Loading...
HomeMy WebLinkAboutNC0003425_Application (Ash Basin flow outfall 003)_20161201Roxboro Steam Electric Plant Post ash basin flow outfall 003 .< . ................................................................................................................... < . ......................................................................................................................................... < . .......... : Plant Process Streams A I Water Treatment —� Systems Plant Drainage System Drains from oil filled equipment containment Treatment (Oil/Water Separator) Metal cleaning Outfall 009 (internal) Low Volume Collection Sump Generation TO Atmosphere Unit 4 Cooling Unit # 4 Tower D B ' Unit 3 Cooling — Water' 1 Alternative modes I G C I Unit 1 & 2 Cooling Water Outfall 005 (internal) ..................................................................................... F Maintenance Drain � Unit 3 Cooling To Atmosphere Tower E Landfill Stormwater (redirected from ash basin) East ash basin closure flows (Interstitial water , treated extracted groundwater and stormwater). Temporary flow stream Up to 1.5 MGD Stormwater from Gypsum Storage Pile Area Plant Power block Stormwater T Outfall012a Treatment basin or similar Physical/Chemical treatment H Outfall 008 (internal) Domestic Sewage Waste Treatment Plant NH3 Vapor Suppression (Emergency) o Option ............................................. [Leachate sh Landfill See # to right K Heated Water Discharge Canal rnal) Effluent Channel or f T AOWs From lined and seeps retention bas above ............ >.......... : H yco Reservoir P Emergency Overflow Flue Gas FDesulfurization Lined Outfall011 (internal) Retention P/C, R FGD basin Blowdown Ultra OR filtration zOR East West Stormwater see settling settling Below pond pond Silo # Unit 3 Cooling Wash Water H Tower Basin C Outfall002 internal L IL Outfall010 Ash basin closure flows O M Hyco IOutfall 003 S Outfall 012b (internal) Reservoir Bioreactor Flush pond ; Ei0 Lu poration Form 2C — Item II A Flows, Sources of Pollution, and Treatment Technologies Outfall 003 December 2016 Roxboro Steam Plant Outfall 006 Raw water tank drainage Stormwater (maintenance) Outfall 006 Coal Pile Runoff Treatment Basin N Limestone pile runoff Absorber seal Leakage (rare) Emergency Gypsum I Truck wheel wash stack Hyco Reservoir Form 2C — Item II A Flows, Sources of Pollution, and Treatment Technologies Outfall 006 December 2016 Roxboro Steam Plant Outfall 001 Stormwater through remnant of east ash basin AOW's and seepage Incidental Gypsum and rail runoff Outfall 001 9 Hyco Reservoir Plant Intake Canal Form 2C — Item II A Flows, Sources of Pollution, and Treatment Technologies Outfall 001 December 2016