 55)] / 4.030 18 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Post Development - BMP Hyd. No. 2 -- 100 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 3 Post Development - Bypass Hydrograph type = SCS Runoff Peak discharge = 171.89 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 368,090 cuft Drainage area = 18.140 ac Curve number = 85* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 7.74 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(12.500 x 98) + (5.640 x 55)] / 18.140 19 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 20.00 20.00 40.00 40.00 60.00 60.00 80.00 80.00 100.00 100.00 120.00 120.00 140.00 140.00 160.00 160.00 180.00 180.00 Q (cfs) Time (hrs) Post Development - Bypass Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 4 Dry Pond Hydrograph type = Reservoir Peak discharge = 26.09 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 81,659 cuft Inflow hyd. No. = 2 - Post Development - BMP Max. Elevation = 633.74 ft Reservoir name = Dry Pond Max. Storage = 33,007 cuft Storage Indication method used. 20 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Dry Pond Hyd. No. 4 -- 100 Year Hyd No. 4 Hyd No. 2 Total storage used = 33,007 cuft Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.2 Thursday, Apr 30, 2020 Hyd. No. 5 Post-Development Total Site Hydrograph type = Combine Peak discharge = 193.79 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 449,748 cuft Inflow hyds. = 3, 4 Contrib. drain. area = 18.140 ac 21 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 30.00 30.00 60.00 60.00 90.00 90.00 120.00 120.00 150.00 150.00 180.00 180.00 210.00 210.00 Q (cfs) Time (hrs) Post-Development Total Site Hyd. No. 5 -- 100 Year Hyd No. 5 Hyd No. 3 Hyd No. 4