Loading...
HomeMy WebLinkAboutNCC201660_ESC Approval Submitted_20200605Kk-'" i ('P. ( ) 13121r N WRFNy )(,;:w Vac r , Johnston County Attn: Rick Hester, County Manager PO Box 1049 Smithfield, NC 27577 �r)Fzrw� t;rRc7ti��,a (Cnr�rr-nrr}nenta? C�ucxliry February ! 7, 2020 LETTER Off APPROI'AL RE: Project Name: Selma Cqualization and Wastewater Pump Station Facilities Flood Resiliency Improvement CDBG-1 17-1-2965 Acres Approved: 1.85 Project ID: JOHNS-2020-007 County: JOHNSTON, City: Selma, Address: US 70, SR 1003, SR 2576 River Basin: Neuse, Stream Classification: Other Submitted By: McGill Associates, PA Date Received by LQS: February 4, 2020 Plan Type: Revised Dear Mr. Hester: The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B 40129, As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOl) form requesting a Certificate of Coverage (COC) under the NCGOE0000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity an the above -named project. The NOI fonn may be accessed at deq.nc.gov/NCG0L Please direct questions about the NOI form to Annette Lucas at Annette.Lucas(t0cdenr.goy or Paul Clark at Paul.Clark 0incdcringov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMI.R will not charge a fee for coverage under the NCGOI permit. I•Eowever, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stomiwater Central Office staff in Raleigh. Title ISA NCAC 413'.0115(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO l permit and the COC, ancc it is received. 3. Records of inspections made during the previous 12 months. t `�ii� �• n.�' i It ,i .f �1 i,c, , � i .+u�,C. _ i ,. h .i � �. 1, .:u i, `,ht��=� +� I Letter of Approval Johnston County February 17, 2020 Page 2 of 2 Also, this letter gives the notice required by G.S. 1 13A-61. [ (a) of our right of periodic inspection to insure compliance with the approved plan. Title [ SA NCAC 4B .OI I8(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. I I3A-61.I(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance- oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-SI through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other pen -nit or approval. Please note thak this approval is based in pa►•t on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form ifthere is any change in the information included on the form. This permit allows for a landAisturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Sally Castle, El Regional Engineering Associate Land Quality Section Enclosures: CerkificateofApproval N['DES NCG01 Pact Sheet cc; David L. Honeycutt, PE (dwid.honeycutttu n�lct;illassociates.cam) Electronic Copy Regional Oftice file