HomeMy WebLinkAboutNCC202358_ESC Approval Submitted_20200605HENOERSON COUNTY GOVERNMENT
SITE DEVELOPMENT DEPARTMENT
Noda Telephone
8)69-65Enq53er Soil Erosion and Sedimentation Control Division Telephone telephone{gp8jd94-6553 iela hone 2B
June 1, 2020
LETTER OF APPROVAL
Raymond Shem, CFO
Pine Gate Renewables
130 Roberts Street
Asheville, NC 28801
RE: Project Name: Sawtell Solar Farm
Acres Approved: 20.6 Acres
Project ID: 2020-032
County: Henderson
City: Not Applicable
Address: 3455 Chimney Rock Rd
River Basin: Broad River
Stream Classification: Henderson Creek, C: Tr (6-55-11-9)
Submitted By: Josh Houde
Date Received by HC: 3-16-2020
Plan Type: New
Dear Mr. Shem,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. This plan shall expire three (3) years following the
date of approval, if no land disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (N01) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above -named project. The N01 form
may be accessed at deq.nc.gov/NCG01. Please direct questions about the N01 form to Annette
Lucas at Annette.lucas a1ncdenr.gov or Paul Clark at Pau Lclark90cdenr.gov. After you submit
a complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, NC DEG DEMLR will not charge a fee for coverage under the NCG01 permit. However,
on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Site Development Department
Soil Erosion and Sedimentation Control Program V
240 Second Avenue East
Hendersonville, NC 28792
(828) 694-6521 or (828) 694-6553
LETTER OF APPROVAL
PAGE 2OF2
SAWTELL SOLAR SEDIMENT AND EROSION CONTROL PLAN REVIEW APPROVAL 2020-032
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved Soil Erosion & Sedimentation Control plan as well as any approved
deviation.
2. The NCG01 permit and the COC, once received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project. Please
notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Project Engineer
Soil Erosion & Sedimentation Control Office
Enclosures: Certificate of Approval AND NCG01 Fact Sheet
ec: Josh Houde, Civil Design Concepts Engineering
Rick Brooks, Erosion Control Technician
Stan Aiken PE, DEG - Asheville
Site Development Department
Soil Erosion and Sedimentation Control Program
240 Second Avenue East
Hendersonville, NC 28792
(828) 694-6521 or (828) 694-6553