Loading...
HomeMy WebLinkAboutNC0003425_Attachment 3 Form 2C_20160101Duke Energy Progress, LLC Roxboro Steam Electric Plant National Pollutant Discharge Elimination System Permit Number NC0003425 Attachment 3 Form 2C — Item II -A - Flow, Sources of Pollution, and Treatment Technologies Stream Estimate(d� Average Flow Comments A 4 Make-up water for Water Treatment Systems B 505 Unit 3 Cooling Water Intake C 592 Units 1 & 2 Cooling Water Intake D 7 Unit 4 Cooling Tower Blowdown E 505 Unit 3 Cooling Water Discharge F 17.3 Unit 4 Cooling Tower Intake G 505 Unit 3 Cooling Water Discharge H 0.025 Sewage Treatment Plant Discharge I 3 Low Volume discharge into Ash Pond/Retention Basin J 12 Ash transport into Ash Pond (To be discontinued) K 0.17 Silo wash water L 15 Ash Pond discharge into Discharge Canal (closure flows) M 1067 Discharge Canal flow into Hyco Lake N 0.09 Coal Pile Runoff Pond discharge to Hyco Lake O 1.92 Flue Gas Desulfurization Discharge P 5.81 (maximum) Intake to Flue Gas Desulfurization Q 0.02 (more during precipitation) Outfall 001 discharge, seeps, stormwater from remnant of east ash basin area. R 1.92 New FGD wastewater treatment system S 7.0 Flow from lined retention basin (internal) Roxboro Steam Plant N00003425 September 2016 update �o a) U) a) 0 U T 0 LL Roxboro Steam Electric Plant Post ash basin flow outfall 003 Plant Process Streams A I Water Treatment 0. Systems Plant Drainage System Drains from oil filled equipment containment F eatment il/Waterparator) Metal cleaning Outfall 009 (internal) I F Low Volume Collection Sump Unit 4 Cooling 30Unit 4 Cooling To Atmosphere Water Tower D Outfall 005 (internal) F............................................................. Maintenance Drain B Unit 3 Cooling —� Water' Alternative modes G Unit 1&2 —� Cooling Water I� Unit 3 Cooling To Atmosphere Tower E Stormwater from Gypsum Storage Pile Area Outfall 008 (internal) H Domestic Sewage Waste Treatment Plant Hyco Reservoir P I Emergency Flue Gas Discharge Desulfurization NH3 Vapor Outfall 011 all I Suppression Lined P/C, R FGD —Option (Emergency) Retention �<••"•" Bio, <............. Blowdown basins Ultra OR (east and filtration OR Ash Landfill Leachate west) East settling West and SW K Stormwater See settling pond pond below i Silo Unit 3 Cooling T: c3 Wash Water Tower Pond Bioreactor m'• CD E?O Outfall002 internal w L Outfall010 Flush •••• pond Heated Water Ash basin closure flows Mixing Zone M Hyco Stormwater Effluent Channel Outfall 003 Reservoir Evaporation Form 2C — Item II A Flows, S Outfall 012 (internal) Sources of Pollution, and AOW's and seeps From Lined Treatment Technologies retention Outfall 003 September 2016 basins above Roxboro Steam Plant Outfall 006 Raw water tank drainage Stormwater (maintenance) Outfall 006 Coal Pile Runoff Treatment Basin N Hyco Reservoir pile runoff Emergency Gypsum I I Truck wheel wash stack Form 2C — Item II A Flows, Sources of Pollution, and Treatment Technologies Outfall 006 September 2016 Roxboro Steam Plant Outfall 001 Stormwater through remnant of east ash basin Incidental AOW's and Gypsum and rail seepage I runoff Outfall 001 �Intakepumpsfor Plant Intake Canal plant processes Q A Outfall 003 Form 2C — Item II A Flows, Sources of Pollution, and Treatment Technologies Outfall 001 September 2016