HomeMy WebLinkAbout20091012 Ver 1_DCM Permit_20100112N
Ftrmic Class Permit Nun,,cer
NEW - 4-10------
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources p i p + a
and
Coastal Resources Commission
r
rrm t
for a
_X Major Development in an Area of Environmental Concern 7
} pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Bernice A. Page Family Trust, 308 VFW Road, Swansboro, NC 28584
Authorizing development in Onslow County at Queens Creek, 187 Fishing Creek Lane,
Hubert as requested in the permittee's application dated 7/14/09, including the
attached workplan drawings 2) Sheet 1 and 2 of 2 dated 7/2/09 _
This permit, issued on Jannar2-2,010 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Boat Ramp
1) Unless specifically altered herein, this permit authorizes the boatramp and uses located in or over the
water that are expressly and specifically set forth in the permit application. No other structure,
whether floating or stationary, shall become a permanent part of this boatramp facility without permit
modification. No non-water dependent uses of structures shall be conducted on, in or over public
trust waters without permit modification.
2) The permittee shall maintain the authorized work in good condition and in conformance with the
terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons
the permitted activity without having it transferred to a third party.
(See Attached Sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 19, 2014
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
V James H. Greg' n, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Bernice A. Page Family Trust
Permit #4-10
Page 2 of 3
ADDITIONAL CONDITIONS
3) Excavation and ground disturbing activities above and below the normal water line shall be limited to
that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size than
specified in the attached permit application and work-plan drawings.
4) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact
waters of the State or waters that will enter waters of the State.
5) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
6) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
7) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
boatramp facility. Any sewage discharge at the boatramp facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout
the entire existence of the permitted structure.
8) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
Spoil Disposal
9) No spoil material shall be placed within 30 feet of the normal high water line.
10) All excavated materials shall be confined above normal high water and landward of regularly or
irregularly flooded Coastal Wetlands behind adequate dikes or other retaining structures to prevent
spillover of solids into any marsh or surrounding waters.
Boat Basin
11) No excavation shall take place outside the area indicated on the attached workplan drawings.
12) Excavation shall not exceed -4 feet below the normal water level. In no case shall the depth of
excavation exceed the depth of the connecting waters.
13) No vegetated wetlands shall be excavated outside the area indicated on the attached workplan drawings.
14) The temporary placement of double handling of excavated materials within waters or vegetated wetlands
is not authorized.
Bernice A. Page Family Trust Permit #4-10
Page 3 of 3
ADDITI O'-'NAL CO DITIO? S
Sedimentation and Erosion Control
i5) A ground cover SUffiClcrlt tG TCStra1 crv31Gn Shall be prprovided within 30 Calendar days of completion of
f any phase of grading on cut or filled slopes.
16) In order to protect water quality, runoff from construction shall not visibly increase the amount of
r suspended sediments in adjacent waters. a
General
17) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions
caused thereby, without expense to the United States or the state of North Carolina. No claim shall be
made against the United States or the state of North Carolina on account of any such removal or
alteration.
18) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required, including but not limited to a Stormwater
Management Permit.
NOTE: The permittee and/or his contractor is urged to meet with a representative of the Division prior to
project initiation.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No.
09-1012.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No.
SAW-2009-00259 which was issued on 10/28/09.
North as per
I® r
-- M.B. 47, Pg. 23
1.5 3 1 PROPOSED SILT FENC
_
3 Tr + 3.5 +5.4
N 2.8 3.5 ° HATCHING LEGEN
EXISTING PIER PROPOSED a ,
U a'? Al BOAT RAMP
WATER `
?Ij{ I I I 47.4+ 5.0? ,
NORMA L kV OVA R V I I I I I I I 12.5 4.0 +. `
\ OI I,I?I?IiI111?I1II'I I"
U? o I PROPOSED BOAT BASIN I I 40:0
I I?_
N I I I' I' I I I 1 i o
-4 -T--t-t-t? IC1 I I I N PROPOSED BOAT RAMP N , -.)\ I .. ,
I II I II I II I II I I 152.2'1 I I I I I I i I l I l ; `40 0
/ R
4.2 I X a EXCAVATION BELOW C
NORMAL
WATER HIGH 30' AEC Line \ NORMAL HIGH WATER
(ZIP / 404 WETLAND I I EXCAVATION ABOVE
LINE I I NORMAL-HIG4 WATER
'F-7V WETLAND LINE
3.6
PROPOSED SILT FENCE
f! EXCAVATION ABOVE
f! X
Proposed Conditions 404 WETLAND LINE
\ .
3 r 8
EXCAVATION ABOVE
7 404 WETLAND LINE
7
W INCLUDES SHEET 1 OF 2
2
J (165 YDS.)
Q
Z
6 6
V.
5 ?
5
UPLAND EXCAVATION
(SEE SHEET 1 OF 2)
1
t J
W EXCAVATION ABOVE ?
NORMAL HIGH WATER pJ I
TO WETLAND LINEG?
3 3
= (235 YDS.) ?? I ? 3 wetland
,CJ I I ( Substrate
I I I I ???
2 o ?
2
z 1
1
1 ?°'
1 I
1
1
11 I 1.5 = Normal
V I I I I I I I I I I 1 1 1 1 1 1 1 ?
o?°. High Water
Xl?
i l l
l l l l l l l l l l l l l l oe :, ?
l `
I
I ?
?
1 1 1 1 1 1 I
I
I
I
I I I y?
?` y?
I
I
I ?
Normal Low
FORMAL HIGH WATER I 0
(25 YDS
) I
I
I
I I I I I I I I I I I :::::?." Water
.
=
J I
I
( I h
I I I I I I I I I I I I I I I' i I I ?O
-- , 5 _
- 7
°
I
I
I
I I I I I
I
I oe
,:
I
I
I
I
I
I
I I I :: r
Q
= 1
1
1 1 1 1 1 1 I I I I I I I 1 11
_2 1
1
ELEVATIONS ARE BASED ON
NORMAL LOW WATER OF 0.0'
r
Vertical Scale: 1"-2'
I I I
F
I Horizontal Scale: 1 "=20'
- NATURAL O
qOTTOM.
PROPOSE
BASIN
BOTTOM -4
SHEET 2 OF 2
FOR CAMA APPLICATION PURPOSES ONLY
07/02/09
AWN
CAB/-LW
1 •-20
PROD. NO.
08926CAMA2
COGO
08926
Bell
1,0
Major CAMA Appli ca ti on for:
Bernice A. Page Family Trust
PROPERTY OFF N. C.S.R. 1501
SANDRIDGE ROAD TRACT
SWANSBORO TOWNSHIP, ONSLOW COUNTY, N. C.
& Phillips Surveying, PLLC
604E CEDAR POINT BLVD.
CEDAR POINT, N. C. 28584
TELEPHONE: (252)-393-6101
EMAIL: abellsurveying®tcp2.com
uroa•Zda4®.'O"urd'an-Insrrage :rreurd
`
'
'
' rn o
J
?uzod .Tepa,O
PAra 7urod -lepa,9 lyfi09
TO T9-060(0.90)
A[
•
`
' \
° .frzr2
azi-xn,s sdrrr1zrd rraa
,?'Z7d
Q
"
W °vv N
O 00
O Co
O
U
a
3
E I TM lliNI100 .4407SNO
7sn.rL A*Irrusj a.9sd •? aarusag
n- 0
d.IHSN.440,L 0906SNYIS
?,
0
3
o
m
:.roj uoT7eogddV ?WVj rofuN o° ? v o` cn ?
ov
z\
ti `
hJ
U
a
?W
o-=
m ?
W ? ?Q e
0 41 i
o Q?
W ? a
U
W
RW
4
? N
y._
2
Q
R
tr
U O
° h Of 'T O N ^ O?
?,7 p ) O h b •; Y b
?`I N c d W ?. O N
y ? ^ ^ N N ? V N
q
O? ??.i W W W ??? W W
^? u - ? ^ ?
a v N ) 0
d b
^ O
' m h tl
' ^ N
?
ro ) ;
)
? V
m O :
1 Y
?
„p o m m ro
ry0 ?n v? v? <n ? 2 ?n
O x,
m
J
U
'l?a h QO
V ?p
4
O?
04
x ?
0
U
2 m
O
CO 0
O
2 O O
W 4 2 4
T ¢
Ez '?d `LP '9w
sad sa rn.roNV
AYMb3lYM
I
V
+
O
W ro jh
N ;1'i +
,V,
U Q;
t
EXISTING PIER .
O p
W ° o
h Z N
a
kz
e + +
al h o N + III
q 32
x a
o? Q
U
O o
v U
? ?
W 40 m
(."? O
O J? W
Q ?' ?? w
'?' ? 3
o
? 2
5 N W 3
v ? ' Ul
>C
W
O` /
, 3W 2?
\vf ;
b ?
W2
ti
0
Cl)
I O
O
I N
?
p
a
I
N °
I I o
it F
"
I I w
w
a
IIN W
L o a
U
L
I I co
U_
x
I I C1.
O Q
O ?
I I
1 1 .-? U
ti
T
ti
¢WO
002+
pW?QO
O
?Q??O
?a2o
yW nzsv)
?W
2j'`20
tn?U2? J .y N )gym
W1H 4 S z
aT020 U ?r? S
U J 2 ,{p r
?QQ?v? b ?'d lYJy
w?2iW °H c'?`
m \SR
2?O?W
QW??O
?U=WO
Km2ti¢
UW2?W
T?n4?
a 6
h
L?
a
R z,,
Co 0
U
0
?m°o`