HomeMy WebLinkAbout20200672 Ver 1_More Info Received_20200604Strickland, Bev
From: Sommer Celli <sommereperth@icloud.com>
Sent: Thursday, June 4, 2020 3:47 PM
To: Perez, Douglas J
Subject: [External] Sommer eperthener
Attachments: New Document.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report. Spam@nc.gov<mailto:report.spamLa)nc.gov>
Here is the link to get it from App Store
https://urldefense.com/v3/_https://goo.gl/o4JLcTJ!HYmSToo! PFz2eTXhVASNMMYTxgLEkX04_Z-
61cGLDakBOv8eNOkhB32CQFs9RABZifLdiTArCZNPS
Sent from my Whone
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address:
Owner:
Print 1% 15l
oul
_County:
nature
Contractor/agent:
Print Signature
Y J`�
The approval is for the purpose and design described in your application. Imparts not indicated in the
application is a ►violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC OMB ,O243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full fond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B.0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. (15A NCAC 02B.0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation an size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from lard must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the fake. Al! constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheep flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
.0
Acknowledgement of Notification
� ()( e herebystate that ! have been informed of the Catawba
YYI�
Riparian Buffer Rule. AnyVor, conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial cornpkanee and intent of the 401 Wader
Quality Certification and Buffer Rules, the approved plan(s) and specifiGation(s), and other supporting
materials.
Signature (owner),.a
Date: