Loading...
HomeMy WebLinkAboutNC0003425_Application_20160101Roxboro Steam Electric Plant Post ash basin flow outfall 003 .................................................................................. � --- ---- ---- ---- --- ---- ---- ----................................................................... �......... Outfall 008 (internal) Plant Process Plant Drainage H Streams System Metal cleaning Domestic Sewage D Outfall 009 Drains from oil Waste Treatment Plant filled (internal) ---------------->--.....----.... equipment containment Low Volume Water Treatment Treatment Collection Sump Reservoir Systems (Oil/Water P Separator) Emergency Overflow Flue Gas Desulfurization It NH3 Vapor Generation To Atmosphere Suppression Lined Outfall 011 (inte Unit 4 Cooling P/C, R Unit # 4 Tower D (Emergency) Retention non Bio, Outfall 005 (internal) Option Ultra OR filtration F ........................Maintenance Drain..............................................................., Ash Landfill East Leachate Stormwater see settling See # K Below pond B oTo Atmosphere to right Unit 3 Cooling Unit 3 Cooling WaterTower Alternative modes G C I Unit 1 & 2 7 Cooling Water Landfill Stormwater (redirected from ash basin) East ash basin closure flows (Interstitial water , treated extracted groundwater and stormwater). Temporary flow stream Up to 1.5 MGD Stormwater from Gypsum Storage Pile Area Plant Power block Stormwater o Treatment basin or similar Physical/Chemical treatment Heated Water Discharge Canal -rnal) I Effluent Channel or Aow s From lined and retention b seeps above Silo # Unit 3 Coolin Wash Water H Tower Basin Outfall 002 (internal) I Ash basin closure flows 4FGDBlo OR West settling pond Bioreactor Outfall010 Flush O pond M Hyco Outfall003 Reservoir Evaporation S Outfall 012b (internal) Form 2C — Item II A Flows, Sources of Pollution, and Treatment Technologies in Outfall 003 December 2016 Roxboro Steam Plant Outfall 006 Raw water tank drainage Stormwater (maintenance) Coal Pile Runoff Treatment Basin N Outfall 006 Hyco Reservoir Limestone pile runoff Absorber seal Leakage (rare) Emergency Gypsum I Truck wheel wash stack Form 2C — Item II A Flows, Sources of Pollution, and Treatment Technologies Outfall 006 December 2016 Roxboro Steam Plant Outfall 001 Stormwater through remnant of east ash basin Incidental AOW's and Gypsum and rail seepage runoff Outfall 001 Hyco Reservoir Plant Intake Canal Q Form 2C — Item II A Flows, Sources of Pollution, and Treatment Technologies Outfall 001 December 2016