Loading...
HomeMy WebLinkAboutNC0064726_AUTHORIZATION TO CONSTRUCT_20081113WDES DOCUWEMT SCANNIMSi COVER SHEET NPDES Permit: NC0064726 East Bend Industrial Park WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Staff Report Instream Assessment (67b) Environmental Assessment (EA) Permit History Document Date: November 13, 2008 This document is priaated on reuse paper - more nay coateat oa the reverse side 11 0 uo: oe ra.i a1a J7Z 117U Town of Fast Bend A To C No. 064726AO2 Issued June 30, 2008 MUNICIPAL ENGINEERING - NOV 4 2008 f �u li ilr m 002 Engineer's Certification WAIEFas a duly registered Professional Engineer in the State of North Carolina, having n authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the East Bend Industrial Park WWTP, located on NC HWY 67 E in Yadkin County for the Town of East Bend, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following A 6,000 gallon steel flow equalization tank with 12 scfm blower and diffuser assembly, duplex 20 GPM submersible grinder pumps, manual bar screen, 6,000 gallon steel sludge storage tank, duplex 30 GPM submersible grinder sludge pumps, and one (1) 4-foot diameter manhole, including all piping, electrical controls, and other appurtenances necessary to provide a complete system, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature X Pwa�s- Registration No. ( � Date 1L/t3 Lo2 GARpii, .... ) Sena —to - Cons uc Mants"& Loans DENR/DWQ = gEA 9 1633 Mail Service Center _ 3tinp J Raleigh, NC 27699-1633 ; �d—jn� 2 �'.srFNGINE� EN i R AY, o�0F W AT4 99 Michael F. Easley, Governor 0 Y William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources O Y Colcen H. Sullins. Director Division of Water Quality June 30, 2008 Mr. Alton R. Johnson, Utilities Supervisor Town of East Bend 108 West Main Street East Bend, North Carolina 27018 SUBJECT: Authorization to Construct ATC No. O64726AO2 Town of East Bend East Bend Industrial Park WWTP Yadkin County Dear Mr. Johnson: A letter of request for Authorization to Construct was received November 16, 2007, by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.01 MGD Wastewater Treatment Plant, with discharge of treated wastewater into unnamed tributary to the Yadkin River in the Yadkin -Pee Dee River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: A 6,000 gallon steel flow equalization tank with 12 scfm blower and diffuser assembly, duplex 20 GPM submersible grinder pumps, manual bar screen, 6,000 gallon steel sludge storage tank, duplex 30 GPM submersible grinder sludge pumps, and one (1) 4-foot diameter manhole, including all piping, electrical controls, and other appurtenances necessary to provide a complete system, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part 111, Paragraph A of NPDES Permit No. NCOO64726 issued November 26, 2003, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NCOO64726. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. 0. N_ophCarolina ,/VQi[!!l7l�j Noah Carolina Division of Water Quality 1617 Mail service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: wwwomaurnuality.orn 512 N. Salisbury St. Raleigh. NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal OppodunitylAtiionative Action Employer— 50 % Recycledll0 % Post Consumer Paper Mr. Johnson June 30, 2008 Page 2 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771-5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class 11, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Mr. Johnson June 30, 2008 Page 3 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Ken Pohlig, P.E. at telephone number (919) 715-6221. AR:kp Sincerely, / i,. / . I i � --� . rColeen H. Sullins cc: Municipal Engineering Services Company, Inc. - Steven R. Gandy, Ph.D, P.E. Yadkin County Health Department DWQ Winston-Salem Regional Office, Surface Water Protection Technical Assistance and Certification Unit Point Source Branch, NPDES Program Daniel Blaisdell, P.E. Ken Pohlig, P.E. Anita E. Reed, P.E. ATC File