Loading...
HomeMy WebLinkAbout20200672 Ver 1_More Info Received_20200604Strickland, Bev From: Sommer Celli <sommereperth@icloud.com> Sent: Thursday, June 4, 2020 3:47 PM To: Perez, Douglas J Subject: [External] Sommer eperthener Attachments: New Document.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report. Spam@nc.gov<mailto:report.spamLa)nc.gov> Here is the link to get it from App Store https://urldefense.com/v3/_https://goo.gl/o4JLcTJ!HYmSToo! PFz2eTXhVASNMMYTxgLEkX04_Z- 61cGLDakBOv8eNOkhB32CQFs9RABZifLdiTArCZNPS Sent from my Whone CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: Owner: Print 1% 15l oul _County: nature Contractor/agent: Print Signature Y J`� The approval is for the purpose and design described in your application. Imparts not indicated in the application is a ►violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC OMB ,O243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full fond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. (15A NCAC 02B.0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation an size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from lard must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the fake. Al! constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheep flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] .0 Acknowledgement of Notification � ()( e herebystate that ! have been informed of the Catawba YYI� Riparian Buffer Rule. AnyVor, conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial cornpkanee and intent of the 401 Wader Quality Certification and Buffer Rules, the approved plan(s) and specifiGation(s), and other supporting materials. Signature (owner),.a Date: P C r.- A